Attachment 1 - PWS - Range Maintenance and Cleaning (NFARS - 17 Feb 2026).pdf

PDF 779 KB Posted

Attached to
Shooting Range Maintenance (Annual/Quarterly Maintenance and Cleaning) - Combined Synopsis/Solicitation - Niagara Falls ARS, Niagara Falls, NY
Solicitation number
FA667026Q0003
Issued by

About this file

This is a Performance Work Statement (PWS) for cleaning and maintaining a small arms firing range at Niagara Falls Air Reserve Station for the 914 Air Refueling Wing, effective January 2026.

The PWS establishes comprehensive requirements for removing heavy metal particulates (lead, copper, etc.) from the indoor small arms range facility (Building B427) consisting of 21 covered firing points, bullet-trap, dust collection system, and collection drums. Core cleaning activities include quarterly removal and disposal of bullet fragments and residual munitions debris, quarterly range cleaning using HEPA vacuums and D-Lead heavy-metal wipes, annual replacement of bullet trap dust collection unit filters, and base-year ventilation system cleaning following NADCA standards. The contractor must perform all work in compliance with federal, state, and local environmental regulations, OSHA requirements, and Air Force policies. Annual maintenance includes replacing 40 HEPA filters and 40 pre-filters in the exhaust fan system, servicing air compressors, inspecting bullet trap and target systems, and conducting testing and air balancing by AABC, NEBB, or TABB certified firms. All contaminated waste must be sampled for TCLP metals analysis, properly containerized in UN-approved drums, and disposed of within 90 days. The contractor is responsible for wipe sampling both pre- and post-cleaning at specified locations using NIOSH 9100 methods, with clearance levels of 200 µg/sf in industrial areas and 40 µg/sf in non-industrial areas. All contractor personnel require base vetting (up to two weeks processing), and work must be coordinated with 914 ARW CATM personnel with range closure during maintenance activities. The contractor must provide monthly/quarterly status reports, training documentation for lead abatement work, and all shipping manifests and TSDF documentation within required timeframes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

CLEAN AND MAINTAIN SMALL ARMS FIRING RANGE

914 Air Refueling Wing

Niagara Falls Air Reserve Station

January 2026

DESCRIPTION OF SERVICES

In carrying out work under this contract, the Contractor shall furnish the personnel, services, equipment, tools, materials, vehicles, facilities supervision and other requirements necessary for, or incidental to, the performance of work set forth herein; assure any and all program and/or project related costing information (regardless of its stage in development) is secured, as directed by the Contracting Officer (CO); and be responsible for safeguarding proprietary, classified, and other sensitive information. The Contractor shall be immediately capable of addressing and interpreting all aspects of environmental law and regulation.

1.0 Scope

The Contractor shall furnish, unless otherwise specified, all tools, equipment, labor, and material necessary to accomplish removal of heavy metal particulates, (including, but not limited to, lead, copper, etc.), located at the 914 Air Refueling Wing (ARW) Small Arms Firing Range, B427.

The range is an indoor small-arms range consisting of 21 covered firing points, bullet-trap, dust collection system and outdoor and indoor collection drums.

The objective of this contract is to clean the existing firing range of heavy metal particulates and residual munitions debris in order to provide a safe and healthy work environment for AF personnel. A schedule of the various types of cleaning and maintenance is presented in Appendix A and B.

1.1 Policy and Requirement Statement

All work performed by the Contractor under this contract shall be conducted in full compliance with Federal, State and local environmental regulations, Air Force (AF) policies, and Occupational Safety and Health regulations. The Contractor shall be responsible for ensuring that their employees and AF personnel are adequately protected from all hazards encountered during the course of work.

Contracts are to be efficiently managed. This includes accurate, on-time submittals of contract deliverables and timely identification and solution of impediments to successful project execution. Early involvement of all concerned parties fosters the development of the most cost-effective and technically sound solutions. CO shall rely on the Contractor’s expertise in recognizing and addressing problematic issues and successful execution of this contract.

1.2 Site Access

All Contractor -personnel must be vetted to gain access to the Base. This information will be requested by the Contracting Officer (CO) prior to start date. It takes up to two (2) weeks to process this information.

The firing range is normally operated on a daily basis; operating hours are as scheduled, typically Monday through Friday from 0800-1500, excluding Federal holidays. Access to the range must always be scheduled and coordinated through 914 ARW CATM personnel. There are no special badging or vehicle requirements for entrance to the range.

The firing range will be closed during the performance of work. Contractor shall schedule maintenance and cleaning at the start of the contract option year. If alternate dates are desired after they have been established, the dates shall be agreed upon by the Contractor and 914 CATM Section Chief. Range will not be available on Federal Holidays for maintenance.

Contractor personnel shall not work on site without a CATM staff member and/or a Contracting Officer Representative (COR) being present.

Access to B427 for Contractor’s vehicles and equipment is by a 13-foot-wide paved asphalt driveway running North-South along the entire East side of the building. At the Southeast corner of the range firing bay is the main exterior entranceway, a set of double-doors providing a non-obstructed opening (no support pillars) 7’-10” wide. A 6-foot wise concrete sidewalk connects this entranceway to the asphalt driveway. There are also four (4) other 3’wide exterior doors for accessing the range’s firing bay. Three of these are located at the bay’s other corners (NE, NW, and SW), and one is located approximately ¾ of the way along the East wall, North of the main exterior entrance.

Access to the back of the facility where the exhaust air systems are located is available via an open grassy area.

1.3 Lead Cleaning and Removal

The Contractor shall perform cleaning per the schedule in Appendix A. See Appendix D for B427 map.

1.3.1 Bullet Fragments

Bullet fragments or residue are collected in a 20-gal drum at the end of the bullet trap that is located inside the building. All captured bullet fragments shall be transported to B820 (Munitions) by the Contractor for processing. Contractor shall replace removed drum with a new, in-kind, UN Rated drum with lid.

1.3.2 Bullet Trap Dust Collection System

All heavy metal dust from the bullet trap dust collection unit (DCU) (Torit) are collected in a 55-gal metal drum located outside. This drum shall be transported to B820 (Munitions) by the Contractor for processing. Contractor shall provide and replace a new, in-kind, UN-approved 55-gallon drum suitable for exterior use.

The Contractor shall replace the DCU filters (Torit) per maintenance schedule and procedures in Appendix A and B. The filter part number is P191889-016-436 and the quantity is 16. The waste filters will be sampled and analyzed for Toxicity Characteristic Leaching Procedure (TCLP) Metals and the analysis report will be provided to the 914 MSG/CEV for review. The filters shall be properly packaged, shipped and disposed of by the Contractor in accordance with federal, state and local regulatory requirements. The Contractor shall provide proper waste containers.

The DCU filters (Torit) have been previously characterized as hazardous waste.

1.3.3 Range Cleaning

All heavy metal dust and debris located on accessible horizontal surfaces located at the small arms range building shall be cleaned to include:

The bullet trap (interior and exterior), range floor (including crevices and expansion joints), and installed equipment.

HEPA vacuum and wipe-down of the area behind the firing line to the back wall, including the shooting booths and horizontal surfaces likely to be touched, with D- Lead® (or equivalent as approved by 914 ARW) heavy-metal wipes/cleaner

HEPA vacuum and wipe-down of the target carriers and rails with D-Lead® (or equivalent as approved by 914 ARW) heavy-metal wipes/cleaner

HEPA vacuum and wipe-down of the face of the bullet trap with D-Lead® (or equivalent as approved by 914 ARW) heavy-metal wipes/cleaner

HEPA vacuum and wipe-down of the area behind the bullet trap to include the bullet trap room floors, bullet trap room walls, conveyor system exterior, conveyor duct exterior, air compressor, and electrical equipment around conveyor system with D- Lead® (or equivalent as approved by 914 ARW) heavy-metal wipes/cleaner

Wipe-down of control room with D-Lead® (or equivalent as approved by 914 ARW) heavy-metal wipes/cleaner. This area only can be wet mopped with wastewater discharged to the sanitary sewer.

Wipe-down of gun cleaning room with D-Lead® (or equivalent as approved by 914 ARW) heavy-metal wipes/cleaner. This area only can be wet mopped with wastewater discharged to the sanitary sewer.

The Contractor shall utilize an explosion-proof HEPA vacuum to remove all lead fragments, particulates, and dust from the range surfaces. Prior to each cleaning event, the Contractor shall provide documentation to Wing Safety, Bio-Environmental, and CATM Section that the vacuum is certified clean, documenting that there is no residual waste in the vacuum from previous uses and a new filter(s) was installed. There are approximately twelve (12) ceiling-mounted extension cord reels with 40' of cord available to supply power to the explosion-proof HEPA vacuum.

Water shall not be used for cleaning unless otherwise stated. The collected waste shall be sampled and analyzed for TCLP metals, and the analysis report shall be provided to the 914 MSG/CEV for review. The waste shall be properly containerized using UN approved drums supplied by the Contractor and disposed of by the Contractor in accordance with all federal, state and local regulatory requirements.

Floor residue from the range have been previously characterized as hazardous waste.

1.3.4 Incidental Material

All incidental material contaminated with lead particulates or dust shall be removed and disposed of by the Contractor. Incidental materials may include HEPA-vacuumed dust or debris which may contain lead, filters containing lead, personal protective clothing and equipment (PPE) that has been contaminated with lead dust. All incidental material shall be properly containerized using UN approved drums supplied by the Contractor and disposed of by the Contractor in accordance with all federal, state and local regulatory requirements.

PPE has been previously characterized as hazardous waste.

1.3.5 Ventilation System Cleaning

This section defines the minimum requirements necessary to render HVAC components clean, and to verify the cleanliness through inspection and/or testing in accordance with items specified herein and applicable NADCA (National Air Duct Cleaners Association) Standards. The Contractor shall be responsible for the removal of visible surface contaminants and deposits from within the HVAC system in strict accordance with these specifications. The HVAC systems serving B427 are served by air handling units and includes any interior surface of the air distribution system for conditioned spaces and/or occupied zones. This includes the entire heating, air-conditioning and ventilation system from the points where the air enters the system to the points where the air is discharged from the system. The outside air intake grilles, outside air ducts to the air handling unit (AHU), the interior surfaces of the AHU, mixing box, coil compartment, coils, condensate drain pans, humidifiers, supply air ducts, fans, fan housing, fan blades, air wash systems, spray eliminators, turning vanes, filters, filter housings, reheat coils, and supply, return and exhaust diffusers are all considered part of the HVAC system. The HVAC system also includes several dedicated exhaust systems which is included in this scope of work.

This includes the exhaust fans, exhaust diffusers, and all other exhaust system components. Final report will be provided to include before and after pictures of, ducts, AHU’s, Exhaust fans, filter boxes, cooling, pre-heating and reheating coils. Report will also identify any deficiencies found including broken or leaking ducts, filter boxes and access doors or gaskets, deteriorated insulation or any other issue that could cause a potential safety risk or problems to the operation of the HVAC systems.

1.3.5.1 Qualification of the HVAC System Cleaning Contractor

Membership: The HVAC system cleaning Contractor shall be a certified member of the National Air Duct Cleaners Association (NADCA) or shall maintain membership in a nationally recognized non-profit industry organization dedicated to the cleaning of HVAC systems.

Certification: The HVAC system cleaning Contractor shall have a minimum of one (1) Air System Cleaning Specialist (ASCS) certified by NADCA on a full-time basis or shall have staff certified by a nationally recognized certification program and organization dedicated to the cleaning of HVAC systems.

Supervisor Qualifications: A person certified as an ASCS by NADCA or maintaining an equivalent certification by a nationally recognized program and organization, shall be responsible for the total work herein specified.

Experience: The HVAC system cleaning Contractor shall submit records of experience in the field of HVAC system cleaning as requested by the COR.

Equipment, Materials and Labor: The HVAC system cleaning Contractor shall possess and furnish all necessary equipment, materials and labor to adequately perform the specified services.

The Contractor shall assure that its employees have received safety equipment training, medical surveillance programs, individual health protection measures, and manufacturer’s product and Safety Data Sheets (SDS) as required for the work by the U.S. Occupational Safety and Health Administration, and as described by this specification.

The Contractor shall maintain a copy of all current SDS documentation and safety certifications at the site at all times, as well as comply with all other site documentation requirements of applicable OSHA programs and this specification.

Contractor shall submit to the COR all Safety Data Sheets (SDS) for all chemical products proposed to be used in the cleaning process.

Licensing: The HVAC system cleaning Contractor shall provide proof of maintaining the proper license(s), if any, as required to do work in this state. Contractor shall comply with all Federal, state and local rules, regulations, and licensing requirements.

1.3.5.2 Standards

NADCA Standards: The HVAC system cleaning Contractor shall perform the services specified here in accordance with the current published standards of the National Air Duct Cleaners Association (NADCA).

All terms in this specification shall have their meaning defined as stated in the NADCA Standards.

NADCA Standards must be followed with no modifications or deviations being allowed.

1.3.5.3 Documents

Mechanical Drawings: The COR shall provide the HVAC system cleaning Contractor with one copy of the following documents:

Project drawings and specifications.

Approved construction revisions pertaining to the HVAC system.

Any existing indoor air quality (IAQ) assessments or environmental reports prepared for the facility.

1.3.5.4 General HVAC System Cleaning Requirements

Containment: Debris removed during cleaning shall be collected and precautions must be taken to ensure that Debris is not otherwise dispersed outside the HVAC system during the cleaning process.

Particulate Collection: Where the Particulate Collection Equipment is exhausting inside the building, HEPA filtration with 99.97% collection efficiency for 0.3-micron size (or greater) particles shall be used. When the Particulate Collection Equipment is exhausting outside the building, Mechanical Cleaning operations shall be undertaken only with Particulate Collection Equipment in place, including adequate filtration to contain Debris removed from the HVAC system. When the Particulate Collection Equipment is exhausting outside the building, precautions shall be taken to locate the equipment down wind and away from all air intakes and other points of entry into the building.

Controlling Odors: Measures shall be employed to control odors and/or mist vapors during the cleaning process. (See coordination plan 2.02 B)

Component Cleaning: Cleaning methods shall be employed such that all HVAC system components must be Visibly Clean as defined in applicable standards (see NADCA Standards). Upon completion, all components must be returned to those settings recorded just prior to cleaning operations.

Air-Volume Control Devices: Dampers and any air-directional mechanical devices inside the HVAC system must have their position marked prior to cleaning and, upon completion, must be restored to their marked position.

Service Openings: The Contractor shall utilize service openings, as required for proper cleaning, at various points of the HVAC system for physical and mechanical entry, and inspection.

Contractor shall utilize the existing service openings already installed in the HVAC system where possible.

Other openings shall be created where needed and they must be created so they can be sealed in accordance with industry codes and standards.

Closures must not significantly hinder, restrict, or alter the airflow within the system.

Closures must be properly insulated to prevent heat loss/gain or condensation on surfaces within the system.

Openings must not compromise the structural integrity of the system.

Construction techniques used in the creation of openings should conform to requirements of applicable building and fire codes, and applicable NFPA, SMACNA and NADCA Standards.

Cutting service openings into flexible duct is not permitted. Flexible duct shall be disconnected at the ends as needed for proper cleaning and inspection.

Rigid fiber glass duct systems shall be resealed in accordance with NAIMA recommended practices. Only closure techniques that comply with UL Standard 181 or UL Standard 181a are suitable for fiber glass duct system closures.

All service openings capable of being re-opened for future inspection or remediation shall be clearly marked and shall have their location reported to the COR in project report documents.

1.3.5.5 Mechanical Cleaning Methodology

Source Removal Cleaning Methods: The HVAC system shall be cleaned using Source

Removal mechanical cleaning methods designed to extract contaminants from within the HVAC system and safely remove contaminants from the facility. It is the Contractor’s responsibility to select Source Removal methods that will render the HVAC system Visibly Clean and capable of passing cleaning verification methods (See applicable NADCA Standards) and other specified tests, in accordance with all general requirements. No cleaning method, or combination of methods, shall be used which could potentially damage components of the HVAC system or negatively alter the integrity of the system.

All methods used shall incorporate the use of vacuum collection devices that are operated continuously during cleaning. A vacuum device shall be connected to the downstream end of the section being cleaned through a predetermined opening. The vacuum collection device must be of sufficient power to render all areas being cleaned under negative pressure, such that containment of debris and the protection of the indoor environment are assured.

All vacuum devices exhausting air inside the building shall be equipped with HEPA filters (minimum efficiency), including hand-held vacuums and wet vacuums.

All vacuum devices exhausting air outside the facility shall be equipped with Particulate Collection including adequate filtration to contain Debris removed from the HVAC system. Such devices shall exhaust in a manner that will not allow contaminants to re-enter the facility. Release of debris outdoors must not violate any outdoor environmental standards, codes or regulations.

All methods require mechanical agitation devices to dislodge debris adhered to interior HVAC system surfaces, such that debris may be safely conveyed to vacuum collection devices. Acceptable methods will include those, which will not potentially damage the integrity of the ductwork, nor damage porous surface materials such as liners inside the ductwork or system components.

Cleaning of coils: Any cleaning method may be used which will render the Coil Visibly Clean and capable of passing Coil Cleaning Verification (see applicable NADCA Standards). Coil drain pans shall be subject to Non-Porous Surfaces Cleaning Verification. The drain for the condensate drain pan shall be operational. Cleaning methods shall not cause any appreciable damage to, displacement of, inhibit heat transfer, or erosion of the coil surface or fins, and shall conform to coil manufacturer recommendations when available. Coils shall be thoroughly rinsed with clean water to remove any latent residues.

Antimicrobial Agents and Coatings: Antimicrobial agents shall only be applied if active fungal growth is reasonably suspected, or where unacceptable levels of fungal contamination have been verified through testing. Application of any antimicrobial agents used to control the growth of fungal or bacteriological contaminants shall be performed after the removal of surface deposits and debris. When used, antimicrobial treatments and coatings shall be applied in strict accordance with the manufacturer’s written recommendations and EPA registration listing. Antimicrobial coatings shall be applied according to the manufacturer’s written instructions. Coatings shall be sprayed directly onto interior ductwork surfaces, rather than “fogged” downstream onto surfaces.

1.3.5.6 Cleanliness Verification

General: Verification of HVAC System cleanliness will be determined after mechanical cleaning and before the application of any treatment or introduction of any treatment-related substance to the HVAC system, including biocidal agents and coatings.

Visual Inspection: The HVAC system shall be inspected visually to ensure that no visible contaminants are present.

If no contaminants are evident through visual inspection, the HVAC system shall be considered clean; however, the Government reserves the right to further verify system cleanliness through Surface Comparison Testing or the NADCA vacuum test specified in the NADCA standards.

If visible contaminants are evident through visual inspection, those portions of the system where contaminants are visible shall be re-cleaned and subjected to re-inspection for cleanliness.

Pre-existing System Damage: Contractor is not responsible for problems resulting from prior inappropriate or careless cleaning techniques of others.

Post-project Report: At the conclusion of the project, the Contractor shall provide a report to the COR indicating the following: Success of the cleaning project, as verified through visual inspection and/or gravimetric analysis. Areas of the system found to be damaged and/or in need of repair.

All debris removed from the ventilation system will be managed in accordance with Sections 1.5.

1.3.5.7 Equipment and Associate Ductwork

Equipment and associated ductwork to be Cleaned (See Drawings Provided for Details)

See Appendix A for list of systems and devices.

1.4 Range Preventative Maintenance

The Contractor shall perform maintenance per the schedule in Appendix A and procedures in Appendix B. See Appendix D for B427 map.

1.4.1 Range Exhaust Fans and Filter Bank

Remove HEPA filters and replace with new filters annually. There are 40 HEPA filters. Filter specifications: 24”H x 24” W x 11.5”D, High Capacity (2,000 CFM, 99.97% @ .3 μ, MERV 17), header less galvanized box frame with full seal. The Contractor shall properly containerize, label, and palletize for disposal the waste HEPA filters. Replace/install new filters and ensuring proper seal and labeling in place. The waste filters shall be properly containerized using compatible containers supplied by the Contractor and disposed of by the Contractor in accordance with all federal, state and local regulatory requirements.

Remove and replace pre-filters quarterly. There are 40 pre-filters. Filter specifications: 24”H x 24” W x 2”D, MERV 7 pleated. Replace/install new filters and ensuring proper seal and labeling in place. The waste filters shall be properly containerized using compatible containers supplied by the Contractor and disposed of by the Contractor in accordance with all federal, state and local regulatory requirements. Filters shall be marked with the date they were installed and the initials of the person installing.

HEPA filters have been previously characterized as hazardous waste.

Pre-filters have been previously characterized as hazardous for lead but below the threshold to qualify as a hazardous waste.

1.4.2 Bullet Trap and Target System Inspection and Maintenance The Contractor shall inspect the bullet trap and target system in accordance with procedures and schedule outlined in Appendix A and B.

1.4.3 Other Range Maintenance

The Contractor shall service the air compressors that service the Torit System and the weapons cleaning room in accordance with procedures and schedule outlined in Appendix A and B.

1.4.4 Testing and Air Balancing (TAB)

All TAB work shall be accomplished by a AABC or NEBB or TABB TAB firm: AABC registration number and expiration date of current certification; or NEBB certification number and expiration date of current certification; or TABB certification number and expiration date of current certification.

1.4.4.1 TAB Standards

Perform TAB in accordance with the requirements of the standard under which the TAB Firm’s qualifications are approved, i.e., AABC MN-1, NEBB PROCEDURAL STANDARDS, or SMACNA 1780 unless otherwise specified herein.

1.4.4.2 Coordination of Supporting Personnel

Provide the technical personnel, such as factory representatives or HVAC controls installer required by the TAB field team to support the DALT and the TAB field measurement work.

Provide equipment mechanics to operate HVAC equipment and ductwork mechanics to provide the field designated test ports to enable TAB field team to accomplish the DALT and the TAB field measurement work.

Ensure these support personnel are present at the times required by the TAB team and cause no delay in the DALT and the TAB field work.

1.4.4.3 Scope of TAB Work

TAB work is for air side testing only no hydronic work will be required.

Work will be in accordance with NEHC-TM-IH 6290.99-10 Chapter 5.2.

All TAB work will be performed as described in Appendix B on the systems listed in

Appendix A.

1.5 Disposal of Contaminated Waste

The Contractor shall take care to segregate all removed materials properly and manage site work to minimize the amount of waste generated. Specific separate waste streams shall be identified in coordination with the 914 MSG/CEV. All TCLP samples of waste or material shall be collected prior to the Contractor leaving the site and the analysis results provided by a certified lab shall be provided to 914 MSG/CEV within 30 days of collection, for proper labeling, shipment and recycling or disposal of waste. All generated recyclable materials and/or wastes shall be removed/shipped from the site for recycling or disposal at a permitted TSDF by the Contractor within 90 days of generation. Return of closed (TSDF signed manifest) shall be returned to the COR within 30 days.

All waste shall be stored in new Contractor-supplied UN-approved steel drums or containers.

Containers shall only be opened to add waste and shall otherwise remain closed as waste accumulates. Full containers shall be stored at the job site in an area protected from weather exposure.

All storage containers shall be labeled and/or marked properly to meet all Federal, State or local regulatory requirements. The Contractor shall be responsible for all proper labeling and marking and temporary storage in coordination with all pertinent regulations.

All generated waste shall be properly disposed of by the Contractor in accordance with Federal and State regulations.

The 914 ARW EPA Generator ID NY0570024273. Waste can be accumulated at B427 as a satellite accumulation area and cannot exceed 55 gallons of hazardous waste per type. Waste streams over 55 gallons must be stored at the Central Accumulation Area. NFARS utilizes 6 NYCCRR 374-1.13 when applicable to determine when a military munition is defined as a solid waste.

The Contractor shall use the site EPA ID number for the facility to manifest hazardous waste from the site. Handling and disposition of hazardous waste shall be coordinated with the 914 MSG/CEV. All hazardous waste documents shall be signed by the 914 MSG/CEV or other Government representative designated in writing from the Wing Commander. Failure of the Contractor to properly coordinate review/signature of the aforementioned documents may result in delay of waste shipments off-base and incurrence of additional costs by the Contractor.

Payment of such cost(s) is solely the responsibility of the Contractor, the Government incurring no additional cost.

The Contractor shall be responsible for any fines, fees or penalties associated with improper management of hazardous waste.

1.6 Wipe Sampling

Prior to cleaning of the range, the Contractor shall conduct wipe sampling of horizontal surfaces located in the small arms range; specific locations of the samples are listed in table below. All wipe samples will be labeled with location of sample.

Upon completion of cleaning, and prior to clearance sampling, the Contractor shall conduct a visual inspection of areas potentially affected by the project. The purpose of the inspection is to determine whether the work was completed as required and whether visible settled dust or debris is present. The inspection shall include a surface-by-surface examination to determine if known or suspected lead dust surfaces are still present at the range. A member of Combat Arms shall be present during the visual inspection, to confirm that the space is physically cleaned to their satisfaction.

Upon completion of the range cleaning, clearance wipe sampling shall be conducted at the determined locations listed in the table below. Samples shall be submitted to a National Voluntary Laboratory Accreditation Program (NAVLAP) certified laboratory for analysis, with a requested 24hr turn-around time. The NAVLAP certified laboratory sample analysis report shall be provided to 914 Bioenvironmental upon receipt by the Contractor.

All wipe sampling with be conducted in accordance with NIOSH 9100 sample methods. Use of alternate methods will require pre-approval from 914 ARW Bioenvironmental. Sample templates shall be 12" square. Clearance samples must be less than 200 µg/sf in industrial areas and 40 µg/sf in non-industrial areas. If they exceed the clearance levels, then area(s) must be re-cleaned and re-sampled at Contractor expense until they are less than the specified clearance levels, unless the CO waives the requirement for certain area(s). See the table below for sample locations and clearance sampling criteria required.

Wipe Sample Location1 # pre-samples

# post-samples

Location Total

Cleaning Criteria (µg/sf)

Sample Method

Control Room -desk 1 1 2 40

NIOSH 9100/

12” square sample template

Control Room - floor 1 1 2 40

Gun Cleaning Room - counter 1 1 2 200

Gun Cleaning Room - floor 1 1 2 200

Storage/Office Room - desk 1 1 2 40

Storage/Office Room - floor 1 1 2 40

Vestibule2 1 1 2 200

Firing Line3 5 5 10 200

Bullet Trap - floor 1 1 2 200

26 TOTAL

1 See Appendix D for B427 map

2Vestibule between the gun cleaning room and firing range.

3At the firing line where personnel stand; random firing lanes to be selected by 914 ARW COR for each event.

1.7 Sampling and Analysis

The Contractor shall prepare a waste profile for all waste generated which shall be disposed in accordance with Federal, State and local requirements. The Contractor shall conduct TCLP metal analyses on each distinct waste stream to determine if hazardous wastes are present and to properly characterize the waste stream. Characterization and profiling of hazardous wastes shall be coordinated with the 914 MSG/CEV.

1.8 Additional Requirements

In the event of a hazardous material or waste spill, the CO shall be notified immediately. The Contractor is entirely responsible for spill response actions, notifications, and cleanup resulting from their operations under this contract.

All work performed under this contract must be performed by workers who are properly trained, and, where required by any Federal, state, or local laws or regulations, licensed or certified to perform the work required under this contract.

The Contractor shall provide Safety Data Sheets (SDSs) to 914 MSG/CEV for all hazardous materials used during the project a minimum of 2 weeks prior to planned date to bring them on base. Usage of all hazardous materials shall be tracked and reported to 914 MSG/CEV. The Contractor shall have the applicable SDS readily available while on base where hazardous materials are used and stored. The Contractor shall ensure employees are trained in the proper handling of hazardous materials. Any hazardous materials stored on base will need inventoried and barcoded by the base Hazmat pharmacy.

1.9 Submittals

All required submittals shall be provided to the CO for approval within 10 business days unless otherwise defined in this PWS.

The Contractor shall submit for approval written evidence of training that demonstrates their personnel have been properly trained for lead abatement work (i.e. lead worker, lead supervisor, etc.) prior to commencement of work on site.

The Contractor shall provide copies of all required documentation regarding disposition of material including manifests, facility receipts, etc. Copies of all shipping documents and manifests shall be provided at least 5 days prior to shipment for 914 MSG/CEV review and signature.

2.0 Applicable Documents

The Contractor shall comply with all applicable federal, state, and local environmental statutes, instructions, manuals, handbooks, regulations, guidance, policy letters, and rules (including all changes and amendments in effect on the date of issuance of each TO). It is the Contractor's responsibility to identify all applicable federal, state, and local environmental statutes, instructions, manuals, handbooks, regulations, guidance, policy letters, and rules for all work performed and apply the procedures and protocols required.

2.1 Regulatory Interface

The Contractor shall assist in the application of general and site-specific regulatory requirements that pertain to the project and maintain currency with changing DOD, Federal, state, and local statutes and regulations as follows:

The Contractor is not an employee of the government and shall not represent the government in a official or unofficial capacity without the express prior written permission from the CO.

In the event that an unspecified regulatory representative approaches the Contractor with a stated intent to inspect the activities of the Contractor, the Contractor shall respectfully decline the inspection until the CO is properly notified and a duly appointed representative is present or other direction is issued by the CO. If this is not possible, due to project constraints, the Contractor shall notify the CO at the earliest possible time following the inspection.

2.2 Coordination with Other Contractors

The Contractor shall cooperate fully with other Contractors and government employees. The Contractor shall not commit any act that shall interfere with the performance of work by any other Contractor or government employee. The CO shall resolve work schedule conflicts between this contract and the additional work awarded to other Contractor(s). The CO shall provide written direction to the Contractor to reschedule work when required.

2.3 Special Notification

2.3.1 Health Risks

The Contractor shall immediately report to the CO and the COR, verbally by telephone or e-mail pursuant to the contract, any issues or incidents which may indicate potential imminent risk to contracted, federal, or local personnel, the public at large or the environment.

2.3.2 Identification and Change of Critical Contractor Personnel The Contractor shall immediately notify the CO of any changes in critical Contractor personnel.

The Contractor shall obtain CO approval of any proposed changes in project personnel along with the steps taken/proposed to ensure there are no impacts to the schedule or costs associated with individual tasks. Identify to the CO all subcontractors to be used under contracts issued pursuant to this PWS, prior to signing any contract or initiating any work. Provide subcontractor qualifications to the CO prior to subcontractor utilization.

2.4 Work Site Requirements

2.4.1 Safety Requirements

The Contractor shall be responsible for protecting the lives and health of employees and other persons on the work site, preventing damage to property, materials, supplies, and equipment, avoiding work interruptions and complying with Occupational Safety and Health Administration (OSHA) regulations and Base safety office requirements. The Contractor shall perform all operations in a prudent, conscientious, safe and professional manner and conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work. The Contractor shall maintain documentation supporting training records on site and have written Health and Safety Plans on site and available for workers and/or regulatory review. The Contractor shall provide the CO copies of any OSHA report(s), regarding a project site, submitted during the duration of the contract.

The Contractor shall record and report promptly (within 1 hour) by telephone, facsimile or other direct means to the CO or the COR, and to the military installation’s Safety Office, all available facts relating to each instance of damage to Government property or injury to either Contractor or Government personnel. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, preserve evidence until released by the accident/mishap investigative authority through the CO, and immediately report the incident to the Base Security at (716) 236-2280. If the government elects to conduct an investigation of the accident/mishap, the Contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.

The Contractor agrees that his personnel and equipment are subject to safety inspections by government personnel while on federal property.

2.4.2 Fire Prevention and Protection

The Contractor and his employees shall comply with the military installation’s regulations, and Air Force Occupational and Environmental Safety, Fire Prevention and Health (AFOSH) Program, as applicable. Coordinate with the base Fire Inspector for hot permits (for welding or open flame operations), as required.

2.4.3 Work-Site Maintenance

The Contractor shall maintain the work site to prevent the spread of contamination, provide for the integrity of the samples obtained, provide for the safety of all individuals in the vicinity of the work site areas, and prevent the release of any contamination to the environment. The work site shall be well marked to prevent inadvertent entry into all work areas. Access to work areas shall be monitored and thoroughly controlled. Standard work zones and access points for controlled operations shall be established and maintained as the site conditions warrant. Ensure compliance with any federal, state, and local regulations and QA/QC protocols and procedures for decontaminating tools, equipment, or other materials, as required. At all times, keep the work area free from accumulation of waste and non-essential hazardous materials. Remove non-essential equipment from the work site when not in use. The worksite shall be maintained to present an orderly appearance and to maximize work efficiency. Before completing the work at each work location, remove, from the work premises, any rubbish, tools, equipment, and materials that are not the property of the government. Properly dispose of all debris and other waste(s). Upon completing the work, leave the area clean, neat, orderly, and return the work site(s) to an appropriate condition subject to the work as specified in this contract.

2.4.4 Storage

No on-site storage will be available for cleaning and maintenance material. Contractor shall remove all materials when cleaning and maintenance is complete.

2.4.5 Permits

The Contractor shall be responsible for coordinating and obtaining the required permits to implement a site-specific project.

3.0 Management, Planning, and Reporting Requirements

The Contractor shall plan project activities, including the development, implementation, and maintenance of project schedules, events, status of resources, report(s) on the activities and progress toward accomplishing project objectives, and document for Government review and approval the results of the project efforts for this contract.

3.1 Post Award Meeting/Teleconference

After the issuance of this contract, the Contractor shall attend a post award meeting/teleconference at the location specified by the CO. The purpose of the meeting shall be to become familiar with the work requirements, information, and/or site-specific data addressed under this contract.

3.2 Plans

The Contractor shall prepare and submit a Work Plan describing the Contractors plan to implement the work required in the task order. The Contractor shall prepare and submit, as required, a health & safety, waste management, or other needed plan.

3.3 Pollution Prevention

The Contractor shall conduct all operations and activities with the intent of reducing the amount of energy used and pollution generated. Specific areas to be focused on are generation of solid waste, use of hazardous materials, use of ozone depleting chemicals, generation of hazardous waste, and use of energy and water.

4.0 Certifications and Training

Contractor personnel shall possess appropriate certifications and training to accomplish activities on systems as specified in this contract. These services shall include:

4.1 Hazardous Material

The Contractor shall comply with all regulations governing the transportation, handling, storage and use of hazardous materials such as Hazardous Materials Act (HMA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), and Emergency Preparedness and Community Right-to-Know Act (EPCRA). Comply with all DoD Hazardous Materials programs including, but not limited to, hazardous materials and hazardous waste reduction programs.

4.2 Hazardous Waste

The Contractor shall comply with all regulations governing the control of hazardous waste from its origin to ultimate treatment, storage, or disposal, such as Resource Conservation and Recovery Act (RCRA), Hazardous and Solid Waste Act (HSWA). The Contractor shall perform activities such as hazardous waste collection and accumulation site operations and management, sampling and analysis. The Contractor shall be responsible to ascertain and maintain documentation (including refresher courses as required) that all workers at a site have been properly trained in lead abatement verification.

4.3 Integrated Solid Waste Management

The Contractors shall operate, maintain and perform services in support of activities to comply with federal, state, and local solid waste management regulations. These activities shall include characterization of solid wastes, separation of recoverable/non-recoverable wastes and the recycling of those materials, operation and management of comprehensive recycling programs, operations and maintenance of monitoring equipment, composting operations, landfill operations and maintenance, construction and demolition debris operations and management.

The Contractor shall create and maintain in one location written records sufficient to recreate each sampling, analytical, testing and monitoring event. The Contractor shall make these records available to the government upon request or as specified in this contract.

APPENDIX A

SCHEDULE OF SMALL ARMS RANGE CLEANING AND MAINTENANCE

CLEANING

CLIN Frequency Description PWS Reference

1 Base Year a. Ventilation System Cleaning

b. HVU 1 - HVU 3

c. RFB 1, RFB 2

d. REF 1, REF 2

e. EF 1 – EF 3

f. AC 1, AC 2

g. GF 1, GF2

h. ACCU 1, ACCU 2

i. ERV 1

j. Air Devices A - J

k. Louvers 1 – 9

l. UH 1, UH 2

m. EHU 1, EHU

a. 1.3.5

2 Annual a. Bullet Trap Dust Collection System (drum)

a. 1.3.2

3 Quarterly a. Bullet Fragments (drum)

b. Range Cleaning

c. Incidental Materials

a. 1.3.1

b. 1.3.3

c. 1.3.4

MAINTENANCE

4 Annual a. Range Exhaust Fans and Filter Bank (HEPA filters)

b. Bullet Trap Dust Collection System (replace filters)

c. Air compressors (belts)

a. 1.4.1

b. 1.3.2

c. 1.4.3

5 Quarterly a. Range Exhaust Fans and Filter Banks (pre-filters)

b. Bullet Trap and Target Systems

c. Bullet Trap Dust Collection System

d. Air compressors

a. 1.4.1

b. 1.4.2

c. 1.3.2

d. 1.4.3

TAB

6 Annual a. HVU 1, HVU 2, HVU 3

b. REF 1 and REF 2

c. EF 3

d. All shooting lanes on the range.

a. 1.4.4

APPENDIX B

SMALL ARMS RANGE MAINTENANCE PROCEDURES

1.0 BULLET TRAP SYSTEM MAINTENANCE SERVICES

The Contractor shall provide a report documenting maintenance actions performed with this task. Recommendations for deficiencies or repairs with cost estimates shall be included in the report and submitted to the 914 ARW.

a. ☐ Facility Manager Check In. Contractors shall check in with facility managers to ensure range is safe and clear before entering the range or mechanical room before performing any maintenance, tasks or work.

b. ☐ Bullet Trap Opening. Inspect and measure bullet trap opening. Verify measurement is within specifications for trap.

c. ☐ Deflectors. Inspect deflectors. Verify all deflectors in -place and are operational.

d. ☐ Range Walls. Inspect range walls, overhead baffles, sacrificial material for damage and evidence of escaping rounds.

e. ☐ Conveyor System. Inspect conveyor belt and rollers for debris build up and clean. Run up conveyor system and check for proper operation. Inspect conveyor motor for proper operation and lubricate.

f. ☐ HVAC Filtration System. Check system for proper operation. Ensure range is ventilating properly.

g. ☐ Documentation. Sign all inspection tags. Provide report as stated above.

2.0 BULLET TRAP DUST COLLECTION UNIT MAINTENANCE SERVICES

The Contractor shall provide a report documenting maintenance actions performed with this task. Recommendations for deficiencies or repairs with cost estimates shall be included in the report and submitted to the 914 ARW.

a. ☐ Facility Manager Check in. Contractors shall check in with facility managers to

b. ☐ Filtration System. Operate and inspect system for proper operation. Inspect duct between bullet trap and lead filtration system, vacuum and clean out any debris.

c. ☐ Lead Shot Dust Collector. Inspect containers. Ensure containers are functional.

Empty collection container and dispose of as discussed in Section 1.5 of this PWS.

d. ☐ Wet Conveyor System. Operate and inspect system for proper operation.

e. ☐ Filtration Chamber. Inspect filtration chamber. Vacuum and clean out any debris. Replace filters annually.

f. ☐ Documentation. Sign all inspection tags. Provide report as stated above.

3.0 RANGE EXHAUST FAN MAINTENANCE SERVICES

The Contractor shall provide a report documenting maintenance actions performed with this task. Recommendations for deficiencies or repairs with cost estimates shall be included in the report and submitted to the 914 ARW.

a. ☐ Facility Manager Check in. Contractors shall check in with facility managers to

b. ☐ Fan. Start and stop fan with local switch. Ensure proper operation and cleanliness.

c. ☐ Motor. Check motor and fan shaft bearings for noise, vibration and overheating.

Lubricate bearings up to manufacturer specifications.

d. ☐ Belts. Check belts for wear, tension, and alignment. If applicable, adjust as required. Replace belts annually.

e. ☐ Blower Dampers. Operate and inspect dampers for proper operation. Lubricate to manufacturer specifications.

f. ☐ Electrical wiring. Check all wiring and connections. Ensure all connections are tight and secure. Tighten loose connections as needed.

g. ☐ Filters. Pre-filters shall be replaced quarterly. HEPA filters shall be replaced annually. Date and initial filters to document date of replacement.

h. ☐ Documentation. Sign all inspection tags. Provide report as stated above.

4.0 TARGET SYSTEM MAINTENANCE SERVICES

The Contractor shall provide a report documenting maintenance actions performed

b. ☐ Carriers. Inspect the carrier for any damage from direct or secondary bullet impacts. Remove the side cover on the drive wheel side of the carrier and check the drive wheels and belts. Adjust the tension and align the pulleys if needed.

c. ☐ Track. Inspect the track for damage from bullet strikes. Check track for loose joints and hangers. Tighten screws and annotate missing screws or hangers. Check the integrity of the far end stop.

d. ☐ Documentation. Sign all inspection tags. Provide report as stated above.

5.0 AIR COMPRESSOR MAINTENANCE SERVICES

b. ☐ Compressor. Replace compressor oil. Perform operational check of compressor system and adjust as required. Clean air intake filter, replace annually.

c. ☐ Motor. Check motor operation for excessive vibration, noise, and overheating.

Lubricate motor. Check tension, condition, and alignment of v-belts; adjust as necessary. Replace belts annually.

d. ☐ Tank. Drain moisture from air storage tank and check low pressure cut-in. While draining, check discharge for indication of interior corrosion. Clean oil and water trap.

e. ☐ Documentation. Sign all inspection tags. Provide report as stated above.

6.0 TESTING AND BALANCING (TAB) PROCEDURES

a. ☐ Smoke test. Using either a smoke tube or smoke candle, observe airflow currents and patterns throughout the range. This should identify disturbances and direction of airflow. Unnecessary personnel should not be present in the range or near the supply air plenum during the assessment. Prior to activating the tube or candle, ensure that the ventilation system is on and operating. If a smoke candle is used, a coffee can with some type of a handle fabricated (pliers) should be used to handle the candle. At the firing line, smoke test each firing station (booth). Test from the floor to about 6-foot level. Observe the smoke pattern. The smoke should move down range and demonstrate laminar flow. Document unusual smoke patterns or where smoke swirls and returns to the shooter's position. Eddies or swirls near the floor, or other obstructions are a concern and should be noted. If turbulence is observed, air velocities may be high in that area. Note that air velocity measurements conducted later in this area may not truly indicate the direction of the flow (turbulence and eddies may have flow directions other than down range but will be reflected only as a measured value). Conduct additional smoke measurements down range to ensure adequate air velocities and patterns are maintained down range towards the bullet stop. Note that many ranges were designed to have multiple exhaust points down range that will affect the smoke patterns.

b. ☐ Air Flow Testing: Measure the cross-sectional area for the range and calculate the necessary volumetric air flow. Measure the ceiling height and width of the range at the firing line. Measure the ventilation.