Attachment 1-Section B Schedule of Services and Supplies.xls

XLS spreadsheet 48 KB Posted

Attached to
USCGC MOBILE BAY & BARGE FY23 Dry-Dock
Solicitation number
70Z08523QIBCT0001
Issued by

About this file

This document contains a pricing schedule for drydock availability services for the USCGC Mobile Bay and associated 120-foot barge. Services include hull inspection and preservation, tank cleaning and preservation, machinery inspection and maintenance, deck preservation, cathodic protection anode renewal, and drydocking for both vessels. Pricing is provided for definite line items as well as optional items, and a composite labor rate is listed. The solicitation number is 70Z08523QIBCT0001 and was issued by the Department of Homeland Security United States Coast Guard for drydock availability of their 140-foot Great Lakes icebreaker USCGC Mobile Bay and barge for fiscal year 2023. Services are to be provided by the awardee during a five day drydock period.

View the file

Other files

File Type Posted
Attachment 1 - Schedule of Services and Supplices - CGC MOBILE BAY DD.xls XLS spreadsheet
70Z08523QIBCT0001 Amendment 0006 - CGC MOBILE BAY and BARGE DD FY23.pdf PDF
Attachment 2 - SpecificationCGC MOBILE BAY (WTGB 140) DD.pdf PDF
Attachment 2 - Specificatio MOBILE BAY (WTGB 140) DD Rev-1.pdf PDF
70Z08523QIBCT0001 Amendment 0005 - CGC MOBILE BAY and BARGE DD FY23.pdf PDF
Attachment 1-Section B Schedule of Services and Supplies 8 March 23.xls XLS spreadsheet
70Z08523QIBCT0001 Amendment 0004 - CGC MOBILE BAY and BARGE DD FY23.pdf PDF
70Z08523QIBCT0001 Amendment 0003 - CGC MOBILE BAY and BARGE DD FY23.pdf PDF
Attachment 1 - Section B Schedule of Services and Supplies 6 Feb 23.xls XLS spreadsheet
70Z08523QIBCT0001 Amendment 0002 - CGC MOBILE BAY and BARGE DD FY23.pdf PDF
Attachment 2 - MOBILE BAY and BARGE DD FY23 Specification.pdf PDF
70Z08523QIBCT0001 Amendment 0001 - CGC MOBILE BAY and BARGE DD FY23.pdf PDF
Attachment 1-Section B Schedule of Services and Supplies Revised.xls XLS spreadsheet
Attachment 5 - USCG Ombudsman Notice.pdf PDF
Attachment 6 - JTFOC_WI-26_RudderStocKBearings_ThordonTech_Redacted.pdf PDF
ATTACHMENT 4 - REQUEST FOR CLARIFICATION UsCGC MOBILE BAYand BARGE DD FY23.docx DOCX document
Attachment 6 - JTFOC_WI-14_Propulsion Shaft Seal_WDI_Redacted.pdf PDF
Attachment 3 - Past Performance Information Form.docx DOCX document
Attachment 2 - CGC MOBILE BAY and BARGE DD FY23 Specification.pdf PDF
70Z08523QIBCT0001 USCGC MOBILE BAY and BARGE CSS.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC MOBILE BAY (WTGB-140) DRYDOCK AVAILABILITY FY2023
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating, U/W Body, InspectJOB1
D-002U/W Body, Preserve, 100 percent - TenderJOB1
D-003Hull Plating Freeboard, Preserve, 100 Percent - TenderJOB1
D-004Bubbler Channels, InspectJOB1
D-005Fenders, Bow, Inspect and Repair - TugJOB1
D-006Appendages, U/W, Leak TestJOB1
D-007Propulsion Shaft Rope Guards, InspectJOB1
O-008Appendages, U/W, Internal, PreserveJOB1
D-009Tanks, MP Fuel Stowage and Overflow, Clean and InspectJOB1
D-010Tanks, MP Fuel Service, Clean and InspectJOB1
D-011Tanks, Ballast, Clean and InspectJOB1
D-012Main Diesel Engine (MDE) Lube Oil Cooler, Clean, Inspect, and HydroJOB1
D-013Both Main Diesel Engine and Generator Resilient Mounts, RenewalJOB1
D-014Propulsion Shaft Seals, Mechanical Overhaul and Inflatable RenewJOB1
D-015Propulsion Shafting; Remove, Inspect, and ReinstallJOB1
D-016Propulsion Shaft Bearings, External, Check ClearancesJOB1
D-017Stern Tube Bearing Staves, RenewJOB1
D-018Propeller , Remove, Inspect, and ReinstallJOB1
D-019Circuit Breakers (60 Hz), Inspect and TestJOB1
D-020Fathometer Transducer, RenewJOB1
D-021Sea Valves and Waster Pieces, Overhaul Or RenewJOB1
D-022Sea Strainers, Simplex, All Sizes, Clean and InspectJOB1
D-023Fuel Manifold, OverhaulJOB1
D-024Rudder Assembly, Remove, Inspect And ReinstallJOB1
D-025Rudders, Preserve, 100 PercentJOB1
D-026Rudder Stock Bearings (Upper And Lower), RenewJOB1
D-027Hull Fittings (Weight Handling Rigging Hardware), Inspect and TestJOB1
D-028Anchor Windlass, Inspect and ServiceJOB1
D-029Anchor Chain and Ground Tackle, PreserveJOB1
D-030Anchors, PreserveJOB1
D-031Hawse Pipes, PreserveJOB1
D-032Grey Water Holding Tanks, Clean and InspectJOB1
D-033Sewage Holding Tanks, Clean and InspectJOB1
O-034Tanks (Sewage Holding), Preserve, 100 percentJOB1
O-035Tanks, Ballast, Preserve, 100 PercentJOB4
O-036Chain Locker, Preserve, 100 PercentJOB1
O-037Tanks, Grey Water Holding, Preserve, 100 PercentJOB3
D-038Tanks, Potable Water Preserve, 100 PercentJOB2
D-039Decks - Exterior, Preserve, Non-Skid Broadcast Grit SystemJOB1
D-040Cathodic Protection, Zinc Anodes, Renew,JOB1
D-041DrydockJOB1
D-042Temporary Services, Provide - Tender and BargeJOB1
D-043Sea Trial Performance, Support, ProvideJOB1
D-044Tanks, Ballast, Clean and Inspect - BargeJOB1
D-045Heat Exchangers, Clean, Inspect And Hydro - BargeJOB1
D-046Fathometer Transducer, Renew - BargeJOB1
O-047Tanks, Ballast, Preserve, 100 Percent - BargeJOB4
O-048Tanks, Grey Water Holding, Preserve, 100 Percent - BargeJOB1
D-049U/W Body, Preserve, 100 percent - BargeJOB1
D-050Hull Plating Freeboard, Preserve, 100 Percent - BargeJOB1
D-051Sea Strainers, Duplex, All Sizes, Overhaul - BargeJOB1
D-052Thruster Unit, Overhaul - BargeJOB1
D-053Tanks (Aft Grey Water), Preserve “100%”- BargeJOB1
D-054Decks – Exterior (Buoy or Construction Deck), Preserve 100%JOB1
D-055Bilge and Ballast Valves, Overhaul or RenewJOB1
D-056Bilges, Preserve - BargeJOB1
O-057Hatches, RenewJOB1
D-058Hull Repair BargeJOB1
D-059Wireway Channel Repair BargeJOB1
D-060Bubbler Air Piping, RenewalJOB1
D-061Barge Salt Water Cooling Duplex Strainer, RenewJOB1
D-062Water Mist Tank Low Level Switch, RelocateJOB1
D-063Steering Gear (General), InspectJOB1
D-064Hull Fittings (Mooring and Towing), Inspect and Test - BargeJOB1
D-065Grey Water Piping, Clean and FlushJOB1
D-066Sewage Piping, Clean and FlushJOB1
D-067Tank (Water Mist), Preserve (100%)JOB1
D-068Hull Plating, U/W Body, Inspect - BargeJOB1
D-069Hull Plating, U/W Body, Ultrasonic Testing - BargeJOB1
D-070Tanks, Potable Water Preserve, 100 Percent - BargeJOB3
D-071Tanks, Sewage Holding, Preserve, 100 percent - BargeJOB2
D-072Cathodic Protection, Zinc Anodes, Renew - BargeJOB1
D-073Point of Use Potable Water Filters, Install - BargeJOB1
D-074Anchor Chain and Ground Tackle, Preserve - BargeJOB1
D-075Anchors, Preserve - BargeJOB1
D-076Drydock - BargeJOB1
D-077Exhaust Weld RepairJOB1
D-078Barge Fuel Gauge Valve, RenewJOB1
D-079Vent Ducts, Engine And Motor Room, All, Commercial CleaningJOB1
D-080Tanks, MP Fuel Stowage and Overflow, Clean and Inspect - BargeJOB1
D-081Tanks, MP Fuel Service, Clean and Inspect - BargeJOB1
D-082Lead Dust, CleanJOB1
D-083Hull Plating, Side Scan, Ultrasonic TestingJOB1
O-084Tanks, Fuel, Preserve, 100 Percent - BargeJOB4
D-085Tanks, Sewage Vacuum Collection, Preserve, 100 Percent - BargeJOB1
D-086Grey Water Holding Tanks, Clean and Inspect - BargeJOB1
D-087Sewage Holding Tanks, Clean and Inspect - BargeJOB1
D-088Fixed Ballast, Lead Ingots, EncapsulateJOB1
D-089Fixed Ballast, Lead Ingots, Reinstall in Containment BoxesJOB1
D-090Handrails and Stanchions, Inspect, Repair or RenewJOB1
D-091Tank Level Indicators, RepairJOB1
D-092Compartment Insulation and Sheathing, RenewJOB1
O-00AComposite Labor RateHour1,890
D-00BGFP ReportNSPEA1NSP
D-00CTravel and Perdiem$0.00JOB$0.00
O-00ZLaydaysDay5
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items

&C(12/20/2022) Rev-0 - Page &P of &N