Attachment 1 Scope of Work (SOW).docx
DOCX document 4 MB Posted
- Attached to
- Replace Fan Coil Units Federal contract opportunity
- Solicitation number
- 1232SA25Q0162
About this file
This Statement of Work (SOW) details a replacement project for fan coil units at the National Peanut Research Laboratory in Dawson, Georgia. The project involves removing 21 existing 2-pipe fan coil units and replacing them with new 4-pipe units, including installing individual thermostats and connecting to a new 4-pipe HVAC system. The scope includes 5 units at 7,800w/400CFM, 15 units at 5,800w/300CFM, and 1 unit at 11,800w/600CFM, with requirements for electrical connections, controls programming, and system startup and testing.
The project is solicited under USDA Agricultural Research Service contract number 1232SA25Q0162, with a performance period not to exceed 120 days from the notice to proceed. Contractor work hours are restricted to Monday through Friday, 7:30 AM to 4:30 PM, excluding government holidays. Safety requirements include submitting a Site Safety Specific Plan within 14 days of contract award, and all contractor employees must undergo background checks. The project location is 1011 Forrester Dr., S.E. Dawson, GA 39842, with contact persons including Tochie Ezento (Contracting Officer) and Hector Rodriguez (Location Monitor).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_1232SA25Q0162_Amd_0002.pdf | ||
| 1232SA25Q0162 Questions and Answers.pdf | ||
| Sol_1232SA25Q0162_Amd_0001.pdf | ||
| Attachment 3 - Additional Specifications from Site Visit Docs.pdf | ||
| Site Visit Information.docx | DOCX document | |
| Solicitation 1232SA25Q0162.pdf | ||
| Attachment 2 Wage Determination GA20250313.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Agricultural Research Service
STATEMENT OF WORK
Replacing of existing Fan coil units National Peanut Research Laboratory 1011 FORRESTER DR, S.E. DAWSON, GA 39842 Asset IDs 660400B001
Prepared by Reviewed by Date: 04/10/2025
Contents
| 1. | BACKGROUND: | 3 |
| 2. | SCOPE OF SERVICES: | 3 |
| 3. | PROJECT DESCRIPTION AND REQUIREMENTS: | 3 |
| 4. | SAFETY REQUIREMENTS | 3 |
| 5. | PERIOD OF PERFORMANCE | 3 |
| 6. | HOURS OF OPERATION | 4 |
| 7. | PHYSICAL SECURITY. | 4 |
| 8. | GENERAL REQUIREMENTS: | 4 |
| 9. | PROJECT CONTACT PERSONS: | 5 |
| 10. Picture 1. | 6 |
BACKGROUND:
The HVAC controls need to be upgraded. The facility has already procured and installed a highly efficient chiller. We also need to make the system more reliable by going from a 2-pipe system to a 4-pipe system, so there is better control of HVAC system as a smaller number of valves would reduce the chances of system failure.
Project Location:
National Peanut Research Laboratory 1011 Forrester Dr., S.E.
Dawson, GA 39842
SCOPE OF SERVICES:
The scope of work for this project shall be to replace the old 2-pipe fan coils with more efficient 4-pipe fan coils which can perform at the same output parameters as existing. Please also provide a quote for the replacement of the fan coils. The asset ID is 660400B001.
PROJECT DESCRIPTION AND REQUIREMENTS:
Base bid:
· Removal and replacement of the original 21 old 2-pipe fan coil units with new 4-pipe units with controls.
· Make all electrical connections to units.
· There are 5 ea. 7,800w / 400CFM fans, 15 ea. 5,800w / 300 CFM fans and 1 ea. 11,800 w / 600 CFM fan.
· Individually control new thermostats installed and programing for proper operation installed in each room.
· Connect the new units to the 4-pipe system.
· Startup system and test for proper operation.
· Make sure all air is blead from lines.
SAFETY REQUIREMENTS
The contractor is responsible for complying with all local, state and federal safety codes and regulations.
The contractor will submit a Site Safety Specific Plan (SSSP) in industry recognizable format to the Contracting Officer within 14 days of contract award. The Government shall review the SSSP prior to the start of any construction activities.
Safety and health matters, as they relate to the work, are the exclusive responsibility of the contractor. The contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions that may be required by law or local authorities for the protection and security of the grounds, facilities and personnel.
PERIOD OF PERFORMANCE
The completion of this project shall not exceed 120 days from date of notice to proceed. A request for time extension must be submitted to the Contracting Officer in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
HOURS OF OPERATION
Contractor work hours shall be Monday through Friday, 7:30 A.M. to 4:30 P.M. except on Government holidays. Any changes to work schedule shall be submitted to Contracting Officer for written approval three days prior to schedule change.
The facility is open Monday through Friday from 8am until 4pm except for Government holidays.
PHYSICAL SECURITY.
The Contractor shall establish and implement methods to control and account for all keys and access cards issued to the Contractor. No keys shall be duplicated by the Contractor without CO or designated Government official approval. Lost keys or access cards shall be reported to the CO or designated Government official immediately. The cost associated with replacement of lost keys shall be borne by the Contractor. All contractor employees will be required to undergo a background check before receiving an access card for the site.
The Contractor shall operate a strict system of personnel identification to control entry of all persons to and from exits at various locations at the Center. The contractor shall monitor access for prime contractors and subcontractors. However, the Government will be responsible for issuing keys and access cards. The Contractor shall prohibit the opening of locked areas by the Contractor’s employees to permit the entrance of persons other than the Contractor’s or Center employees engaged in the performance of assigned work in those areas.
GENERAL REQUIREMENTS:
Contractor shall furnish everything required to perform every task mentioned in the statement of work. There would be no government equipment provided.
The construction site shall always be kept clean and free of debris. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.
PROJECT CONTACT PERSONS:
| Name and Address |
| Phone / Email |
Contracting Officer
(CO)
| Engineering Project Manager (EPM / COR) |
| Tochie U. Ezento |
141 Experiment Station Rd Stoneville, MS 38776 Office: 346‐500-7565 tochie.ezento@usda.gov
Location Monitor (LM) Hector Rodriguez 1011 Forrester Dr., SE Dawson, GA 39842
Office: 229‐995‐7418 hector.rodriguez@usda.gov
Research Lead Marshall Lamb 1011 Forrester Dr., SE Dawson, GA 39842
229‐995‐7417 marshall.lamb@usda.gov
| Safety, Health, & Environmental Management Branch (SHEMB) Representative |
| David Daniels |
950 College Station Rd Athens, GA 30605
Office: (706) 248‐8194 david.daniels@usda.gov
Existing Fan‐coil Pictures and documents from original install
Pictures Specifications
Questions and answers previously asked
Question-1-Is the 120-day set in stone or can it be adjusted Answer-?
Question-2-Ask if all work must be completed at one time Answer- can be divided into stages that does not disrupt ongoing research
Question-3-Can control valves be installed below unit in crawl space Answer- yes, if they are easily accessible
Question-4-Are there additional drawings Answer- included above
Question-5-Can other manufacturers fans be used other than Johnson Control units Answer- If they are equivalent or better than JC units
Question-6- Can T-Stat be wall mounted in each office Answer- Yes
Question-7- Can units be individually control or wired to HVAC control system Answer- Units are to be individually controlled
1 | Page image2.jpeg image3.jpeg image4.png image5.png image6.jpg image7.jpg image8.jpg image9.jpg image10.jpg image1.jpeg