ATTACHMENT_1_SOW_Main_Entrance_Redesign_and_Campus_Improvements.pdf
PDF 358 KB Posted
- Attached to
- MAIN ENTRANCE REDESIGN SIPI
- Solicitation number
- 140A2326R0041
About this file
This is a Statement of Work (SOW) for Southwestern Indian Polytechnic Institute (SIPI) in Albuquerque, New Mexico, dated June 24, 2026, soliciting design-build services for campus improvements and front entrance revitalization. The work encompasses selective mechanical, electrical, and civil demolition; design services for main entrance redesign; campus improvements; and tree trimming and removal.
The project is organized into six contract line items (CLINs) priced separately with government option to accept any or all items. CLIN #001 requires demolition of Building 138, temporary power pole installation, propane tank removal, fence relocation, concrete bollard installation, new gate motor installation, and main entrance resurfacing. CLIN #002 involves vegetation clearing around the SIPI sign, installation of an 8-foot chain-link fence on the east side, re-stuccoing and painting of the sign, and reinstallation of the SIPI blue pedestrian fence. CLIN #003 addresses campus vegetation improvements including tree removal and trimming across the campus. CLIN #004 requires warehouse dock bumper pad revitalization at Building 107 and installation of a new outdoor mailbox. CLIN #005 involves asphalt roadway repairs and pavement markings from Coors Boulevard to the front gate. CLIN #006 covers design services for main entrance security upgrades including a guard building, possible search lane, and new motorized safety gate incorporating Native designs and SIPI colors. The contractor must be a qualified general contractor with minimum five years of commercial construction experience, preferably on university campuses, and must comply with extensive codes and standards including NFPA, ASHRAE, ADAABAAG, OSHA, and the IA Design Handbook for BIE School Facilities. The period of performance is 365 days from Notice to Proceed. All contractors must undergo background investigations with clearance required before NTP issuance. Key deliverables include performance bonds, insurance, project schedules, design submittals per IA Design Handbook Part 2, shop drawings, materials submittals, safety plans, quality control plans, as-built drawings, operations and manuals, and warranty documents. The Contracting Officer Representative is Garrick Harlan at garrick.harlan@bie.edu; the Contracting Officer is to be determined.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
SOUTHWESTERN INDIAN POLYTECH INSTITUTE
D-B CAMPUS IMPROVEMENTS AND FRONT ENTRANCE
REVITALIZATION.
June 24, 2026
Contents
A. GENERAL
B. CODES AND STANDARDS
C. SCOPE OF WORK
D. TASK DESCRIPTION
E. DELIVERABLES
F. PERIOD OF PERFORMANCE
G. BACKGROUND INVESTIGATIONS
A. GENERAL
1. Purpose:
Southwestern Indian Polytechnic Institute is requesting services from a qualified general contractor to provide a design-build effort including selective mechanical/electrical/civil demolition, design services for redesign of main entrance, campus improvements and tree trimming/removal. The Contractor shall provide all services including, engineering design services, materials, labor and supervision to accomplish the tasks in accordance with this Statement of Work, Contract Terms and Conditions, Specifications, concept drawings and any special requirements. Refer to Codes and Standards below.
2. Project Location:
Southwestern Indian Polytechnic Institute located in Albuquerque, New Mexico. 9169
Coors Blvd, Albuquerque, NM 87120.
3. Definitions and Acronyms:
The following specifications/guidelines shall be utilized work described.
Definitions and Acronyms:
“ADAABAAG” means “Americans with Disabilities Act and Architectural Barriers Act
Accessibility Guidelines”.
“A/E” refers to a qualified and licensed Architect and/or Engineer
“AHJ” refers to the Authority Having Jurisdiction
“BIA” refers to the Bureau of Indian Affairs.
“BIE” refers to the Bureau of Indian Education.
“CO” refers to the Contracting Officer.
“COR” refers to the Contracting Officer’s Representative.
“Design Handbook” refers to the latest published edition of the IA Design Handbook for
BIE School Facilities.
“DOI” refers to the U.S. Dept. of the Interior.
“DOR” refers to the Designer Of Records.
“DSRM” refers to the Indian Affairs - “Division of Safety and Risk Management” which is the AHJ and located in Albuquerque, NM.
“FM” refers to Factory Mutual approval standards.
“SIPI” refers to Southwestern Indian Polytech Institute.
“Plan Review Procedure” refers to the May 2020 edition, “Safety, Health and
Accessibility Design Guidelines for Architects, Engineers and Design Firms”.
“SOW” refers to Statement of Work.
“UL” refers to Underwriters Laboratories.
B. CODES AND STANDARDS
The Contractor shall provide a multi-disciplined team to furnish services required to complete the work. Each responsible team member must be knowledgeable of and provide work in compliance with the latest published editions of all applicable codes, standards, design handbooks, plan review procedures, and guidelines as adopted by BIA /BIE which include but may not be limited to:
• NFPA 5000 Building Construction, Life Safety, and Fire Codes
• NFPA Codes for Occupancy Classification
• NFPA 1 Fire Code
• NFPA 70, National Electrical Code
• NFPA 13 Standard for the Installation of Sprinkler Systems
• NFPA 92A Std. for Installation of Air Conditioning and Ventilation Systems
• NFPA 92B Std. for Heating, Ventilation, and Air Conditioning Systems
• NFPA 101 Life Safety Code
• Uniform Plumbing and Mechanical Codes
• ASHRAE Standards, Handbooks, Journals and Publications.
• AHRI 340/360 Commercial and Industrial Unitary Air‐Conditioning and Heat Pump
Equipment.
• ANSI/AHRI 210/240 Performance Rating of Unitary Air Conditioning and Air‐Source
Heat Pump Equipment
• ASHRAE 90.1 Energy Standard for Buildings
• Americans with Disabilities Act and Architectural Barriers Act Accessibility Guidelines
(ADAABAAG)
• Occupational Safety Health Administration (OSHA) - Federal Regulations
• EPA - Tribal, State, Federal Regulations
• Value Engineering DOI OMB Circular A-131
• DOI – Guiding Principles for Sustainable Federal Buildings
• IA Design Handbook for BIE School Facilities dated September 18, 2025
• FEMA-428/BIPS-07/January 2012 Edition 2 - Buildings and Infrastructure Protection
Series Primer to Design Safe School Projects in Case of Terrorist Attacks and School
Shootings
• Final Inspection and Certificate of Occupancy Guidelines
• All other standards referenced in the project specifications file.
Where applicable, the Contractor shall adhere to all federal and state statutes pertaining to archaeological, historical, and environmental clearances which may affect this project. Strict adherence to the National Environmental Protection Act (NEPA) and the National Historic
Preservation Act (NHPA), Section 106, will be mandatory.
SIPI utilizes an Environmental Management Policy to follow regulations concerning environmental laws. The Contractor shall follow all applicable environmental laws.
C. SCOPE OF WORK
1. Scope of work for the project is to supply all labor, materials, equipment, permitting and all other requirements to provide D-B services for demolition of the main entrance security building and the design services for redesigning of the main entrance. Work to include all disciplines involvement as outlined in section D of this Statement of Work.
2. At the discretion of the Contracting Officer, a mandatory Pre-Bid Proposal Conference may be scheduled. The Bidders shall attend this informational meeting on site at SIPI.
The Contracting Officer will notify the Bidders via the Solicitation Amendment process, of the date and time of this meeting. Bidders shall bear all cost of preparing their proposal including any site visit, pre-bid conference or site investigations.
3. Bidders shall meet on-site with SIPI staff as directed by the Contracting Officer to discuss specific requirements.
4. Bidders and the awarded Contractor are responsible for verifying all dimensions, systems, existing conditions of all systems and facilities related to the work in this SOW, and all requirements of the new work to achieve a fully functional intended product of this project.
5. The Contractor shall request from the CO any existing facility drawings, records, reports, and other relevant information that may be available. Existing building documentation provided is for informational purposes only. It is the responsibility of the bidders to field verify the completeness and accuracy of the information requested.
6. Contractor shall locate, inspect, and determine capacity of any site conditions, architectural, structural, mechanical, electrical, and plumbing that will be affected by construction operations. Verify all existing building conditions, utilities, finishes, dimensions, and clearances impacted by the work. Contractor shall notify COR of any deficiencies or suspected hazardous materials encountered.
7. The Contractor shall verify and provide the quantity of labor and materials required to complete the work.
8. All contractors, sub-contractors, and suppliers shall abide by all COVID protocols currently in effect while on campus.
9. Contractor to provide PPE and implement an OSHA compliant safety program as required.
10. Applicable life safety and accessibility components of the project, such as structural, fire alarm, fire suppression, ADAABAAG requirements, etc. are subject to DSRM review.
11. All damages to SIPI facilities due to destructive investigation, demolition, construction, or staging operations shall be the Contractor’s responsibility to repair.
12. The Contractor shall provide their own dumpster for removed materials and identify all removed materials that are suitable for recycling. In addition, the contractor shall provide their own portable toilets and hand washing stations on-site.
13. All waste materials shall be removed and disposed of in a manner in accordance with local, State, and Federal regulations. Disposal manifest to be submitted to document proper disposal.
14. The Contractor shall make areas safe during demolition and construction phases to keep students, staff, workers, and public safe. The Contractor Safety Plan shall address all safety concerns and solutions to perform the project in a safe manner. Submit location of staging areas to COR for review.
15. The facility(s) may be in use during the Period of Performance (POP). Schedule any utility outages and building closings with the COR and SIPI Facilities Department.
16. The building may be occupied during the construction period. Install protective temporary partitions, dust control measures, plastic sheeting, proper ventilation etc. as required to protect areas of the building not part of the work and maintain the normal facility operations.
17. Utilize low /zero VOC materials to minimize vapors. Any paints or coatings utilized in the project shall be no VOC content type.
18. All components and other materials utilized shall conform to all applicable testing standards, as well as fire rating per NFPA and other applicable code requirements for the occupancy of the space. Include all seismic mounting requirements per applicable code.
19. The Contractor shall provide a copy of the organization’s safety plan to the COR after award of contract.
20. Contractor shall provide 1-year warranty for all construction work from the date of acceptance including materials and labor in addition to the standard manufacturer’s warranty for all installed and supplied systems. This is the minimum warranty requirements unless otherwise additional requirements included elsewhere in the contract documents.
21. Design/Build Requirements:
a. The contractor shall locate, inspect, and determine capacity of any civil and structural, mechanical, electrical, and plumbing systems that will be affected by the construction. This list must be coordinated with the COR and Construction project management staff to have a complete list of all refurbishment items.
b. Based on the determination of the design requirements as presented for each task, the
Contractor shall provide, as needed, A-E services including, but not limited to; design and calculations for architectural, structural, mechanical, electrical, plumbing and system work. Design document submission shall adhere to IA Design Handbook for
BIE School Facilities dated September 18, 2025, guidelines.
c. The Contractor shall acquire the service of licensed engineer/s in any of the 50 states for the disciplines included in the project to perform as the project Designer of
Record. The design deliverables shall be in accordance with Part 2 of IA Design
Handbook for BIE School Facilities dated September 18, 2025.
d. The DOR shall clearly identify the submittals required per specifications division as part of the design generated documents. Contractor’s technical submittals shall be properly reviewed / approved by the DOR prior to submittal to the Government. The
DOR shall ensure all drawings are stamped by a Licensed Professional Engineer and
Licensed Architect for the 100% construction drawings before any work is to be completed.
22. Additional Project Requirements:
a. This work shall be performed by a qualified contractor with a minimum of 5 years of experience in commercial construction, preferably on University campus buildings.
b. All materials utilized and work performed shall follow all applicable codes and standards. The installation shall be done in a quality workmanship-like manner.
c. The Contractor shall be certified by the Equipment manufacturer as an authorized installer to perform such work.
d. The contractor shall provide training for SIPI staff for each system installed. Submit a training schedule and materials 14 days prior to the scheduled date.
e. Salvage and reinstall all devices or equipment interfering with the new installation as required to complete the project. Notify COR of any damaged or non-functional equipment encountered.
f. If mechanical, electrical, plumbing, or other system serving the building is interrupted for an extended period greater than 48 hours, then the Contractor shall provide temporary service to the building for the duration of the interruption.
g. The Contractor shall furnish all equipment, tools, scaffolding, lifts, crane, shoring, safety gear, etc., as required to perform the work.
D. TASK DESCRIPTION
The following item numbers shall be priced separately and as a total. The Government reserves the right to accept any or all contract line-item numbers. See other sections of this
Statement of Work (SOW) for additional requirements.
NOTE: No work may proceed without approval by the Contracting Officer.
CLIN #001: Bldg. 138 Demolition and Resurface Main Entrance
Contractor to provide the Design-Build services for the demolition of Bldg. 138 and resurfacing/refinishing of the main entrance after demolition in accordance with the SOW, Contractor’s approved Drawings and specifications and all applicable codes and guidelines.
The job includes all disciplines included in the Contract. This is to include all required civil, structural, mechanical, electrical, plumbing, controls and any other required to provide a fully functional systems in accordance with the detailed requirements below and the applicable codes.
1. The contractor shall identify all equipment to be selectively deconstructed and removed from Bldg. 138 and relocated to a place specified in the SOW or by SIPI personnel during construction kick off.
2. The contractor shall install a temporary power pole inside the SIPI property near Bldg.
138 in order to uninstall the power panels from Bldg. 138 and install them on the power pole. This includes removing IT panels and placing them on the power pole. Contractor shall relocate security camera to power pole to ensure same coverage as when it was on the building.
3. Ground all newly installed equipment.
4. Test all work performed in presence of the COR or his/her nominated person or third party.
5. The contractor shall level landscape where Bldg. 138 stood after removal.
6. The contractor shall remove and dispose of the propane tank behind Bldg. 138 and the chain link fence currently around the propone tank.
7. The contractor shall relocate the turquoise fence and gate (as indicated in the picture) west of the current location to ensure closure of the campus.
8. The contractor shall install concrete bollards where Bldg. 138 was to ensure no vehicle passage off the main road near the main entrance.
9. The contractor shall install new gate motors for the main motorized gate, to include all components necessary for the installation of a new gate motor and new road sensors.
10. The contractor shall selectively deconstruct all systems identified above and pre-establish cut-off points, such as ductwork, electrical junction boxes and isolating valves that could be tapped into for future use. All deconstructed equipment shall be approved to be removed by the designer of record before demolition commences. The contractor shall coordinate all phases between subcontractors, designers of record, and the COR for an approved notice to proceed.
11. The contractor shall remove all deconstructed materials offsite in its entirety unless the
COR has identified reusable items that should be consolidated and stored onsite.
12. The contractor shall construct the electrical and mechanical system per specifications and design approved by the COR.
13. The contractor shall have all parties punch lists finalized between the designer, constructor, and end-user.
14. Systems and equipment to be selectively deconstructed with associated piping or conduit shall be completed up to isolating points in the system. Asbestos Containing Material and Lead containing material shall be removed and disposed of where required. Asbestos
Survey completed in 2021 for B138 Guardhouse will be provided. Asbestos Containing
Material (ACM) removal and disposal where required and shall be according to applicable regulatory requirements.
15. Contractor is responsible for providing all PPE, as required for construction project.
16. Damages to Southwestern Indian Polytechnic Institute facilities due to construction activities or staging operations shall be the Contractor's responsibility to repair. The contractor shall ensure protection measures are in place prior to commencing work efforts for all government personnel, equipment and property.
CLIN #002: SIPI Front Sign Revitalization
Contractor to provide Design-Build services for clearing vegetation around the SIPI Sign, the installation of a new 8’ chain-link fence on the east side of the SIPI Sign, and the re-stucco and painting of the SIPI Sign in accordance with the SOW, and applicable codes referenced.
The job includes all disciplines included in the Contract. This is to include all required civil, landscaping, structural, electrical, controls and any other required to provide fully functional systems in accordance with the detailed requirements below and the applicable codes.
1. Clearing and Preparation around SIPI Sign
a. The Contractor shall clear and prepare the landscape located east of the SIPI sign to allow for the newly installed 8’ fence.
b. The contractor shall ensure ground is level for the installation of the 8’ fence.
c. The contractor shall remove additional vegetation around the SIPI Sign to include all trees and pushes that restrict visibility of the sign.
2. Re-stucco and painting of SIPI Sign
a. The contractor shall re-stucco the wall around the SIPI Sign.
b. The contractor shall repaint the block lettering on the wall around the SIPI Sign, repaint the information box on the wall, and repaint the SIPI Sign itself.
c. The contractor shall provide colors for SIPI review and approval for all painting and stucco colors before any work is completed.
3. Installation of 8’ Fence East side of SIPI Sign
a. The contractor shall provide design for an 8’ chain link fence to be installed east of the SIPI Sign.
b. The contractor shall provide options for vehicle and pedestrian gates to access the
SIPI Sign for maintenance.
c. The contractor shall design the fence and gates to not allow anyone to squeeze between the fence and the wall nor between the gates and posts.
d. The contractor shall ensure fence is installed per the manufacturer’s specifications.
4. Reinstallation of SIPI Blue Pedestrian Fence.
a. The contractor shall reinstall the SIPI Pedestrian Fence that is currently detached from the rest of the fence near the SIPI Sign. See attached pictures.
b. The contractor shall ensure the fence is straight with adjacent fence and plumb.
c. The contractor shall repaint SIPI pedestrian fence from the former guardhouse
(including the SIPI blue gates by guardhouse) all the way along the front entrance road around the SIPI Sign and ending on Coors Blvd near the Albuquerque bus stop.
d. The contractor shall provide colors for SIPI review and approval before any painting is completed.
5. Contractor is responsible for providing all PPE, as required for construction project.
6. Damages to Southwestern Indian Polytechnic Institute facilities due to construction activities or staging operations shall be the Contractor's responsibility to repair. The
CLIN #003: SIPI Campus Vegetation Improvements
Contractor to provide Design-Build services for clearing vegetation around the SIPI Campus to include trimming trees and tree removal around campus in accordance with the SOW, and applicable codes referenced. The job includes all disciplines included in the Contract. This is to include all required civil, landscaping, structural, electrical, controls and any other required to provide fully functional systems in accordance with the detailed requirements below and the applicable codes.
1. Tree removal.
a. The contractor shall remove trees as indicated on the drawings provided.
b. The contractor shall completely remove felled trees from campus and ensure area is free of debris.
c. The contractor shall grind stump down 6” below ground and backfill hole with fill dirt to ensure no tripping/ falling hazard.
2. Tree trimming
a. The contractor shall trim trees as indicated on the drawings provided.
b. The contractor shall ensure during the trimming process that the tree is structurally sound with weight distribution and will not fall.
c. The contractor shall trim trees up past 8’ from the ground to ensure no low hanging branches hinder walking or UTV movement around campus, which also includes trimming trees away from roadways, powerlines, and buildings.
d. The contractor shall ensure trees located in Bldg. 100 parking lot are trimmed away from parking spaces and trimmed back to localized area.
e. The contractor shall trim trees near Bldg. 108 and Bldg. 109 and ensure the trees are trimmed away from buildings and pathways.
f. The contractor shall trim the tree near the north border fence near the apartment complex and ensure the tree is not touching the building. The contractor shall assess the tree and work with SIPI to see if the tree will need outright removal due to proximity to the apartment complex.
g. The contractor shall trim the tree near the walking public walking path on the northwest side of campus to ensure tree is not touching the powerlines.
3. Contractor is responsible for providing all PPE, as required for construction project.
4. Damages to Southwestern Indian Polytechnic Institute facilities due to construction activities or staging operations shall be the Contractor's responsibility to repair. The
CLIN #004: Warehouse Dock Revitalization and Mailbox Installation
Contractor to provide Design-Build services for revitalization of the Bldg. 107 Warehouse loading dock bumper pads and the installation of a new SIPI Mailbox to replace the one removed from Bldg. 138 in accordance with the SOW, and applicable codes referenced. The job includes all disciplines included in the Contract. This is to include all required civil, landscaping, structural, electrical, controls and any other required to provide fully functional systems in accordance with the detailed requirements below and the applicable codes.
1. Loading Dock Bumper Pads
a. The contractor shall design and construct new bumper pads at Bldg. 107 Warehouse loading dock.
b. The contractor shall design for the replacement of the wood bracing approximately
50’L by 13” W by 11” H. The contractor shall field verify dimensions.
c. The contractor shall design for nine (9) new rubber bumper pads approximately 33” L by 12” W by 4.5” H. The contractor shall field verify dimensions.
d. The contractor shall conduct an assessment of the loading dock to ensure no structural issues are present for the installation of the new bracing and bumper pads. The contractor shall provide documentation of the assessment to the CO and COR with stamped approval from a professional engineer.
2. New SIPI Mailbox
a. The contractor shall design a new standalone outdoor mailbox near Bldg. 107
Warehouse (location provided in the drawings) to facilitate SIPI’s daily mail delivery since the current mailbox will be removed with Bldg. 138.
b. The contractor shall design a concrete pad that will support the mailbox.
c. The contractor shall provide several options for the mailbox for SIPI review and approval. The mailbox overall size shall be bigger than 29” H and 20” W and a package opening larger than 16”L and 7” H.
3. Contractor is responsible for providing all PPE, as required for construction project.
4. Damages to Southwestern Indian Polytechnic Institute facilities due to construction activities or staging operations shall be the Contractor's responsibility to repair. The
CLIN #005: Main Road Asphalt Repairs
Contractor to provide Design-Build services for repairing the asphalt roadway from Coors
Blvd intersection to the front gate of SIPI in accordance with the SOW, and applicable codes referenced. The job includes all disciplines included in the Contract. This is to include all required civil, landscaping, structural, electrical, controls and any other required to provide fully functional systems in accordance with the detailed requirements below and the applicable codes.
1. Remove And Replace Asphalt Repairs
a. The contractor shall make necessary sawcuts and remove approx. 1,250sqft of failed asphalt to a depth of up to 4 inches. Contractor shall field verify square footage with
SIPI COR.
b. The contractor shall compact existing base and pave with up to 4 inches of hot mix asphaltic surface course.
c. The contractor shall perform the work in 2 sections over 2 continuous working days.
2. Pavement Markings W/ Reflectorized Glass Beads
a. The contractor shall paint two (2) large arrows on the asphalt using reflectorized white/yellow latex traffic paint.
b. The contractor shall stencil one (1) area with “Bike Xing” using 8 ft letters on the asphalt using reflectorized white/yellow latex traffic paint.
c. The contractor shall paint approx. 50 linear feet of 4-inch striping using reflectorized white latex traffic paint.
d. The contractor shall paint approx. 50 linear feet of 4-inch striping (double line) using reflectorized yellow latex traffic paint.
e. Contractor is responsible for providing all PPE, as required for construction project.
f. Damages to Southwestern Indian Polytechnic Institute facilities due to construction activities or staging operations shall be the Contractor's responsibility to repair. The contractor shall ensure protection measures are in place prior to commencing work efforts for all government personnel, equipment and property.
CLIN #006: Design of Main Entrance
Contractor to provide Design services for the redesign of main entrance in accordance with the SOW, and applicable codes referenced. The job includes all disciplines included in the
Contract. This is to include all required civil, landscaping, structural, electrical, controls and any other required to provide a fully functional systems in accordance with the detailed requirements below and the applicable codes. All work explained below shall be Design services:
Design work
The current main entrance does not meet security requirements as stated in the BIA Design
Handbook for BIE School Facilities and Buildings and Infrastructure Protection Series
Primer to Design Safe School Projects in Case of Terrorist Attacks and School Shootings
FEMA-428/BIPS-07/January 2012 Edition 2.
1. The contractor shall design a main entrance to address the security issues and comply with the above references. This includes but is not limited to:
g. The contractor shall design small guard building between the incoming traffic lane and outgoing traffic lane.
h. The contractor shall design a possible search lane (if room is available)
i. The contractor shall design a new motorized safety gate.
2. The contractor shall design the front entrance in a way to make it appealing to students coming to the campus and the staff that work on campus.
3. The contractor shall design incorporating Native designs and using SIPI colors.
E. DELIVERABLES
The following deliverables are required when checked.
Project Deliverables
Item Submittal Check as required
For
Approval
FIO Required Review
Period
Remarks
1 Performance
Bond ☒ ☒ ☐ 10 Days from
Award
15 days NTP Issuance requirement
2 Insurance ☒ ☒ ☐ 10 Days from
Award
15 days NTP Issuance requirement
3 Superintendent
Information ☒ ☒ ☐ After award 4-6 weeks
Assume 4-6 weeks for
Background check. NTP issuance requirement.
4 Project
Schedule ☒ ☒ ☐ 10 Days from
NTP
15 days Submit
Monthly update.
Submit narrative report with the update.
5 Site Health and
Safety Plan ☒ ☒ ☐ After NTP
Prior to start any work
15 days
6 QC Plan ☒ ☒ ☐ 10 days after
NTP
15 days
7 Phasing plan ☒ ☒ ☐ 10 Days from
NTP
15 days
8 Other preconstruction submittals
☒ ☐ ☐ Prior to the
Preconstruction meeting
15 days Reference the specifications for required submittals.
9 Design submittals ☒ ☒ ☐ 30-60 days after NTP
20 days Part 2 of IA
Design
Handbook for
BIE School
Facilities dated
September
18, 2025
10 Shop drawings ☒ ☒ ☐ 15 Days prior to start work
15 days
11 Materials / equipment submittals
☒ ☒ ☐ 15 Days prior to start work
15 days
12 Method statement / work plan
☐ ☐ ☐ 15 Days prior to start work
15 days
13 Performance /
QC Report ☒ ☐ ☒ Weekly 7 days
14 QC Inspections ☒ ☐ ☒ Daily 15 days Per DOR’s generated specifications
15 Special
Inspections
Submittals
☐ ☐ ☐ Frequency according to the Special
Inspections
Documents
To be developed by the SI contractor
16 Test Reports ☒ ☒ ☐ 3 days from receiving the report
15 days
17 Submittal Log ☒ ☐ ☒ 15 days from
NTP or with
QC Plan if any
15 days Update
Weekly
18 Meeting
Minutes ☒ ☐ ☒ 3 days after the meeting date
7 days
19 RFI ☒ ☐ ☐ For differing site conditions or any clarification required by the contractor.
10 days As needed.
20 Contractor / subcontractor qualifications
☒ ☒ ☐ 10 days from
Award
10 days
21 As-built
Drawings ☒ ☒ ☐ 20 days prior to work completion
15 days
22 O&M Manuals ☒ ☒ ☐ 20 days prior to work completion
15 days
23 Prefinal
Inspection ☒ ☒ ☐ At the work completion
7 days Joint inspection
24 Final
Inspection ☒ ☐ ☐ After punch list is cleared out
Government
Inspection
1. Submit baseline schedule using P6 software. Update schedule on monthly basis with narratives comparing the update to the baseline with all areas of impacts and mitigations taken to back to the project to track. Submit .Xer file with the baseline schedule and with every update.
2. Design materials to be submitted as 3 hard copies with the 2 copies of the design CAD files on compacted disk or an encrypted thumb drive with the encryption information provided to the COR. Coordinate with the COR for the desire method in compliance with the BIA cyber security compliance rules.
3. If design is required, as part of the design, submit red marked edited specifications using the standard specifications site referenced in SIPI School Facilities Design Guidebook.
4. All for information only (FIO) submittals do not require the Government response unless the COR finds that the submittal is not in compliance with the contract. In this case, the
COR will return the submittal for the proper corrective action required by the Contractor.
5. The Contractor shall submit for review samples, product data, and other submittals with the COR regarding details, materials, and equipment that will be used as part of the project.
6. Approval of any submittal by the Government must not relief the contractor from the responsibility to comply with the contract and to comply to the respective submittal codes and standards. Approval of any submittal does not represent any approval for a deviation from the contract requirements. Deviations, changes shall be processed formally through the Contracting Officer as it is the authority of the Contracting Officer only.
7. Submit manufacturer’s standard warranty documents and contractor 1-year warranty documents 30 days prior to the final inspection for review. Submit O&M Manuals for every system supplied and provide digital copy, bookmarked with the as-built drawings.
8. The Contractor shall provide samples, color cards, etc. related to finishes for selection and approval by the COR.
9. The Contractor shall perform its own inspection prior to call the Government for a prefinal inspection. The Government shall perform a joint prefinal inspection with the contractor upon work completion, the Government will issue a punch list and then the contractor will submit a request for final inspection with the supporting documents that the punch list was cleared by the contractor.
10. Submit a request for inspection 5 days prior to the intended inspection.
11. The Contractor shall provide all close out documents, including, but not limited to, construction documents, reports, record (“as built”) drawings, training, O&M manuals, warranty documents, ...etc. as required by the contract.
12. Submit deliverables to:
Contracting Officer Representative (COR):
Garrick Harlan
Southwestern Indian Polytech Institute garrick.harlan@bie.edu
Contracting Officer (CO): TBD
F. PERIOD OF PERFORMANCE
The Contractor shall complete this work within 365 days from Notice to Proceed as issued by the
Contracting Officer.
G. BACKGROUND INVESTIGATIONS
The Contractor shall be required to submit to a background investigation. The background check process will include, but may not be limited to, filling out hard copy forms, online forms, fingerprinting, and submitting documentation in a timely manner. Contractor will not be paid for any time associated with this process outside this contract but should include estimated costs in their bid to meet this requirement. It can take 2-5 weeks for clearance, so it is imperative to start this process as soon as possible. Typically, the Project Manager and the alternate is to submit paperwork (daily, payroll, testing, and weekly reports). The “Notice to Proceed” will not be issued until the background checks have cleared.
End of SOW mailto:garrick.harlan@bie.edu
File details come from the government source that posted it. Updated .