Attachment 2- Schedule of Services Rev-2.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
WILLIAM HART Drydock Repairs FY24 Federal contract opportunity
Solicitation number
70Z08024QPBPL0003
Issued by
Department of Homeland Security US Coast Guard

About this file

This document contains a government estimate for drydock repair services for the USCGC William C. Hart (WPC-154) in fiscal year 2024. The estimate lists 25 line items for inspection, repair, cleaning, and preservation services required for the cutter's hull, tanks, watertight closures, propulsion systems, ventilation systems, rudders, fins, and other equipment. The estimate also includes items for drydocking services, sea trials, and a composite labor rate for any additional work. The related federal contract opportunity notice is a combined synopsis/solicitation issued as a Request for Quotation for the drydock repairs, with quotes due by the specified date. The Coast Guard is seeking vendors to provide the inspection, repair, cleaning and preservation services for the USCGC William C. Hart during its fiscal year 2024 drydock availability as outlined in the detailed government estimate.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

GOVERNMENT ESTIMATE FOR:
USCGC WILLIAM C. HART (WPC-154) DRYDOCK AVAILABILITY FY2024
CONTRACTOR'S NAME:
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICETypeAFCSME ActionDate SME Done
D-001Hull Plating, Inspect$0.00JOB$0.00RWI45No
D-002Tanks, Clean and Inspect$0.00JOB$0.00RWI45No
D-003Watertight Closures, Assess$0.00JOB$0.00RWI45No
D-004Propulsion Shafting System, Inspect and Repair$0.00JOB$0.00RWI45No
D-005ASW/Firemain System Components, Renew/Overhaul$0.00JOB$0.00RWI45No
D-006Electrical Power Distribution System, Thermographic Inspection (450 VAC And Below)$0.00JOB$0.00RWI45No
D-007Bilge Surface, Clean and Inspect$0.00JOB$0.00RWI45No
D-008Machinery Ventilation System, Clean$0.00JOB$0.00RWI45No
D-009HVAC Ventilation System, Modify$0.00JOB$0.00TCTO45No
D-010HVAC Duct System, Clean$0.00JOB$0.00RWI45No
D-011Rudder Assemblies, Inspect and Repair$0.00JOB$0.00RWI45No
D-012Stabilizing Fins, Inspect and Repair$0.00JOB$0.00RWI45No
D-013Bow Thruster Propeller and Tunnel, Inspect and Repair$0.00JOB$0.00RWI45No
D-014Stern Launch Door, Inspect and Preserve$0.00JOB$0.00RWI45No
D-015Sewage and Grey Water System, Clean and Inspect$0.00JOB$0.00RWI45No
D-016Topside Exterior Surfaces, Preserve$0.00JOB$0.00RWI45No
D-017Superstructure, Preserve$0.00JOB$0.00RWI45No
D-018Mast, Preserve$0.00JOB$0.00RWI45No
D-019U/W Body, Preserve$0.00JOB$0.00RWI45No
D-020Impressed Current Cathodic Protection (ICCP) and Anti-Fouling System, Inspect and Maintain$0.00JOB$0.00RWI45No
D-021Interior Wet Deck Coverings, Reseal$0.00JOB$0.00RWI45No
D-022Drydock$0.00JOB$0.00RWI45No
D-023Temporary Services, Provide - Cutter$0.00JOB$0.00RWI45No
D-024Sea Trial Performance, Support, Provide (DD)$0.00JOB$0.00RWI45No
D-025SSDG Plenum and Softpatch, Repair$0.00JOB$0.00CSMP45No
O-00AComposite Labor RateHour10
D-00BGFP ReportNSPEANSP
D-00CTravel and Perdiem$500.00JOB$0.00
O-00ZLaydaysDay$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
O-00AComposite Labor Rate0Hour0ERROR:#REF!
Over and Above/Growth Work
The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
OA/G-001**Provide breakdown, as follows:

Over and Above/Growth Labor Rate

Unit Price: $________; Quantity: 2538; Unit of Issue: Hour; Extended Price: $____________Hour2538
OA/G-002Over and Above/Growth Material Markup/Handling Fee

Unit Price: $330,000; Quantity: 1; Unit of Issue: Percent ________%;

Extended Price: [$330,000.00 X percentage quoted]: $______________%
Total Price of Over and Above/Growth

THE FOLLOWING RATE USED FOR GROWTH WORK:

(6/20/2023)_x000D_ Rev-3 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
D-001Hull Plating, Inspect$ - 00062Baltimore, MD10000025
D-002Tanks, Clean and Inspect$ - 00052Biloxi, MS10000080
D-003Watertight Closures, Assess$ - 00056Boston, MA100000WPC 154
D-004Propulsion Shafting System, Inspect and Repair$ - 00050Charleston, SC1000000
D-005ASW/Firemain System Components, Renew/Overhaul$ - 00060Corpus Christi, TX10000016
D-006Electrical Power Distribution System, Thermographic Inspection (450 VAC And Below)$ - 00051Hampton Roads100000125
D-007Bilge Surface, Clean and Inspect$ - 00064Honolulu, HI100000FY2024
D-008Machinery Ventilation System, Clean$ - 00055Houston, TX100000DD
D-009HVAC Ventilation System, Modify$ - 00056Los Angeles, CA100000cutter
D-010HVAC Duct System, Clean$ - 00055Median Rate100000WILLIAM C. HART (WPC 154) DD FQ1 PJC 24R3.doc
D-011Rudder Assemblies, Inspect and Repair$ - 00049Miami100000
D-012Stabilizing Fins, Inspect and Repair$ - 00050Narragansett Bay, RI100000
D-013Bow Thruster Propeller and Tunnel, Inspect and Repair$ - 00055New London, CN100000
D-014Stern Launch Door, Inspect and Preserve$ - 00045New Orleans100000
D-015Sewage and Grey Water System, Clean and Inspect$ - 00062NYNY100000
D-016Topside Exterior Surfaces, Preserve$ - 00049Panama City, FL100000
D-017Superstructure, Preserve$ - 00060Philadelphia, PA100000
D-018Mast, Preserve$ - 00051Portland, ME100000
D-019U/W Body, Preserve$ - 00057Portland, OR100000
D-020Impressed Current Cathodic Protection (ICCP) and Anti-Fouling System, Inspect and Maintain$ - 00055San Diego, CA100000
D-021Interior Wet Deck Coverings, Reseal$ - 00067San Francisco, CA100000
D-022Drydock$ - 00055Santa Barbara, CA5551
D-023Temporary Services, Provide - Cutter$ - 00055SE North Carolina5561
D-024Sea Trial Performance, Support, Provide (DD)$ - 00065Seattle, WA107081
D-025SSDG Plenum and Softpatch, Repair$ - 00048Tampa-St. Petersburg100000
60Wilmington, DE

(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
Sub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDT
DESCRIPTIONUNIT PRICELab RateArea
$00$062Baltimore, MD
$00$052Biloxi, MS
$00$056Boston, MA
$00$050Charleston, SC
$00$060Corpus Christi, TX
$00$064Honolulu, HI
$00$055Houston, TX
$00$056Los Angeles, CA
$00$055Median Rate
$00$055Median Rate
$00$050Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

File details come from the government source that posted it. Updated .