Attachment 1 Schedule of Services_Blank.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- WILLIAM HART Drydock Repairs FY24 Federal contract opportunity
- Solicitation number
- 70Z08024QPBPL0003
About this file
This document contains a schedule of services and foreseeable cost worksheet for repairs to the USCGC William Hart in fiscal year 2024. The Coast Guard requires inspection and repair services for the vessel's hull plating, tanks, watertight closures, propulsion shafting system, ASW/firemain system components, electrical power distribution system, bilge surfaces, machinery ventilation system, HVAC systems, rudders, stabilizing fins, bow thruster, stern launch door, sewage/grey water system, topside and underwater surfaces, superstructure, mast, and impressed current cathodic protection system. The schedule also includes drydocking services, temporary services while in drydock, and sea trial support. The foreseeable cost worksheet estimates travel expenses, per diem costs, family separation allowances, and crew transportation for home visits based on the location of work performance relative to homeports.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 70Z08024QPBPL00030005_US.pdf | ||
| Questions-Answers Amendment 0005.pdf | ||
| Attachment 2- Schedule of Services Rev-2.xlsx | XLSX spreadsheet | |
| Attachment 2 -SCHEDULE OF SERVICES REV-1 (2).xlsx | XLSX spreadsheet | |
| ATTACHMENT 1-Statement of Work- Specification Rev-4 2 Feb 2024.pdf | ||
| USCGC WILLIAM HART- Questions -Answers for Amendment 004.pdf | ||
| 70Z08024QPBPL00030004_US.pdf | ||
| 70Z08024QPBPL00030003_US.pdf | ||
| USCGC WILLIAM HART-QUESTIONS ANSWERS.pdf | ||
| ATCH 1-SOW -SPEC REV-3 31 JAN 2024.pdf | ||
| 70Z08024QPBPL00030002_US.pdf | ||
| WILLIAM C. HART (WPC 154) DD FQ1 PJC 24R1.pdf | ||
| Q-A for Clarification -W POC Cutter information.pdf | ||
| WILLIAM C. HART (WPC 154) DD FQ1 PJC 24R2.pdf | ||
| 70Z08024QPBPL00030001_US.pdf | ||
| Attachment 2 SOW_Spec.pdf | ||
| 70Z08024QPBPL0003.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| Schedule of Services | APM |
| USCGC WILLIAM C. HART (WPC-154) DRYDOCK AVAILABILITY FY2024 | Date Spec Due |
| Date Est Due |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating, Inspect | $0.00 | JOB | $0.00 | |
| D-002 | Tanks, Clean and Inspect | $0.00 | JOB | $0.00 | |
| D-003 | Watertight Closures, Assess | $0.00 | JOB | $0.00 | |
| D-004 | Propulsion Shafting System, Inspect and Repair | $0.00 | JOB | $0.00 | |
| D-005 | ASW/Firemain System Components, Renew/Overhaul | $0.00 | JOB | $0.00 | |
| D-006 | Electrical Power Distribution System, Thermographic Inspection (450 VAC And Below) | $0.00 | JOB | $0.00 | |
| D-007 | Bilge Surface, Clean and Inspect | $0.00 | JOB | $0.00 | |
| D-008 | Machinery Ventilation System, Clean | $0.00 | JOB | $0.00 | |
| D-009 | HVAC Ventilation System, Modify | $0.00 | JOB | $0.00 | |
| D-010 | HVAC Duct System, Clean | $0.00 | JOB | $0.00 | |
| D-011 | Rudder Assemblies, Inspect and Repair | $0.00 | JOB | $0.00 | |
| D-012 | Stabilizing Fins, Inspect and Repair | $0.00 | JOB | $0.00 | |
| D-013 | Bow Thruster Propeller and Tunnel, Inspect and Repair | $0.00 | JOB | $0.00 | |
| D-014 | Stern Launch Door, Inspect and Preserve | $0.00 | JOB | $0.00 | |
| D-015 | Sewage and Grey Water System, Clean and Inspect | $0.00 | JOB | $0.00 | |
| D-016 | Topside Exterior Surfaces, Preserve | $0.00 | JOB | $0.00 | |
| D-017 | Superstructure, Preserve | $0.00 | JOB | $0.00 | |
| D-018 | Mast, Preserve | $0.00 | JOB | $0.00 | |
| D-019 | U/W Body, Preserve | $0.00 | JOB | $0.00 | |
| D-020 | Impressed Current Cathodic Protection (ICCP) and Anti-Fouling System, Inspect and Maintain | $0.00 | JOB | $0.00 | |
| D-021 | Interior Wet Deck Coverings, Reseal | $0.00 | JOB | $0.00 | |
| D-022 | Drydock | $0.00 | JOB | $0.00 | |
| D-023 | Temporary Services, Provide - Cutter | $0.00 | JOB | $0.00 | |
| D-024 | Sea Trial Performance, Support, Provide (DD) | $0.00 | JOB | $0.00 | |
| D-025 | SSDG Plenum and Softpatch, Repair | $0.00 | JOB | $0.00 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | ERROR:#REF! | JOB | ERROR:#REF! | |
| Total Price of Definite Items | ERROR:#REF! | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | ERROR:#REF! | ||||
| Over and Above/Growth Work | |||||
| The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |||||
| OA/G-001 | **Provide breakdown, as follows: |
Over and Above/Growth Labor Rate
| Unit Price: $________; Quantity: 2538; Unit of Issue: Hour; Extended Price: $____________ | Hour | 2538 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee |
Unit Price: $330,000; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [$330,000.00 X percentage quoted]: $______________ | $330,000.00 | % |
| Total Price of Over and Above/Growth |
| THE FOLLOWING RATE USED FOR GROWTH WORK: | |
| Layday | Daily Rate |
(6/20/2023)_x000D_ Rev-3 - Page &P of &N
Foreseeable Costs
| FORESEEABLE COST WORKSHEET | |
| USCGC WILLIAM HART | FY24 |
| Contractor's Name: | |
| The contractor shall fill-in all yellow labeled boxes below to determine their foreseeable costs. Please read all notes and headers of sections for instructions in completing this worksheet. |
| DISTANCE FACTORS FOR: USCGC WILLIAM HART, HONOLULU, HI | |
| NAUTICAL MILES BASED ON ROUND-TRIP (TO AND FROM) | |
| NUMBER OF DAYS OF AVAILABILITY | 133 |
| (1) Port Engineer Transportation: AIR TRAVEL | |
| (Applicable if > 50 miles from PE address |
(PE's desk location)
| A. Number of CG Representatives from NESU: | A= | 1 |
| B. The number of round trips between the contractor's facility and NESU | B= | |
| C. A multiplied by B: | AxB=C= | 0 |
| D. Travel cost per trip: | D= |
Massey, Marc A CIV: Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do.
| Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 driving miles from the PE's homeport OR (2) Enter "0" if their dry dock is less than 150 driving miles from the PE's homeport. | E. C multiplied by D =E, if >50 miles from NESU otherwise N/A. | E= | |
| (2) Port Engineer Transportation: CAR TRAVEL | |||
| A. Number of CG Representatives from NESU: | A= | 1 | |
| B. Number of Driving miles Round-trip between the COR office and contractors facility: | B= | ||
| C. Travel cost per driving mile (rate at $0.58 per mile) | $0.580 | $0.00 | |
| (3) PER DIEM: (Applicable >50 miles CREW + PE) | |||
| A. Number of Ship's Crew & Port Engineer | A= | 25 | |
| B. Total number of day(s) in drydock. | B= | 133 | |
| C. Per diem cost at place of performance, per day: (if < 50 miles, enter "0" for all below) | C= | ||
| C.1.1. Enter Lodging Daily Per Diem Rate for October | |||
| C.2.1. Enter Meals & Incidentals Total Daily Rate for October | |||
| C.2.1.1. Enter Meals & Incidentals First Day of Travel Daily Rate for October | |||
| D. Ax B= C: (if >50 miles from NESU) | AxB=C= | ||
| (4) PER DIEM: (Applicable >50 miles Contracting Officer Travel & Per Diem. KO location is Norfolk, VA 23510) | |||
| A. Number of KO authorized travel: | A= | 1 | |
| B. Total number of KO travel days: | B= | 3 | |
| C. Transportation cost for KO travel | C= |
| Massey, Marc A CIV: Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do. Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 miles from the KO's location in Norfolk, VA 23510 or (2) Enter "0" if their dry dock is less than 150 miles from the PE's homeport. | D. Per diem cost at place of performance, per day | D= | |
| D.1.1. Enter Lodging Per Diem Rate for Nov | |||
| D.2.1. Enter Meals & Incidentals Total Daily Rate for Nov | |||
| D.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate for Nov | |||
| E. A [(B*D) + C] = | E= | $0.00 | |
| (5) CUTTER COST Operation Factors: | |||
| A. Round Trip Nautical Miles from the vessels pier to the contractors facility: | A= | 0 | |
| B. Cutter Cost Factor Per Nautical Mile: | B= | $51.04 | |
| C. A multiplied by B= C | C= | $0.00 | |
| (6) FAMILY SEPARATION ALLOWANCES (FSA) Applicable if > 50 miles from Homeport - for crew with dependents only (Daily Rate $8.33). If less than 50 miles enter 0 for A below. | |||
| A. Number of Personnel entitled to Family Separation Allowance: | A= | 0 |
Strawbridge, Tracey CIV: Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.
| B. Number of Days for Availability minus 30 days if availability is greather than 30 days: | B= | 103 |
| C. A multiplied by B = C (Daily FSA rate of $8.33) | C= | |
| (7) CREW TRANSPORTATION FOR HOME VISIT (Applicable after 31 consecutive days if > 50 miles from Homeport - for crew with dependents only | ||
| A. Number of Personnel (with dependents) entitled to HOME visit: | A= | 12 |
| B. Number of Homeport Visits: | B= | 2 |
| C Mileage to homeport = (Roundtrip Ticket Cost) | C= |
Massey, Marc A CIV: If contractor's facility is:
- located < 50 miles from the ship's homeport, enter $0.
- located > 51 miles but less than 149 miles from the ship's homeport, multiply round trip vehicle mileage by $0.58
- located > 150 miles from ship's homeport, utilize https://cpsearch.fas.gsa.gov/cpsearch/search.do.
Massey, Marc A CIV: Contractor enters name here Massey, Marc A CIV: Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates Massey, Marc A CIV: Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport.
Massey, Marc A CIV: Contractor shall utilize: https://nauticalcharts.noaa.gov/publications/docs/distances.pdf http://ports.com/sea-route/ Massey, Marc A CIV: Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates based on the location of their facility.
Strawbridge, Tracey CIV: Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.
| D. A multiplied by B, multiplied by C = D: | C= | $0.00 |
| GRAND TOTAL | ||
| 1. PE/COR Transportation (AIRFARE) | $0.00 | |
| 2. PE/COR Transportation (CAR) | $0.00 | |
| 3. Per Diem for Crew and PE/COR | $0.00 | |
| 4. Cutter Cost Operations Factors | $0.00 | |
| 5. Family Separation Allowance | $0.00 | |
| 6. Crew Transportation Home Visit | $0.00 | |
| Total Cost of Distance Factors: | $0.00 | |
| Total Contractor Quoted/Proposal Price: | ERROR:#REF! | |
| TOTAL EVALUATED QUOTE/PRICE | ERROR:#REF! |
File details come from the government source that posted it. Updated .