This document contains an attachment to a solicitation for the US Coast Guard vessel USCGC PETREL.
The attachment provides a price schedule for dockside maintenance and repairs to be performed on the USCGC PETREL during FY-2021. Services included in the schedule are cleaning and inspection of waste holding tanks, piping, and the hull; replacing carpeting, door stoppers, and the galley range; and performing W-5 maintenance on the main diesel engines. Labor rates and prices for individual line items are not provided, as all are listed as $0. The total price of definite and optional items is also listed as $0. The related federal contract opportunity notice provides the solicitation number and identifies the Department of Homeland Security US Coast Guard as the contracting agency. Responses are due by July 9, 2020.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment-1 Price Schedule
| ATTACHMENT-1 PRICE SCHEUDULE FOR: | ||||||
| USCGC PETREL (WPB-87350) DOCKSIDE AVAILABILITY FY-2021 | ||||||
| AFC | ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 30 | D-001 | U/W Body, Diver Clean and Inspect | JOB | 1 | $0.00 | |
| 45 | D-002 | Main Diesel Engine Assemblies, Perform W-5 Maintenance And Update Control System Configuration | JOB | 1 | $0.00 | |
| 45 | D-003 | Grey Water Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| 45 | D-004 | Sewage Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| 45 | D-005 | Grey Water Piping, Clean And Flush | JOB | 1 | $0.00 | |
| 45 | D-006 | Sewage Piping, Clean And Flush | JOB | 1 | $0.00 | |
| 45 T | D-007 | Fire Alarm Control Panel, Replace | JOB | 1 | $0.00 | |
| 30 | D-008 | Carpeting, Berthing Space, Renew | JOB | 1 | $0.00 | |
| 45 | D-009 | Joint, Transition, Repair | JOB | 1 | $0.00 | |
| 30 | D-010 | Bulkhead, Door Stopper, Renew | JOB | 1 | $0.00 | |
| 45 T | D-011 | Galley Range, Install New | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 190 | $0.00 | ||
| D-00B | GFP Report | NSP | EA | NSP | ||
| 45 | D-00C | Travel and Perdiem | JOB | 1 | $0.00 | |
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 |