attachment-1-rfp-f-g-2026-02-responses.pdf
PDF 33 KB Posted
- Solicitation number
- RFP F&G 2026-02
- Issued by
- Cheshire County, New Hampshire
About this file
This is an RFP responses document from the New Hampshire Fish and Game Department for the Connecticut Lakes Natural Area Scott Bog Spur Road Stream Crossing Replacement project. The department is procuring professional licensed engineering services for the design and engineering analysis of a stream crossing replacement project located in Pittsburg, New Hampshire. The selected Architect and Engineering firm will perform a Hydrologic & Hydraulic study, conduct comprehensive engineering analysis, and deliver complete design services for the removal and replacement of a damaged 6-foot CMP culvert. The engineer must evaluate three crossing options—a free span bridge, open bottom culvert, and squish culvert—and recommend the most suitable solution based on criteria including aquatic organism passage, longevity, public safety, and cost-effectiveness. Deliverables must include detailed plans suitable for NHDES wetland permitting and FEMA submission, along with a cost estimate for in-kind replacement using a new 6-foot CMP culvert with United States-sourced materials. The mandatory site visit is scheduled for May 12, 2026, at 10:00 AM at the Pittsburg Fire Department parking lot. Proposals were due on May 29, 2026, at 12:00 PM, with the RFP closing on June 2, 2026, at 12:00 PM ET. Three responses were received. Contract selection notification is anticipated on June 5, 2026, with Governor & Executive Council approval expected by July 22, 2026. Design work is anticipated during summer-fall 2026, with stream crossing replacement construction scheduled for spring-summer 2027.
The evaluation will employ a 100-point scoring system with 50 points allocated to the technical proposal and 50 points to the price proposal, which must be submitted on a lump sum or not-to-exceed basis. The crossing design must accommodate HS-20 load ratings and support vehicles weighing up to 100,000 pounds, including cement trucks required for Scott Bog Dam maintenance. This contract is partially funded by the Department of Homeland Security Federal Emergency Management Agency (FEMA) and requires compliance with federal regulations including Executive Order 11246 regarding equal employment opportunity and debarment/suspension requirements. Vendors must indicate whether their business qualifies as a minority business, women's business enterprise, or labor surplus area firm per 2 CFR 200.3212. No specific award value or budget range is provided in the available documentation. Permitting costs are explicitly excluded from the RFP scope, with the New Hampshire Fish and Game Department retaining full responsibility for obtaining necessary permits. No set-aside designations or incumbent contractor restrictions are specified in the procurement documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| rfp-f-g-2026-02.pdf | ||
| addendum-2-rfp-f-g-2026-02.pdf | ||
| addendum-1-rfp-f-g-2026-02.pdf | ||
| attachment-1-rfp-f-g-2026-02-scoring.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF NEW HAMPSHIRE
New Hampshire Fish and Game Department
11 Hazen Drive, Concord NH
RFP/BID INVITATION #: 2026-02
FOR: Connecticut Lakes Natural Area Scott Bog Spur Road Stream Crossing Replacement
DATE OF RFP CLOSING: June 2, 2026 12:00 PM ET
Number of Responses to RFP Solicitation: 3
AGENCY CONTACT: John Sojka