The document is a Schedule of Items (SOI) for the SRD Boat Ramp Gate Replacement project located in the Arapaho & Roosevelt National Forests and Pawnee National Grassland. The SOI details five base items: 1) Mobilization as a lump sum, and 2-5) gate removal and installation at multiple locations - specifically two 20-ft gates and one each of 50-ft and 32-ft gates at Green Ridge, Stillwater, and Sunset boat ramps. All gates will be government-furnished, and the contractor is responsible for installation, requiring one lump sum mobilization and individual installations at each specified location.
The contract opportunity is part of Solicitation Number 1240LT25R0026, issued by the Department of Agriculture Forest Service R2-Rocky Mountain Region. The scope involves replacing gates on boat ramps in the Sulphur Ranger District, with the contractor required to provide all necessary hardware and materials for successful gate installation. The SOI serves as a detailed breakdown of the specific gate replacement tasks, quantities, and locations, providing a clear itemization of the project's core requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Items
Description Method of
Measure Unit Quantity Unit Price TOTAL
1 Mobilization L.S.Q Lump Sum 1
Government Furnished 20-ft Gate Removal and Installation - Green Ridge
EA EA 2
Government Furnished 50-ft Gate Removal and Installation - Green Ridge
EA EA 1
Government Furnished 50-ft Gate Removal and Installation - Stillwater
EA EA 1
Government Furnished 32-ft Gate Removal and Installation - Sunset
EA EA 1
Schedule of Items (SOI)
SRD Boat Ramp Gate Replacement
ARAPAHO & ROOSEVELT NATIONAL FORESTS AND PAWNEE NATIONAL GRASSLAND
TOTAL BASE ITEMS