Attachment 1 - SOW Mobile Jet Blast Barriers.docx
DOCX document 29 KB Posted
- Attached to
- Mobile Blast Deflectors Federal contract opportunity
- Solicitation number
- FA558724Q0097
About this file
This document is a Statement of Work (SOW) for the design, manufacture, and installation of a Mobile Jet Blast Deflector (JBD) system at Royal Air Force (RAF) Lakenheath. The primary objective is to enhance the safety of the Victor Ramp by mitigating the risk of damage to personnel, equipment, and infrastructure from high-velocity aircraft exhaust.
The SOW requires the contractor to provide 200 linear meters of mobile jet blast barriers that are at least 6.7 m but not more than 9 m tall, constructed of hot-dip galvanized steel, and designed to withstand wind speeds up to 100 mph. The contractor is responsible for the complete delivery and installation of the JBD system, including the concrete foundation and safety features. The work must be completed within the agreed-upon timeline and in compliance with all relevant safety regulations. The contractor must also manage the contract, subcontractors (if any), and maintain effective communication with the Government.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DCP DATA SHEET Victor Blast Protectors.pdf | ||
| Solicitation Amendment - FA558724Q00970001.pdf | ||
| Attachment 0002 - Quote Sheet Blast Deflectors.pdf | ||
| Blast Deflectors Questions Answers.pdf | ||
| Blast Deflectors Questions Answers.docx | DOCX document | |
| Attachment 2 - Quote Sheet Blast Deflectors.pdf | ||
| FA558724Q0097 - Solicitation.pdf | ||
| CSB Fixed.JPG | JPG image | |
| Attachment 3 - Past Performance Questionaire.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
(SOW)
Mobile Blast Deflectors on Victor Ramp at Royal Air Force (RAF) Lakenheath “Rev. 1, 12 August 2024”
1.0 Introduction
1.1 Mission: The primary mission of this project is to enhance the safety of Victor Ramp at RAF Lakenheath by installing Mobile Jet Blast Deflectors (JBDs). These deflectors are vital for protecting personnel, equipment, and infrastructure from the powerful forces and high temperatures produced during aircraft taxi.
1.2 Background: JBDs are critical to modern airbase operations, particularly in environments like RAF Lakenheath, where aircraft operations are frequent. These structures are engineered to redirect the high-velocity exhaust from jet engines, thereby mitigating the risk of damage to nearby equipment, structures, and personnel.
1.3 Scope: The scope of this contract includes the design, manufacture, and installation of a Mobile Jet Blast Deflector system at RAF Lakenheath. The contractor will be responsible for delivering a fully integrated mobile JBD solution, which includes all necessary foundations, structural components, and associated safety features. These will be portable, be at least 6.7 m, but not more than 9 m tall, with no visible gaps between.
2.0 General Requirements
2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.
2.2 Contract Management & Administration
2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.
2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.
2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.
2.4 Hours of Work: Workdays are from Monday through Friday excluding US federal holidays and UK bank holidays. Work hours are from 0800 to 1700 local UK time.
3.0 Product Specifications & Delivery Requirements
3.1 The contractor must provide all personnel, equipment, tools, materials, supervision, transportation, safety equipment, any other items and services necessary to
3.2 Contractor shall provide mobile jet blast design for review and approval.
3.2.1 Hot-dip Galvanized Steel will be used for the frame and bolts.
3.2.2 Deflecting surface will have a galvanized finished.
3.2.3 There will be no visible gaps between both the deflecting surface and each blast wall section.
3.2.4 The contractor must provide a detailed design of the mobile jet blast deflector, including the dimensions, materials, and specifications for the concrete platform and blast deflector structure.
3.3 Contractor shall deliver and install 200 linear meters (656 feet) of mobile jet blast barriers.
3.3.1 Contractor must review and validate with PM/COR locations and position.
3.3.2 The installation of barriers involves the placement of a concrete platform and the subsequent attachment of the blast deflector structure to it.
3.3.3 The contractor must ensure that the installation of the barriers is following all relevant safety regulations and guidelines. All structures and technology must be in compliance with UFC 3-260-01.
3.3.4 The contractor must provide a timeline for the delivery and installation of the barriers and must complete the work within the agreed-upon timeframe.
3.4 Barrier height must be at least 6.7 m, but not more than 9 m.
3.4.1 Base width and height must be suitable to withstand 40 m/s (100 mph) wind.
3.4.2 The contractor must ensure that the barriers are designed and installed to withstand the specified wind loads, while also taking into consideration any other relevant environmental factors.
3.5 Barrier base must be forklift ready (allowing mobility and transport).
3.5.1 The contractor must ensure that the forklift-ready base is designed and constructed in accordance with all relevant safety regulations and guidelines.
3.5.2 The contractor must provide a detailed plan for the mobilization and transport of the barriers, including the type of forklift or other equipment to be used and the procedures to be followed.
4.0 Special Requirements
4.1 Security & Safety
4.1.1 Operational Security (OPSEC): If any installation is required to take place in a Government facility, the Contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access to. The required CIIL can be provided by the Contracting Officer.
4.1.2 Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.
4.2 Contractor Access to Installations: Access to DoD installations is limited to personnel with a valid installation access pass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees may be subject to personal and vehicle searched when entering or leaving a DoD installation. If installation access is required, the Government will provide the Contractor with the required information and documents for installation access passes upon award. Subsequently, the Contractor shall provide a list of all employees along working under this contract, along with the required documentation upon receipt of contract award, and no later than 30 days prior to the projected need for any new installation access pass requirements. The Contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The cognizant mission partner is responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract the Contractor is responsible for collecting employee installation access passes and turning them in to the CO, or the cognizant mission partner in a timely fashion.
4.3 Shipping Instructions
Shipment shall be FOB Destination.
All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either include the shipping in the costs of the items or outline it in a separate line item).
The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.
File details come from the government source that posted it. Updated .