This document is a Statement of Work (SOW) for a federal contract opportunity to remove and replace six rollup doors at the Bureau of Reclamation's Yuma Area Office in Yuma, Arizona.
The SOW requires the contractor to provide all labor and materials to procure and install six 480V 3-phase rollup doors, including door railings, openers/closers, safety sensors, and related parts at the specified locations. The contractor is also responsible for removing and disposing of the existing doors. The work must be completed within 90 days of the notice to proceed and is subject to government inspections and quality control testing. The contractor must follow site safety and security requirements, including restricted site access and escorted vehicle entry. A one-year warranty is required on all installed products and workmanship. The work is to be performed during regular business hours, Monday through Friday, except for federal holidays.
The related federal contract opportunity has a solicitation number of 140R3024Q0060 and is for the "Replace Rollup Doors at Yuma Area Office" requirement issued by the Department of the Interior Bureau of Reclamation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R3024Q0060_Amd_0004.pdf | ||
| Attachment_3_-_Wage_Determination_-_AZ20240042_0003.pdf | ||
| Sol_140R3024Q0060_Amd_0003.pdf | ||
| Attachment_1_-_Revised_Statement_of_Work_0002.pdf | ||
| SF24-23a_0002.pdf | ||
| Sol_140R3024Q0060_Amd_0002.pdf | ||
| Attachment_1_-_Revised_Statement_of_Work_0001.pdf | ||
| Attachment_5_-_140R3024Q0060_-_FOREWORD_(pg_3)_0001.pdf | ||
| Attachment_4_-_Questions_and_Answers_0001.pdf | ||
| Sol_140R3024Q0060_Amd_0001.pdf | ||
| Attachment_6_-_Site_Visit_Sign-In_Sheet_0001.pdf | ||
| 140R3024Q0060.pdf | ||
| Sol_140R3024Q0060.pdf | ||
| Attachment_3_-_Wage_Determination.pdf | ||
| Attachment_2_-_Pictures.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 Scope of Work
This page intentionally left blank
Statement of Work Replace Rollup Doors at Yuma Area Office
PART 1 GENERAL
1.01 Description & Background
The Bureau of Reclamation (BOR), Yuma Area Office (YAO), has a requirement to replace 6 480V 3 phase rollup doors. Occasional repairs have been needed as these rollup doors were included in the original build of the facilities, since 1985. All six (6) rollup doors to be replaced are located at 7301 Calle Agua Salada, Yuma, AZ 85364.
PART 2 SCOPE
Contractor shall provide all labor and materials required to procure and install six (6) rollup doors, door railings, opener/closers, safety door sensors and related parts at the specified locations. The contractor is also responsible for removal and disposal of existing doors to be replaced. All door frames are bolted onto/into the door openings and does not modify the building itself.
2.01 Rollup Door Specifications and Location:
a. Dry Chemical Building – 1-480 V 3-Phase motor 1-Door Opening -10’ x 10” 1-Rollup door size – 12’6.5” x 10’4” (stainless steel or aluminum) 1-Wall mounted electric industrial opener/closer 1-Wall mounted chain opener/closer 1-Door railing and related parts 1-Door sensors for safety
b. Wet Chemical Building- 1-480 V 3-Phase motor 1-Door opening 10’ x 10’ 1-Rollup door size 12’6.5” x 10’4” (stainless steel or aluminum) 1-Wall mounted electric industrial opener/closer 1-Wall mounted chain opener/closer
c. WQIC Building West – (this location has 2 doors exact size) 2-480 V 3-Phase motor 2-Roll Up Door Opening 10’ x 10’ 2-Rollup doors size 12’6.5” x 10’4” (stainless steel or aluminum) 2-Wall mounted electric opener/closer 2-Wall mounted chain opener/closer 2-Door railing and related parts 2-Door sensors for safety
d. WQIC Building South –
1-Door Opening 18’ x 15’ 1-rollup door size 18’1” (minimum) height x 15’7” width (stainless steel or aluminum) Door height cannot be confirmed due to its door sliding into overhead box when open. Contractor shall verify measurements during performance.
1-Wall mounted electric industrial opener/closer 1-Wall mounted chain opener/closer
e. YAO Warehouse Building –
1-Door Opening 16’ x 16’ 1-Rollup door size 16’1” height x 16’2” with – top windows included
(stainless steel or aluminum) 1-Wall mounted electric industrial opener/closer 1-Wall mounted chain opener/closer 1-Door railing and related parts 1-Door sensors for safety
PART 3 CONTRACTOR SERVICES
3.01 Delivery & Installation
Contractor shall arrange for delivery. The roll up doors and all associated parts and hardware shall be crated, boxed, or otherwise packaged to the extent necessary to prevent damage during shipment or delivery to Yuma Area Office. Any damage incurred due to inadequate protection during shipment shall be repaired by the contractor at their own expense. Delivery and installation shall be completed within 90 days of notice to proceed (NTP).
Contractor shall provide all parts and associated hardware and install doors to the manufacturer’s specification. Contractor shall transport off site, all trash and removed items no longer used. The COR will coordinate all power outages needed during performance, to allow for the wiring and electrical connections completed by the contractor.
3.02 Field Quality Control
The Government will conduct site inspections and witness functionality specified in this section.
The Contractor shall perform tests and provide labor, equipment, and incidentals required for testing. Be able to produce evidence, when required, that each item of work has been constructed properly in accordance with the statement of work.
3.03 Site Safety & Security
The site is within the Yuma Area Office and is secured. Reclamation will arrange site access into the required buildings as determined by the Safety Office. Upon completion of work for the day, all contractor staff shall be escorted off the installation.
Construction Work Areas are defined as areas where work is required under this contract. This includes designated access routes and any areas used by the Contractor for temporary service areas, storage areas, or parking areas.
The Contractor shall restrict entrance of personnel and vehicles, including vehicles of subcontractors and suppliers, into project site and existing facilities. Entry shall be limited to the Construction Work Area and all contractor and subcontractor employees must have proper identification. Suppliers and delivery vehicles must be escorted onsite by the Contractor’s superintendent and Reclamation staff.
Contractor is responsible for following their established Safety Plan and Job Hazard Analysis for each task that is performed. Contractor is responsible for all incidents or accidents involving contracted employees.
All work is to be performed in areas that do require access cards or keys to access the area. Access cards and keys will not be issued for this contract.
3.04 Warranty
Contractor shall provide a one (1) year warranty on all installed products, parts and components to include workmanship of the contractor.
PART 4: PLACE AND HOURS OF OPERATION
Place of Performance:
U.S. Bureau of Reclamation Yuma Area Office 7301 Calle Agua Salada Yuma, AZ 85364
Hours of Operation: The work shall normally be performed during regular working hours.
Regular working hours for this requirement shall be defined as 7:00 am to 4:00 pm Monday through Thursday and Friday from 7:00 am to 2:00 pm; except Federal Holidays, and any other days specifically designated by the Government Representative. If a federal holiday falls on a Saturday, it will be observed on the preceding Friday. If the holiday falls on a Sunday, it will be observed on the following Monday. The Contractor shall not be required to perform services on these days unless an urgent or emergency service call is received from the Government Representative. Also, in the event an Executive Order issued by the President of the United States declares Agencies of the Federal Government closed on a Contractor’s scheduled service date, the Government Representative shall advise the contractor on whether services should be performed for that day or services should be rescheduled.
The following is a list of the official 2024 Federal Government Holidays:
Date Holiday Monday, January 01 New Year’s Day Monday, January 15 Birthday of Martin Luther King, Jr.
Monday, February 19 Washington’s Birthday Monday, May 27 Memorial Day Wednesday, June 19 Juneteenth National Independence Day Thursday, July 04 Independence Day Monday, September 02 Labor Day Monday, October 14 Columbus Day Monday, November 11 Veterans Day Thursday, November 28 Thanksgiving Day Wednesday, December 25 Christmas Day
| PART 1 GENERAL |
| PART 2 SCOPE |
| Contractor shall provide all labor and materials required to procure and install six (6) rollup doors, door railings, opener/closers, safety door sensors and related parts at the specified locations. The contractor is also responsible for removal and ... |
| PART 3 CONTRACTOR SERVICES |
| 3.02 Field Quality Control |
| 3.03 Site Safety & Security |