This statement of work outlines requirements for a contract to install new signage at the West Texas VA Health Care System facility in Big Spring, Texas. The project includes removing old signs and installing new exterior monument signs, building signs, and interior signs throughout the facility. The performance period is 365 days after notice to proceed. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 17 for opportunity 519-17-300. Contractors must follow all safety, security and facility access procedures and use qualified personnel with the required training and credentials. Work may only be performed during normal business hours excluding federal holidays, and the contractor is responsible for protecting facilities and replacing any damaged items. The contractor must submit a work and safety plan within 10 days of award for approval.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Install New Signage
519-17-300
BACKGROUND: The West Texas VA Health Care System (WTVAHCS) currently has a requirement for a project to Install New Signage. The location of this project is the facility and buildings at the West Texas VA Health Care System (WTVAHCS) located at 300 W. Veterans
Blvd. Big Spring, TX 79720.
PERFORMANCE PERIOD: 365 Days after notice to proceed is issued.
STATEMENT OF WORK: The project will include all labor, materials, equipment, supervision to perform the required work to install new signage per the drawings and specifications.
Contractor Shall use the Drawings & Specifications, 519-17-300 “Install New Signage”. The scope of this project will require coordination between the contactor, COR and VA staff.
Ultimately the means and methods to perform this work and determine a sequence of work will be determined by the contractor.
WORK SHALL INCLUDE: The contractor shall provide the specific services and deliverables described below: The work effort, however, does suggest a general, phased sequence of construction.
1. Identify sequence of work.
2. Remove old signs and install new signs.
3. Work consists of outside monument signs, building signs, and interior signs throughout the facility.
4. Clean up and approval of work.
DELIVERY: If for any reason any deliverable cannot be delivered within the scheduled time frame, the contractor is required to notify the CO in writing including a firm commitment of when the work shall be completed. The notice shall cite the reason for delay and the impact on the installation.
SECURITY: This service does not involve contractor connection of one or more contractor-owned IT devices (such as laptop computer or remote connection from a contractor system) to a
VA internal trusted (i.e., non-public network) therefore Information Technology (IT) Security certification and accreditation (authorization) (C&A) requirements do not apply per VA
Handbook 6500.6 The C&A requirements do not apply and that a Security Accreditation is not required.
REQUIREMENTS AND CONSIDERATIONS:
1. The Contractor shall provide all work required in the plans and specification for “Install
New Signage” at Big Spring, Texas.
2. The Contractor shall survey all work areas and report any suspicious material before starting work.
3. All contractor personnel must report to the Police Service at the Facility prior and after any work performed and sign out after completion of services. The contractor must furnish to the
COR a detailed field report, or equivalent, showing work completed before leaving the
Facility.
4. The Contractor shall not perform any service that will result in additional charges without prior approval from the Contracting Officer.
5. The Contractor shall comply with the standards in the Occupational Safety and Health
Act (OSHA). Superintendent Shall have OSHA 30-hour training & all workers OSHA 10 hours training.
6. The Contractor is responsible for his employees while on Facility grounds including any accidents while performing the service.
DELIVERY LOCATION: All work related to this contract shall be accomplished at the
WTVAHCS, 300 Veterans Blvd. Big Spring, Texas.
COMPETENCY OF PERSONNEL: Personnel shall be authorized by the contractor to perform the services. All work shall be performed by fully qualified and competent personnel. The government reserves the right to request training certificates and credentials from the contractor at any time during this contract through written request by the Contracting Officer (CO).
BADGES: All Contractor personnel are required to wear I.D. badges during the entire time he/she is on Government property. I.D. badges must have an identification picture and shall state the name of the individual and the company he/she represents. The Contractor is to coordinate with the COR to obtain the I.D. badge from the Police Service. The Contractor is to provide a list of personnel who shall be performing the service.
HOURS: Contractor personnel shall notify the Contracting Officer Representative (COR) when arriving on station, prior to commencing services. Services shall be performed during normal working hours from 8:00 am to 4:30 pm excluding federal holidays unless requested and approved by the COR. Federal holidays include:
New Year's Day January 1st
Martin Luther King's Birthday Third Monday in January
President's Day Third Monday in February
Memorial Day Last Monday in May
Independence Day July 4th
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day November 11th
Thanksgiving Day Fourth Thursday in November
Christmas Day December 25th
When a holiday falls on a Sunday, the following Monday shall be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also, included, would be any other day specifically declared by the President of the United States of America to be a National Holiday.
SMOKING: Smoking is prohibited on campus at the WTVAHCS.
PARKING: It is the responsibility of the Contractor’s personnel to park only in designated parking areas. The WTVAHCS shall not waive or make reimbursement for parking violations of the Contractor’s personnel under any circumstances.
PROTECTION FROM DAMAGE: The Contractor shall provide all necessary to protect personnel, furnishings, equipment, and buildings from damage; Contractor shall move, remove, and/or replace movable items as necessary and shall replace any item damaged due to work performed under this contract, equal to its original installation, and/or finish.
Schedule of Deliverables
Deliverable No. Item Quantity Delivery Date
One A detailed Work and Safety Plan 2 each 10 days after award
Submitted to VA for approval after award