Attachment 1 - PWS Static Display Restoration A-10 B-52 HH-3 and F-4 11 Aug 2023.pdf

PDF 293 KB Posted

Attached to
USAFA Static Display Aircraft Restoration
Solicitation number
FA700023Q0075
Issued by

About this file

This performance work statement outlines requirements for the restoration of four static display aircraft located at the United States Air Force Academy. The contractor shall complete restoration of an A-10, B-52, and F-4 aircraft, which includes stripping paint, completing structural and corrosion repairs, applying primer and paint, replacing markings, and installing bird proofing. The contractor must also install bird proofing on an HH-3 aircraft. All work must be completed within 300 calendar days and match original aircraft specifications and configurations. The performance work statement provides restoration objectives and requirements, general contract information regarding safety, security, and facility access, and confirms utilities and emergency services available from the government.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THE UNITED STATES AIR FORCE ACADEMY (USAFA)

HERITAGE (MUSEUM) PROGRAM

PERFORMANCE WORK STATEMENT (PWS)

for

A-10, B-52, HH-3, and F-4 Static Display Aircraft Restoration/Maintenance and Bird-Proofing

August 11, 2023

TABLE OF CONTENTS

Paragraph Title Page

SECTION I DESCRIPTION OF SERVICES 4

1.0 Scope of Work 4

1.1 A-10, B-52, and F-4D Restoration 4

1.1.1 Preparation of Aircraft 5

1.1.2 Aircraft Maintenance Discrepancy Repairs 5

1.1.3 Bird Proofing 5

1.1.4 Applying Adhesive and Screws 6

1.1.5 Guaranteed Workmanship 6

1.1.6 Performance Period

1.2 HH-3 Bird-Proofing 6

SECTION II

S

SERVICE SUMMARY 7

2.0 Service Summary 7

SECTION III GENERAL INFORMATION 8

3.0 General Information 8

3.1 Hazardous Material Identification 8

3.2 Spill Response 8

3.3 Hazardous Material Handling 8

3.4 Contract Management 8

3.5 Government Access 8

3.6 Contractor Personnel 8

3.6.1 Contractor Employee Performance 8

3.7 Hours of Operation 9

3.7.1 Holidays 9

3.8 Security Requirements 9

3.8.1 Badge Requests 9

3.8.1.1 Pass and Identification Requirements 9

3.8.1.1.1 USAFA Badge Request 9

3.8.1.2 Vehicle Requirements 9

3.9 Safety on an Air Force Installation 10

3.10 Licenses and Permits 10

3.11 Vehicles 10

3.12 Performance of Service During Crisis Declared by the National Command Authority

SECTION IV GOVERNMENT-FURNISHED PROPERTY AND SERVICES 11

4.0 General Information 11

4.1 Utility Services 11

4.1.2 Police, Fire Protection and Medical Services 11

SECTION I

DESCRIPTION OF SERVICES

1.0 Scope of Work. The contractor shall execute the project as shown in this Performance Work Statement (PWS) for restoration and preservation that maintains the aircraft in an original unaltered condition. The primary goal is to preserve the history of the United States Air Force and maintain authenticity of each static display aircraft. Contractor shall provide all personnel, tools, equipment, material, supervision, technical expertise, and other related items necessary to perform restoration of aircraft i.e., sheet metal work, maintenance repairs, bird proofing and painting static display aircraft located on the United States Air Force Academy (USAFA). Requirements of this PWS are applicable to only static display aircraft located on USAFA.

1.1 A-10, B-52, and F-4 Complete Restoration. Contractor shall accomplish a total strip to a solid substrate of identified aircraft and complete the exterior aircraft restoration in 300 calendar days i.e. strip to a solid substrate, repair all sheet-metal damage, maintenance required, install bird proofing, primer, paint, apply new decals and standard markings. All work shall be accomplished in accordance with (IAW) US Air Force Technical Orders 1-1-8 Application and Removal of Organic Coatings, Aerospace and Non-Aerospace Equipment, 8 Jun 2022, and 1-1-4 Exterior Finishes, Insignia and Markings, Applicable to USAF Aircraft 14 May 1994, Change 7, 17 July 1998, and AC 43.13-1B, Acceptable Methods, Techniques, and Practices, Aircraft Inspection and Repair dated 8 September 1998 and must be comparable and similar in repair for appearance and hardware of original aircraft. The paint color shade examples are listed in Federal Standard 595 Paint Specification, the chart found online only provides rough approximations of a few colors.

The RGB Hex Code is a reference to what is shown on your monitor and is only a rough approximation of the true color. For accurate representations of all Fed-Std-595 colors, please use a fan deck for a definitive reference. The government has color fan deck on-hand. Performance of restoration requirements will include, but not limited to paint preparation, corrosion repairs, sheet metal work, fiberglass work, primer, aircraft maintenance repairs, painting, bird-proofing, hardware replacement, adhesive use, and vinyl/decal replacement.

For the A-10 and F-4 the Canopy color is Champagne Pearl Met, Chrysler. The canopy color is specific to USAFA. Follow the Color, Markings and Insignia (CMI) for all three aircraft. The following are listed aircraft colors:

- A-10A aircraft is marked in the European I camouflage markings, see CMI. Colors are Black FS 27038, Light Green FS 24102, Dark Green FS 24092, and Dark Gray FS 26081, both rudders are painted Light Green, FS 24102.

- F-4D aircraft is marked in standard USAF SEA camouflage markings for F-4 aircraft, paint color shades are Black FS 17038, Green FS 24079, Green FS 24102, Tan FS 20219, and White FS 17875.

- B-52 aircraft is marked in standard USAF SEA camouflage markings for B-52 D aircraft, paint color shades are: Black FS 17038, Green FS 24079, Green FS 24159, and Tan FS 24201.

All three aircraft require standard markings applied in accordance with US Air Force Technical Order 1-1-4, Exterior Finishes, Insignia, and Markings, Applicable to USAF Aircraft 14 May 1994, Change 7, 17 July 1998, to include marking specific to that particular aircraft CMI. The green canopy trim with white outline and green stripe on the tip of the vertical stabilizer are correct and signify the 555 TFS.

Contractor shall protect all landscaping adjacent to aircraft from damage. All damage caused by the contractor will be repaired or replaced by the contractor, at no additional cost to the government, within 10 days after identification/notification by the Contracting Officer. At the end of the workday clean and pick up area.

1.1.1 Preparation of Aircraft. Contractor shall assess aircraft for structural soundness and ensure previous paint, dirt deposits, residual oil/hydraulic fluid, biological soils, pest, and insect/bird nests etc. will be removed from aircraft as necessary. Contractor shall follow manufacturer's recommended instructions for preparation and painting of highest-grade Pittsburg Paint Group (PPG) Commercial Performance Coatings of 2K high solids urethane. Procedures found in PP&G Publication CA8200 Military and Defense Topcoats, and CA 8800 Paint Process Standard for Exterior Commercial Aircraft must be followed. Contractor shall inspect to ensure substrate is free of corrosion and solid prior to paint/primer. The contractor may find/discover various quantities of bird nests and debris found within the structure. The contractor shall remove all bird nests, debris, areas of corrosion and damage. The contractor shall repair or replace any panels or structural pieces that are damaged to include areas of corrosion, prepare the aircraft to a sound substrate per paint manufactures paint specifications prior to painting, and ensure to coat aircraft with primer as needed prior to painting. Painting shall not be performed on aircraft until sheet metal damage is repaired or replaced, corrosion and composite repairs are completed, primer applied, and aircraft maintenance discrepancies are completed. The aircraft is ready for paint once the exterior structure is repaired, prepped, and washed, the contractor will contact government personnel (10th Logistics Readiness Squadron (10 LRS) or Museum Specialist) to inspect aircraft prior to painting and government personnel will give email approval to move forward with painting. Paint scheme, colors, and pattern of aircraft shall simulate original specifications. Contractor shall ensure the painted/restored static displays have a smooth (semi-gloss) finish and all decals/markings are replaced as needed and in appropriate positions simulating original specifications. Contractor shall utilize PPG Commercial Performance Coatings of 2K AUE-360/AUE-3501 high solids urethane two-part paint. Paint shall present a semi-gloss appearance with no more than 1 in2 per 15 ft2 paint defects. Paint job shall sustain 3-year durability for protection against weathering, rust, cracking, and peeling.

1.1.2 Aircraft Maintenance Discrepancy Repairs. Maintenance repairs restore aircraft to their original unaltered or properly altered condition. Where repairs, alterations, or maintenance is performed, every effort shall be made to ensure repairs are comparable and similar in appearance and hardware. Screw applications are divided into three basic groups: structural screws, machine screws, and self-tapping screws; all can be used for static display aircraft repair. Bolts used in aircraft structures are general-purpose, internal-wrenching, or close-tolerance. Hardware used on aircraft are identified in AC 43.13-1B.

1.1.3 Bird Proofing. Install bird proofing securely to close openings and to prevent birds from landing on/in aircraft surfaces. Bird proofing can have a number of different processes depending on where the need is on the airplane, for example:

- Bird spikes are a long lasting, humane, nearly invisible low profile bird control product, used to protect numerous areas around an aircraft. Spikes deter problem birds from aircraft areas by presenting an unsuitable landing area and preventing birds from gaining footholds.

- The use of wire mesh around holes and openings is allowable.

- All installed bird proofing shall be secure and effective, closing off holes and remain humane.

- Bird proof aircraft is completed by screening, plugging or covering vents, nozzles, wheel wells, cowlings and cowl flap areas, intakes, air scoops, exhausts, aircraft stand, and engines.

- The government shall approve all bird-proofing solutions prior to installation.

1.1.4 Applying Adhesive and Screws. The contractor shall follow the instructions for adhesive and screw applications IAW AC 43.13-1B, Acceptable Methods, Techniques, and Practices, Aircraft Inspection and Repair, to make a satisfactory bonded joint spread the adhesive in a thin, even layer on both clean surfaces to be joined. It is recommended a clean brush be used and ensure all surfaces are covered. Spreading of adhesive on only one of the two surfaces not recommended.

Be sure to read and follow adhesive manufacturer’s application instructions. Additional use of self-tapping screws for bird proofing adds an increase support from the environment and high winds.

1.1.5 Guaranteed Workmanship. Contractor shall guarantee that completed repairs and paint remain in an acceptable condition for at least three years from acceptance of work by government personnel. The contracting office determines if re-performance is necessary. Re-performance shall be required if static display shows evidence of rust, peeling, flaking, cracking, dulling, oxidation, loose hardware, looseness of repair, and/or any other surface deterioration within three years from acceptance.

1.1.6 Performance Period. Contractor will have 300 calendar days to perform and complete requested work from the date of contract award. Contractor shall not work during scheduled events, to include parades. Dates will vary and the Purchase Order will specify the scheduled dates of the events. All requests for extensions will be coordinated through the Contracting Officer

(CO).

1.2 HH-3 Bird-Proofing. Install bird proofing securely to close openings and to prevent birds from landing on/in aircraft surfaces. Refer to 1.1.3 Bird Proofing. Complete bird-proofing in 300 calendar days.

SECTION II

SERVICE SUMMARY

2.0. Service Summary (SS) Table:

Service Summary implements and identifies critical contract success factors.

A-10, B-52, and F-4 Restoration HH-3 Bird Proofing (As Applicable)

Performance Objective

PWS

Paragraph Performance Threshold

Prep paint, repair as required, and remove all dirt, residual oil/hydraulic fluid, biological soils, and insect/bird nests from aircraft as necessary on static display aircraft.

1.1.1

100% Prep paint, repair as required, and remove all dirt, residual oil/hydraulic fluid, biological soils, and insect/bird nests.

Complete striping of aircraft.

Structural and Corrosion repair then primer aircraft surface.

1.1/1.1.1

100% of these requirements are to present and original, or close to original appearance of the repaired surface to maintain authenticity.

3 Paint Quality. 1.1.1

Only utilized PPG AUE-360/AUE- 3501 2K high solids urethane

Paint shall present a semi-gloss appearance with no more than 1 in2 per 15 ft2 shall have paint defects.

No overspray: on painted or non-painted parts of the display, surrounding area or landscape.

4 Paint Scheme. 1.1/1.1.1 Paint schemes shall match original specifications.

5 Aircraft Markings 1.1/1.1.1 Exact reproduction of all aircraft markings; 100% of the time.

6 Period for completion of restoration. 1.1.6 Not to exceed 300 calendar days from contract award.

Have repairs, alterations comparable in appearance and hardware replacement.

1.1/1.1.2

100% repairs comparable and similar in appearance of original configuration.

Install bird proofing securely to close holes and to prevent landing on aircraft surface.

1.1.3/1.1.4 All bird proofing installed shall be 100% effective, safe, and secure.

SECTION III

GENERAL INFORMATION

3.0 General Information. General information relating to contract.

3.1 Hazardous Material Identification. Material Safety Data Sheets (MSDS) are required IAW Federal Standard No. 313 (including revisions adopted during the term of the contract), and for any other material designated by a government technical representative as potentially hazardous and requiring safety controls. MSDS must be available upon request from the government.

3.2 Spill Response. Contractor shall call 911 and promptly cleanup all spills in a manner consistent with current environmental regulations. In the event it is necessary to utilize government material, equipment, or personnel to clean up a contractor-caused spill, contractor shall be required to reimburse all associated costs to the government.

3.3 Hazardous Material Handling. Contractor shall comply with Federal, State, and local Environmental Protection Agency guidance for painting/sanding, spills, and disposal of hazardous wastes and materials. Contractor shall coordinate with the 10 LRS, Hazardous Material Flight, at

(719) 333-3223 or building 8110 door 29, prior to starting work on USAFA, to identify what products/supplies are being used. This requires completing an AF Form 3952 (Chemical Hazardous Material Request /Authorization) and applicable MSDS’s.

3.4 Contract Management. Contractor shall provide management oversight for all work performed in this PWS. The contractor shall identify a Contract Manager (CM) to serve as the interface between the government and contractor. Contractor shall appoint an alternate CM if the primary is unavailable for duty (vacation, illness, etc.). CM or alternate shall have full authority to act for the contractor, on all matters relating to this contract. CM or alternate shall be available, during normal duty hours, within the same day to meet on the installation with government personnel during periods when work is performed.

3.5 Government Access. Contractor shall allow government personnel access to work areas, provide support, and not interfere with 10 LRS static display functional representatives, state, federal, and other designated personnel in performance of their official duties.

3.6 Contractor Personnel. Attire shall be in good repair and shall not be considered offensive, disruptive, or unsafe. Government is authorized to restrict employment, under the contract of any contractor employee or prospective contractor employee, who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of USAFA and its population.

3.6.1 Contractor Employee Performance. The contractor shall use experienced, responsible, and capable people to perform the work under this contract. The government shall inform the contractor of any negative occurrence regarding performance, security, or misconduct by an employee of the contractor. Contractor employees who endanger persons or property or whose employment is inconsistent with the interest of military security and/or performance IAW this contract will be directly related to the contractor's ability to perform and staff the work under the contract.

3.7 Hours of Operation. Hours of operation are Monday through Sunday, 0700 to 1900 hours, excluding federal holidays and scheduled events. Contractor shall notify the 10 LRS static display function representatives via email (craig.hendrickson.4@us.af.mil) or phone (719-333- 4520/3483), prior to initially commencing work on static displays and during periods of extended breaks for anything longer than 7 days.

3.7.1 Holidays. Routine repair work will not be required on any federal holidays, or any holidays/down days observed in lieu thereof.

3.8 Security Requirements. The Contractor and all employees will comply with all USAFA security requirement imposed by the local installation commander at all times while on the premises to include not using cell phones while operating a vehicle on Base. Contractor will obtain necessary badges(s) required for access to USAFA.

3.8.1 Badge Request. The information contained in the Badge Request Letter is subject to the Privacy Act of 1974 as follows: AUTHORITY: 5 U.S.C. 4501; 10 U.S.C. 1124; EO 9397;

PRINCIPAL PURPOSE: to list the names of personnel authorized to perform various functions under this contract. ROUTINE USES: To ensure positive identification of personnel authorized to perform the listed functions. Two forms of federal identification, such as driver’s license, social security card, or birth certificate is required. Disclosure is voluntary, however, failure to supply any required information may cause denial of entry to or delays in processing access onto

USAFA.

3.8.1.1 Pass and Identification Requirements. Contractor shall obtain pass and identification items required for contract performance for employees and non-government owned vehicles IAW clauses of this contract. Contractor will retrieve all identification media, including vehicle passes, from employees upon termination of on-site employment and turn said media into Pass & ID.

3.8.1.1.1 USAFA Badge Request. Contractor shall email the static display function representatives with the first, MI and last name along with a good contact number for personnel requiring access to work on the static display aircraft located on USAFA. Send this information no earlier than two weeks prior to the date requiring entry. The static display function representatives will complete the USAFA Form 13 and forward it to 10 SFS/S5B for processing. The contractor may call 10 SFS Pass & ID at 719-333-0441 for status of the badge, the static display function representatives are not notified of approved badging. Contractors will report to USAFA Security Force Squadron Pass & ID, located in Building 8486 just outside the South Gate (Air Field Drive). Badges are processed Monday through Friday from 7:30 a.m. to 3:45 p.m. No appointment is necessary. Upon completion or termination of the contract or termination of a Contractor employee, the Contractor will surrender any identification badges and vehicle identification to Pass & ID the following business day.

3.8.1.2 Vehicle Requirements. Proper state vehicle registration, proof of insurance and a valid driver’s license are required to drive on base. After obtaining the proper badges/vehicle identification at Pass & ID (Bldg 8486), all commercial vehicles must enter through the South Gate (Air Field Drive), the primary search area for all commercial delivery vehicles.

3.9 Safety on an Air Force Installation and Traffic Laws. Contractor shall comply with all USAFA safety and traffic regulations while on USAFA, including Air Force Instruction (AFI) 91- 207 “The US Air Force Traffic Safety Program”.

3.10 Licenses and Permits. Obtain any necessary licenses and permits, and comply with any federal, state, and municipal laws, codes, and regulations applicable to the performance of work in this PWS. Contractor will provide proof of such applicable licenses and permits upon request by the Government.

3.11 Vehicles. All vehicle cleaning and maintenance will be done off-base. The Contractor is responsible for cleanup of any vehicle leaks.

3.12 Performance of Service During Crisis Declared by the National Command Authority.

This service is determined to be non-essential for performance during crisis IAW DODI 1100.22.

However, in the event of a crisis or significant emergency is declared, the CO will contact the contractor to notify them of the situation and any possible changes to their contract responsibilities. The performance of these services is non-mission essential during times of crisis.

Should a crisis be declared, the Contracting Officer or their representative will verbally advise the Contractor if temporary suspension of work is required, followed by a written notification. A representative of the contracting officer will further notify the Contractor verbally when the crisis has ended with written notification to follow.

SECTION IV

GOVERNMENT-FURNISHED PROPERTY AND SERVICES

4.0 General Information: Government will furnish or make available to contractor all Department of Defense, Department of the Air Force, and local forms, operating memoranda, regulations, and technical orders as applicable.

4.1 Utility Services: The contractor is allowed to utilize existing utilities (electricity, water, and sewer) if available and within proximity to the static aircraft display(s) identified for repair in this

PWS.

4.1.2 Police, Fire Protection, and Medical Services: Government will provide police and fire protection to support this PWS. Government will provide emergency medical treatment and emergency patient transportation service for contractor personnel who are injured or become ill during performance of this contract. Treated personnel shall be responsible for reimbursing the government for medical treatment costs and patient transportation at the current inpatient or outpatient treatment rate. The telephone number for emergency police, fire, and medical services is 911.

TABLE OF CONTENTS
SECTION I
DESCRIPTION OF SERVICES