This document contains a request for proposals for road maintenance services on the Apalachicola National Forest in Florida. The USDA Forest Service is seeking a contractor to provide all materials, equipment, labor and transportation necessary to complete soil erosion control, culvert removal and installation, construction of a 100-foot low water crossing, roadway aggregate, roadway and ditch reconditioning, and temporary traffic control on Briar Patch Road. The work will be performed in Liberty County, Florida. A mandatory site visit will be held on June 21, 2022. The contract will be a firm fixed-price awarded under the low price technically acceptable method. As a 100% small business set aside, the NAICS code is 237310 and small business size standard is $39.5 million. There is no incumbent contractor. Proposals are due by the date specified in the solicitation.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT

PRICE

OM 15101 Mobilization 1 CQ LS $ $

OM 15713

Soil erosion and pollution control seed and fertilize 10’ each side of road (see notes on Sheet 13 OF 16 of the drawings/plans)

76.23 CQ AC $ $

OM 20301

Remove CMP /dispose old culverts, disposal method a (Remove from project).

7 AQ EA $ $

OM 30116

100' Low Water Crossing (Flat bottom crossing);

installed - includes 100 TONS Screened Aggregate Limerock Grade FDOT Size No. 4 - (2 inch minus) Compaction Method A, (Operating spreading and hauling equipment over the full width of the travelway.) Geotextile Fabric, equipment hours, and Erosion Control (see notes on Sheet 10 OF 16 of the drawings/plans)

30 CQ LS $ $

OM 30208

Roadway aggregate (LIMEROCK roadbase), compaction method 2 (Compact each layer full width.

Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and places not accessible to the roller, compact the material with approved tampers or compactors.)

23,460 AQ TON $ $

BRIAR PATCH ROAD MAINTENANCE 12441922R0003

Amend A000001

APALACHICOLA NATIONAL FOREST

REVISED 6/28/2022 SECTION B - SCHEDULE OF ITEMS

TOTALITEM DESCRIPTION QUANTITY MM UNIT

OM 30315

Roadway Reconditioning (This work consists of reconditioning ditches [includes cleaning culvert inlets and outlets], shoulders, roadbeds, aggregate surfaces, or the entire road), Compaction Method C (Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density).

31.28 AQ MI $ $

OM 60203

INSTALL CULVERT - (2) 32' x 28"x20”, 14 GA, CMP according to the design and plans (see notes on Sheet 11 OF 27 of the drawings/plans) (installation includes 40 TONS RipRap per culvert, [8 inch minus limerock] Geotextile Fabric, and erosion control)

64 AQ LF $ $

OM 60203

INSTALL CULVERTS – (1) 32' x 42"x29”, 14 GA, CMP, according to the design and plans (see notes on Sheet 11 OF 27 of the drawings/plans) (installation includes 40 TONS RipRap per culvert that is size 8 inch minus limerock, Geotextile Fabric, and erosion control)

32 AQ LF $ $

OM 63501 Temporary traffic control 1 CQ LS $ $

PROJECT TOTAL $

Schedule Notes:

Additional Vendor Information Contact Name:

Email:

One award will be made from this solicitation, contractors must submit pricing for all items. Multiply the Unit Price against the Qty to get the Total Price.

Phone No:

SAM UEI:

OM 30103 Aggregate base (Gov't supplied SAND/CLAY), grading B, compaction method B 1200 AQ CY $ $