Attachment 1 - RFP SOW Carwash_XLWU 22-4006_22June2022.pdf
PDF 1 MB Posted
- Attached to
- Design-Build Car Wash
- Solicitation number
- FA481922R0037
About this file
This is a synopsis for a Design-Build project for a Car Wash at Tyndall Air Force Base, Florida. The project will be awarded as a firm-fixed price contract to a single contractor responsible for design, permitting, equipment, labor, materials, and ancillary items to complete the tasks defined in the Statement of Work. The work must adhere to Unified Facilities Criteria, Army Corps of Engineers, IBC, OSHA, and EPA standards. The North American Industry Classification System code is 236220 with a $39.5M size standard. The period of performance is 365 calendar days. The solicitation will be issued on July 26, 2022 via SAM and use Lowest Price Technically Acceptable source selection. The site visit date will be in the solicitation. The response is limited to small businesses. Questions should be directed to 325th Contracting Construction Flight.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4819-22-R-0031
XLWU-22-4006
22 June 2022
RFP SOW Page 1 of 82
Construct Car Wash
REQUEST FOR PROPOSAL
For
TYNDALL AFB, FLORIDA
Project Number: XLWU 22-4006
RFP SOW Page 2 of 82
TABLE OF CONTENTS
1.0 SCOPE OF WORK
1.1 GENERAL REQUIREMENTS
1.2 APPLICABLE DOCUMENTS
2.0 GOVERNMENT PROPERTY INCLUDING GOVERNMENT FURNISHED INFORMATION,
EQUIPMENT, AND PROPERTY (GFI, GFE, GFP)
3.0 MANAGEMENT, PLANNING, AND REPORTING REQUIREMENTS
4.0 SUBMITTAL FORMAT AND TIMING
4.0A TABLE 1 - TABLE OF DELIVERABLES
4.1 WORK BREAKDOWN STRUCTURE (WBS)
4.2 SCHEDULE AND PLANNING REQUIREMENTS
4.3 PROJECT PLANNING CHART (PPC) AND/OR CONSTRUCTION PLANNING CHART (CPC)
4.4 INTEGRATED MASTER SCHEDULE (IMS)
4.5 CONTRACT PROGRESS SCHEDULE (AF 3064)
4.6 CONTRACT PROGRESS REPORT (AF 3065)
4.7 SUBMITTING SCHEDULES AND REPORTS
4.8 STATUS REPORTING
4.9 REPORTING REQUIREMENTS FOR FIRM FIXED PRICE (FFP)
4.10 CONTRACTOR’S PROGRESS, STATUS, AND MANAGEMENT REPORT (CPSMR)
4.11 HEALTH AND SAFETY PLAN (HSP) OR (APP)
4.12 QUALITY SYSTEM PLAN (QSP)
5.0 MEETING, CONFERENCE/TELECONFERENCE REQUIREMENTS
5.1 RED ZONE MEETING
6.0 CONTRACTOR DOCUMENTATION
6.1 NOTIFICATION REQUIREMENTS
6.2 PERMITS
6.3 PHOTO DOCUMENTATION
6.4 PROJECT DATA/PROJECT DELIVERABLES
6.5 PROTECTING UNCLASSIFIED DOD DATA
6.6 SECURITY BREACH NOTIFICATION
6.7 DATA COLLABORATION SITE
6.8 CONSTRUCTION WORK PLAN
6.9 TECHNICAL REPORTS
6.10 TECHNICAL PLANS AND REPORTS
7.0 SITE ACCESS BADGES
8.0 WORKSITE ACTIVITIES AND COORDINATION
8.1 REMOTE AND/OR AUSTERE SITES
8.2 COORDINATION OF ACTIVITIES
8.3 RADIOLOGICAL WASTE, HAZARDOUS MATERIAL AND HAZARDOUS WASTE PERMITTING AND
REPORTING
8.4 HAZARDOUS MATERIAL AND HAZARDOUS WASTE
8.5 ENVIRONMENTAL PROTECTION
8.6 ENVIRONMENTAL PERMITS
8.7 NATIONAL ENVIRONMENTAL PROTECTION ACT (NEPA)
8.8 ENVIRONMENTAL PROTECTION PLAN (EPP)
8.9 FUEL TANKS
8.10 AIR QUALITY
RFP SOW Page 3 of 82
8.11 HAZARDOUS WASTE
8.12 HAZARDOUS MATERIAL INVENTORY AND TRACKING
8.13 PETROLEUM, OILS AND LUBRICANTS (POL)/TANKS
8.14 RECYCLING
8.15 STORAGE
8.16 DIGGING/EXCAVATION
8.17 LEAD AND ASBESTOS
8.18 RECORDING AND PRESERVING HISTORICAL AND ARCHEAOLOGICAL FINDS
9.0 PROSECUTING THE WORK
10.0 SITE WORK
10.1 SITE CONTROL
10.2 UTILITIES (EXISTING)
10.3 LOCATES
10.4 OUTAGES
10.5 DEMOLITION
11.0 CONSTRUCTION OPERATION SERVICES
11.1 CONSTRUCTION
12.0 INSPECTIONS
12.1 PRE-FINAL INSPECTION
12.2 FINAL INSPECTION
12.3 DELIVERY AND WARRANTY
13.0 DEMOBILIZATION
13.1 EMERGENCY RESPONSE
13.2 MAINTENANCE AND REPAIR
13.3 ORDNANCE REMOVAL AND SUPPORT
13.4 SECURITY REQUIREMENTS
13.5 GENERAL SAFETY REQUIREMENTS
13.6 GENERATED REFUSE
14.0 FACILITY CONSTRUCTION PROJECT DELIVERY METHODS
14.1 DESIGN-BUILD (D-B)
14.2 DESIGNER OF RECORD (DOR)/DESIGN PROJECT MANAGER (PM)
14.3 CONTRACTOR DESIGN REQUIREMENTS AFTER AWARD
14.4 USER REQUIREMENT DESIGN MEETING
14.5 GEOTECHNICAL/HAZARDOUS MATERIAL SURVEY REQUIREMENTS AND
RESPONSIBILITES
14.6 SOIL SURVEY REQUIREMENTS AND RESPONSIBILITIES FOR CONTRACTOR
15.0 GENERAL DESIGN REQUIREMENTS
15.1 GOVERNMENT DESIGN REVIEW
15.2 AS-BUILT DOCUMENTATION
15.3 RESPONSIBILITY FOR ERRORS OR OMISSIONS
16.0 ARCHITECTURAL AND STRUCTURAL
16.1 BASE WIND SPEED REQUIREMENTS
16.2 HVHZ WINDOWS AND STOREFRONTS PERFORMANCE REQUIREMENTS
16.3 DESIGN FLOOD ELEVATION
16.4 ROOF ACCESS
16.5 EXTERIOR AND INTERIOR DOORS INCLUDING OVERHEAD/SECTIONAL
RFP SOW Page 4 of 82
17.0 STRUCTURAL INTERIOR DESIGN (SID) DESIGN SUBMITTALS
18.0 LIGHTING:
19.0 PLUMBING:
20.0 MECHANICAL
20.1 HVAC CONTROLS
20.2 VAVS
20.3 METERING
21.0 POINTS OF CONTACT (POCS)
APPENDICES
RFP SOW Page 5 of 82
1.0 SCOPE OF WORK
A. This is a Design-Build project to provide a new car wash facility for Tyndall Air Force
Base, Florida. The project is comprised of the design and construction work required to result in a complete and useable Car Wash facility on Tyndall AFB.
a. BUILDING SCOPE – GENERAL DESCRIPTION
i. The new facility shall include the following spaces and features:
ii. 1 Automated Wash Bay,
iii. 2 Self-service Wash Bays.
iv. Car wash Equipment Room.
v. Dedicated Comm. Room,
vi. Dedicated Electrical Room,
vii. 4 Vacuum Stations,
viii. Curved standing seam metal roofs
ix. Tyndall AFB IFS compliant finishes and color scheme.
B. The Design-Build Team will consist of a Construction and design team Designer of Record
(DOR) that shall perform the services herein and as described in this Statement of Work
(SOW).The Contractor shall be responsible for all professional services, A/E design, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the SOW, including the disposal of all resulting waste materials and project clean up. The performed tasks shall be based on the project description, other data furnished in this SOW, and information covered during kick-off meeting.
C. Ancillary items: Providing necessary support to the primary activities or operation of an organization, institution, industry, or system. An example of ancillary item: Lighting controls, but is not limited to the following: switches, motions sensors, and dimmers, ballasts, emergency backup controls, etc. An incompatible dimmer or electronic equipment replacement to support a conversion from fluorescent to LEDS lights would fit the ancillary item description. Another example is Pump controls but is not limited to the following: Starters, on and off switches, logic controllers. This is all support equipment to ensure the task is completed. Roofs: All required items required by regulations code to complete the installation of a roof system such as detection, fire protections, etc. All of these items must result in a complete and usable product at completion of the project to ensure all the previous functionality was provided in the new design.
D. This SOW sets forth the requirements for Design/Build (DB) contract site-specific design and construction effort to remove, repair and restore interior and exterior elements and related infrastructure within a building on Tyndall AFB, Florida.
RFP SOW Page 6 of 82
1.1 GENERAL REQUIREMENTS
A. Applicable provisions of the Contract Clauses in the contract will govern work under each section of the UFGS specifications.
B. This project has an estimated period of performance from Notification to Proceed (NTP) through completion and turnover of the facility back to the Government for mission operations of 365 calendar days.
C. Proposal Documents: The contractor shall complete the proposal schedule included in the solicitation and include the completed schedule with the submitted proposal documents.
D. Measurements: The GC is required to validate dimensions and quantities. The quantities are listed as approximations and GC field measurements and quaintly verification should be used for bidding package.
E. Field Changes:
a. Field Changes: The Contractor and the Government may agree to perform a no cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated items. All field changes must be approved by the CO prior to execution. Only the CO may authorize field changes or deviations from the SOW.
b. No order, statement or direction of the Contracting Officer, an authorized representative of the Contracting Officer whether or not acting within the limits of his authority, or any other representatives of the Government, shall constitute a change order under the “Changes” clause of this contract or entitle the contractor(s) to an equitable adjustment of the price or delivery schedule, unless such a change is issued in writing and signed by the Contracting Officer.
F. Job Start Meeting: A job start meeting shall be accomplished with the Contractor, Contracting Officer, CE, and user upon acceptance of the 35%, 65%, or 95% design submission. The meeting objective is to review project details, determine design delivery dates and anticipated construction start date, security procedures for site, dumpster locations, and any applicable requirements during construction. The Contractor shall visit the job site to verify location, conditions, and dimensions prior to starting work.
G. Pre-Construction Meeting: A preconstruction meeting shall be held when all the design has reached the Issued For Construction (IFC) stage and all preconstruction submittals have been approved. The contractor Quality Control Manager, Site Safety Officer, and
Superintendent shall be required to attend. This meeting will address all items specific to the project to include access, safety, and environmental needs.
RFP SOW Page 7 of 82
H. Facility Occupancy: There is no existing facility at location of project. During performance of this contract, non-work areas will remain functional to normal base activities. The Contractor is responsible for diverting and restricting pedestrian and vehicle traffic if required for any reason for the duration of the performance period.
I. Bulletin Board: Immediately upon mobilization, the Contractor shall provide a bulletin board not less than 36 by 48 inches (915 by 1220 mm) in size for displaying various documents required within the contract. The bulletin board shall be located at the project site in a conspicuous place easily accessible to all employees. All documents posted shall be legible and replaced as needed when unreadable. The board shall be displayed until the work is completed whereby the Contractor shall remove the board and remain the property of the Contractor. The contents of the board shall include, but not limited to, the following:
a. Contractor’s company name
b. Project name
c. MPLS number
d. Superintendent’s name and a 24 hour available response phone number
e. Equal Employment Opportunity poster
f. Wage determination
g. Wage Rate Information poster.
h. Other documents as needed or required.
J. Employee Parking: Contractor employees shall park privately owned vehicles in an area designated by CES and approved by the CO.
K. Job Site Tools and Equipment: All hand tools and equipment shall be maintained in good working conditions and properly stored when not in use. Construction attire shall be in accordance with applicable OSHA regulations.
L. Field Measurements: The Contractor shall be required to make his/her own field investigations to verify existing conditions, dimensions and other information shown on
Government available non-verified furnished reference drawings, solicitation documents and construction documents. Deviations, errors, or omissions in the government supplied reference materials or the design team’s construction documents shall be identified and addressed by the contractor during the design phase of the contract. They shall be annotated on the respective contract documents as well as on a consolidated register that will be made available to the government for simplified identification and review.
M. Notification Requirements: The Contractor shall notify the Government a minimum of ten (10) days in advance of each mobilization. The Contractor is required to notify the
CO and Government Project Manager of critical issues that may affect the contract performance and/or human health and the environment. For critical issues pertaining to human health and the environment, the Contractor shall immediately notify the CO and
RFP SOW Page 8 of 82 stop work. Work shall only resume at the direction of the CO following resolution of the issue.
N. On-Site Field Oversight: The Contractor shall provide the manpower, equipment, material, services, and transportation necessary to ensure oversight services throughout accomplishment of the construction period for the contract. It is the responsibility of the
Contractor to establish and maintain open communications between salient authorities associated with accomplishment of this contract.
O. Federal Holidays:
a. The standard Federal legal holidays are observed:
1. New Year’s Day January 1
2. Birthday of Martin Luther King, Jr. Third Monday in January
3. Washington’s Birthday/President’s Day Third Monday in February
4. Memorial Day Last Monday in May
5. Juneteenth June 19
6. Independence Day July 4
7. Labor Day First Monday in September
8. Columbus Day Second Monday in October
9. Veterans Day Second Monday in November
10. Thanksgiving Day Fourth Thursday in November
11. Christmas Day December 25
b. Any of the holidays falling on Saturday will be observed on preceding Friday;
holidays falling on Sunday will be observed on the following Monday. In addition, the Government may dictate the work day before or the work day after an observed holiday as a “Family Day.”
c. The Contractor should not perform work on observed holidays, Wing Down Days, Wing Safety Days or Family Days unless authorized by the Contracting Officer for the TO. In the event work is authorized on observed holidays, the Contractor shall pay all applicable overtime and/or holiday pay rates required by law.
P. Working Hours: The normal duty hours of the facility are from 7:00 AM to 5:00 PM, Monday thru Friday excluding Federal Holidays. All work shall be performed during normal duty hours. All other hours to include weekend and holidays shall be requested through the CO for approval. This request shall be submitted no less than three (3) workdays prior to the time requested.
Q. Availability and Use of Utility Services:
1. The contractor should plan on having an offsite office location. The government does not guarantee office space will be provided. The Government does not guarantee
RFP SOW Page 9 of 82 utilities will be provided for office space. The use of a generator and porta toilets may be required of office space is provided. To install and office space and laydown yard will require an 813 permit determination and could take up to 60 days to obtain the permit.
2. The Contractor shall coordinate with Contracting Officer's Representative (COR) for laydown area, offices, and parking and storage facilities. Any damage to existing improvements adjacent to or on the project site due to construction activity under this contract shall be replaced/repaired at the Contractor's expense. All Contractor POV parking areas shall be coordinated and approved in advance by the Contracting
Officer's Representative.
3. Construction sites shall be kept neat and free of trash. Site construction areas shall be surrounded with orange, plastic safety barrier fence when required to separate construction activities from daily personnel traffic.
R. Sanitation: The Contractor shall provide and maintain within the construction area minimum field-type sanitary facilities approved by the CO. Government toilet facilities will not be available to Contractor's personnel.
S. Clean Up: At the end of each working day the Contractor shall clean up the work site by the removal of all construction debris, waste materials, packaging material and the like. If the before mentioned items could become airborne they shall be placed in refuse containers immediately. Clean up of the work site shall include the construction area(s), construction office area(s), material storage area (s), parking and eating area(s), and any other area(s) effected by the construction process. Any dirt or mud which is tracked on to any Base street, parking area, sidewalk, patio, or driveway shall be cleaned away daily.
Materials resulting from demolition activities which are salvageable shall be stored within the work area or at a supplemental storage area. Stored material not in trailers, whether new or salvaged, shall be neatly stacked when stored in an approved location.
T. Contractor’s Management and Use of Electromagnetic Emission Devices on Base:
(Electromagnetic emission devices include: Radio/Radar Transmitters; Navigational
Aids/Instrumentations; Signaling, Intrusion Detecting, and Identification Devices; Mobile and Fixed Business Radio Communications Equipment; and MARS, CBs, and Amateur
Radio Stations.) The Contractor shall comply with the Air Force Military Training
Center (AFMTC) Regulation 700-14, Jul 89.
U. Preparation of Progress Schedules and Reports: The reports contemplated by FAR
Clause, 52.236-15, Schedules for Construction Contracts, shall be accomplished on and in accordance with instructions pertaining to AF Form 3064, Contract Progress Schedule, and AF Form 3065, Contract Progress Report. Contract Schedules and Reports shall run from Monday through Sunday and be submitted to the CO per table of deliverables located in 4.0A Table 1 - Table of Deliverables.
RFP SOW Page 10 of 82
V. Deteriorated Construction And Finish
a. Authority: The QA Inspector will be the governing authority in determining if existing construction and finishes are deteriorated and require repair and/or replacement.
W. Contractor Storage/Staging Area
a. Operations and Storage Approval: Notwithstanding Contract FAR Clause, FAR
52.236-10, Operations and Storage Areas, subject to approval by the CO and in turn, availability and need, a storage/staging area may be provided at the subject project site. If project site space is not available, then offsite storage may be required.
b. Utility ‘tie-ins’, where available, are the Contractor’s responsibility. See 1.1 General
Requirements, Q. Availability and Use of Utility Services for additional information.
c. Storage Area Clean Up: Weekly discard trash and debris in the Contractor’s containers (dumpsters). Do not allow debris to accumulate. At work completion, clean the storage area. This area must be free of any materials, trash or debris before receipt of final payment.
d. In areas of high visibility, the job site construction fence shall have a screen fabric material applied to the fence fabric in order to block the view during the construction phase. The CO will make the determination at the pre-construction meeting if the subject project will require a screened fence or not. Remove fence upon completion.
Rehabilitate disturbed turfs and grass and if reseeding is required use Bermuda grass.
X. Hazardous component abatement for materials such as asbestos, lead-based paint, PCBs, and other hazardous materials shall be the responsibility of the Contractor. Abatement of mold resulting from water damaged materials shall be the responsibility of the
Contractor.
Y. The duration of days is considered calendar days unless otherwise noted.
Z. COVID-19 Requirements - During the COVID-19 pandemic it is vital to Tyndall AFB’s
Mission that the Contractor adhere to all Tyndall AFB Covid-19 directives to mitigate virus transmission. The contractor shall be responsible for the following: follow CDC guide lines, setting up teleconference meetings, wearing mask and social distancing when entering a government facility, the screening of their employees, and reporting COVID-
19 cases to the 325th CONS and 325th CES project manage (PM). As Covid-19 directives are living documents, it is the Contractor’s responsibility to be informed and follow the most recent published directive.
AA. Project Signage: As required per the FAR.
RFP SOW Page 11 of 82
a. As required, a job sign shall be required at the project site. The CO or the
Government Inspector will make a determination based on cost and visibility. The sign shall indicate the Contractor’s company name, project name and MPLS number, superintendent’s name and a 24 hour available response phone number. The size of the sign shall be 4’ x 8’ x ¾” thick plywood board mounted to a 2x4 wood frame and diagonal braces. The wood frame shall be supported on 4x4 wood supports and be mounted to the ground in concrete footings. Background color shall be in accordance with Federal Standard White (Gloss). The color of the lettering shall be Black (gloss) with Helvetica font.
1.2 APPLICABLE DOCUMENTS
A. The Contractor shall identify and comply with all applicable federal, state, and local laws; statutes; Executive Orders; Department of Defense/Air Force manuals, handbooks, regulations, guidance, and policies. The contractor shall comply with the National
Institute of Building Sciences’ Whole Building Design Guide Construction Criteria Base
(CCB) Unified Facility Criteria (UFC) 3-600-01 and all of the related libraries. The primary criteria are the Air Force Criteria from the Documents Library, but other agency criteria may be directed for use, depending on the customer agency for a particular TO.
The Unified Facilities Guide Specifications (UFGS) is the mandatory starting point for all specifications, and shall not be deleted, materially modified, or made less stringent without Government approval. It is the contractor’s responsibility to identify and comply with all applicable requirements. It shall be the contractor’s responsibility as the
Designer of Record (DOR) to identify any design/construction criteria waivers that are warranted for the Project and to accomplish all necessary coordination activities necessary to obtain approval of these proposed waivers through the Contracting Officer
(CO), and/or Project Manager (PM).
B. In addition, the contractor shall refer to and comply with the current versions of the
Department of Defense Policy and Guidelines for Acquisitions Involving Environmental
Sampling or Testing and The United States Air Force Construction Management
Implementation Guide as well as the latest version of The USAF Project Manager’s
Guide to Design and Construction. Base-specific documents are identified in the attached appendices.
C. The Contractor and Design Team shall adhere to the following guidance during design and construction phase(s) of this project: Those sections of the Southern Standard
Building Codes not incorporated in the UBC/International Building Code (IBC) for our respective area, International Concrete Repair Institute (ICRI) Guidelines, Air Force
Standards, Department of Defense (DOD) Directives, Florida State Statutes, and the
Tyndall AFB Facility Excellence Plan (Base Regulations), Occupational Safety and
Health Administration (OSHA) Requirements, Department of Environmental Protection
(DEP) Regulations, Environmental Protection Agency (EPA) Regulations, and ABA
Accessibility Compliance Requirements.
RFP SOW Page 12 of 82
D. In addition to adhering to the previous guidance, the Contractor shall review and adhere to the most recent version of the following code criteria as applicable at start of the design phase:
a. Tyndall AFB IFS Tyndall Air Force Base Installation Facility Standard www.tyndallifs.com
b. UFC 1-200-01 The DoD Building Code
c. UFC 1-200-02 High Performance and Sustainable Building Requirements
d. UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Standard
e. UFC 1-300-07A Design Build Technical Requirements
f. UFC 1-300-08 Criteria for Transfer and Acceptance of DoD Real Property
g. UFC 3-101-01 Architecture
h. UFC 3-110-03 Roofing
i. UFC 3-110-04 Roofing Maintenance and Repair
j. UFC 3-120-01 Design: Sign Standards
k. UFC 3-120-10 Interior Design
l. UFC 3-190-06 Protective Coatings and Paints
m. UFC 3-201-01 Civil Engineering
n. UFC 3-201-02 Landscape Architecture
o. UFC 3-210-10 Low Impact Development
p. UFC 3-220-01 Geotechnical Engineering
q. UFC 3-220-05 Dewatering and Groundwater Control
r. UFC 3-230-01 Water Storage and Distribution
s. UFC 3-230-10A Water Supply, Water Distribution
t. UFC 3-240-01 Wastewater Collection and Treatment
u. UFC 3-250-01 Pavement Design for Roads and Parking Areas
v. UFC 3-250-03 Standard Practice Manual for Flexible Pavements
w. UFC 3-250-04 Standard Practice for Concrete Pavements
x. UFC 3-250-08FA Sealing Joints and Cracks
y. UFC 3-250-11 Soil Stabilization for Pavements
z. UFC 3-260-02 Pavement Design for Roads, Streets, Walks, and Open
Storage Areas
aa. UFC 3-300-07A Design Build Technical Requirements
bb. UFC 3-301-01 Structural Engineering
cc. UFC 3-310-04 Seismic Design for Buildings
dd. UFC 3-400-02 Design: Engineering Weather Data
ee. UFC 3-401-01 Mechanical Engineering
ff. UFC 3-410-01 Heating, Ventilating, and Air Conditioning
gg. UFC 3-410-02 Direct Digital Control for HVAC
hh. UFC 3-410-04 Industrial Ventilation
ii. UFC 3-420-01 Plumbing Systems
jj. UFC 3-420-02FA Compressed Air
kk. UFC 3-430-09 Exterior Mechanical Utility Distribution https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-300-02 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-300-08 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-101-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-110-03 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-110-04 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-190-06 https://www.wbdg.org/FFC/DOD/UFC/ufc_3_201_01_2018_c5.pdf https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-250-08fa https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-301-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-310-04 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-400-02 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-401-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-410-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-410-02 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-410-04 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-420-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-430-01fa
RFP SOW Page 13 of 82
ll. UFC 3-450-01 Noise and Vibration Control
mm. UFC 3-501-01 Electrical Engineering
nn. UFC 3-520-01 Interior Electrical Systems
oo. UFC 3-530-01 Interior and Exterior Lighting and Controls
pp. UFC 3-540-01 Engine-Driven Generator Systems for Prime and Standby
Power Applications, with Change 2
qq. UFC 3-550-01 Exterior Electrical Power Distribution
rr. UFC 3-560-01 Electrical Safety O&M
ss. UFC 3-570-01 Cathodic Protection
tt. UFC 3-570-06 Operation and Maintenance: Cathodic Protection Systems
uu. UFC 3-575-01 Lightning and Static Electricity Protection
vv. UFC 3-580-01 Telecommunications Interior Infrastructure
ww. UFC 3-600-01 Fire Protection Engineering for Facilities
xx. UFC 3-701-01 DoD Facilities Pricing Guide, with Change 2; 2019
yy. UFC 3-730-01 Programming Cost Estimates for Military Construction
zz. UFC 3-740-05 Handbook: Construction Cost Estimating aaa. UFC 4-010-01 DOD Minimum Antiterrorism Standards for Buildings bbb. UFC 4-010-05 Sensitive Compartmented Information Facilities ccc. UFC 4-010-06 Cybersecurity of Facility-Related Control Systems ddd. UFC 4-020-01 DoD Security Engineering Facilities Planning Manual eee. UFC 4-021-01 Mass Notification Systems fff. UFC 4-021-02 Electronic Security Systems ggg. UFC 4-211-01 Aircraft Maintenance Hangars hhh. UFC 4-214-03 Central Vehicle Wash Facilities
iii. USAF BIM Minimum Requirements Version 2.1 jjj. AASHTO A Policy on Geometric Design of Highways and Streets kkk. ABAS Architectural Barriers Act Standards; The ABA may be found at https://www.access- board.gov/guidelines-and-standards/buildings-and-sites/about-the-aba-standards/aba-standards lll. AFDS Air Force Design Guide mmm. AFGM 2018-32-01 Civil Engineer Control Systems Cybersecurity nnn. AFI 32-1020 Planning And Programming Built Infrastructure Projects ooo. AFI 32-1024 Standard Facility Requirements ppp. AFI 32-1063 Electrical Power Systems qqq. AFI 32-1064 Electrical Safe Practices rrr. AFI 32-1065 Grounding System www.wbdg.org › FFC › AFI › afi_32_1065_2017 sss. AFI 32-1067 Water Systems ttt. AFI 32-1068 Heating Systems and Unfired Pressure Vessels uuu. AFI 32-1069 Gas Supply and Distribution
vvv. AFMAN 91-203 Air Force Occupational Safety, Fire and Health Standards www. AFMAN 32-1084 Facility Requirements Standards
xxx. AFMAN 32-1061 PROVIDING UTILITIES TO U.S. AIR FORCE
INSTALLATIONS
https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-450-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-501-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-520-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-530-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-540-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-540-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-550-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-560-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-570-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-575-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-580-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-600-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-4-010-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-4-010-05 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-4-021-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-4-021-02 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-4-211-01 http://www.wbdg.org/FFC/AF/AFBIM/AF_Minimum_BIM_Requirements_V2.1.pdf
RFP SOW Page 14 of 82 yyy. ANSI C2 National Electric Safety Code zzz. ASCE 7-10 Wind Loads aaaa. ASHRAE 55 Thermal Environmental Conditions for Human Occupancy bbbb. ASHRAE 62.1 Ventilation for Acceptable Indoor Air Quality cccc. ASHRAE 90.1 Energy Standard for Bldgs. Except Low-Rise Residential dddd. ASHRAE 100 Energy Conservation in Existing Buildings eeee. ASHRAE 111 Testing, Adjusting, and Balancing of Building HVAC
Systems ffff. ASHRAE 180 Inspection & Maintenance Commercial Bldg. HVAC
Systems gggg. ASHRAE 189.1 Standard for the Design of High-Performance Green
Buildings hhhh. ASHRAE 202 Commissioning Process for Buildings and Systems
iiii. ASHRAE Guide 4 Prep of Operating and Maintenance Documentation jjjj. ECB 2018-11 Control System Cybersecurity Coordination Requirement kkkk. EISA Energy Independence and Security Act of 2007 llll. EM 385-1-1 USACE Safety and Health Requirements Manual mmmm. EPAct 2005 Energy Policy Act of 2005 nnnn. FC 4-218-03F Air Force Criteria for Precision Measurement Equipment
Laboratory Design and Construction oooo. FAR Federal Acquisition Regulations pppp. FS 553 Florida Building Code qqqq. IBC International Building Code rrrr. IES Illuminating Engineering Society Lighting Handbook ssss. IFGS International Fuel Gas Code tttt. IMC International Mechanical Code uuuu. IPC International Plumbing Code
vvvv. MIL-HDBK-1190 MILITARY HANDBOOK: FACILITY PLANNING AND
DESIGN GUIDE
wwww. NACE SP-0169
xxxx. NACE SP-0185 yyyy. NACE SP-0286 zzzz. NBIMS US V3 National BIM Standard US Version 3 aaaaa. NEBB Standards for Whole Building Systems Commissioning bbbbb. NEC National Electrical Code, current edition ccccc. NEMA National Electrical Manufacturer's Association ddddd. NESC National Electrical Safety Code current edition eeeee. NFPA 13 Standard for the Installation of Sprinkler Systems fffff. NFPA 24 Installation of Private Fire Service Mains and Their
Appurtenances ggggg. NFPA 70 National Electric Code hhhhh. NFPA 72 National Fire Alarm Code
iiiii. NFPA 90A Standard for the Installation of Heating and Air
Conditioning Systems jjjjj. NFPA 101 Life Safety Code https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf https://www.nationalbimstandard.org/files/NBIMS-US_V3_4.2_COBie.pdf
RFP SOW Page 15 of 82 kkkkk. NFPA 1141 Standard for Fire Protection Infrastructure for Land
Development in Wildland, Rural, and Suburban Areas lllll. NPDES National Pollutant Discharge Elimination System http://www.dep.state.fl.us/water/stormwater/npdes/construction3.htm mmmmm. SMACNA Guides
Sheet Metal & Air Conditioning
Contractors’ National Assoc.
nnnnn. TAFB FEP TAFB Facility Excellence Plan ooooo. TAFB IFS TAFB Installation Facility Standard https://www.tyndallifs.com/ ppppp. TM 5-683 Facilities Engineering Electrical Interior Facilities qqqqq. TM 5-684 Facilities Engineering - Electrical Exterior rrrrr. USAF BIM Minimum Requirements Version 2.1 sssss. UFAS Uniform Federal Accessibility Standards ttttt. UFGS 23 09 00 Instrumentation and Control for HVAC uuuuu. UFGS 23 09 13 Instrumentation and Control Devices for HVAC
vvvvv. UFGS 23 09 23.02
BACnet Direct Digital Control for HVAC and Other
Building Control Systems wwwww. UFGS 23 09 93 Sequences of Operations for HVAC Controls
xxxxx. UFGS 25 05 11 Cybersecurity for Facility-Related Control Systems yyyyy. UFGS 23 08 10 Utility Monitoring and Control System Testing zzzzz. UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration
E. Miscellaneous
a. AFCEC AGRAM 17-01 Change to AF New Construction and Major Renovation
Certification Requirements
b. Air Force Pamphlet 91-210 (Contract Safety)
c. Air Force Systems Security Instruction 7700 - Communications and Information -
Emission Security
d. Air Force Systems Security Instruction 7702 - Communications and Information
- Emission Security
e. Air Force Sustainable Design and Development (SDD) Implementation Guidance
f. Tyndall Mass Notification System Messages
g. Tyndall Rebuild Facility Related Control Systems (FRCS) Technology Summary
–Appendix L –22 Sept 2021
h. Draft Rule Amendments of the Environmental Resource Permitting (ERP)
Program in the Northwest District, Applicant's Handbook Volume I & II, http://www.dep.state.fl.us/water/wetlands/erp/rules/draft nw.htm.
i. Recommended Standards for Wastewater Facilities (Ten States Standards)
j. Chapter 62-555 FAC General Permit of Construction of Water Main Extension for Public Water System
k. Chapter 62-600 of the Florida Administrative Code, Public Drinking Water
Distribution System and Domestic Wastewater Facilities http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/tyndall-afb-ifs http://www.wbdg.org/FFC/AF/AFBIM/AF_Minimum_BIM_Requirements_V2.1.pdf http://www.dep.state.fl.us/water/wetlands/erp/rules/draft%20nw.htm
RFP SOW Page 16 of 82
l. Chapter 62-604 FAC Collection Systems and Transmission Facilities of the
Florida Administrative Code, Domestic Wastewater Facilities and the Wastewater
Permit checklist.
m. Manual of Practice No. FD-4 Design of Wastewater and Stormwater Pumping
Stations.
n. Manual of Practice No. FD-5 Gravity Sanitary Sewer Design and Construction.
o. USACE ETL 1110-3-466 Selection and Design of Oil/Water Separators at Army
Facilities, August 1994
p. USACE Designing Coalescing Oil/Water Separators for Use at Army Washracks, December 2000
q. GCEC MANUAL OF STANDARDS AND SPECIFICATIONS FOR WATER
MAIN CONSTRUCTION FOR TYNDALL AFB SYSTEM
r. Guiding Principles for Sustainable Federal Buildings and Associated Installations
s. Illuminating Engineering Society of North America (Handbook)
t. Florida Fish and Wildlife Commission;
u. E.O. 13834 Efficient Federal Operations
F. Lightning Protection Requirement: Lightning Protection System (LPS) shall be designed and installed IAW the following references:
a. AFI 32-1065 Grounding System www.wbdg.org › FFC › AFI › afi_32_1065_2017
b. NFPA 70 National Electric Code
c. NFPA 780 Standard for the installation of Lightning Protection System
d. UFC 3-575-01 Lightning and Static Electricity Protection System
e. UL 96 Lightning Protection Components
f. UL 96A Installation Requirements for Lightning Protection System
g. UL 467 Grounding and Bonding Equipment
F. Security Requirements:
a. MIL-HDBK-1013: DOD Military Handbook Design Guidelines for Physical
Security of Facilities
b. AFI 31-101: Air Force Instruction 31-101: The Air Force Installation
Security Program
c. DOD 5200.1.R Department of Defense 5200.1.R: Information Security
Program Construction Standards.
d. ICD-ICS-705 Tech Spec
e. UFC 4-010-01 Unified Facilities Criteria Antiterrorism Standards for New and Existing Facilities
f. UFC 4-010-06 Cybersecurity of Facility-Related Control Systems
G. FAR Case No. 92-54 requires the Solicitation Package for all construction projects to reflect the government's preference for "acquisition of environmentally sound and energy
RFP SOW Page 17 of 82 efficient products and services, and an affirmative procurement program favoring items containing the maximum practicable content of recovered materials".
H. DOD Information
a. Department of Defense Manual 5200.01, Volume 1; DoD Information Security
Program: Overview, Classification, and Declassification; 2012
b. Department of Defense Manual 5200.01, Volume 2; DoD Information Security
Program: Marking of Classified Information; 2013
c. Department of Defense Manual 5200.01, Volume 3; DoD Information Security
Program: Protection of Classified Information; 2013
d. Department of Defense Manual 5200.01, Volume 4; DoD Information Security
Program: Controlled Unclassified Information (CUI); with Change 1 2018
I. Federal Green Construction Guide for specifiers. This guide can be found at:
http://www.wbdg.org/design/greenspec.php
J. The Contractor shall perform all work IAW with AFI, ETL, UFC and industry standards.
Compliance with AF UFCs is mandatory unless the Tyndall AFB IFS has more stringent requirements. If the Contractor determines that the work cannot be performed and/or included in the SOW IAW with ETL’s/UFCs or industry standards, the Contractor shall notify the Tyndall AFB POC listed in this document in writing immediately before award of the contract. Otherwise, the Contractor shall be responsible for the required work.
K. All work shall be in compliance with all Public Laws (P.L.), Executive Orders (E.O.), Code of Federal Regulations (CFR), Department of Defense Instructions (DODI), Department of Defense Directives (DODD), or other higher authority documents as applicable. Many applicable compliance documents are authorized by DoD MIL-STD-
3007F, and are available through the Government-sponsored Whole Building Design
Guide located at https://www.wbdg.org.
L. If there is a conflict between these codes, regulations specifications, and/or guidance documents, the most stringent requirements shall apply, as determined by the CO through the Request for Information (RFI) process. These listed documents do not relieve the
Contractor from complying with other required regulatory documents not listed.
M. The government may take up to 30 days to review design documents. The contractor schedule activity for less days will be overridden by this time frame and will not be considered a delay by the government. The contractor schedule shall reflect the 30 day review time.
2.0 GOVERNMENT PROPERTY INCLUDING GOVERNMENT FURNISHED
INFORMATION, EQUIPMENT, AND PROPERTY (GFI, GFE, GFP)
http://www.wbdg.org/design/greenspec.php https://www.wbdg.org/FFC/FEDMIL/std3007f.pdf https://www.wbdg.org/FFC/FEDMIL/std3007f.pdf https://www.wbdg.org/
RFP SOW Page 18 of 82
A. Historical architectural and structural construction documents may be available for review, however field verification and documentation of existing conditions and configurations prior to construction is essential. The government takes no responsibility for errors and omissions contained in the reference material and field verification shall be performed by the contractor.
3.0 MANAGEMENT, PLANNING, AND REPORTING REQUIREMENTS
A. Design submittals, 35%, 65%, and/or 95%, and 100%, will be routed with an AF Form
3000 and will be reviewed and approved/disapproved within 30 calendar days.
B. No delay damages or time extensions will be allowed for time lost in late or lost submittals. Government review times may take up to 30 days and is not considered a delay for design reviews. The contractor’s schedule shall include time for these 30 day reviews. The official review time starts when the CO acknowledges the receipt of the submittal.
C. Submittals pertaining to environmental issues may take up to 30-45 days for review and approval. Wetland permits may take greater than 60 days to process. Environmental 813 submittals shall include drawings, locates for utilities with depth, size of lines, length of runs, underground or above ground routing, spatial coordinates, duration of the laydown yard or temporary trailer, number of personnel, location of temporary porta toilets, etc.
Delays greater than the anticipated days listed herein do not constitute a governmental delay. Contractor will be allotted a no-cost PoP extension for days over and above those listed herein.
D. All other submittals should be reviewed and approved/disapproved within 10 work days.
Submittals will be reviewed for accuracy and relevance to the project and specifications.
Material Submittal documents shall be submitted with AF Form 3000, Material Approval
Submittal.
E. Submittal shall follow the UFGS Specification Section 013300 SUBMITTAL
PROCEDURES as well as the respective submittal section requiring forms, reports, drawings, samples, pictures, media recordings, manufacturer data, certifications, test reports, equipment warranty information, and the like. Submittal documents shall be submitted by the Contractor to the by CO for approval. All submitted documentation shall become the complete property of the Government. The Contractor shall not purchase, install, or construct any equipment or facility component, for which a submittal is required, without first obtaining an approved signed submittal from the CO. Required submittals shall be listed on AF Form 66, Schedule of Material Submittals, and/or a
Submittal Register approved by the CO.
F. Table of Deliverables: Project deliverables shall be as shown in the following 4.0A
Table 1 - Table of Deliverables. The dates in the table are hard dates not to be exceeded
RFP SOW Page 19 of 82 without CO approval. The deliverables and scheduled activities may be provided or completed early.
G. Coordinate scheduling, sequencing, preparing, and processing of submittals with performance of work so that work will not be delayed by submittal processing. The
Contractor is responsible for additional time required for Government reviews resulting from required resubmittals. The review period for each resubmittal is the same as for the initial submittal.
H. Submittals required by the contract documents are listed on the submittal register. If a submittal is listed in the submittal register but does not pertain to the contract work, the
Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but have been omitted from the register or marked "N/A."
I. Resubmit the submittal register and annotate it monthly with actual submission and approval dates. When all items on the register have been fully approved, no further resubmittal is required.
J. Contracting Officer Review will be completed within 30 calendar working days after the date of submission for submittals requiring Government approval.
4.0 SUBMITTAL FORMAT AND TIMING
A. Submittals will have the full contract number, Type of submittal (RFI, RFP, Specification
Section Number, etc.) , a unique sequential number (-001, -001A, -002, etc.) Description and a Date. Example FA4820FAC0029_RFI-001_Toilet accessories_14Jun2021.
Revisions will have an alphabetic letter after the original number. Example
FA4820FAC0029 RFI-001A Toilet accessories 14Jun2021
RFP SOW Page 20 of 82
4.0A Table 1 - Table of Deliverables
Interim = 35% and 65% submittals, Final = 95% Submittals, IFC Issue for Construction = 100%
Document
Copies
Max Delivery Timeframe 3
C
E S
C
O N le ct ro n ic
H a rd C o p y ct ro rd C o
Standard Meetings and Reports
Meeting Minutes 1 0 1 0 3 calendar days after each meeting
Progress Schedule(AF 3064 or approved equivalent) 1 0 1 0
5 calendar days after NTP or modification to extend PoP
Progress Report (AF 3065 or approved equivalent) 1 0 1 0
Weekly
3-week Look Ahead report 1 0 1 0 Weekly
Daily Logs - Form 1477 or equiv. 1 0 1 0 NLT 0900 the day following - Daily
HAZMAT Forms 81 and 82 1 1 1 1 10 Days prior to preconstruction meeting
Work Clearance Request (AF Form 103A) 1 1 1 1 10 Days prior to preconstruction meeting
Material Approval (AF Form 3000) 1 0 1 0 At the 100% Final Design
Construction Material Testing Reports 1 0 1 0 As required
Welding/Burn Permit 1 0 1 0 Prior to commencing work
Production or Delivery Problem Report 1 1 1 1 At time of identification
Draft DD1354 1 0 1 0 When request for final inspection is submitted
Work Activities
IMS, WBS and AF 3064/3065 1 0 1 0 15 Days Prior to NTP
Kickoff meeting with all stakeholders 1 0 1 0 5 Days Prior to NTP
Health and Safety Plan (HSP) or (APP) 1 0 1 0 Prior to site visits
NTP 1 0 1 0 NA
Contractor Site Investigation 1 0 1 0 5 Days from NTP
Design Quality Plan (DQCP) or (DQSP) 1 0 1 0 Prior to Design Starting
Quality Control Pan (QCP) or (QSP) 1 0 1 0 Prior to construction activities
Construction Work Plan (CWP) 1 0 1 0 Prior to construction activities
Site Investigation Memorandum 1 0 1 0 10 Days from NTP
Charrette Meeting 40 Days from NTP
RFP SOW Page 21 of 82
Copies
Max Delivery Timeframe 3
C
C
O ct ro rd C o ct ro rd C o
Charrette Meeting Minutes Acceptance and
Approval 1 0 1 0
20 Days from 1st Design Submittal
The 35% and 65% design may be waived for small projects
NA
35% Design w/ AF Form 3000 1* 0 1* 0 40 Days from NTP
35% Design Review and Meeting 1 0 1 0 30 Days from 35% Design Submittal
35% Design Resubmittal if submittal was disapproved 1 0 1 0
10 Days from 35% Design Disapproval
35% Design Final Submittal and Approval 1 0 1 0 10 Days from 35% Design Re-Submittal
65% Design w/ AF Form 3000 1* 0 1* 0 40 Days from NTP or 20 Days 35%
Design Approval
65% Design Review and Meeting 1 0 1 0 30 Days from 65% Design Submittal
65% Design Resubmittal if submittal was disapproved 1 0 1 0
10 Days from 65% Design Disapproval
65% Design Final Submittal and Approval 1 0 1 0 10 Days from 65% Design Re-Submittal
95% Design w/ AF Form 3000 0 0 0 0
40 Days from NTP or 20 Days 65%
Design Approval
95% Design Review and Meeting 1 0 1 0 30 Days from 95% Design Submittal
95% Design Resubmittal if submittal was disapproved 1 0 1 0
10 Days from 95% Design Disapproval
95% Design Final Submittal and Approval 1 0 1 0 10 Days from 95% Design Re-Submittal
100% Design w/ AF Form 3000 1* 0 1* 0 20 Days from 95% Final Design
100% Design Review and Meeting 1 0 1 0 30 Days from 100% Design Submittal
100% Design Resubmittal if submittal was disapproved 1 0 1 0
10 Days from 100% Design Disapproval
100% Design Final Submittal and Approval 1 0 1 0
10 Days from 100% Design Re-
Submittal
All Material Submittals 1 0 1 0
At 100% Design Approval or 30 Days from design Approval with CO approval.
Demolition Plan when demolition activities 1 0 1 0 Prior to 100% Design Approval
Environmental Plan (EPP) 1 0 1 0 Prior to 100% Design Approval
Storm Water Pollution Protection Plan
(SWPPP)
1 0 1 0 Provided as part of the EPP
Red Line drawings Submitted 1 0 1 0 15 Days prior to Start Work
Draft Phasing Plan 1 0 1 0 10 Days prior to Start Work
RFP SOW Page 22 of 82
Copies
Max Delivery Timeframe 3
C
C
O ct ro rd C o ct ro rd C o
Final Phasing Plan 1 0 1 0 5 Days prior to Start Work
Mobilization of Contractor 0 0 0 0 After 100% Design Approval or before with CO approval
Job Start Meeting 1 0 1 0 After 100% Design Approval or before with CO approval
Implementation of the Design 100 to 200 Days
Red Zone Meeting 1 0 1 0 60 Days Prior to Beneficial Occupancy
Date (BOD)
Pre-Final Inspection 1 0 1 0 At end of Implementation
Pre-Final Inspection Report 1 0 1 0 5 Days prior to Final Inspection
Operations & Maintenance Manuals 1 1 1 1 5 Days prior to Final Inspection
HAZMAT Form 83 1 0 1 0 Prior to Final Inspection
Final Inspection 1 0 1 0 10 Days after Pre-Inspection
Final Inspection Report 1 0 1 0 5 Days After Final Inspection
O&M’s Review 1* 1 1* 0 5 Days After Final Inspection
As-Built Design Documents 1 0 1 0 5 Days After Final Inspection
As-Built Design Drawings 1* 0 1* 0 5 Days After Final Inspection
As Built Review Meeting 1 1 1 1 10 Days After Final Inspection
As Built Review Comments 1 0 1 0 15 Days After Final Inspection
O&M’s Acceptance 1* 1 1* 0 15 Days After Final Inspection
As Built Comments Acceptance 1 0 1 0 20 Days After Final Inspection
As Built Approval 1 0 1 0 20 Days After Final Inspection
Transfer & Acceptance of Military Real
Property (DD 1354) 1 1 1 0 5 Days after Final Design Approval
O&M’s to user 1 0 1 0 10 Days after Final Design Approval
User training 1* 1 1* 0 15 Days after Final Design Approval
Items in red may be tailored to fast track requirement
*Both Autodesk AutoCAD and Adobe Acrobat versions of drawings are required
K. Electronic copies of all design deliverable documents shall be provided on CD or DVD discs, formatted for use by the latest software version, and compatible with the
Government’s version of Microsoft Word, Excel, PowerPoint, Access, Outlook, the
Adobe family of products, the Autodesk family of applications, the ANSYS family of
RFP SOW Page 23 of 82 applications, or other software platform as appropriate and as determined and directed by the CO. Whenever possible, the electronic files given to the Government should be compatible with at least one software program application listed on the Air Force
Evaluated Products List (EPL) or the Defense Information Systems Agency (DISA)
Approved Products List (APL). For any submitted documents converted to one of the above formats from another software program, the Contractor shall also submit the electronic document file from the software program originally creating it, along with a statement describing what creating software program and version was used, as well as any programs used to convert files from one format to another. Submitted electronic files shall be unlocked and fully editable.
L. Builder Template
a. A builder template will be provided to the contractor to complete for real property items that were installed per the scope of work.
4.1 WORK BREAKDOWN STRUCTURE (WBS)
A. A 3064 or equivalent spreadsheet is used for the WBS. The task number, start and stop dates, Value for the task will be provided.
4.2 SCHEDULE AND PLANNING REQUIREMENTS
A. See Section General Requirements
4.3 PROJECT PLANNING CHART (PPC) and/or CONSTRUCTION PLANNING
CHART (CPC)
A. Provide as needed.
4.4 INTEGRATED MASTER SCHEDULE (IMS)
4.5 CONTRACT PROGRESS SCHEDULE (AF 3064)
A. The Contractor shall submit a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .