Attachment 1-Section B Schedule of Services and Supplies Revised.xls
XLS spreadsheet 48 KB Posted
- Attached to
- USCGC MOBILE BAY & BARGE FY23 Dry-Dock
- Solicitation number
- 70Z08523QIBCT0001
About this file
This document contains a pricing schedule for dry-docking services for the USCGC Mobile Bay and associated barge. The schedule lists over ninety line items for work including hull inspection and preservation, tank cleaning and preservation, machinery maintenance and overhauls, and various repairs. The solicitation was issued by the Department of Homeland Security Coast Guard for a combined synopsis and solicitation under number 70Z08523QIBCT0001. Pricing is provided by job or unit with quantities and extended costs. Significant tasks involve hull plating inspection and preservation, machinery systems work including main engines and generators, and tank cleaning and preservation. Laydays of five days are specified with a period of performance through fiscal year 2023. Total pricing is to be provided for definite, optional, and combined definite and optional line items.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC MOBILE BAY (WTGB-140) DRYDOCK AVAILABILITY FY2023 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating, U/W Body, Inspect | JOB | 1 | ||
| D-002 | U/W Body, Preserve, 100 percent - Tender | JOB | 1 | ||
| D-003 | Hull Plating Freeboard, Preserve, 100 Percent - Tender | JOB | 1 | ||
| D-004 | Bubbler Channels, Inspect | JOB | 1 | ||
| D-005 | Fenders, Bow, Inspect and Repair - Tug | JOB | 1 | ||
| D-006 | Appendages, U/W, Leak Test | JOB | 1 | ||
| D-007 | Propulsion Shaft Rope Guards, Inspect | JOB | 1 | ||
| O-008 | Appendages, U/W, Internal, Preserve | JOB | 1 | ||
| D-009 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | JOB | 1 | ||
| D-010 | Tanks, MP Fuel Service, Clean and Inspect | JOB | 1 | ||
| D-011 | Tanks, Ballast, Clean and Inspect | JOB | 1 | ||
| D-012 | Main Diesel Engine (MDE) Lube Oil Cooler, Clean, Inspect, and Hydro | JOB | 1 | ||
| D-013 | Both Main Diesel Engine and Generator Resilient Mounts, Renewal | JOB | 1 | ||
| D-014 | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | JOB | 1 | ||
| D-015 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-016 | Propulsion Shaft Bearings, External, Check Clearances | JOB | 1 | ||
| D-017 | Stern Tube Bearing Staves, Renew | JOB | 1 | ||
| D-018 | Propeller , Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-019 | Circuit Breakers (60 Hz), Inspect and Test | JOB | 1 | ||
| D-020 | Fathometer Transducer, Renew | JOB | 1 | ||
| D-021 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | ||
| D-022 | Sea Strainers, Simplex, All Sizes, Clean and Inspect | JOB | 1 | ||
| D-023 | Fuel Manifold, Overhaul | JOB | 1 | ||
| D-024 | Rudder Assembly, Remove, Inspect And Reinstall | JOB | 1 | ||
| D-025 | Rudders, Preserve, 100 Percent | JOB | 1 | ||
| D-026 | Rudder Stock Bearings (Upper And Lower), Renew | JOB | 1 | ||
| D-027 | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test | JOB | 1 | ||
| D-028 | Anchor Windlass, Inspect and Service | JOB | 1 | ||
| D-029 | Anchor Chain and Ground Tackle, Preserve | JOB | 1 | ||
| D-030 | Anchors, Preserve | JOB | 1 | ||
| D-031 | Hawse Pipes, Preserve | JOB | 1 | ||
| D-032 | Grey Water Holding Tanks, Clean and Inspect | JOB | 1 | ||
| D-033 | Sewage Holding Tanks, Clean and Inspect | JOB | 1 | ||
| O-034 | Tanks (Sewage Holding), Preserve, 100 percent | JOB | 1 | ||
| O-035 | Tanks, Ballast, Preserve, 100 Percent | JOB | 4 | ||
| O-036 | Chain Locker, Preserve, 100 Percent | JOB | 1 | ||
| O-037 | Tanks, Grey Water Holding, Preserve, 100 Percent | JOB | 3 | ||
| D-038 | Tanks, Potable Water Preserve, 100 Percent | JOB | 2 | ||
| D-039 | Decks - Exterior, Preserve, Non-Skid Broadcast Grit System | JOB | 1 | ||
| D-040 | Cathodic Protection, Zinc Anodes, Renew, | JOB | 1 | ||
| D-041 | Drydock | JOB | 1 | ||
| D-042 | Temporary Services, Provide - Tender and Barge | JOB | 1 | ||
| D-043 | Sea Trial Performance, Support, Provide | JOB | 1 | ||
| D-044 | Tanks, Ballast, Clean and Inspect - Barge | JOB | 1 | ||
| D-045 | Heat Exchangers, Clean, Inspect And Hydro - Barge | JOB | 1 | ||
| D-046 | Fathometer Transducer, Renew - Barge | JOB | 1 | ||
| O-047 | Tanks, Ballast, Preserve, 100 Percent - Barge | JOB | 4 | ||
| O-048 | Tanks, Grey Water Holding, Preserve, 100 Percent - Barge | JOB | 1 | ||
| D-049 | U/W Body, Preserve, 100 percent - Barge | JOB | 1 | ||
| D-050 | Hull Plating Freeboard, Preserve, 100 Percent - Barge | JOB | 1 | ||
| D-051 | Sea Strainers, Duplex, All Sizes, Overhaul - Barge | JOB | 1 | ||
| D-052 | Thruster Unit, Overhaul - Barge | JOB | 1 | ||
| D-053 | Tanks (Aft Grey Water), Preserve “100%”- Barge | JOB | 1 | ||
| D-054 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | ||
| D-055 | Bilge and Ballast Valves, Overhaul or Renew | JOB | 1 | ||
| D-056 | Bilges, Preserve - Barge | JOB | 1 | ||
| O-057 | Hatches, Renew | JOB | 1 | ||
| D-058 | Hull Repair Barge | JOB | 1 | ||
| D-059 | Wireway Channel Repair Barge | JOB | 1 | ||
| D-060 | Bubbler Air Piping, Renewal | JOB | 1 | ||
| D-061 | Barge Salt Water Cooling Duplex Strainer, Renew | JOB | 1 | ||
| D-062 | Water Mist Tank Low Level Switch, Relocate | JOB | 1 | ||
| D-063 | Steering Gear (General), Inspect | JOB | 1 | ||
| D-064 | Hull Fittings (Mooring and Towing), Inspect and Test - Barge | JOB | 1 | ||
| D-065 | Grey Water Piping, Clean and Flush | JOB | 1 | ||
| D-066 | Sewage Piping, Clean and Flush | JOB | 1 | ||
| D-067 | Tank (Water Mist), Preserve (100%) | JOB | 1 | ||
| D-068 | Hull Plating, U/W Body, Inspect - Barge | JOB | 1 | ||
| D-069 | Hull Plating, U/W Body, Ultrasonic Testing - Barge | JOB | 1 | ||
| D-070 | Tanks, Potable Water Preserve, 100 Percent - Barge | JOB | 3 | ||
| D-071 | Tanks, Sewage Holding, Preserve, 100 percent - Barge | JOB | 2 | ||
| D-072 | Cathodic Protection, Zinc Anodes, Renew - Barge | JOB | 1 | ||
| D-073 | Point of Use Potable Water Filters, Install - Barge | JOB | 1 | ||
| D-074 | Anchor Chain and Ground Tackle, Preserve - Barge | JOB | 1 | ||
| D-075 | Anchors, Preserve - Barge | JOB | 1 | ||
| D-076 | Drydock - Barge | JOB | 1 | ||
| D-077 | Exhaust Weld Repair | JOB | 1 | ||
| D-078 | Barge Fuel Gauge Valve, Renew | JOB | 1 | ||
| D-079 | Vent Ducts, Engine And Motor Room, All, Commercial Cleaning | JOB | 1 | ||
| D-080 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect - Barge | JOB | 1 | ||
| D-081 | Tanks, MP Fuel Service, Clean and Inspect - Barge | JOB | 1 | ||
| D-082 | Lead Dust, Clean | JOB | 1 | ||
| D-083 | Hull Plating, Side Scan, Ultrasonic Testing | JOB | 1 | ||
| O-084 | Tanks, Fuel, Preserve, 100 Percent - Barge | JOB | 4 | ||
| D-085 | Tanks, Sewage Vacuum Collection, Preserve, 100 Percent - Barge | JOB | 1 | ||
| D-086 | Grey Water Holding Tanks, Clean and Inspect - Barge | JOB | 1 | ||
| D-087 | Sewage Holding Tanks, Clean and Inspect - Barge | JOB | 1 | ||
| D-088 | Fixed Ballast, Lead Ingots, Encapsulate | JOB | 1 | ||
| D-089 | Fixed Ballast, Lead Ingots, Reinstall in Containment Boxes | JOB | 1 | ||
| D-090 | Handrails and Stanchions, Inspect, Repair or Renew | JOB | 1 | ||
| D-091 | Tank Level Indicators, Repair | JOB | 1 | ||
| D-092 | Compartment Insulation and Sheathing, Renew | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 1,890 | ||
| D-00B | GFP Report | NSP | EA | 1 | NSP |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(12/20/2022) Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .