Attachment 1 - SOW Hazardous Material Storage Portable Building.pdf

PDF 82 KB Posted

Attached to
Hazardous Material Portable Storage Building
Solicitation number
FA441925Q0052
Issued by

About this file

This Statement of Work (SOW) details the procurement of a Hazardous Material Portable Storage Building for the 85th Fighter Group at Ebbing Air National Guard Base (ANGB) in Fort Smith, Arkansas. The commercial off-the-shelf (COTS) building must meet specific engineering requirements, including HVAC to maintain temperatures between 60-80 degrees Fahrenheit, minimum 170 square feet of space, spill containment, electrical systems, interior and exterior lighting, ventilation, fire rating, and dry chemical fire suppression. The vendor is responsible for offloading, setup, and installation, and must provide warranty information and operational instructions.

The contract will be coordinated by the 97 Contracting Squadron (CONS) in conjunction with Headquarters Air Education and Training Command (AETC)/A4, with payment made in US dollars through various methods including ACH, wire transfer, or check. The Period of Performance is six months after complete installation, covering order receipt, manufacture, shipping, receiving, and quality assurance checks. Technical support is limited, with the vendor providing customer support for replacement components and troubleshooting. Any modifications to the SOW require written approval from the contracting agency at Altus Air Force Base in Oklahoma.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hazardous Material Portable Storage Building Statement of Work

(SOW)

Procurement 10 June 2025

1. General

The Hazardous Material Portable Storage Building is required to support F-35 maintenance operaƟons for the 85th Fighter Group assigned to Ebbing Air NaƟonal Guard Base (ANGB). The procurement of this equipment is required due to current capacity constraints and necessary temperature controls for hazardous material storage to meet mission requirements.

2. Scope of Work, Overview

This Statement of Work (SOW) covers procurement of one Hazardous Material Portable Storage Building staƟoned at Ebbing Air NaƟonal Guard Base, Fort Smith Arkansas.

3. Engineering, Scope of work.

Required HVAC to maintain temperature between 60 - 80 degrees Fahrenheit, minimum of 170 square feet, spill containment, Electric, interior and exterior lighƟng, venƟlaƟon system, fire rated, and dry chemical fire suppression.

Require vendor offload, set up and installaƟon of building.

4. Contract management

According to the 97 ContracƟng Squadron (CONS), the contract will be coordinated with applicable vendors, in conjuncƟon with Headquarters (HQ) Air EducaƟon and Training Command (AETC)/A4, to procure the Hazardous Material Portable Storage Building for the delivery of the equipment and installaƟon at Ebbing ANGB, within prescribed need by date.

Payment to the vendor will be made via United States (US) dollars and may be procured with Automated Clearing House (ACH), wire, credit or debit card, or check to the vendor.

5. Scope of Work. Hardware

The vendor is responsible for providing all hardware and installaƟon of hardware for the piece of equipment to include warranty informaƟon, and operaƟonal instrucƟons.

6. OperaƟonal and Packing InformaƟon

The Hazardous Material Portable Storage Building is procured as Commercial Off-The-Shelf (COTS) products. It will be delivered with manufacturer-provided instrucƟon manuals to ensure proper operaƟon. Users will adhere to Air Force regulaƟons and aircraŌ specific Joint-Service Technical Data (JTD), or Technical Orders established for hazardous material storage.

7. Engineering Technical Support

Technical support for equipment malfuncƟons is not included, as the unit is a COTS product.

However, customer support for acquiring replacement components and troubleshooƟng will be provided by vendor.

8. Variances to the SOW

There will not be any alteraƟons or modificaƟons to this plan without wriƩen approval from the contracƟng agency (97 CONS) at Altus AFB, Oklahoma.

9. DuraƟon

The Period of Performance for the Hazardous Material Portable Storage Building will be for six months aŌer complete installaƟon to cover the receipt of order, manufacture, shipping, receiving, quality assurance checks upon receipt and installaƟon of the equipment.

10. DefiniƟons

Automated Clearing House (ACH) Air Force Base (AFB) Air NaƟonal Guard Base (ANGB) ContracƟng Squadron (CONS) Commercial Off-The-Shelf (COTS) Headquarters (HQ) Air EducaƟon and Training Command (AETC) Joint-Service Technical Data (JTD) Statement of Work (SOW)