Attachment 1 Schedule of Items.pdf
PDF 86 KB Posted
- Attached to
- GAOA Seeley Lake Bunkhouse Remodel
- Solicitation number
- 1240LU25R0030
About this file
This document is a Schedule of Items for the Seeley Lake Bunkhouse Remodel project for the United States Forest Service, Region 1, located in Seeley Lake, Montana. The solicitation includes 11 primary construction divisions covering general requirements, existing conditions, masonry, wood, thermal protection, openings, finishes, specialties, plumbing, HVAC, and electrical work, all to be priced as lump sum items. Additionally, the contract includes 8 optional items such as floor refinishing, kitchen peninsula, casework, closet fit-outs, roofing replacement, chimney replacement, heat recovery ventilator, and window shades. The government reserves the right to exercise these option items at award or during the construction period, but no later than 90 days after the initial contract award, with pricing to be evaluated on the total of all items including options.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES
Seeley Lake Bunkhouse Remodel
United States Forest Service
Region 1
Seeley Lake, MT
Missoula County
B- 1 Schedule of Items
PAY ITEM ITEM DESCRIPTION UNIT OF
MEASURE
EST.
QTY
TOTAL PRICE
SEELEY LAKE BUNKHOUSE REMODEL
001 Division 01 – General Requirements Lump Sum LS $
002 Division 02 – Existing Conditions (including Demolition)
Lump Sum LS $
003 Division 04 – Masonry Lump Sum LS $
004 Division 06 – Wood, Plastics, Composites
Lump Sum LS $
005 Division 07 – Thermal & Moisture Protection
Lump Sum LS $
006 Division 08 – Openings Lump Sum LS $
007 Division 09 – Finishes Lump Sum LS $
008 Division 10 – Specialities Lump Sum LS $
009 Division 22 – Plumbing Lump Sum LS $
010 Division 23 – HVAC Lump Sum LS $
011 Division 26 – Electrical Lump Sum LS $
SEELEY LAKE BUNKHOUSE REMODEL – OPTION ITEMS
012 Option Item 1 – Refinish Floors Lump Sum LS $
013 Option Item 2 – Kitchen Peninsular Lump Sum LS $
014 Option Item 3 – Casework Package Lump Sum LS $
015 Option Item 4 – Closet Fit-outs Lump Sum LS $
016 Option Item 5 – Roofing Replacement Lump Sum LS $
017 Option Item 6 – Chimney Replacement
Lump Sum LS $
018 Option Item 7 – Heat Recovery Ventilator
Lump Sum LS $
019 Option Item 8 – Window Shades Lump Sum LS $
* The Government may exercise the Option Items at award or during the construction period, but no later than 90 days after the initial contract award.
* Price will be evaluated as the total of all items, including Option Items
* Bid Division(s) 11-14 within Division 10.