Rev1 10July20 Attachment-1 Schedule of Services CGC PETREL Dockside.xls
XLS spreadsheet 37 KB Posted
- Attached to
- DOCKSIDE USCGC PETREL WPB-87350
- Solicitation number
- 70Z080-21-Q-P4502400
About this file
This document is an attachment to a solicitation providing a price schedule for dockside maintenance services for the USCGC Petrel. The schedule lists line items for cleaning and inspecting waste holding tanks, piping, and other systems; replacing carpeting, door stoppers, and other components; and performing engine maintenance. Labor is priced at $190 per hour. The total price of definite and optional items is to be provided. The combined synopsis solicitation was issued on July 9, 2020 by the Department of Homeland Security's United States Coast Guard for dockside maintenance availability of the USCGC Petrel (WPB-87350) to be performed in fiscal year 2021. Responses are due by the date specified in the solicitation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment-1 Price Schedule
| REV1 | ATTACHMENT-1 PRICE SCHEUDULE FOR: | |||||
| USCGC PETREL (WPB-87350) DOCKSIDE AVAILABILITY FY-2021 | ||||||
| AFC | ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 30 | D-001 | U/W Body, Diver Clean and Inspect | JOB | 1 | $0.00 | |
| 45 | D-002 | Main Diesel Engine Assemblies, Perform W-5 Maintenance And Update Control System Configuration | JOB | 1 | $0.00 | |
| 45 | D-003 | Grey Water Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| 45 | D-004 | Sewage Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | |
| 45 | D-005 | Grey Water Piping, Clean And Flush | JOB | 1 | $0.00 | |
| 45 | D-006 | Sewage Piping, Clean And Flush | JOB | 1 | $0.00 | |
| 45 T | D-007 | Fire Alarm Control Panel, Replace | JOB | 1 | $0.00 | |
| 30 | D-008 | Carpeting, Berthing Space, Renew | JOB | 1 | $0.00 | |
| 45 | D-009 | Surface(s) Touch-up Preserve | JOB | 1 | $0.00 | |
| 30 | D-010 | Bulkhead, Door Stopper, Renew | JOB | 1 | $0.00 | |
| 45 T | D-011 | Galley Range, Install New | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 190 | $0.00 | ||
| D-00B | GFP Report | NSP | EA | NSP | ||
| 45 | D-00C | Travel and Perdiem | JOB | 1 | $0.00 | |
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 |
&C(4/27/2020)
Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .