Attachment_1_-_Specifications_-_GAOA_Crooked_Creek_Road.pdf

PDF 471 KB Posted

Attached to
GAOA Crooked Creek Road
Solicitation number
140L3625R0009
Issued by

About this file

This document is a detailed project specification for the GAOA Crooked Creek Road project for the Bureau of Land Management located in Carbon County, Montana. The project involves road maintenance and rehabilitation of a 3.64-mile road segment, with specific requirements including: re-establishing the road's typical section through grading and compacting, establishing road ditches to prevent stormwater run-on, providing soil moisture management, furnishing and compacting crushed aggregate surfacing, and removing and replacing existing culverts and cattle guards.

The project specifications are comprehensive, covering multiple construction divisions including general requirements, earthwork, aggregate surfacing, and miscellaneous construction. Key technical requirements include using specific types of materials like polymer-coated steel pipes, crushed aggregate with precise gradation specifications, and a native seed mixture for revegetation. The project will utilize geosynthetic materials for separation and stabilization, and requires careful compaction and finishing of roadway surfaces. The work is to be performed according to Montana Department of Transportation and federal highway construction standards, with detailed guidelines for material testing, quality control, and environmental considerations.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GAOA CROOKED CREEK ROAD

PROJECT SPECIFICATION

BUREAU OF LAND MANAGEMENT

111 Garryowen Road

Miles City, Montana 59301

January 2025

TABLE OF CONTENTS

TABLE OF CONTENTS

GAOA CROOKED CREEK ROAD 2025

DIVISION 100 – GENERAL REQUIREMENTS ........................................................ 100-1 SECTION 101 – TERMS, FORMAT, AND DEFINITIONS .................................................................. 100-1 SECTION 103 - SCOPE OF WORK ................................................................................................... 100-2 SECTION 104 - CONTROL OF WORK .............................................................................................. 100-3 SECTION 106 – ACCEPTANCE OF WORK ....................................................................................... 100-4 SECTION 107 – LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC.............................. 100-4

DIVISION 150 – PROJECT REQUIREMENTS ........................................................ 150-1 SECTION 151 – MOBILIZATION ....................................................................................................... 150-1 SECTION 152 – CONSTRUCTION SURVEY AND STAKING........................................................... 150-1 SECTION 154 – CONTRACTOR SAMPLING AND TESTING........................................................... 150-2 SECTION 155 – SCHEDULES FOR CONSTRUCTION CONTRACTS ............................................. 150-3 SECTION 156 – TEMPORARY TRAFFIC CONTROL ....................................................................... 150-3 SECTION 157 – SOIL EROSION AND SEDIMENT CONTROL ........................................................ 150-4 SECTION 158 – WATERING FOR DUST CONTROL ....................................................................... 150-5

DIVISION 200 – EARTHWORK ............................................................................... 200-1 SECTION 201 – CLEARING AND GRUBBING .................................................................................. 200-1 SECTION 203 – REMOVAL OF STRUCTURES AND OBSTRUCTIONS .......................................... 220-1 SECTION 204 – EXCAVATION AND EMBANKMENT ....................................................................... 200-2 SECTION 207 – GEOSYNTHETICS ................................................................................................... 200-4 SECTION 209 – STRUCTURE EXCAVATION AND BACKFILL ......................................................... 200-4 SECTION 212 – LINEAR GRADING ................................................................................................... 200-6

DIVISION 250 – EARTH RETAINING SYSTEMS AND SLOPES ............................ 250-1 SECTION 251 – RIPRAP .................................................................................................................... 250-1

DIVISION 300 – AGGREGATE AND BASE COURSES .......................................... 300-1 SECTION 302 – CRUSHED AGGREGATE ........................................................................................ 300-1

DIVISION 600 – INCIDENTAL CONSTRUCTION ................................................... 600-1 SECTION 602 – CULVERTS .............................................................................................................. 600-1 SECTION 619 – CATTLE GUARDS ................................................................................................... 600-1 SECTION 624 – TOPSOIL .................................................................................................................. 600-2 SECTION 625 – SEEDING ................................................................................................................. 600-3

DIVISION 700 – MATERIALS .................................................................................. 700-1 SECTION 703 – AGGREGATES ........................................................................................................ 700-1 SUBSECTION 703.06 – CRUSHED AGGREGATE ....................................................................... 700-1 SUBSECTION 703.11 – BEDDING MATERIAL FOR CULVERTS ................................................ 700-1 SECTION 705 – ROCK ....................................................................................................................... 700-1 SUBSECTION 705.02 – RIPRAP ................................................................................................... 700-1 SECTION 707 – METAL PIPE ............................................................................................................ 700-2 SUBSECTION 707.08 – POLYMER COATED STEEL PIPE ......................................................... 700-2 SECTION 713 – MISCELLANEOUS MATERIALS .............................................................................. 700-3 SUBSECTION 713.04 – SEED ...................................................................................................... 700-3 SUBSECTION 713.17 – ROLLED EROSION CONTROL PRODUCTS ......................................... 700-3 SUBSECTION 713.23 – WATER ................................................................................................... 700-3 SECTION 714 – GEOSYNTHETIC MATERIAL .................................................................................. 700-3 SUBSECTION 714.01 – GEOTEXTILE ......................................................................................... 700-3

DIVISION 100 – General Requirements

GENERAL REQUIREMENTS

GAOA Crooked Creek Road 2025

100-1

SECTION 101 – TERMS, FORMAT, AND DEFINITIONS

101.01 Specifications Format: These specifications are model after the FP-24. The FP-24 is divided into 10 Divisions as follows:

1. Division 100 consists of general contract requirements for which no direct payment is made.

2. Division 150 consists of project specific contract requirements. Work under Division 150 is paid for directly or indirectly according to the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made.

3. Divisions 200 through 600 consist of construction requirements for specific items of work. Work under these Divisions is paid for directly or indirectly according to the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made.

4. Division 700 contains the material requirements for Divisions 150 through 600. No direct payment is made in Division 700. Payment for material is included as part of the work required in Divisions 150 through 600.

5. The first three digits of the pay item number in the bid schedule identify the Section under which the work is performed.

101.02 References: Referenced Specifications/Standards with Abbreviations and/or Acronyms:

Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following:

AASHTO American Association of State Highway and Transportation Officials 444 North Capitol Street N.W., Suite 225 Washington, DC 20001

ASTM American Society for Testing and Materials

1916 Race Street Philadelphia, PA 19103

FP Standard Specifications for Construction of Roads and

Bridges on Federal Highway Projects Superintendent of Documents Government Printing Office Washington, DC 20402

Fed. Spec. Federal Specification/Standard

General Services Administration Specifications Branch Room 6039, GSA Building Seventh and D Streets, S.W.

Washington, DC 20407

MDT Standard Specifications for Road and Bridge Construction, 2024Ed.

Montana Department of Transportation Contract Plans Section 2701 Prospect Avenue Helena, MT, 59620

GAOA Crooked Creek Road 2025

100-2

MPWSS Montana Public Works Standard Specifications 1717 11th Ave.

PO Box 4519 Helena, MT 59604

MUTCD Manual on Uniform Traffic Control Devices for Streets and Highways

Superintendent of Documents Government Printing Office Washington, DC 20402

OSHA Occupational Safety and Health Administration's Standards

U.S. Department of Labor Occupational Safety and Health Administration Denver Area Office 333 West Colfax Avenue Denver, CO 80204

*Federal Specifications and catalogs may be obtained at Business Service Centers of Regional Offices of the General Services Administration. (Washington, DC; Boston, MA; New York, NY; Philadelphia, PA;

Atlanta, GA; Chicago, IL; Kansas City, MO; Fort Worth, TX; Denver, CO; San Francisco, CA; and Auburn, WA.)

101.03 Definitions:

1. Approvals – Approval of the submittal is an indication that the Contractor's submittal has been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing. After approval of an item, the Contractor may submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.

2. Contracting Officer (CO) – Person or persons responsible for the administrative supervision of the contract.

3. Contracting Officer Representative (COR) – Person or persons appointed by the CO responsible for the engineering/technical oversight and documentation of the project. The COR is the contractor’s first contact for all project related technical issues unless another person or agency is specifically stated in the contract.

4. Contract Item (Pay Item or Line Item) – A specific unit of work for which a price is provided in the contract.

5. Culvert – any structure not classified as a bridge that provides an opening under the roadway.

6. Equipment – All machinery, tools, apparatus, and supplies necessary for the upkeep, maintenance, construction, and completion of the project.

7. Inspector – The CO or COR’s authorized representative assigned to make inspections of work and materials furnished.

8. Plans – The approved contract drawings showing the location, type, dimensions, and details of the work required under the contract.

9. Subgrade – The top surface of the roadbed upon which the surface course is constructed.

10. Surface Course – One or more layers of material designed to accommodate the traffic load.

11. Work – The furnishing of all resources necessary to complete the project.

SECTION 103 – SCOPE OF WORK

100-3

103.01 Description of Work: Furnishing labor, equipment, supplies, and materials, to:

1. Re-establish road typical section, grade, shape and compact 3.64 miles of road.

2. Establish road typical ditch where required to prevent stormwater run-on.

3. Provide adequate soil moisture when and where natural conditions are not suitable to conduct road maintenance activities.

4. Furnish, spread, and compact Crushed Aggregate Surfacing Course as awarded and directed by the Contracting Officer’s Representative.

5. Remove and replace existing culverts as called out in the design drawings.

6. Remove and replace or reset existing fence/cattle guards as called out in the design drawings.

103.02 Location: Work under this Contract is located approximately 30 miles southeast of Bridger, Montana in Carbon County, Montana on Crooked Creek Road. The work location is shown in the design drawings attached.

103.03 Drawings and Maps: The drawings and maps designate the type and quantity of work required at the project location.

103.04 Access to Site: Access to the work is by state, county, and Bureau of Land Management

(BLM) roads.

SECTION 104 – CONTROL OF WORK

104.01 Authority of the Contracting Officer (CO): The CO may delegate authority to representatives to decide on acceptability of work, progress of work, suspension of work, interpretation of the contract, and acceptable fulfillment of the contract. The term "CO" includes authorized representatives of the CO, including inspectors, acting within the limits of their authority as delegated by the CO.

104.02 Authority of Inspectors: Inspectors are authorized to inspect work including the preparation, fabrication, or manufacture of material for the project. The inspector is not authorized to alter or waive contract requirements, issue instruction contrary to the contract, act as foreman for the Contractor, or direct the Contractor's operations. The inspector has authority to identify non-conforming work until the issue can be referred to and decided by the CO. The inspector may take necessary action to prevent imminent and substantial risk of death or injury including stopping work.

104.03 Submittals: Submittals may include, but are not necessarily limited to, the following: design computations, shop drawings, manufacturers' literature, as-built drawings, samples, maintenance manuals, and material cut sheets.

Identification of Submittal – Completely identify each submittal by showing at least the following information:

1. Name and Address of submitter, plus name and telephone number of the individual to contact for further information.

2. Name of project as it appears in these specifications.

3. Contract number, drawing number, and specification section number to which the submittal applies.

4. Whether this is an original submittal or a re-submittal

100-4

5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.

SECTION 106 – ACCEPTANCE OF WORK

106.01 Visual Inspection: Acceptance is based on visual inspection of the work for compliance with the contract and prevailing industry standards.

106.02 Certification of Conformance: For material manufactured off-site, acceptance is based on manufactures certification of conformance. Certification must be from manufacture and include the flowing:

1. Date and place of manufacture.

2. Lot number or other means of cross-referencing to the manufacturer’s inspection and testing system.

3. Substantiating evidence that the material conforms to the contract quality requirements including the following:

a) Test results on material from the same lot and documentation of the inspection and testing system.

b) A statement from the manufacturer that the material complies with the contract.

c) Manufacturer’s signature or other means of demonstrating accountability for the certification.

106.03 Measured or Tested Conformance: Perform necessary measurements and tests to ensure work complies with the contract. Use prevailing industry standards in the absence of contract requirements or tolerances. Submit measurements, tests, and supporting data for acceptance.

106.04 Final acceptance: Notify the COR when the entire project is complete to schedule an inspection. If work is determined to be complete, the inspection will constitute the final inspection. The Contractor will be notified in writing of final acceptance as of the date of the final inspection. Final acceptance relieves the Contractor of further responsibility for the maintenance of the project. If the inspection discloses unsatisfactory work, the COR will provide to the Contractor a list of the work that is incomplete or requires correction. Immediately complete or correct the work. Submit notification when the work has been completed as provided above.

SECTION 107 – LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

107.01 Laws to be Observed: Comply with applicable laws, ordinances, safety codes, regulations, orders, and decrees. Protect and indemnify the Government and its representatives against claim or liability arising from or based on the alleged violation of the same.

Comply with permits and agreements obtained by the Government for performing the work that is included in the contract. Obtain additional permits or agreements and modifications to Government-obtained permits or agreements that are required by the Contractor's methods of operation. Submit copies of permits and agreements to CO and COR.

107.02 Protection and Restoration of Property and Landscape: Preserve public and private property. Protect monuments established for perpetuating horizontal, vertical, cadastral, or boundary control. When necessary to destroy a monument, reestablish the monument according to applicable state statute or by the direction of the agency or individual who established the monument.

100-5

Do not disturb the area beyond the construction limits. Replace trees, shrubs, or vegetated areas damaged by construction operations as directed and at no cost to the Government. Remove damaged limbs of existing trees by an approved arborist.

Do not excavate, remove, damage, alter, or deface archeological or paleontological remains or specimens. Control the actions of employees and subcontractors on the project to ensure that protected sites are not disturbed or damaged. Should these items be encountered, suspend operations at the discovery site, notify the CO and continue operations in other areas. The CO will inform the Contractor when operations may resume at the discovery site.

When utilities are to be relocated or adjusted, the Government will notify utility owners affected by the relocations or adjustments.

Before beginning work in an area, contact the local utility locating service to mark the utilities.

Protect utilities from construction operations. Cooperate with utility owners to expedite the relocation or adjustment of their utilities to minimize interruption of service and duplication of work.

If utility services are interrupted as a result of damage by the construction, immediately notify the utility owner, the COR, and other proper authorities. Cooperate with them until service is restored.

Do not work around fire hydrants until provisions for continued service are made and approved by the local fire authority.

Notify the COR if utility work is required. Compensation for the work will be provided under applicable clauses of the contract. Satisfactorily repair damage due to the fault or negligence of the Contractor at no cost to the Government.

Repair of damage to underground utilities not shown in the plans or identified before construction, and not caused by the fault or negligence of the Contractor will be paid for by the Government.

END OF SECTION

DIVISION 150 – PROJECT REQUIREMENTS

PROJECT REQUIREMENTS

Crooked Creek Road 2025

150-1

SECTION 151 – MOBILIZATION

151.01 General: Mobilization is the preparatory work and operations performed including, but not limited to, those necessary for:

1. The movement of personnel, equipment, supplies, and incidentals to the project site.

2. The establishment of all offices, buildings, and other facilities necessary for work on the project.

3. Premium on contract bonds.

4. Insurance for the contract.

5. Other work and operations that must be preformed or costs incurred before beginning contract work.

6. Mobilization costs for subcontracted work.

7. Submission of all forms, certifications, and documentation required by the Government to prepare the final estimate and issue a certificate of completion.

8. Demobilization

151.02 Measurement and Payment: No direct measurement will be made for payment. Payment will be full compensation for the work described in this Section. Progress payments for mobilization by the lump sum will be paid as follows:

1. When 5 percent of the original contract amount is earned from pay items (not including mobilization), 50 percent of the mobilization pay item, or 5 percent of the original contract amount, whichever is less, will be paid.

2. When 10 percent of the original contract amount is earned from pay items (not including mobilization), 100 percent of the mobilization pay item, or 10 percent of the original contract amount, whichever is less, will be paid.

3. Any portion of the mobilization pay item in excess of 10 percent of the original contract amount will be paid after final acceptance.

4. The total sum of all payments shall not exceed the original contract amount bid for mobilization, regardless of contractor demobilizations and mobilizations during the project.

Line Item Description Pay Unit 151(01) Mobilization Lump Sum (LS)

SECTION 152 – CONSTURCTION SURVEY AND STAKING

152.01 General: This work consists of performing surveying, staking, calculating, and recording data for the control of work.

152.02 Qualifications: Provide technically qualified survey crews experienced in roadway construction survey and staking. Provide personnel capable of preforming in a timely and accurate manner.

152.03 Schedule: Include staking activities in the construction schedule according to Section 155.

Include the dates and sequence of each staking activity.

152.04 Government Responsibilities: The Government will set initial horizontal and vertical control points for the project. The Government will provide data for use in establishing control for completion of

Crooked Creek Road 2025

150-2 the work. The Government will furnish data relating to horizontal and vertical alignment, theoretical slope stake catch points, and other miscellaneous design data. Reformatting and additional calculations may be required for the convenient use of the Government-furnished data. Provide immediate notification to the CO and COR of apparent errors in the initial staking or in the Government-furnished data.

152.05 Contractor Responsibilities:

1. Control Points: Preserve and protect Government furnished control points and replace any that may be damaged, displaced or removed. Replace any stakes that are obliterated by the Contractor or by construction activities. Use provided controls as the field control to perform the work. Verify accuracy of all Government furnished controls before any layout staking or grading is performed. Request all Government furnished construction staking or data in writing.

2. Construction Staking: All aspects of construction staking are the responsibility of the contractor. These aspects include but are not limited to.

a. Centerline Establishment

b. Original ground topographic verification

c. Slope and references stakes

d. Clearing and grubbing limits

e. Finish grade control

f. Culverts

g. Borrow and waste sites

3. Inform COR immediately if culverts are to be moved to better align with drainage channel.

152.06 Measurement and Payment: No direct measurements will be made for payment. Payment will be full compensation for the work described in this Section. Progress payments for lump sum pay items will be prorated based on total work completed under this Section.

152(01) Contractor Survey and Staking Lump Sum (LS)

SECTION 154 – CONTRACTOR SAMPLING AND TESTING

154.01 General: This work consists of obtaining samples, testing, and reporting the required test results. Contractor shall employ and pay for all services of an independent testing agency to perform specified testing. Employment of agency in no way relieves Contractor of obligation to preform work in accordance with requirements of contract documents.

154.02 Testing Requirements: Requirements are indicated in individual specification sections.

154.03 Contractor Employed Agency:

1. Testing agency: Comply with requirements of ASTM E329, ASTM E543, ASTM E699, ASTM

C1021, ASTM C1077, ASTM C1093, ASTM D3740.

2. Inspection agency: Comply with requirements of ASTM D3740, ASTM E32.

3. Laboratory Qualifications: Accredited by IAS according to IAS AC89.

4. Laboratory: Authorized to operate in the State in which the Project is located.

5. Laboratory Staff: Maintain a full-time registered Engineer on staff to review services.

150-3

6. Testing Equipment: Calibrated at reasonable intervals either by NIST or using an NIST established Measurement Assurance Program, under a laboratory measurement quality assurance program.

154.04 Measurement and Payment: No direct measurement will be made for payment. Payment will be full compensation for the work described in this Section. Progress payments for lump sum pay items will be prorated based on total work completed under this Section.

154(01) Contractor Sampling and Testing Lump Sum (LS)

SECTION 155 – SCHEDULES FOR CONSTRUCTION CONTRACTS

155.01 General: This work consists of scheduling, monitoring, and reporting the progress of construction activities.

155.02 Construction Schedule: Within 14 calendar days after date of notice to proceed, submit a schedule to CO and COR. Do not start work, except mobilization, without an approved schedule. No progress payments will be made until a schedule has been approved. Include the following.

1. A schedule diagram showing work activities; with activities duration.

2. Description of the number of workdays per week, holidays, number of shifts per workday, and number of hours per shift.

3. Description of expected and critical delivery dates for equipment and material that can affect completion of the project. Describe the fabrication and delivery of key and long-lead time procurement activities.

4. Name of vendor, supplier, or subcontractor to perform an activity. State assumptions made in scheduling their work.

155.03 Construction Schedule Update:

1. Submit a construction schedule update within 2 days of major schedule changes (schedule change that will result in the project completion date changing more than 10 days) to the CO and COR. Schedule update should include:

a. Updated schedule diagram showing work activities; and updated activity durations.

b. Changes to vendors, suppliers, or subcontractors that are performing an activity.

c. Anticipated date of project completion; and anticipated date of return to site if schedule change involves contractor pausing work for a period of time.

2. Contact the COR via phone and email for any minor schedule changes (any change that results in any activities completion date changing).

155.04 Measurement and Payment: No direct payment for the work described in this section will be made.

SECTION 156 – TEMPORARY TRAFFIC CONTROL

156.01 General: This work consists of controlling and protecting public traffic adjacent to and within the project.

150-4

156.02 Accommodating Traffic During Work: Accommodate traffic according to the MUTCD, Section 635. At least 30 days before intended use, submit a temporary traffic control plan.

156.03 Maintaining Roadways During Work: Maintain roadways as follows:

1. Ensure the safety and convenience of the public and protect the residents and property adjacent to the project.

2. IMMEDIATELY open the road to emergency vehicles.

3. Maintain roadway during work.

a. Maintain intersections and provide access to trails, roads, parking areas, farms/ranches, and other features at all times.

b. Remove accumulations of soil and other material from the traveled way.

c. Do not allow water to pond on traveled way.

d. Maintain the roadway in a safe and acceptable condition.

4. Roadway may be fully closed for certain work activities if approved by COR. Submit temporary traffic control plan and narrative for road closures to COR at least 5 days prior to planed closures.

156.04 Maintaining Roadways During Non-Work Periods. Maintain roadways and traffic control for public traffic during periods when work is not in progress. Roadway shall be open to public traffic during all non-work periods.

156.05 Measurement and Payment: No direct measurements will be made for payment. Payment will be full compensation for the work described in this Section. Lump sum progress payments for temporary traffic control will be paid as follows:

SECTION 157 – SOIL EROSION AND SEDIMENT CONTROL

157.01 General: This work consists of providing, constructing, maintaining, and removing soil erosion and sediment control measures to eliminate or minimize pollutants in stormwater discharges from the project.

Progress Estimate Payment Percent of Lump Sum Item

First partial payment after start of contract work

Estimate paying 25 % of original contract amount

Estimate paying 50 % of original contract amount

Estimate paying 75 % of original contract amount

Final payment Remainder of traffic control contract price

156(01) Temporary Traffic Control Lump Sum (LS)

150-5

Provide and construct permanent and temporary soil erosion and sediment control measures according to the plans, contract permits, and this Section. Contract permits amend the requirements of this Section. Do not modify the type, size, or location of measures or practices without approval.

Manage SWPPP documentation and reporting requirements according to contract permits. An alternate erosion and sediment control plan or SWPPP, with necessary permits, may be submitted for approval.

Submit alternate erosion and sediment control proposals at least 30 days before their intended use.

If soil erosion and sediment control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in stormwater discharges from the project.

157.02 Construction: Construct and implement soil erosion and sediment control measures as follows:

1. Shape earthwork to minimize and control soil erosion and sediment transport form stormwater runoff.

2. Construct outlet protection a soon as culverts or other structures are complete.

3. Construct and maintain filter barriers (rolled erosion control) at all new culvert inlets and outlets. Provide rolled erosion materials per section 713.17.

4. Maintain stabilized construction exits to minimize tracking or soil onto existing roads.

157.03 Inspection and Reporting: Inspect erosion and sediment control measures according to contract permits.

157.04 Measurement and Payment: No direct measurements will be made for payment. Payment will be full compensation for the work described in this Section. Lump sum progress payments for temporary traffic control will be paid as follows:

SECTION 158 – WATERING FOR DUST CONTROL

158.01 General: This work consists of providing and applying water for the control of dust caused by the work and public travel. Provide an adequate water supply and apply water uniformly across the traveled way as necessary to control dust. Uniformly apply water using pressure-type distributors. Apply water at the locations, rates, and frequencies as necessary to control the dust, or as ordered by COR.

Progress Estimate Payment Percent of Lump Sum Item

First partial payment after start of contract work

Estimate paying 25 % of original contract amount

Estimate paying 50 % of original contract amount

Estimate paying 75 % of original contract amount

Final payment Remainder of traffic control contract price

157(01) Temporary Erosion Control Lump Sum (LS)

150-6

158.02 Measurement and Payment: No direct payment for the work described in this section will be made.

DIVISION 200 – EARTHWORK

Crooked Creek Road 2025

200-1

SECTION 201 – CLEARING AND GRUBBING

201.01 General: This work consists of clearing and grubbing within the clearing limits designated in the plans.

Construct erosion and sediment control measures according to Section 157. Perform work within approved limits as shown in plans. Where possible, preserve vegetation.

Do not damage vegetation designated to remain. If damage occurs, repair or replace the vegetation in an acceptable manner. Treat wounds or scarred surfaces of trees or shrubs with tree wound dressing.

201.02 Clearing: Within the clearing limits, clear trees, brush, downed timber, and other vegetation as follows:

1. Cut trees so they fall within the clearing limits.

2. In areas of cut slope rounding, cut stumps flush with or below the final ground-line.

3. In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 6 inches of the existing ground.

4. Trim tree branches that extend over the road surface and shoulders to a clear height of 20 feet. If required, remove other branches to present a balanced appearance. Trim according to accepted tree surgery practices. Treat cuts with tree wound dressing.

201.03 Grubbing: Grub deep enough to remove stumps, roots, buried logs, moss, turf, grass, and other vegetation as follows:

1. Grub areas to be excavated, except for cut slope rounding areas.

2. Grub embankment areas. Undisturbed stumps less than 24 inches in diameter may be left in place if they protrude less than 4 inches above the original ground and will be covered with more than 48 inches of embankment. Remove all other stumps.

201.04 Disposal: Disposal of all clearing and grubbing material is the responsibility of the Contractor.

201.05 Measurement and Payment: No direct measurement or payment will be made for the work described in this section. Cost of work described in this section should be included in the price for line item 212(01) Linear Grading.

SECTION 203 – REMOVAL OF STRUCTURES AND OBSTRUCTIONS

203.01 General: This work consists of removing, disposing, and salvaging of structures, obstructions, and materials not designated to remain.

203.02 Salvaging Material: Salvage designated material with reasonable care. Salvage in readily transportable sections or pieces. Replace or repair members, pins, nuts, plates, and related hardware damaged, lost, or destroyed during the salvage operation. Contact COR at least 5 days prior to delivering salvaged material.

Stockpile salvaged material at the BLM Shop in Laurel Montana: 2424 Thiel Road, Laurel, MT 59044

200-2

203.03 Removing Structures: Remove all structures specified in the plans. All removed structures become property of the contractor unless otherwise stated.

203.04 Measurement and Payment: Payment will be full compensation for the work described in this

Section. Measurement for payment will be linear feet of culvert removed and each location for cattleguard removed.

Line Item Description Pay Unit 201(01) Remove Culvert Linear Foot (LF) 201(02) Remove and Salvage Cattleguard Each

SECTION 204 – EXCAVATION AND EMBANKMENT

204.01 General: This work consists of excavating material and constructing embankments. This work also includes providing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.

204.02 Definitions:

1. Excavation: Excavation consists of the following:

a. Roadway excavation: Material excavated from within the right-of-way or easement areas, except sub excavation and structure excavation. Roadway excavation includes all material encountered regardless of its nature or characteristics.

b. Sub excavation: Material excavated from below subgrade elevation in cut sections or from below the original ground-line in embankment sections.

2. Embankment: Embankment consists of placing and compacting roadway or borrow excavation. This work includes:

a. Preparing foundations for embankments;

b. Constructing roadway embankments;

c. Benching for side-hill embankments;

d. Constructing dikes, ramps, mounds, and berms; and

e. Backfilling sub excavated areas, holes, pits, and other depressions.

3. Conserved Topsoil: Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.

4. Waste: Excess or unsuitable roadway excavation and sub excavation that cannot be used.

204.03 Conserved Topsoil: Conserve topsoil from roadway excavation and embankment foundation areas. Stockpile conserved topsoil in low windrows less than 4 feet in height and located immediately beyond the rounding limits of cut and embankment slopes or in other approved locations. Separate topsoil from other excavated material. Do not drive or park on conserved topsoil.

Place conserved topsoil on completed slopes according to Section 624 within 1 year of stockpiling.

204.04 Roadway Excavation: Scarify earth cuts to 4 inches below subgrade within the roadbed limits. Compact the scarified material according to Subsection 204.07. Dispose of unsuitable or excess

200-3 excavation material. Replace shortage of suitable material caused by premature disposal of roadway excavation.

At the end of each day’s operations, shape to drain and compact the work area to a uniform cross-section.

204.05 Preparing Foundation for Embankment: Prepare foundation for embankment construction as follows:

1. Embankment over natural ground. Remove topsoil and break up the ground surface to a minimum depth of 6 inches by plowing or scarifying. Compact the ground surface according to Subsection 204.07.

2. Embankment on an existing slope steeper than 1V:3H. Cut horizontal steps in the existing slope to a sufficient width to accommodate placement and compaction operations and equipment. Step the slope as the embankment is placed and compacted in lifts. Start each step at the intersection of the original ground and the vertical cut of the previous step.

204.06 Embankment Construction: Incorporate only suitable roadway excavation material into the embankment.

1. General: At the end of each day’s operations, shape to drain away from the embankment and compact the embankment surface to a uniform cross-section. Eliminate ruts and low spots that could hold water.

During all stages of construction, route and distribute hauling and leveling equipment over the width and length of each lift of material.

Compact embankment side slopes with a tamping foot roller, by walking with a dozer, or by over building the fill and then removing excess material to the final slope line. For slopes 1V:1¾H or steeper, compact the slopes as embankment construction progresses.

2. Embankment within the roadway prism: Place embankment material in horizontal lifts no more than 8 inches in compacted thickness. Construct the top 12 inches of the embankment using 4-inch minus material. Incorporate oversize boulders or rock fragments into the lower lifts by reducing them in size or placing them individually as required below. Compact each lift according to Subsection 204.07 before placing the next lift.

3. Embankment outside of roadway prism: If placing embankment outside the staked roadway prism, place material in horizontal lifts less than 10 inches in compacted thickness. Compact each lift according to Subsection 204.07.

204.07 Compaction: Compact each layer of material to the in-place density requirements of Table

204-1 for the method of moisture and density control used. Incorporate water to achieve optimum moisture range. Density testing may be performed by BLM personnel at the Contracting Officer’s discretion using a Nuclear Densometer.

200-4

Table 204-1 Compaction Control Method

Material Compacted

Proctor Zero Air Voids Test methods: AASHTO T 99, AASHTO T 180, AASHTO T

310 and T 355

Test Methods: MT 229 – See MDT Materials Manual for test procedure

Earth embankment within roadway prism Minimum 95% of max density at optimum moisture ± 3%

Less than 10% air-filled voids Culvert foundation

Earth embankment outside roadway prism Minimum 90% of max density at optimum moisture ± 3%

Less than 12% air-filled voids

204.08 Sloping, Shaping, and Finishing: Complete slopes, ditches, culverts, riprap, and other underground minor structures before placing aggregate courses. Slope, shape, and finish as follows:

1. Sloping: Leave earth slopes with uniform roughened surfaces with no noticeable break as viewed from the road. Except in solid rock, round tops and bottoms of slopes including the slopes of drainage ditches. Round material overlaying solid rock to the extent practical.

Remove loose or unstable rocks and dress all rock slopes as the excavation process progresses and slopes are still accessible to the equipment.

Do not place topsoil or mulch on slopes until approved. If a shallow landslide occurs on a cut or embankment slope, remove or replace the material and repair or restore damage to the work. Bench or key the slope to stabilize the slide. Reshape the cut or embankment slope to an acceptable condition.

2. Shaping: Shape the subgrade to a smooth surface and to the typicals required. Shape slopes to gradually transition into slope adjustments without noticeable breaks. At culverts, the ends of cuts, and at intersections of cuts and embankments, adjust slopes in the horizontal and vertical planes to blend into each other or into the natural ground.

3. Finishing: Remove material larger than 6 inches from the top 6 inches of the roadbed.

Remove unsuitable material from the roadbed and replace it with suitable material.

Finish roadbeds and ditch cross-sections to maintain proper ditch drainage.

204.09 Measurement and Payment: No direct measurement or payment will be made for the work described in this section. Cost of work described in this section should be included in the price for line item 212(01) Linear Grading.

SECTION 207 – GEOSYNTHETICS

207.01 General: This work consists of providing and installing geotextile in separation, stabilization, filter, and reinforcement applications, geogrid in stabilization and reinforcement applications, and geomembranes in moisture barrier applications.

Provide geotextile in accordance with subsection 714.01.

207.02 Construction:

200-5

1. Identify, store, and handle geosynthetics according to the manufacturer’s recommendations.

Elevate and protect geosynthetic rolls with a waterproof cover if stored outdoors. Maintain product identification labels in a visible location on the inside of the core. Limit geosynthetics exposure to less than 10 days of ultraviolet radiation.

2. Unless otherwise specified, overlap geosynthetics in the direction, sequence, and distance according to the manufacturer’s recommendations.

3. Before placing the geotextile remove sharp objects and large rocks. Fill depressions or holes with suitable material to provide a smooth surface.

207.03 Measurement and Payment: No direct measurement or payment will be made for the work described in this section. Cost of work described in this section should be included in the line item price for culverts (Section 602).

SECTION 209 – STRUCTURE EXCAVATION AND BACKFILL

209.01 General: This work consists of excavating material for the construction of structures. This work also includes preparing foundations, bedding, and backfilling.

209.02 Foundation Preparation: Excavate unsuitable material if encountered at foundation grade as directed by COR. Compact culvert foundation per subsection 209.05.

209.03 Bedding for Pipe Culverts: Level the foundation. Place uncompacted bedding material over the foundation in a layer of uniform thickness. Lay 3 inches of bedding for pipes with diameters of 12 to 54 inches. Lay 6 inches of bedding for pipe with diameters larger than 54 inches. Recess the bedding to receive the joints for pipes with belled joints.

Details shown in plans.

Provide bedding material per subsection 703.11.

209.04 Backfill: Place backfill lifts evenly on all sides of the structure. Extend each lift to the limits of the excavation or natural ground.

Place backfill in compacted lifts no more than 6 inches in thickness and compact per subsection 209.05

209.05 Compaction: Determine optimum moisture content and maximum dry density according to

AASHTO T 99, Method C. Adjust the moisture content of the backfill to a moisture content suitable for compaction.

Compact material placed in each lift to at least 95 percent of the maximum density. Determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

Do not apply density requirements as measured by AASHTO T 310 to material that cannot be tested or compacted to maximum values determined by AASHTO T 99. For this material, fill the voids around the rocky material in each lift with structural backfill or foundation fill as appropriate. Compact each lift until there is no visible evidence of further consolidation.

209.06 Acceptance: See Table 209-1 for sampling, testing, and acceptance requirements.

200-6

Table 209-1

Material or Product

(subsection)

Type of Acceptance (subsection)

Characteristic Test Methods Specifications

Sampling Frequency

Reporting Time

Remar ks

Bedding Material

Measured & Tested for

Conformance (209.03 & 713.04)

Gradation AASHTO T 27 & T 11

1 Per Source

Before using in work

Common Backfill

Measured & tested for conformance (209.04)

Moisture - Density AASHTO T 99

1 Per Project or as Directed by COR

Before using in work

Density AASHTO T

2 Per culvert location

Completion of each culvert

209.07 Measurement and Payment: No direct measurement or payment will be made for the work described in this section. Cost of work described in this section should be included in the line item price for culverts (Section 602).

SECTION 212 – LINEAR GRADING

212.01 General: This work consists of performing linear and site grading at designated locations within specified tolerances. Linear grading consists of grading roadways and ditches on a designated alignment.

212.02 Roadway and Site Preparation: Clear the area of vegetation and obstructions according to section 201 and 203.

212.03 Excavation and Embankment. Construct the roadbeds and sites according to the applicable requirements of Section 204, except as modified in this Section.

212.04 Alignment (centerline): Alignment may be shifted a maximum of 5 feet left or right and 2 feet up or down of the planned centerline. Approval from COR must be obtained before any movement of centerline.

212.05 Measurement and Payment: Measurement for payment will be lineal feet along center line of roadway graded. Payment will be full compensation for the work described in this Section.

212(01) Linear Grading Lineal Feet (LF)

DIVISION 250 – EARTHWORK RETAINING SYSTEMS AND SLOPES

EARTH RETAINING SYSTEMS AND SLOPES

GAOA CROOKED CREEK ROAD 2025

250-1

SECTION 251 – RIPRAP

A. General: This work consists of providing and placing Riprap Class I. Riprap gradation is designated according to subsection 705.02. Excavate and backfill according to section 204.

Place Geosynthetics according to section 207. Dress the slope to produce a smooth surface.

B. Construction: Place riprap on a prepared surface at location designated in plans. Place riprap to its full thickness in one operation. Do not place riprap material by methods that cause segregation or damage to the prepared surface. Place or rearrange individual rocks by mechanical or hand methods to obtain a dense uniform blanket with a reasonably smooth surface.

C. Acceptance: Riprap material and placement will be visually inspected by COR.

D. Measurement and Payment: Payment will be full compensation for the work described in this section. Measurement for payment will be in place cubic yards measured by the COR.

251(01) Riprap Class II Cubic Yard (yd3)

DIVISION 300 – AGGREGATE SURFACING

GAOA Crooked Creek Road 2025

300-1

SECTION 302 – CRUSHED AGGREGATE

302.01 General: This work is preparing subgrade, producing, placing, compacting, and finish grading

Crushed Aggregate Surfacing Grade 2 at locations shown in plans.

302.02 Materials: Obtain aggregates in accordance with subsection 703.06 or COR approved equal.

Contactor submittals in accordance with table 302-1.

302.03 Construction:

1. Sampling: Submit test result in accordance table 302-1

2. Surface Preparation: Do not place aggregate surfacing material on any of the following.

a) Any surface not meeting the dry density requirements for that surface.

b) A rutted or Frozen subgrade or aggregate surface.

c) Any surface not meeting grade specifications.

d) Unstable or pumping material is unacceptable. Rework or remove and replace the material prior to place additional lifts or materials.

3. Compaction: Uniformly compact each lift to ensure it does not exhibit heaving, pumping, rutting, or shearing. Lifts should no exceed 5 inches loose.

4. Finishing: Maintain the aggregate course to the correct line, grade, and cross-section by blading, watering, rolling, or combination thereof until placement of the next or final course.

302.04 Measurement and Payment: Payment will be full compensation for the work described in this

Section. Measurement for payment will be certified tickets provided by source to the COR.

302(01) Crushed Aggregate Surfacing Grade 2 Ton (Ton)

300-2

Table 302-1 Sampling, Testing, and Acceptance Requirements

Material or

Product

Characteristic

Category Test Methods

Specifications Sampling Frequency

Point of Sampling

Split Sample

Reporting Time

Remarks

Crushed aggregate

Moisture-density

AASHTO

T 180, Method D(1)

1 per source

Production output or stockpile

Yes

Before placing

Gradation

AASHTO T

11 & T 27

1 per source

Production output or stockpile

Before placing

Crushed

Density (in-place) or other approved procedures

1 per 1000 lineal feet along Center Line

In-place after compaction

No

End of shift

92% of maximum dry density

Moisture content

(in-place) or other approved procedures

1 per 1000 lineal feet along Center Line

In-place after compaction

No

End of shift

± 3% of optimum moisture

(1) At least 5 points per proctor.

DIVISION 600 – MISCELLANEOUS CONSTRUCTION

GAOA Crooked Creek Road 2025

150-1

SECTION 602 – CULVERTS

602.01 General: This work consists of providing and installing culverts.

Plans show the size, length, and approximate location of culverts. Final location, skew, length, elevations, and grade may be changed with approval from COR.

Excavate and backfill according to Section 209.

Remove existing culverts per Section 203.

Provide culverts according to subsection 707.08.

Use the same material and coating on contiguous pipe sections and special sections (such as elbows and branch connections).

602.02 Metal Pipe: Position the pipe with a longitudinal joint so the joint is opposite the invert. Fully join pipe sections with leak-resistant seals according to AASHTO M 36 or AASHTO M 196. Use one of the following:

1. Gasket, bell, and spigot joints. Use on slopes of 10 percent or less and lay the pipe with the bell end up slope.

2. Coupling bands with gaskets. Limit the use of coupling bands with projections (dimples) to attaching prefabricated flared end sections.

3. Approved equal

602.03 Measurement and Payment: Payment will be full compensation for the work described in this

Section. Measurement for payment will be lienal feet of culvert installed.

SECTION 619 – CATTLE GUARDS

619.01 General: This work consists of removing existing, providing, and installing of cattle guards.

Remove existing cattle guards per section 203.

Excavate and backfill according with section 209.

Cattle guard grid, wings, and bases details shown in plans.

All steel is to be melted and manufactured in the United States of America.

619.02 Cattle Guard Girds and Wings: Provide cattle guard grids and…