Attachment 1 - SOW_Briar Patch.pdf

PDF 7 MB Posted

Attached to
Apalachicola National Forest- Briar Patch Road Maintenance
Solicitation number
12441922R0003
Issued by

About this file

This is a request for proposals from the USDA Forest Service Apalachicola National Forest seeking road maintenance services. The scope of work includes soil erosion control, removing and disposing of old culverts, constructing a 100-foot low water crossing, placing roadway aggregate, reconditioning roads and ditches, installing culverts, and providing temporary traffic control along 31 miles of forest roads in Liberty County, Florida. The contract will be awarded on a lowest-price technically acceptable basis as a 100% small business set-aside. Interested parties must attend a mandatory site visit on June 21, 2022 to be eligible to respond. The contract is subject to the Service Contract Act.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIAR PATCH ROAD MAINTENANCE

STATEMENT OF WORK

The Apalachicola National Forest needs Road Maintenance Services for multiple locations. The scope of work includes common road maintenance activities including the following: mobilization, soil erosion and pollution control, seed and fertilize, remove CMP and dispose of old culverts, install a 100’ Low Water Crossing, roadway aggregate compaction method 2, roadway reconditioning, installing a 28” x 20” culvert, installing three (3) 42” x 29” culverts, and temporary traffic control.

The intent of this service contract is to provide for road maintenance of forest roads. The Contractor shall furnish all labor, supplies, tools, transportation and supervision necessary to recondition approximately 31 miles of National Forest Roads (NFR) as identified on the Briar Patch Road Maintenance Overview of Project Map (see Map on page 2). The Contractor shall assume all risk, loss, damage or expense arising out of the prosecution of the work.

The following roads are priority roads and will be completed FIRST:

Woods Road (WR) #2, WR #3, WR #4, NFR 115, NFR 115-H, NFR 115-K, NFR 115-W, NFR 171, NFR 171-A, NFR 171-B, NFR 171-C, NFR 171-D, NFR 171-F, and NFR 171-H will be priority roads for this contract.

They must be completed first.

The following roads will be completed after the priority roads are completed:

WR #1, NFR 115-A, NFR 115-B, NFR 115-B1, NFR 115-B14, NFR 115-C, NFR 115-C11, NFR 115-C12, NFR 115-C2, NFR 115-C3, NFR 115-G, NFR 115-L, NFR 115-M, NFR 115-N, NFR 115-T, NFR 115-U, NFR 115-V, NFR 115-Y, and NFR 179-J will be completed after the priority roads are completed.

Woods Road #1 - SINGLE LANE ROAD

Scope/Description of Reconditioning: Grade .11 miles of road from the intersection of NFR 115-T and Woods Road #1. Add 20 tons of limerock roadbase at 4” depth, as stationed by COR.

Pay Item Woods Road #1 - Complete .11 miles of road reconditioning using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.3 CQ AC

30208 Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

20 AQ TON

30315 Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

.11 AQ MI

63501 Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic through the project).

1 CQ LS

Woods Road #2 - SINGLE LANE ROAD*

Scope/Description of Reconditioning: Grade .29 miles of road from the intersection of NFR 171 and Woods Road #2. Add 80 tons of limerock roadbase at 4” depth as stationed by COR.

*PRIORITY ROADS THAT MUST BE COMPLETED FIRST.

Pay Item Woods Road #2 - Complete .29 miles of road reconditioning using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.7 CQ AC

30208 Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

80 AQ TON

30315 Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

.29 AQ MI

63501 Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

Woods Road #3 - SINGLE LANE ROAD*

Scope/Description of Reconditioning: Grade .10 miles of road from the intersection of NFR 171-F and Woods Road #3. Add 20 tons of limerock roadbase at 4” depth as stationed by COR.

Pay Item Woods Road #3 - Complete .10 miles of road reconditioning using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.2 CQ AC

30208 Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

20 AQ TON

30315 Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

.10 AQ MI

63501 Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

Woods Road #4 - SINGLE LANE ROAD*

Scope/Description of Reconditioning: Grade .18 miles of road from the intersection of NFR 171-F and Woods Road #4. Add 40 tons of limerock roadbase at 4” depth as stationed by COR.

Pay Item Woods Road #4 - Complete .18 miles of road reconditioning using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.4 CQ AC

30208 Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

40 AQ TON

30315 Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

.18 AQ MI

63501 Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115 – SINGLE LANE ROAD*

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115 and FL-

379. Recondition 10.18 mi. of road, then spot surface with 3500 tons of limerock roadbase at 4” depth – as stationed by COR; Install (2) 28x20 CMP and (1) 42x29 CMP as stationed; Install (8) 100’ Flat Bottom LWC as stationed.

*PRIORITY ROAD THAT MUST BE COMPLETED FIRST.

Pay Item NFR 115 - Completion of 10.18 miles of road reconditioning on NFR 115 using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 24.7 CQ AC

20301 Remove CMP/dispose old culverts, disposal method a (Remove from project).

3 AQ EA

30116

100' Low Water Crossing (Flat bottom crossing); installed -includes 100 TONS Screened Aggregate Limerock Grade FDOT Size No. 4 - (2-inch minus) Compaction Method A, (Operating spreading and hauling equipment over the full width of the travelway.) Geotextile Fabric, equipment hours, and Erosion Control (see notes on Sheet 10 OF 16 of the drawings/plans)

8 CQ LS

30208 Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

3,500 AQ TON

30315 Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

10.18 AQ MI

60203

INSTALL CULVERT - 28"x20”, 14 GA, CMP according to the design and plans (see notes on Sheet 11 OF 27 of the drawings/plans) (installation includes 40 TONS RipRap per culvert, [8 inch minus limerock] Geotextile Fabric, and erosion control)

64 AQ LF

60203

INSTALL CULVERT - 42"x29”, 14 GA, CMP according to the design and plans (see notes on Sheet 11 OF 27 of the drawings/plans) (installation includes 40 TONS RipRap per culvert, [8 inch minus limerock] Geotextile Fabric, and erosion control)

32 AQ LF

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-A – SINGLE LANE ROAD

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115 and NFR 115-A. Recondition .53 mi. of roadbed, then add 340 tons of limerock roadbase at 4” depth.

Pay Item NFR 115-A - Completion of .53 miles of road reconditioning on NFR 115-A using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 1.3 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

340 AQ TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

.53 AQ MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-B (NORTH) – SINGLE LANE ROAD

115-B (NORTH). Recondition 1.87 mi. of roadbed, then add 800 tons of limerock roadbase at 4” depth.

Install 100’ Flat Bottom LWC as stationed by COR.

Pay Item NFR 115-B (NORTH) - Completion of 1.87 miles of road reconditioning on NFR 115-B (NORTH) using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 4.6 CQ AC

30116

100' Low Water Crossing (Flat bottom crossing); installed -includes 100 TONS Screened Aggregate Limerock Grade FDOT Size No. 4 - (2 inch minus) Compaction Method A, (Operating spreading and hauling equipment over the full width of the travelway.) Geotextile Fabric, equipment hours, and Erosion Control (see notes on Sheet 10 OF 16 of the drawings/plans)

2 CQ LS

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315 Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction

1.87

AQ

MI

Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-B (SOUTH) – SINGLE LANE ROAD

115-B (SOUTH). Recondition 0.45 mi. of roadbed, then add 600 tons of limerock roadbase at 4” depth as stationed by COR. Remove and dispose of 18” culvert and replace with 100’ LWC.

Pay Item NFR 115-B (SOUTH) - Completion of 0.45 miles of road reconditioning on NFR 115-B (SOUTH) using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 1.1 CQ AC

20301 Remove CMP/dispose old culverts, disposal method a (Remove from project).

AQ EA

30116

100' Low Water Crossing (Flat bottom crossing); installed -includes 100 TONS Screened Aggregate Limerock Grade FDOT Size No. 4 - (2 inch minus) Compaction Method A, (Operating spreading and hauling equipment over the full width of the travelway.) Geotextile Fabric, equipment hours, and Erosion Control (see notes on Sheet 10 OF 16 of the drawings/plans)

1 CQ LS

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

0.45

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-B1 – SINGLE LANE ROAD

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115-B and NFR 115-B1. Recondition 0.13 mi. of roadbed, then add 80 tons of limerock roadbase at 4” depth as stationed by COR.

Pay Item

NFR 115-B1 - Completion of 0.13 miles of road reconditioning on NFR 115-B1 using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.3 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

0.13

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-B14 (NORTH) – SINGLE LANE ROAD

115-B14 (NORTH). Recondition 0.21 mi. of roadbed, then add 120 tons of limerock roadbase at 4” depth as stationed by COR.

Pay Item NFR 115-B14 (NORTH) - Completion of 0.21 miles of road reconditioning on NFR 115-B14 (NORTH) using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.5 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

0.21

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-B14 (SOUTH) – SINGLE LANE ROAD

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115-B (NORTH) and NFR 115-B14 (SOUTH). Recondition 0.21 mi. of roadbed, then add 180 tons of limerock roadbase at 4” depth as stationed by COR.

Pay Item NFR 115-B14 (SOUTH) - Completion of 0.21 miles of road reconditioning on NFR 115-B14 (SOUTH) using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.5 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

0.21

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-C (NORTH) – SINGLE LANE ROAD

115-C (NORTH). Recondition 0.19 mi. of roadbed, then add 140 tons of limerock roadbase at 4” depth as stationed by COR.

Pay Item NFR 115-C (NORTH) - Completion of 0.19 miles of road reconditioning on NFR 115-C (NORTH) using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.5 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

0.19

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-C (SOUTH) – SINGLE LANE ROAD

115-C (SOUTH). Recondition 0.45 mi. of roadbed, then add 340 tons of limerock roadbase at 4” depth as

NFR 115-C (SOUTH) - Completion of 0.45 miles of road reconditioning on NFR 115-C (SOUTH) using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 1.1 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

0.45

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-C2 – SINGLE LANE ROAD

115-C2. Recondition 0.41 mi. of roadbed, then add 40 tons of limerock roadbase at 4” depth as

Pay Item NFR 115-C2 - Completion of 0.41 miles of road reconditioning on NFR 115-C2 using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 1.0 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

0.41

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-C3 – SINGLE LANE ROAD

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115-C2 and NFR 115-C3. Recondition 0.04 mi. of roadbed, then add 20 tons of limerock roadbase at 4” depth as

Pay Item NFR 115-C3 - Completion of 0.04 miles of road reconditioning on NFR 115-C3 using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.1 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

0.04

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-C11 – SINGLE LANE ROAD

115-C11. Recondition 0.13 mi. of roadbed, then add 60 tons of limerock roadbase at 4” depth as

Pay Item NFR 115-C11 - Completion of 0.13 miles of road reconditioning on NFR 115-C11 using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.3 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

0.13

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-C12 – SINGLE LANE ROAD

115-C12. Recondition 0.24 mi. of roadbed, then add 40 tons of limerock roadbase at 4” depth as

Pay Item NFR 115-C12 - Completion of 0.24 miles of road reconditioning on NFR 115-C12 using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.6 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

0.24

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-G – SINGLE LANE ROAD

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115-G and NFR

115. Recondition 0.27 mi. of roadbed, then add 140 tons of limerock roadbase at 4” depth; Remove and dispose of 18” culvert and replace with 100’ flat-bottom LWC - as stationed by COR.

Pay Item NFR 115-G - Completion of 0.27 miles of road reconditioning on NFR 115-G using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.7 CQ AC

20301 Remove CMP /dispose old culverts, disposal method a (Remove from project).

1 AQ EA

100' Low Water Crossing (Flat bottom crossing); installed -includes 100 TONS Screened Aggregate Limerock Grade FDOT Size No. 4 - (2 inch minus) Compaction Method A, (Operating spreading and hauling equipment over the full width of the travelway.) Geotextile Fabric, equipment hours, and Erosion Control (see notes on Sheet 10 OF 16 of the drawings/plans)

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

0.27

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-H – SINGLE LANE ROAD*

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115-H and NFR

115. Recondition 0.27 mi. of roadbed, then add 20 tons of limerock roadbase at 4” depth as stationed by COR.

NFR 115-H - Completion of 0.27 miles of road reconditioning on NFR 115-H using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.7 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

0.27

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-K – SINGLE LANE ROAD*

115-K. Recondition 2.29 mi. of roadbed, then add 500 tons of limerock roadbase at 4” depth. Install 800’ of Flat Bottom LWC’s - as stationed by COR.

NFR 115-K - Completion of 2.29 miles of road reconditioning on NFR 115-K using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 5.6 CQ AC

30116

100' Low Water Crossing (Flat bottom crossing); installed -includes 100 TONS Screened Aggregate Limerock Grade FDOT Size No. 4 - (2 inch minus) Compaction Method A, (Operating spreading and hauling equipment over the full width of the travelway.) Geotextile Fabric, equipment hours, and Erosion Control (see notes on Sheet 10 OF 16 of the drawings/plans)

8 CQ LS

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

2.29

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-L – SINGLE LANE ROAD

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115-L and NFR

115. Recondition 0.13 mi. of roadbed, then add 200 tons of limerock roadbase at 4” depth.

Pay Item NFR 115-L - Completion of 0.13 miles of road reconditioning on NFR 115-L using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 0.3 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

.13

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-M – SINGLE LANE ROAD

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115-M and NFR-115. Recondition 1.92 mi. of roadbed, then add 3,080 tons of limerock roadbase at 4” depth. Install

(2) 50’ Flat Bottom LWC’s as stationed by COR.

Pay Item NFR 115-M - Completion of 1.92 miles of road reconditioning on NFR 115-M using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 4.7 CQ AC

30116

100' Low Water Crossing (Flat bottom crossing); installed -includes 100 TONS Screened Aggregate Limerock Grade FDOT Size No. 4 - (2 inch minus) Compaction Method A, (Operating spreading and hauling equipment over the full width of the travelway.) Geotextile Fabric, equipment hours, and Erosion Control (see notes on Sheet 10 OF 16 of the drawings/plans)

1 CQ LS

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

3,080

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

1.92

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-N – SINGLE LANE ROAD

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115-N and NFR

115. Recondition 2.51 mi. of roadbed, then add 3,900 tons of limerock roadbase at 4” depth. Install a 100’ Flat Bottom LWC and a 400’ Flat Bottom LWC, as stationed by COR.

Pay Item NFR 115-N - Completion of 2.51 miles of road reconditioning on NFR 115-N using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 6.1 CQ AC

30116

100' Low Water Crossing (Flat bottom crossing); installed -includes 100 TONS Screened Aggregate Limerock Grade FDOT Size No. 4 - (2 inch minus) Compaction Method A, (Operating spreading and hauling equipment over the full width of the travelway.) Geotextile Fabric, equipment hours, and Erosion

5 CQ LS

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

3,900

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

2.51

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-T – SINGLE LANE ROAD

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115-T and NFR 115-N. Recondition 0.41 mi. of roadbed, then add 60 tons of limerock roadbase at 4” depth.

Pay Item NFR 115-T - Completion of 0.41 miles of road reconditioning on NFR 115-T using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 1.0 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

.41

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-U – SINGLE LANE ROAD

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115-U and NFR 115-N. Recondition .65 mi. of roadbed, then add 440 tons of limerock roadbase at 4” depth. Remove and dispose of (1) 18” culvert and Install (1) 100’ Flat Bottom LWC - as stationed by COR.

Pay Item NFR 115-U - Completion of .65 miles of road reconditioning on NFR 115-U using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 5.8 CQ AC

20301 Remove CMP /dispose old culverts, disposal method a (Remove from project).

1 AQ EA

30116

100' Low Water Crossing (Flat bottom crossing); installed -includes 100 TONS Screened Aggregate Limerock Grade FDOT Size No. 4 - (2 inch minus) Compaction Method A, (Operating spreading and hauling equipment over the full width of the travelway.) Geotextile Fabric, equipment hours, and Erosion Control (see notes on Sheet 10 OF 16 of the drawings/plans)

1 CQ LS

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact

.65 maximum density).

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-V – SINGLE LANE ROAD

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115-V and NFR 115-U. Recondition 0.04 mi. of roadbed, then add 60 tons of limerock roadbase at 4” depth.

NFR 115-V - Completion of 0.04 miles of road reconditioning on NFR 115-V using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) .1 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

.04

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-W – SINGLE LANE ROAD*

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 115-W and NFR 171. Recondition .65 mi. of roadbed, then add 860 tons of limerock roadbase at 4” depth.

Pay Item NFR 115-W - Completion of .65 miles of road reconditioning on NFR 115-W using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 1.6 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

.65

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 115-Y – SINGLE LANE ROAD

115-Y. Recondition 0.49 mi. of roadbed, then add 640 tons of limerock roadbase at 4” depth.

Pay Item NFR 115-Y - Completion of 0.49 miles of road reconditioning on NFR 115-Y using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 1.2 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

.49

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 171 – SINGLE LANE ROAD*

Scope/Description of Reconditioning: Recondition the road from the intersection of FL-379 and NFR

171. Recondition 2.84 mi. of roadbed, then add 4,000 tons of limerock roadbase at 4” depth. Install a 200’ Flat Bottom LWC as stationed by COR.

Pay Item NFR 171 - Completion of 2.84 miles of road reconditioning on NFR 173 using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 6.9 CQ AC

30116 100' Low Water Crossing (Flat bottom crossing); installed -includes 100 TONS Screened Aggregate Limerock Grade FDOT Size No. 4 - (2 inch minus) Compaction Method A, (Operating

2 CQ LS

spreading and hauling equipment over the full width of the travelway.) Geotextile Fabric, equipment hours, and Erosion Control (see notes on Sheet 10 OF 16 of the drawings/plans)

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

4,000

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

2.84

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 171-A – SINGLE LANE ROAD*

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 171 and NFR 171-A. Recondition 0.21 mi. of roadbed, then add 180 tons of limerock roadbase at 4” depth. Remove and dispose of 18” culvert and replace with a 100’ Flat Bottom LWC as stationed by COR.

Pay Item NFR 171-A - Completion of 0.21 miles of road reconditioning on NFR 171-A using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) .5 CQ AC

30116

100' Low Water Crossing (Flat bottom crossing); installed -includes 100 TONS Screened Aggregate Limerock Grade FDOT Size No. 4 - (2 inch minus) Compaction Method A, (Operating spreading and hauling equipment over the full width of the travelway.) Geotextile Fabric, equipment hours, and Erosion Control (see notes on Sheet 10 OF 16 of the drawings/plans)

1 CQ LS

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact

.21

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 171-B – SINGLE LANE ROAD*

Scope/Description of Reconditioning: Recondition the road from the intersection of NFR 171-B and NFR 171-A. Recondition 0.80 mi. of roadbed, then add 960 tons of limerock roadbase at 4” depth. Remove and dispose of 18” culvert and install a 100’ Flat Bottom LWC as stationed by COR.

Pay Item NFR 171-B - Completion of 0.80 miles of road reconditioning on NFR 171-B using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 1.9 CQ AC

20301 Remove CMP /dispose old culverts, disposal method a (Remove from project).

1 AQ EA

100' Low Water Crossing (Flat bottom crossing); installed -includes 100 TONS Screened Aggregate Limerock Grade FDOT Size No. 4 - (2 inch minus) Compaction Method A, (Operating spreading and hauling equipment over the full width of the travelway.) Geotextile Fabric, equipment hours, and Erosion

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ

TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

.80

AQ

MI

63501

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 171-C – SINGLE LANE ROAD*

Scope/Description of Reconditioning: Recondition the road from the intersection of FL-379/171-H TO NFR 171-H/NFR 171-G intersection (.58 miles). Recondition .58 mi. of roadbed, then spot surface with 780 tons of limerock roadbase at 4” depth, as stationed by COR.

Pay Item NFR 171-C - Complete .58 miles of road reconditioning on NFR 171-C using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans) 1.4 CQ AC

30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

AQ TON

30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the

.58

AQ MI

Temporary traffic control (This work consists of furnishing, installing, maintaining, relocating, and removing temporary traffic control devices for the control and protection of public traffic

NFR 171-D – SINGLE LANE ROAD*

Scope/Description of Reconditioning: Recondition the road from the intersection of 171-D/171-C TO End of project (.31 miles). Recondition .31 mi. of roadbed, then spot surface with 400 tons of limerock roadbase at 4” depth, as stationed by COR.

Pay Item NFR 171-D - Complete .31 miles of road reconditioning on NFR 171-D using the following specifications:

Quantity MM UNIT

15713 Soil erosion and pollution control seed and…

This is the start of the file's text. The full file is on GovTribe.