Attachment 1 PWS.pdf
PDF 176 KB Posted
- Solicitation number
- HT940726QE002
- Issued by
-
Defense Health Agency
About this file
This is a Performance Work Statement for preventive maintenance and repair of food service equipment at the 88th Medical Group at Wright-Patterson Air Force Base in Dayton, Ohio.
The contractor must provide qualified personnel, supervision, materials, equipment, supplies, and transportation for preventative maintenance, routine maintenance, emergency maintenance, and general repairs of kitchen equipment in the Nutritional Medicine Flight dining facility. The contract runs from 15 June 2026 through 14 June 2031, consisting of a base year with four one-year option periods. Work is performed Monday through Friday, 0600-1600, excluding federal holidays, at Building 830, 4881 Sugar Maple Drive, Wright-Patterson AFB, Ohio 45433. Contractor technicians must possess R-410A Technician Certification with five years of refrigerant experience, HVAC Level II Certification with five years of HVAC experience, and five years of commercial kitchen equipment maintenance experience or equivalent plumbing and electrical maintenance experience. Technicians must be certified on equipment manufacturers including Hobart, Imperial, Traulsen, Cleveland, Groen, Electrolux, and others. Personnel must maintain professional appearance with identification badges and cannot include individuals presenting security or safety threats or creating conflicts of interest.
The contractor shall provide three types of maintenance services: preventative maintenance performed quarterly during the first week of the third month of each quarter (March, June, September, December) coordinated with the first Wednesday facility closure; remedial maintenance with 24-hour response time available 24/7; and emergency maintenance with 4-hour response time for hazardous conditions, ware washing system failures, or work outside standard hours. All replacement parts must be new OEM parts meeting manufacturer specifications with 90-day minimum warranty, marked up no more than 5% above published manufacturer price with actual shipping costs invoiced separately. Parts must be ENERGY STAR certified or FEMP-designated where practicable; cleaning chemicals must meet EPA Safer Choice or USDA Certified Biobased standards. Prior written approval from the equipment custodian is required for all part purchases, with verbal approval acceptable in emergencies if followed by written confirmation within 24 hours. Deliverables include invoices submitted through Wide Area Workflow reflecting all work, parts, and labor charges, plus detailed written service reports within 48 hours containing reason for call, time required, parts list with prices, work description, technician name and signature, and authorized government representative signature. Performance standards require no more than two monthly deviations from response times, zero defects in equipment maintenance per OEM standards, 95% compliance with sustainable parts requirements, and service reports delivered within 48 hours with no more than one error per month, with remedies including required resolution within five working days or re-performance at no additional cost.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Equipment Inventory_Nutritional Medicine.xlsx | XLSX spreadsheet | |
| Attachment 3-Wage Determination.pdf | ||
| COMBINED SYNOPSIS.pdf | ||
| Attachment 2 - Pricing Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Defense Defense Health Agency
Performance Work Statement
Preventive Maintenance and Repair of Food Service Equipment
15 June 2026
88th Medical Group at Wright-Patterson AF, Dayton, OH
1.0 GENERAL INFORMATION
1.1 Introduction and Scope
This is a non-personal services contract. The contractor shall provide all qualified personnel, supervision, services, materials, equipment, supplies, and transportation necessary to perform preventative maintenance, routine maintenance, emergency maintenance, and general repairs for the Nutritional Medicine Flight dining facility at Wright Patterson Air Force Base. The objective is to ensure all kitchen equipment is maintained in proper functioning condition, consistent with the manufacturer's standards.
1.2 Period of Performance (PoP)
The period of performance includes a base year and four (4) one-year option periods:
• Base Year: 15 June 2026 – 14 June 2027
• Option Year 1: 15 June 2027 – 14 June 2028
• Option Year 2: 15 June 2028 – 14 June 2029
• Option Year 3: 15 June 2029 – 14 June 2030
• Option Year 4: 15 June 2030 – 14 June 2031
1.3 Place of Performance
The work shall be performed at 4881 Sugar Maple Dr, Wright Patterson Air Force Base, Ohio, 45433, Building 830, in the Nutritional Medicine Flight dining facility.
1.4 Hours of Operation
The contractor shall conduct business Monday through Friday, 0600-1600, excluding Federal holidays. Contractor service time begins upon reporting to the Nutritional Medicine Flight to repair equipment and does not include travel time or time spent procuring parts. The contractor must maintain an adequate workforce for the uninterrupted performance of all tasks.
1.5 Federal Holidays
Contractor services are not required on the following Federal holidays:
New Year’s Day Birthday of Martin Luther King, Jr.
Washington’s Birthday Memorial Day Juneteenth National Independence Day
Independence Day
Labor Day Columbus Day Veteran’s Day Thanksgiving Day Christmas Day
2.0 CONTRACTOR REQUIREMENTS
2.1 Personnel
2.1.1 Special Qualifications: Contractor technicians must be certified and experienced in commercial kitchen equipment repair. Technicians must comply with requirements for continuous learning to maintain required certifications. Specific qualifications include:
• R-410A Technician Certification with five (5) years of experience in refrigerants.
• HVAC Level II Certification with five (5) years of experience in HVAC.
• Five (5) years of focused experience in Commercial Kitchen Equipment
Maintenance and Repair, OR five (5) years of experience in both Plumbing Maintenance/Repair and Electrical Maintenance/Repair.
• Technicians must be certified to perform maintenance on Hobart, Imperial, Traulsen, Thermal Rite, Cleveland, Cold zone, Federal Industries, Nu-Vu, Salvajor, Sani-serv, Utility Refrigerator, Woodstone, Insinkerator, Groen, Electrolux, and other commercial equipment.
• An individual possessing a current certification recognized by the manufacturer or an accredited third party (e.g., The Joint Commission, ANSI).
2.1.2 Conduct, Appearance, and Identification: Contractor personnel shall present a neat, clean, and professional appearance.
• Uniform: Jeans are permitted if clean and without holes. Pants should fit appropriately. Headgear (cap or hairnet) and beard coverings are required when working in food areas. The contractor shall provide specialized protective clothing (e.g., slip-resistant, electrically safe steel-toe boots) as required.
• Identification: Personnel must wear an identification badge displaying their name and company. They shall identify themselves as contractor support in all interactions.
• Conduct: The contractor shall not employ any individual identified as a potential threat to the health, safety, or security of the installation and its population.
2.1.3 Conflict of Interest: The contractor shall not employ any U.S. Government or Department of the Air Force employee if it would create a conflict of interest, unless approved in accordance with DoD Directive 5500.7, Standards of Conduct.
2.2 Security and Access
• Reporting and Badging: Upon arrival, contractor personnel will be escorted by a Nutritional Medicine staff member to Facility Management to sign in and obtain a visitor’s badge. Personnel will not leave the service area without an escort.
• Tools and Materials: The contractor is responsible for the storage and safekeeping of all tools and materials. No permanent government storage space will be provided. If equipment is removed from the facility for repair, the contractor shall be issued an AF Form 1297 (Temporary Issue Receipt).
3.0 SPECIFIC TASKS
3.1 Maintenance Services
The contractor shall provide the following maintenance services:
• Preventive Maintenance: Performed quarterly, unless the manufacturer’s guidelines state otherwise, to keep equipment in good operating condition. Preventive maintenance shall be scheduled during the first week of the third month of each quarter (March, June, September, and December). The contractor shall coordinate with the Government to schedule this service to overlap with the first Wednesday of these respective months. The dining facility is closed on the first Wednesday of each month for cleaning, and aligning maintenance with this closure ensures unobstructed access to the equipment. This service includes inspecting excessive wear, checking gaskets and seals, cleaning condenser coils, and ensuring coolant levels are correct. Preventive maintenance is required for: combi ovens, stoves, evaporator coil units, salad bar, ice makers, serving lines, and ware washing machines.
• Remedial (Non-Emergency) Maintenance: The contractor shall respond to non-emergency service calls within 24 hours. This on-call service is available 24/7.
• Emergency Maintenance: The contractor shall respond to emergency service calls within 4 hours. An emergency is defined as any equipment failure that creates a physical hazard impeding safe execution of kitchen duties or increases the risk injury through continued use or involves the ware washing system or disposal system. Any maintenance required outside of normal operating hours (0600-1600, M-F), on weekends, or on holidays is considered emergency maintenance.
Flowers, Regina D CIV DHA DHA CONTRACTING ACT (USA) This section is good, but "hazard" can be subjective. Clarifying this helps avoid disagreements about whether a 4-hour or 24-hour response is required.
Could we further define what constitutes a "safety or occupational hazard" for an emergency service call? For instance, does a critical piece of equipment (like the main oven) failing during peak service hours qualify as an emergency, even if it's not a direct safety hazard?
Wilkins, Ann E Maj USAF DHA WRIGHT-PATT 88TH MDG (USA) Provided alternative verbiage
3.2 Replacement Parts
a) Part Specifications and Sustainability: The contractor shall provide all necessary labor and replacement parts to perform repairs and preventive maintenance in accordance with Original Equipment Manufacturer (OEM) guidelines. All parts must be new OEM parts unless otherwise specified in writing by the Government; refurbished or used parts are not acceptable. All parts must meet or exceed the manufacturer’s specifications and carry a minimum warranty of 90 days.
IAW FAR 52.223-23, when providing replacement parts, components, or entire replacement units (e.g., motors, compressors), the Contractor shall ensure those items are ENERGY STAR® certified or designated by the Federal Energy Management Program (FEMP) to the maximum extent practicable. Any cleaning chemicals or lubricants utilized shall meet EPA Safer Choice or USDA Certified Biobased standards.
b) Approval: Prior written approval from the equipment custodian or NCOIC is required for all part purchases. In emergency situations, verbal approval is acceptable but must be followed by written confirmation within 24 hours.
c) Pricing and Invoicing: Markup on parts shall not exceed 5% of the manufacturer’s published price. Shipping and handling costs are not subject to the 5% markup and shall be invoiced at actual cost. The contractor shall provide supporting documentation (e.g., official price lists, receipts) for all part and shipping costs with each invoice.
d) Property: All installed parts become Government property. Replaced parts become contractor property for proper disposal.
3.3 Equipment Inventory
The contractor shall add new or replacement equipment to the preventative maintenance schedule as directed by the Nutritional Medicine Flight.
4.0 DELIVERABLES
4.1 Invoices
All invoices shall be submitted through Wide Area Workflow (WAWF). The invoice must reflect all work accomplished, parts used, a description of work, and total labor charges.
4.2 Service Report
A verbal service explanation shall be provided to a Nutritional Medicine representative on the day of service. A detailed written service report shall be provided within 48 hours.
The report must include:
• Reason for the maintenance call
• Time required for the maintenance
• A list of repair parts utilized with prices
• A complete description of all work performed
• Name and signature of the service technician
• Signature of an authorized Nutritional Medicine representative (NCOIC, Flight
Leadership, or Equipment Custodian).
5.0 GOVERNMENT & CONTRACTOR FURNISHED ITEMS
5.1 Government-Furnished Items
The Government will provide adequate workspace, heat, light, ventilation, and electrical outlets at the equipment location. Use of an office telephone for local calls to procure parts is authorized. No permanent office space will be provided.
5.2 Contractor-Furnished Items
The contractor shall furnish everything needed to perform this contract
6.0 PERFORMANCE STANDARDS & REMEDIES
The government will monitor the contractor’s performance against the standards listed in the summary table below. The government reserves the right to inspect all services called for in this contract, at all times and places. If any services do not conform to contract requirements, the government may require the contractor to re-perform the services at no additional cost.
Performance Objective
PWS
Para
Performance Standard Method of Assessment
Remedy
PRS-1: Timely Service Response
3.1 No more than two
deviations per month from specified response times (Emergency: 4 hrs.;
Remedial: 24 hrs.;
Preventive: Quarterly).
100% Inspection Government requires resolution within 5 working days.
PRS-
2: Equipment Maintained
3.1 All equipment is
maintained in good operating condition per OEM standards. Zero defects are acceptable.
100% Inspection / Periodic Checks
Re-performance of service at no additional cost.
PRS-
3: Sustainable Parts & Materials
3.2 95% compliance utilizing
ENERGY STAR / FEMP
parts and biobased/EPA Safer Choice chemicals to the maximum extent practicable.
Periodic inspection of Contractor’s parts invoices and Safety Data Sheets
(SDS).
Contractor shall replace the non-compliant item at no additional cost. If immediate replacement disrupts operations, the deficiency will be documented for past performance evaluation.
PRS-
4: Accurate & Timely Reporting
4.2 Service reports are
delivered within 48 hours and contain all required information. No more than one error per month.
100% Inspection Correction of report within 2 working days.
7.0 POINTS OF CONTACT
7.1 Contractor Point of Contact
The contractor shall provide an emergency contact phone number and a daily operations contact phone number for troubleshooting and service calls.
| 1.0 GENERAL INFORMATION |
| 1.1 Introduction and Scope |
| 1.2 Period of Performance (PoP) |
| 1.3 Place of Performance |
| 1.4 Hours of Operation |
| 1.5 Federal Holidays |
| 2.0 CONTRACTOR REQUIREMENTS |
| 2.1 Personnel |
| 2.2 Security and Access |
| 3.0 SPECIFIC TASKS |
| 3.1 Maintenance Services |
| 3.2 Replacement Parts |
| a) Part Specifications and Sustainability: The contractor shall provide all necessary labor and replacement parts to perform repairs and preventive maintenance in accordance with Original Equipment Manufacturer (OEM) guidelines. All parts must be new ... |
| IAW FAR 52.223-23, when providing replacement parts, components, or entire replacement units (e.g., motors, compressors), the Contractor shall ensure those items are ENERGY STAR® certified or designated by the Federal Energy Management Program (FEMP) ... |
| b) Approval: Prior written approval from the equipment custodian or NCOIC is required for all part purchases. In emergency situations, verbal approval is acceptable but must be followed by written confirmation within 24 hours. |
| c) Pricing and Invoicing: Markup on parts shall not exceed 5% of the manufacturer’s published price. Shipping and handling costs are not subject to the 5% markup and shall be invoiced at actual cost. The contractor shall provide supporting documentati... |
| d) Property: All installed parts become Government property. Replaced parts become contractor property for proper disposal. |
| 3.3 Equipment Inventory |
| 4.0 DELIVERABLES |
| 4.1 Invoices |
| 4.2 Service Report |
| 5.0 GOVERNMENT & CONTRACTOR FURNISHED ITEMS |
| 5.1 Government-Furnished Items |
| 5.2 Contractor-Furnished Items |
| 6.0 PERFORMANCE STANDARDS & REMEDIES |
| 7.0 POINTS OF CONTACT |
| 7.1 Contractor Point of Contact |
File details come from the government source that posted it. Updated .