Q-A for Clarification -W POC Cutter information.pdf
PDF 123 KB Posted
- Attached to
- WILLIAM HART Drydock Repairs FY24 Federal contract opportunity
- Solicitation number
- 70Z08024QPBPL0003
About this file
This document contains questions and answers regarding a solicitation for drydock repairs to the USCGC WILLIAM HART. Key details include that sidescan inspections are included in Work Item 1, Work Items 23 through 25 do not contain priciable data but the work is outlined in the items, the government reserves the right to provide a new fin assembly as government furnished material for Work Item 12 if the existing assembly cannot be repaired, and Work Items 17 and 18 duplicate Work Item 16 and will be removed in a future revision. The Coast Guard is the agency seeking these drydock repair services to be performed on the USCGC WILLIAM HART.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions-Answers Amendment 0005.pdf | ||
| Attachment 2- Schedule of Services Rev-2.xlsx | XLSX spreadsheet | |
| 70Z08024QPBPL00030005_US.pdf | ||
| 70Z08024QPBPL00030004_US.pdf | ||
| Attachment 2 -SCHEDULE OF SERVICES REV-1 (2).xlsx | XLSX spreadsheet | |
| ATTACHMENT 1-Statement of Work- Specification Rev-4 2 Feb 2024.pdf | ||
| USCGC WILLIAM HART- Questions -Answers for Amendment 004.pdf | ||
| 70Z08024QPBPL00030003_US.pdf | ||
| USCGC WILLIAM HART-QUESTIONS ANSWERS.pdf | ||
| ATCH 1-SOW -SPEC REV-3 31 JAN 2024.pdf | ||
| 70Z08024QPBPL00030002_US.pdf | ||
| WILLIAM C. HART (WPC 154) DD FQ1 PJC 24R2.pdf | ||
| 70Z08024QPBPL00030001_US.pdf | ||
| WILLIAM C. HART (WPC 154) DD FQ1 PJC 24R1.pdf | ||
| Attachment 2 SOW_Spec.pdf | ||
| Attachment 1 Schedule of Services_Blank.xlsx | XLSX spreadsheet | |
| 70Z08024QPBPL0003.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC WILLIAM HART
DRYDOCK FY24
SOLICITATION 70Z08024QPBPL0003
VENDOR QUESTIONS/ANSWERS FOR CLARIFICATION
Question 1) Work Item 1, Table 1 indicates both sidescan and 3D laser scan inspections are not included in this scope of work by reading “NO” in the “INCLUDED” column. Paragraphs 3.6.1 and follow detail sidescan and 3D laser scan inspections. Does USG intend for KTR to perform sidescan or 3D laser scan inspections as part of this Work Item?
There will be a SIDESCAN performed. I have provided REV-1 to reflect YES in table.
There will be a SIDESCAN performed. I have provided REV-2 to reflect YES in table.
Question 2) Work Item 23, Tables 1-3, do not seem to be populated with any priceable data. Please verify.
The Work to be performed is outlined within the work item. This is not a standard work item, but work identified by the Port Engineer to be completed during Dry Dock.
Question 3) Does USG intend to provide Shouldered Shaft, P/N 601-15-S00001-00-05_F, as GFM for Work Item 12?
IF found to be damaged or cannot be repaired.
3.3.1 Fin blade and stock assembly renewal. The Government reserves the right to furnish a new fin assembly for installation in place of the existing rudder assembly. If the Government exercises this right, the Contractor must turn over the designated components to the Coast Guard PA as an MTI items.
Question 4) Work specified in Work Item 16 is duplicated by work specified in Work Items 17 and 18. KTR recommends USG clarify or amend spec.
W.I. 17 and 18 can be taken out. Will provide REV-2 spec.
***For Ship checks please coordinate with the Command Cadre of the cutter. The POC for this is SCPO Justin Graham at justin.l.graham@uscg.mil mailto:justin.l.graham@uscg.mil