Attachment 1- PWS_w_Attachments - Final.pdf
PDF 411 KB Posted
- Attached to
- Diesel Engine Parts and Services
- Solicitation number
- N3220525R0010
About this file
This is a Performance Work Statement (PWS) for a Military Sealift Command (MSC) contract to provide maintenance and support services for diesel engines across multiple ship classes. The contract is an Indefinite-Delivery Indefinite-Quantity (IDIQ) type with firm-fixed-price line items, primarily focused on parts procurement, component storage, maintenance, and repair for diesel engines manufactured by original equipment manufacturers (OEMs) like MAN and Fairbanks Morse.
Key requirements include providing qualified technical personnel such as factory-certified technicians, mechanics, and a program manager, with specific experience and certification standards. Services encompass engine overhauls, inspections, repairs, technical support, training, engineering services, and parts replacement for 28 different diesel engine models. The contractor must utilize a Quality Management System certified to ANSI/ISO 9001-2015, provide comprehensive warranty protection, and adhere to strict performance standards. The contract includes detailed reporting requirements, performance metrics, and potential penalties for non-compliance, with the government reserving the right to add contractors through "on-ramp" solicitations during the five-year ordering period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
1. GENERAL
The Government requires a broad range of parts and services of original equipment manufacturers (OEM), original equipment manufacturers authorized, and MSC approved non-OEM equivalent distributors/parts providers/service technicians to maintain diesel engines contained within multiple Military Sealift Command (MSC) classes of ships.
The Government reserves the right to undertake fulfillment of requirements by Government forces, other contractors, and/or other contract vehicles for the same type or similar work as contracted for herein, as the Government deems necessary or desirable.
Per the “Competition in Contracting Act (CICA), 41 U.S. Code, Section 453,” requirement to consistently increase competition, MSC reserves the right to have one or more “on ramp” solicitation(s) during the five-year ordering period, to seek and add MSC screened, capable contractors to this IDIQ. MSC may additionally solicit and approve non-OEM equivalent contractors, to qualify and provide to MSC parts and services for maintaining and supporting the above diesel engines and equipment.
Individual delivery or task orders issued under this contract may consist of procuring materials/parts, services, or a combination of both material/parts and services.
1.1. Glossary of Terms used in the Performance Work Statement
ABS: American Bureau of Shipping BOM: Bill of Material CFM: Contractor Furnished Material CONUS: Continental United States COR: Contract Officer Representative CS: Contract Specialist CSI: Class Standard Item CCSI: Cross Class Standard Item CDRL: Contract Data Requirements List DO: Delivery Order DoD: Department of Defense GFM: Government Furnished Material GSA: General Services Administration FM: Fairbanks Morse JTR: Joint Travel Regulations KO: Contracting Officer MAN: MAN Energy Solutions MCCS: Machinery Centralized Control System
MSC: Military Sealift Command OEM: Original Equipment Manufacturer OCONUS: Outside Continental United States O&A: Over and Above POP: Period of Performance PPE: Principal Port Engineer PWS: Performance Work Statement QA: Quality Assurance RFQ: Request for Quotation SAMM: Shipboard Automated Maintenance Management T-ALT: Transportation Alteration TO: Task Order
1.2. OEM Authorized or MSC Approved Technical Representatives and OEM Parts Supplier
1.2.1. To be considered an approved provider, contractors shall be either the OEM, an authorized OEM dealer/seller or MSC approved Non-OEM Technical Field Service Provider(s), or OEM parts supplier.
Contractors may request qualification as a MSC approved non-OEM service or parts provider. https://www.msc.usff.navy.mil/Business- Opportunities/Contracts/Qualification-for-Items-Critical-to-Shipboard-Safety-on- MSC-Vessels/
2. SCOPE OF WORK
2.1 The scope of work for this contract includes, but is not limited to, services, remote support, parts procurement, and component storage and management for all MSC vessels and any other Government owned or Government chartered ship designated by MSC. Services may include, but are not limited to, overhauls, appraisals, storage, warehousing, groom, inspections, life cycle management, engineering, refurbishment, repairs, reports, tests, upgrades, training, remote support, riding the ship for long periods, pier side availabilities, and calibration.
2.2 The scope of work also includes any O&A work to correct discrepancies discovered while performing an overhaul, maintenance, modification, repair, or assessment effort when that work:
• Was not identifiable at the time of task order award;
• Was discovered during the course of task order performance;
• Is within the general scope of the task order;
• Is not within the specific scope of an existing CLIN on that task order; and
• Is required in order to satisfactorily complete task order performance.
https://www.msc.usff.navy.mil/Business-Opportunities/Contracts/Qualification-for-Items-Critical-to-Shipboard-Safety-on-MSC-Vessels/ https://www.msc.usff.navy.mil/Business-Opportunities/Contracts/Qualification-for-Items-Critical-to-Shipboard-Safety-on-MSC-Vessels/ https://www.msc.usff.navy.mil/Business-Opportunities/Contracts/Qualification-for-Items-Critical-to-Shipboard-Safety-on-MSC-Vessels/
2.3 Under this contract, all task orders performed shall be led by a foreman, technical supervisor, or superintendent who is authorized, certified, and qualified in accordance with paragraph 2.3.1. Proof of certification shall be required, and a hard copy shall be provided to the government for all current and new personnel. Proof of certification for potential project leads shall be provided with each individual task order proposal.
2.3.1 KEY PERSONNEL REQUIREMENTS:
The Contractor shall provide qualified personnel to perform all contract work and services within specified time frames. Contractor personnel performing under this contract shall be able to visit overseas locations unless local service technicians are available and approved by the COR to perform the required effort. Contractor personnel shall be capable of obtaining and maintaining clearance to access the ships. If Contractor personnel lose access to a ship, this shall be reported to the COR within 72 hours of the purported loss of access. Any changes to personnel during maintenance and repair periods shall be vetted to the COR for approval.
While resumes will not be evaluated prior to contract award, the Government reserves the right to request resumes and supporting documentation throughout the contract duration in accordance with CDRL A008. If a deficiency is found with a requested resume and/or personnel supporting documentation, the Contractor shall provide a qualified replacement for associated personnel. Payments for unfilled key positions will cease and may be grounds for termination of contract if a position is left vacant or not filled with a qualified person within seven (7) calendar days.
Qualification requirements are as follows:
2.3.1.1 Contractor Liaison shall be the single point of contact for this contract. This individual shall be able to make decisions that influence maintenance and repair of engines listed in Section 2.15 The Contractor Liaison must be available for emergent calls and deconflict problems as it relates to this PWS and associated TO/DO. Contractor Liaison shall have a minimum of 10+years’ experience within the Marine Industry. This position shall not be a direct charge to the government under this contract.
2.3.1.2 Factory Certified Technicians (Project Lead, Shipboard) shall be fully qualified and certified in accordance with contractor standards. Technicians shall be knowledgeable with the engine(s) listed in Section 2.15 of this contract and shall be able to provide proof of certification upon request as per Section 2.3.1. Factory certified technicians designated as lead shall have a resume provided and shall be approved by the government prior to being assigned to all tasks under this contract. Lead technicians shall have a minimum of seven years’ experience with the specific engine line of notated in the individual task order.
2.3.1.3 Factory Certified Mechanics (Shop) shall be fully qualified and certified in accordance with contractor standards. Shop technicians shall be knowledgeable with the engine(s) listed in Section 2.15 of this contract and shall be able to provide proof of certification upon request.
2.3.1.4 Program Manager (PM) shall have 5 years’ experience working in the shipyard environment and have knowledge of the engines listed in Section
2.15 The PM shall be readily available to the government to discuss solutions or disputes regarding performance or issues on the deck plate. If requested by the Government, a resume shall be provided, and key personnel shall be approved by the government prior to being assigned to task orders issued under this contract. Program Managers must be able to correspond within any time zone differences within a couple hours. At times, Program Managers must be on the deck plate/shipyard to support and remote positions will not sufficiently meet the requirements.
2.3.1.5 All personnel shall be able to read, write, speak, and understand English fluently.
2.4 Contractors are expected to utilize ship’s force when available for troubleshooting and training them on the engines. This is not meant to supplement the contractor’s workforce but more of supporting the ship through education on proper engine maintenance and operation.
2.5 All parts ordered under this contract shall be OEM made, authorized, certified, and qualified parts.
2.6 When and if requested, the Contractor shall provide a detailed proposal outlining their QA process flow for shipboard and repair shop facility work.
2.6.1 Shipboard work means what processes are followed to ensure maintenance procedures are adhered to in order to ensure the highest standard is followed to bring the engine back to original configuration.
2.6.2 Repair shop facility work means what processes/standards/checkpoints are followed to ensure overhauled parts are returned to serviceable, like new condition.
2.6.3 The Contractor shall utilize a Quality Management System (QMS) certified to ANSI/ISO/ASQ 9001-2015 (or the most current revision) in the execution of this Contract. The Contractor shall develop a Quality Assurance Program Plan (DI-
011) defining the quality program, processes, procedures, and metrics to be employed for this Contract. Additionally, refer to CDRL A007. The Contractor shall flow down QMS language in all subcontracts. The Contractor shall provide the Government access to all Contractor and subcontractor/vendor quality records generated in the performance of this Contract.
2.7 For all overhauls, Contractor shall utilize a unit exchange program to the maximum extent practicable. A unit exchange program shall consist of the contractor offering discounted prices for major components, in exchange for receiving the “F Condition” core back from the government. Major components shall include, but are not limited to, cylinder heads, cylinder liners, piston assemblies, fuel pump assemblies, exhaust valve assemblies, support rings, and charge air coolers.
2.8 For all overhauls, Contractor shall provide packaging and transportation for all parts and components, unless specifically stated otherwise at the TO/DO level.
2.9 All parts returned to storage shall be packaged for long-term storage with the expected storage duration to be greater than one (1) year. Packaging procedures shall take into account possibility of a non-climate-controlled space, and possible exposure to environmental elements. All parts returned to the vessel for use or storage shall be packaged for transport taking into account possibility of exposure to environmental elements. Any damage to parts or components due to improper packaging shall be at the fault of the Contractor and remedied at the Contractor’s expense.
2.10 The Contractor shall be an integral part of the Overhaul Management Team (OMT) during overhaul periods. The Overhaul management team, led by the principal port engineer, is the group of government and contracted employees responsible for overseeing successful completion of the shipyard availability to all quality standards, and within the pre-set milestones. The Contractor shall work with the OMT and shipyard Project Management to integrate all engine repair work into the shipyard schedule. The intent is to communicate any problems and resolve conflicts with other ship repair work.
The Contractor shall work with the shipyard to de-conflict any schedule for an on-time completion of engine overhaul. This includes providing an engine overhaul POAM and any updates to the OMT and shipyard Project Manager. The Contractor shall be in attendance for all OMT and shipyard Project Manager morning meetings.
2.11 All work shall be performed in accordance with, but not limited to, MSC qualified and authorized practices and procedures, United States Coast Guard (USCG) regulations, American Bureau of Shipping (ABS) regulations, and MSC Technical Publications.
2.12 Contractors shall provide revised and current technical publications for the engines listed in Section 2.15 All revised and current technical publications shall be distributed to the MSC Technical Library at MSC_N7_TechLibrary@us.navy.mil, and to the COR(s) in accordance with CDRL A005.
mailto:MSC_N7_TechLibrary@us.navy.mil
2.13 Upon request, OEMs shall provide parts lists data that will identify all parts necessary to provide for 100% bill of material for all maintenance intervals. OEMs shall coordinate to ensure full consistency between both OEM’s bills of material for all maintenance intervals and provide updated parts lists to the government on an annual basis. All vendor part numbers in parts list must contain identical part numbers to maintain consistency in pricing reasonableness and ensure accurate parts quoting. The following requirements apply to the parts list:
2.13.1 OEM's superseded part number (FM), and design authority commercial equivalent (MAN) shall be identified when applicable, however the MSC Technical Manual published part number shall be the standard part number referenced.
2.13.2 All parts shall be keyed (using index numbers) to exploded view drawings.
2.13.3 Parts in the listing shall be grouped by assemblies, subassemblies, and modules.
Parts shall be identified in the assembly in which they are components.
2.14 Parts and Labor:
2.14.1 Only OEMs (MAN and FM) parts are authorized for use under this contract. No third party, non-OEM parts are authorized for use on MSC vessels.
2.14.2 Only OEM or MSC Approved Non-OEM Equivalent provided labor is authorized for use under this contract, and on any MSC vessel. OEM or MSC Approved Non-OEM decision to subcontract labor must be explicitly approved by MSC, prior to award of individual task order. Contractor shall reference paragraph 3.2 of this PWS related to use of subcontractors.
2.14.3 Over the course of this contract, contractors shall use the pricing established on Exhibit B Rate Table for parts and labor when submitting quotes at the task/delivery order level. Additional parts not included on Exhibit B Rate Table may be requested during the course of the contract via RFQs at the order level.
2.15 Systems for which services and parts will be provided include, but are not limited to
(bolded systems are included on Exhibit B Rate table):
2.15.1 ALCO 251F
2.15.2 Colt-Pielstick PC4.2
2.15.3 Fairbanks Morse 38D 8-1/8
2.15.4 MAN 51/60
2.15.5 MAN 6L 48/60
2.15.6 MAN 6L 48/60CR
2.15.7 MAN 8L 48/60
2.15.8 MAN 9L 48/60
2.15.9 MAN 12V 48/60CR
2.15.10 MAN 12V 25/30
2.15.11 MAN 18V 20/27
2.15.12 MAN 12L90GFCA
2.15.13 MAN 9K84EF
2.15.14 MAN 12K84EF
2.15.15 MAN 8S28LH
2.15.16 MAN 7S28LH
2.15.17 MAN K7 SZ 90/160 BL
2.15.18 MAN S28LH-2
2.15.19 MAN 32/44
2.15.20 MAN 32/44CR
2.15.21 PA-6B
2.15.22 ALCO 251
2.15.23 PC2.5 STC
2.15.24 PC2.5 STC CR
2.15.25 PC2.5
2.15.26OP 8 1/8
2.15.27 28/33
2.15.28 28/33D
3. TASK ORDER (TO) AND DELIVERY ORDER (DO):
The scope of work shall be defined in each individual task or delivery order. Requirements listed in the base contract are applicable to all task orders and/or delivery orders issued under this contract. Tasks may relate to the maintenance of the systems as described in the performance work statement of each TO and/or DO.
3.1 The below task examples are general in scope, nature, complexity, and purpose of the type and range of services to be acquired under the contract and are not meant to be an exhaustive list.
3.1.1 Provide technical field service representatives to conduct, oversee, and/or provide support services to overhaul, upgrade, and/or perform preventative or corrective maintenance of the system. Scheduled preventive maintenance may occur periodically in accordance with applicable OEM manuals and references as defined in each order.
3.1.2 Provide the services of an OEM authorized repair facility to perform all system component cleaning, disassembly, groom, ship inspection, refurbishment, repair, and/or reassembly in accordance with all OEM requirements.
3.1.3 Provide MSC approved technical field service representatives to inspect, troubleshoot, and/or make adjustments, as necessary, to bring the system to proper operating and load parameters as defined at the task order level.
3.1.4 Coordinate with the Principal Port Engineer, ABS, and USCG to attend, witness, and certify repairs and condition of individual machinery components as specified in OEM technical publications and in accordance with applicable Class and Statutory rules and regulations with presence of an MSC representative.
3.1.5 Provide spare or replacement engine parts as part of a delivery order. Replacement parts may or may not be associated with a task order.
3.1.6 Provide parts repair and storage globally. Storage shall meet the OEM specification for storage of parts, which could include a climate controlled, high ground (above 1,000 Year Flood Plan), and easily accessible for parts retrieval via full size semi-truck.
3.1.7 Provide support for annual automation and machinery testing for Class and/or Statutory surveys and inspections. Support includes oversight and testing of systems’ safeties required to demonstrate safe operation of all systems.
3.1.8 Assist MSC with the development of Life Cycle Management plans that will tailor recommendations to MSC operating profiles and existing ship and class specific MSC authorized diesel maintenance plans. This includes, but is not limited to, a review of MSC’s Shipboard Automated Maintenance (SAMM) preventative maintenance requirements.
3.1.9 Provide training to include a training facility and training material for the engines listed in this contract per Section 2.15 Locations of the training courses can be OCONUS or CONUS.
3.1.10 Provide engineering and administrative support to develop training CD/DVDs to provide ship’s force guidance on standard maintenance actions. Examples of possible training videos include fuel injector rebuild, fuel pump rebuild, exhaust valve assembly and installation, intake/exhaust valve operation, and setting of valve lash.
3.1.11 Provide engineering services from the Contractor to perform calculations or drawing updates for the listed engines. Engineering services range from analysis of failed components to redesign of components that are known to fail in service.
3.1.12 Provide recommendations to revise specific diesel maintenance plans based on a review of “as found” and “as released” condition reports and feedback from port engineers and operators. Make additional adjustments to standard system maintenance to adjust periodicities of standard maintenance actions.
3.1.13 Review MSC Shipboard Automated Maintenance Management system (SAMM) actions pertaining to main propulsion and associated systems to ensure accuracy with the existing machinery maintenance plan.
3.1.14 Provide administrative and engineering support to develop equipment and system technical manual change pages.
3.1.15 Review existing MCCS Periodic/USCG Periodic Safety Test Procedure and provide recommendations for improvements. Provide administrative and engineering support to develop Periodic Safety Test Procedure change pages.
3.1.16 Review MSC CSI and CCSI templates and provide recommendations for improvements. Provide and maintain standard service reports for scheduled maintenance actions.
3.1.17 Provide engineering support to assist MSC in addressing obsolescence issues associated with system and associated components.
3.1.18 Provide engineering support and technical assistance in developing T-ALT’s for system improvement and/or modification.
3.2 Subcontractor pricing for labor directly related to work in the PWS listed in the requirement shall be priced outside of in-house labor rates. The contractor shall be clear and concise in reporting actual internal labor versus subcontractor labor. Additional subcontractor labor rates not defined in this contract shall be reviewed and approved by the Contracting Officer and COR. MSC reserves the right to request, through the prime contractor, a breakdown of subcontractor pricing, to determine subcontractor pricing fair and reasonable.
Per FAR 44.101 Definitions - Subcontractor means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime contractor or another subcontractor. For clarity, a subcontractor is not considered a direct employee of the prime contractor. Similarly, channel partners are classified as subcontractors.
4. TECHNICAL MANUALS:
4.1 Equipment procured under this contract shall be delivered with a supporting technical manual, to be identified at the task order level, as applicable. The equipment technical manual shall be printed in hard copy and the cover shall be durable to withstand frequent handling and exposure to oil and water. The binding will permit adding and removing pages. All manuals shall include the following, as applicable (commensurate with the complexity of the equipment), but not necessarily in the following order:
4.1.1 Cover and Title Page
4.1.2 Manufacturer’s Name and Address
4.1.3 Equipment Name and Application
4.1.4 Table of Contents (including a list of drawings and tables)
4.1.5 Safety Precautions (Cautions, Warning, and Notes)
4.1.6 General Theory of Operation
4.1.7 Preparation for use, installation, and initial adjustment instructions
4.1.8 Operational Instructions
4.1.9 Maintenance Instructions (Preventative and Corrective)
4.1.10 Cleaning and Lubrication Instructions
4.1.11 Performance Verification and Test Features
4.1.12 Frequency of Adjustment/Test Equipment
4.1.13 Troubleshooting Instructions
4.1.14 Disassembly, Repair, Replacement, and Reassembly Instructions
4.1.15 Installation Instructions Diagrams, Illustrations, and Schematics
4.2 For alterations or changes to any documentation, the Contractor shall provide changes to technical manuals and drawings equal or greater to the existing quality in technical manuals and drawings, as applicable and to be addressed via task order. MSC N7 and the corresponding vessel shall be provided two (2) copies each of all manual/drawing changes within ten (10) business days of the change being confirmed by the OEM.
4.2.1 Delivery of electronic and hard copies shall be delivered to the MSC Technical
Library at MSC_N7_TechLibrary@us.navy.mil in accordance with CDRL A005.
5 CONTRACTOR/GOVERNMENT FURNISHED ITEMS:
5.1 Contractor: Contractor is solely responsible for the shipment and return shipment of all machinery components sent to Contractor’s facility for the purpose of testing and refurbishment. This includes machinery components normally overhauled on the vessel but deemed necessary by the Contractor to be sent to the Contractor’s offsite facility so as to complete the project on time. The Contractor shall provide all materials required for work under this contract which are not classified as Government Furnished as stated in the orders. The Contractor shall provide all consumables and other materials required to perform the contract work with the exception of fluids, special tools (properly calibrated by ships force), and specialized test equipment which should be onboard and readily available in advance of the task order for Contractor use. In the event special tools require replacement, Contractor is to have them readily accessible. The Contractor shall maintain documentation of calibration standards/certifications for all Contractor owned tools/test equipment. The Contractor shall also prioritize worker safety throughout the project by implementing necessary safety protocols and providing appropriate protective equipment to all personnel involved in the work.
mailto:MSC_N7_TechLibrary@us.navy.mil
5.2 Government: The Government may furnish property to the Contractor for the performance of work under this contract. In that event, the Contracting Officer may, in his/her sole discretion, unilaterally include any or all of the following clauses in the delivery/task order:
5.2.1 FAR 52.245-1, Government Property
5.2.2 FAR 52.245-9, Use and Charges
5.2.3 DFARS 252.245-7003, Contractor Property Management System Administration
5.2.4 DFARS 252.245-7005, Management and Reporting of Government Property
6. PLACE OF PERFORMANCE:
Services may be accomplished onboard, at a shoreside repair shop facility, at a commercial shipyard, at a government or commercial pier in various locations around the world, or while the ship is underway. Contractor shall visit MSC ships while they are in the various locations, as required. Underway sea trials may be necessary for inspections, overhauls, repairs, and tests. The Contractor shall comply with any necessary shipyard, port authority, or private pier access, security, and insurance requirements.
7. CONTRACT TYPE:
7.1 This will be an Indefinite-Delivery Indefinite-Quantity (IDIQ) type contract with firm-fixed- price Line Items. It is anticipated that the majority of Task Orders issued against this IDIQ will be firm-fixed-price. In some instances, Time-and-Material or Labor-Hour type orders may be issued at the Government’s discretion. This contract type will only be utilized in instances where there is no way, at the time of placing the order, for the Command to accurately estimate the extent or duration of the work or to anticipate associated costs of the requirement. Pre-negotiated part pricing will be subject to a firm-fixed price. Under this type of contract, no work may be performed until directed by a TO or DO. Electronic mail is an acceptable form of transmission for all DOs, TOs, modifications, and correspondence issued under this contract. DOs and TOs may be issued orally; however, orally issued orders will be followed up with a written DO or TO.
8. WORK HOURS:
8.1 Ordinarily, work will commence in accordance with the delivery or task order. Any exceptions and/or changes may only be authorized by the Contracting Officer.
8.2 Work is to be planned and organized so that all the work is completed by the end date of the period of performance. Once a job has commenced, any Contractor caused delays which result in work stoppage shall be at the expense of the Contractor. Yard support should not interfere with completion of Task Orders and Delivery Orders.
8.3 Federal Installations under this contract observe the following legal holidays:
8.3.1 New Year’s Day, 1 January
8.3.2 Martin Luther King’s Birthday, Third Monday in January
8.3.3 President’s Day, Third Monday in February
8.3.4 Memorial Day, Last Monday in May
8.3.5 Juneteenth, 19th of June
8.3.6 Independence Day, 4th of July
8.3.7 Labor Day, First Monday in September
8.3.8 Columbus Day, Second Monday in October
8.3.9 Veterans Day, 11th of November
8.3.10 Thanksgiving Day, Fourth Thursday in November
8.3.11 Christmas Day, 25th of December
8.3.11.1 When one (1) of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the proceeding Friday is observed as a legal holiday. In addition to the days designated as holidays, the Government observes the following days: Any other day designated by federal statute;
any other day designated by Executive Order; and any other day designated by Presidential Proclamation. No other holidays outside of the above listed federally recognized holidays, or others created by federal statue, will be acknowledged for the purposes of this contract.
8.3.11.2 It is understood and agreed between the Government and the Contractor that observance of such days by Government personnel and facilities shall not be a reason for an extended period of performance. Entitlement of compensation for premium labor rates is only acceptable on the holidays listed in paragraph 8.3.
9. DELIVERABLES/CDRL:
9.1 The Contract Data Requirements List (CDRL) provided herein does not constitute a complete listing of all potential data requirements. The Government retains the right, at its sole discretion, to add additional CDRLs throughout the performance of this contract.
9.2 OVERHAUL COMPLETION REPORT: Exhibit A, Contract Data Requirements
List (CDRL) A001: Within seven (7) days of completion of an overhaul, repair, inspection, and/or test, provide a typewritten PDF report prepared by an OEM authorized technical field service representative, or MSC approved non-OEM service provider, detailing the results of all visual inspections, clearance readings, repairs performed, test results, corrective actions, photographs taken, engine start-up certification, and shipboard departure sign-off. The report shall also indicate the next prescribed maintenance interval as well as any potential growth work. The report format may be individual to each Contractor; however, the format shall be uniform for all reports issued by the Contractor for the duration of this contract. The report format as well as any updates or changes shall be agreed upon by MSC. All reports shall be digitally sent to the respective Principal Port Engineer and Contracting Officer’s Representative.
9.3 CONDITION FOUND REPORTS (CFRs): Exhibit A, Contract Data Requirements
List (CDRL) A002: All conditions found which require corrective action outside of the prescribed maintenance interval or task order shall be communicated via Condition Found Report (CFR). All CFRs shall be submitted in accordance with CDRLs established at the base IDIQ contract level as documented under IDIQ Contract. Any condition found which does not require corrective action shall be documented in the final report in accordance with CDRL A001, and a CFR is not required.
9.3.1 Upon discovery of the abnormal condition, the Contractor is to notify the PPE within two (2) hours of discovery, by email, phone call, or in person.
9.3.2 Within twenty-four (24) hours of discovery of an abnormal condition, the Contractor shall notify the PPE and COR(s) by email, (formal report not required), of the condition. If parts are required for repair, then part number(s) (P/N) and quantity should be listed.
9.3.3 The Contractor then shall submit a CFR via email as soon as possible upon discovery of an abnormal condition but no later than one (1) business day after the condition was found. While in the shipyard, Weekends and Holidays are considered Business Days. CFR are to be submitted to the COR and PPE for the TO/DO.
9.3.4 Quotes that correspond to CFRs shall be submitted to contracting expeditiously and not to exceed 24 hours upon request.
9.3.5 CFRs are to be submitted in Contractor format but shall contain the following information:
• Date
• Contractor Name
• Technical Representative Name
• Vessel Name
• Contract #
• TO/DO#
• “As Found” Condition
• Solutions to “as found” condition o If parts are required, P/N and quantity shall be listed.
9.4 ENGINE START-UP CERTIFICATION: Exhibit A, Contract Data Requirements List (CDRL) A003: The Contractor shall submit an Engine Start-Up Certification to the
Port Engineer and Chief Engineer within one (1) day of work completion. A signed copy shall be included in the final report. This document certifies that work is completed and the engine may be started. Prior to engine start up, the Contractor shall obtain verification/signature from the CHENG and onsite certified technician stating close out inspection and engine cleanliness (no rags, diapers, tools, metal shavings, etc. is left behind inside the engine) meets OEM standards for cleanliness. Reference Attachment 2 – Engine Startup Procedure Example (May be subject to change)
9.5 OUSTANDING DO/TO REPORT: Exhibit A: Contract Data Requirements List
(CDRL) A004: The Contractor shall provide a Monthly Outstanding DO/TO Report to the COR(s) with actual final delivery date for each line item on a DO. If there are multiple shipments for one line item, they shall be recorded as quantity delivered and the date (e.g. 10 each/ [7/4/19]). The report will also identify all the outstanding line items on a given DO that have not been delivered and current updated status for final DO delivery completion. Upon final DO delivery completion, the current updated status will reflect "FINAL DELIVERY COMPLETE" on the next Monthly Outstanding DO Report.
On the following Monthly Outstanding DO Report, these DOs will be removed in their entirety. Final report shall be provided as part of the invoice, or the government will withhold payment.
9.6 TECHNICAL BULLETIN UPDATES: Exhibit A: Contract Data Requirements
List (CDRL) A005: Within 48 hours of occurrence, vendor shall provide notification via email to MSC for all service bulletins, part numbers as outlined in the OEM technical manual, and OEM recommendations to the MSC COR and MSC Technical Library (MSC_N7_TechLibrary@us.navy.mil).
9.7 SHIPBOARD DEPARTURE SIGN OFF: Exhibit A: Contract Data Requirements
List (CDRL) A006: The Contractor’s technical representative shall obtain job final sign-off from MSC PPE prior to departing the job site. A copy of final sign-off shall be provided to the Contracting Officer Representative (COR). Sign-off shall be provided as part of the 100% Certificate of Completion or the government will withhold payment.
Attachment 1 provides an illustrative example of such documentation.
9.8 CONTACTOR’S QUALITY ASSURANCE PLAN: Exhibit A: Contract Data
Requirements List (CDRL) A007: Within two weeks after the base contract award and annually thereafter, the Contractor shall submit a Quality Assurance Plan to the CORs and the Contracting Officer. The plan shall include processes, controls, standard operating procedures that will be implemented to ensure quality in parts and services.
9.9 KEY PERSONNEL RESUMES: Exhibit A: Contract Data Requirements List (CDRL) A008: When requested, the Contractor is to submit the resumes of any key personnel, along with any supporting documentation. The Contractor shall provide the resume(s) and supporting documentation within three (3) business days of the date of request. Resume(s) and supporting documentation shall be in either Microsoft Word or PDF version and shall be submitted electronically via email.
mailto:(MSC_N7_TechLibrary@us.navy.mil
10. REQUIRED STANDARD OF WORKMANSHIP/PERFORMANCE STANDARDS:
10.1 Services shall be acquired under this contract. Task orders will be structured as performance-based in accordance with FAR Subpart 37.6. This contract, as supplemented by the PWS contained in each service task order, provides specific requirements to accomplish the work. The Contractor shall be evaluated on their ability to provide quality deliverables in an efficient manner.
10.2 The Government will monitor the Contractor’s performance under this contract using the
Quality Assurance Surveillance Plan (QASP) developed by the Government. In an effort to minimize the contract administration burden, simplified methods of surveillance techniques shall be used by the Government to evaluate Contractor performance. The primary methods of surveillance are Customer Input/Feedback and Inspection of Deliverables through either random sampling or 100% inspection as dictated by the task order. Customer feedback may be obtained either from the results of formal customer satisfaction surveys or from random customer complaints. Customer complaints, to be considered valid, must set forth in writing the detailed nature of the complaint, and must be certified by the COR. The complaint will then be forwarded to the Contracting Officer for review. If the Contracting Officer determines that the compliant is valid, the Contractor will be formally notified in writing. The Contractor will have five (5) business days to formulate a response detailing the actions taken to remedy the complaint filed unless a shorter timeframe is necessary in order to comply with the period of performance of the task order.
10.3 Inspection of deliverables may be conducted by either the COR, Contracting Officer, or other officially designated Government representatives. The level of inspection will be determined based on the task order deliverable requirements and the frequency of deliverables. For deliverables identified as failing to meet the requirements, the Contractor will have five (5) business days to formulate a response detailing the actions taken to remedy the failure unless a shorter timeframe is necessary in order to comply with the period of performance of the task order.
10.4 All parts ordered via DOs under this contract shall be delivered by the Required Delivery
Date (RDD) stated in the order. If the part(s) will be delivered late, the Contractor shall notify the COR(s) and the Contracting Office immediately with the updated delivery date(s). In instances where parts did not meet the original RDD, the government may seek consideration in the form of requesting that funds be deducted from the DO.
10.5 CDRL DELIVERABLES
The Contractor shall deliver all CDRLs in accordance with Section 9 and Exhibit A.
10.6 PERFORMANCE REQUIREMENT STANDARDS (PRS)
10.6.1 Failure to meet a Performance Requirement Summary metric is considered a major nonconformance that adversely impacts (or has the potential to) mission, safety of personnel and/or equipment, environment, performance (quality), schedule (delivery), and/or cost. The government’s contracting officer will communicate major non-conformances to the contractor on a Contract Discrepancy Report (CDR) form, or other correspondence, with a suspense date for the contractor’s corrective action plan.
Performance Objective
Performance Standard
Performance Threshold
Surveillance Method
Incentive (Negative)
Incentive (Positive)
Personnel Manning
Each Task Order shall be assigned qualified key personnel in accordance with Section 2.3.1 of the base contract
PWS.
100% of the task orders are required to have qualified personnel.
COR
Inspection/ Customer Complaints /Customer Feedback /COR Reports and Assessments.
Unsatisfactory/Poor Performance will be documented in
CPARS.
Payments will cease.
Corrective action to be implemented.
Positive
CPARS
Timeliness and accuracy of Deliveries
Contractor provides parts on time as required by the delivery date stated in orders in accordance with section 10.4 of the base contract PWS, and work authorizations in response to CFRs in accordance with section 9.3 of the base contract PWS.
For each individual order, 100% of deliveries are accurate and are provided on time.
COR
Inspection/ Customer Complaints / Customer Feedback/COR Reports and Assessments.
Unsatisfactory/Poor Performance will be documented in
CPARS.
Corrective action to be implemented.
The KO can deduct up to 15% from the final invoice of the total price for each order, or IAW FAR 52.212-4(a) the Government may seek an equitable price reduction or adequate consideration for
Positive
CPARS
acceptance of nonconforming supplies or services.
Accuracy of Deliverables:
CDRLS
Contractor shall have no more than two reviews of submittals prior to acceptance, in accordance with section 9 of the base contract PWS and Exhibit A CDRLs.
95% of the time there will be no more than two reviews per deliverable.
COR
Inspection/ Customer Complaints / Customer Feedback/COR Reports and Assessments.
Unsatisfactory/Poor Performance will be documented in
CPARS.
Re-work is at the expense of the Contractor.
The KO can deduct up to 15% from the final invoice of the total price for each order, or IAW FAR 52.212-4(a) the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services.
Positive
CPARS
Period of Performance
(POP)
Schedule - (Timeliness)
Contractor shall complete Task Order requirements within the original POP stated in the original Task Order.
100% of the time, Contractor shall complete Task Order requirements within the original POP stated in the original Task Order.
COR
Inspection/ Customer Complaints /Customer Feedback /COR Reports and Assessments.
Any delays caused by the Contractor will result in costs incurred by the Government being deducted from the final invoice.
Positive
CPARS
The KO can deduct up to 15% from the final invoice of the total price for each order, or IAW FAR 52.212-4(a) the
Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services.
Corrective Action Plan to be submitted to the Contracting Officer no later than seven (07) days post-Period of Performance and implemented by Contractor. All re-work is completed at the cost of the Contractor.
Unsatisfactory/Poor Performance will be documented in
CPARS.
Quality of Service
All work shall be completed to OEM and MSC technical standards as well as in accordance with CDRL A007
– Contractor’s Quality Assurance Plan.
100% of the time, work shall be completed such that no warranty claims or re-work is required, per OEM warranty policy.
COR
Inspection/ Customer Complaints /Customer Feedback /Reports and Assessments.
Unsatisfactory/Poor Performance will be documented in
CPARS.
The KO can deduct up to 15% from the final invoice of the total price for each order, or IAW FAR 52.212-4(a) the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services.
Positive
CPARS
Corrective Action Plan to be submitted to the Contracting Officer no later than seven (07) days post- Period of Performance and implemented by Contractor. All re-work is completed at the cost of the Contractor.
FAR Clause 52.222-50, Trafficking in Persons
IAW FAR 52.222-
50 Contractor Requirements:
The Contractor shall-
100% compliance required due to U. S. Zero Tolerance policy.
COR/KO
Inspection
Non-conformance will be documented in CPARS.
Positive
CPARS
(1) Notify its employees of
i) The U.S.
Government’s Zero Tolerance policy.
Corrective action to be implemented.
ii) Actions that will be taken against employees for violations of this policy.
(2) Take appropriate actions.
(3) Annually after receiving an award, the Contractor shall submit a certification to the Contracting Officer via email that-
(i) It has implemented a compliance plan to prevent any prohibited activities identified at paragraph (b) of this clause and to monitor, detect, and terminate any agent, subcontract or subcontractor employee engaging in prohibited activities; and
(ii) After having conducted due diligence, either-
(A) To the best of the Contractor’s knowledge and belief, neither it nor any of its agents, subcontractors, or their agents is engaged in any such activities; or
(B) If abuses relating to any of the prohibited activities identified in paragraph (b) of this clause have been found, the Contractor or subcontractor has taken the appropriate remedial and referral actions.
Timeliness and Accuracy of Quotes
Quoting process shall follow timeline in the RFQ in accordance with Section 17.1 of the base contract
PWS.
No late quotes and no more than one (1) quote revision per
RFQ.
CS/KO
monitoring
Non-conformance will be documented in CPARS.
Positive
CPARS
Compliance with
Contractor shall comply with all
100% of the time inform
COR
Verification
Non-conformance will be
Positive
Whistleblower Clause requirements listed in the employees in writing of documented in
CPARS
CPARS
DFARS
252.203-7002
Whistleblower clauses contractor employee whistleblower rights and protections under
10 USC
2409. 100% of the time the contractor shall include the substance of the clause in all subcontracts.
11. TRAVEL
11.1 Travel cost will be determined fair and reasonable at the task order level and will be firm-fixed price. Mileage rates, per diem, lodging, etc. in excess of the DoD Joint Travel Regulations (JTR) located at http://www.defensetravel.dod.mil, GSA (General Services Administration), may not be found to be fair and reasonable. Airfare shall not exceed the lowest customary, standard, coach, or equivalent airfare quoted during normal business hours. The Government is not obligated to reimburse the Contractor for travel in excess of the funded amount stated in the task order. The Government shall not pay for any costs or fees associated with travel beyond actual costs in accordance with JTR and GSA regulations.
11.2 Proposed travel prices will be analyzed to ensure fair and reasonable prices prior to award. Any labor related to travel will not have travel admin fees, G&A, or profit added.
Other travel costs (airfare, per diem, lodging, rental car) can have G&A only, which will not exceed 15%.
12. CONTRACTING OFFICER’S REPRESENTATIVE (COR)
12.1 The COR will represent the Contracting Officer in the administration of technical details within the scope of this contract and will manage inspection of all deliverables. The COR is not otherwise authorized to make any representations or commitments of any kind on behalf of the Contracting Officer or the Government. The COR does not have the authority to alter the Contractor’s obligations or change the specifications in the contract or issue a task order. If, as a result of technical discussions, it is desirable to alter contract obligations or statements of work, a modification must be issued in writing and signed by the Contracting Officer. The COR is responsible for reviewing invoices submitted by the Contractor and informing the Contracting Officer of areas where exceptions are to be taken. The COR authority is non- delegable. The COR may be personally liable for unauthorized acts. A Contracting Officer may designate individuals to act as the COR under a resultant task order.
12.2 The following individual(s) are appointed as Contracting Officer’s Representative(s) under this Contract:
12.2.1 Name: TO BE PROVIDED AT AWARD
12.2.2 Email Address: TO BE PROVIDED AT AWARD
12.2.3 Telephone Number: TO BE PROVIDED AT AWARD
http://www.defensetravel.dod.mil/
13. AUTHORIZED CHANGES BY THE CONTRACTING OFFICER
13.1 The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as a part of this order.
14. CONTRACTOR IDENTIFICATION
14.1 Contractor employees must be clearly identifiable while on Government property by wearing appropriate badges that are fully visible at all times.
14.2 Contractor personnel and their subcontractors must identify themselves as Contractors during meetings, telephone conversations, in electronic messages, or correspondence related to this Contract.
14.3 Contractor-occupied facilities (on Department of the Navy or other Government installations) such as offices, separate rooms, or cubicles must be clearly identified with Contractor supplied signs, name plates, or other identification, showing that these are work areas for Contractor or subcontractor personnel.
15. LICENSES, PERMITS, AND PRECAUTIONS
15.1 The Contractor shall, at the Contractor’s expense, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable laws, codes, and regulations, in connection with the performance of work. Further, the Contractor is responsible to ensure that proper safety and health precautions are taken to protect the work, the workers, the public, and the property of others.
15.2 MAN has the Design Authority and therefore are the owner of the Intellectual Property and Design Rights of the engine types licensed to Fairbanks Morse.
15.3 Any third-party agreements or licenses between companies will not be recognized under this contract.
16. CONTRACTOR PERSONNEL
16.1The Contractor is hereby advised that some Contract requirements may take place at facilities where a visitor security clearance may be required. Therefore, the Government reserves the right to request any appropriate information concerning Contractor personnel as necessary to provide security check and/or clearances to enter such facilities. The Contractor must comply with COMSCINST 5521.1 Series or latest revision.
17. ORDERING PROCEDURES FOR DELIVERY ORDERS (DO) AND TASK ORDERS (TO)
17.1 After Contract award, individual task orders (TOs) and delivery orders (DOs) will be issued as necessary to support contract requirements. The KO or Contract Specialist (CS) will issue an electronic Request for Quote (RFQ) email to all contract holders to solicit a quote for each order. Each RFQ will include a Performance Work Statement (PWS) or parts list, if applicable, a wage determination, if applicable, instructions for submitting quotes, and the Government’s evaluation procedures. In response to the RFQ, the Contractors will provide a firm-fixed-price quote to complete the requirements and any information required by the RFQ instructions. This firm-fixed-price shall include all labor, travel, and materials and shall be priced separately under each order. The Contractors shall respond to each RFQ within the time established by the Government for response. Urgent requirements may require less time for contractors to provide a quote.
The quote submitted by the Contractor shall comply with all requirements specified in the RFQ. All quotes submitted in response to the RFQ must be found technically acceptable and prices determined fair & reasonable. Lowest Price Technically Acceptable (LPTA), or other evaluation methods, will apply at the task and delivery order level(s). If applicable, the Contractor shall resubmit quotes in accordance with any revision/correction requested by the KO/CS. If a quote is not received in accordance with the instructions and timeline in the RFQ, the quote may be deemed non-responsive, and therefore, technically unacceptable. The successful Quoter will be directed to commence work via an order sent from the Contracting Officer or Contract Specialist. The Contractor shall provide notice of acceptance of the TO by either commencing work or signing the SF 1449 and returning it to the Contracting Officer or Contract Specialist.
17.2 Material Shipping - The Contractor shall be responsible for the transportation of all Contractor provided parts and material worldwide once a task or delivery order has been awarded, regardless of delivery destination or circumstances under which the relocation is required.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .