Attachment_1_-_Pricing_Schedule.xlsx
XLSX spreadsheet 111 KB Posted
- Attached to
- GPS CLOCK SYSTEM Federal contract opportunity
- Solicitation number
- 140A2323Q0615
About this file
This document contains two cost estimates for a GPS clock system project for an Indian school. The first estimate is for clocks at the high school, totaling approximately $50,249. It includes materials, labor, and fees for a transmitter, 95 analog clocks, wiring, conduit, and installation. The second estimate is for clocks at the elementary and middle schools, without pricing as the document appears to be a template.
The related federal contract opportunity is solicitation number 140A2323Q0615 from the Department of the Interior Bureau of Indian Affairs Bureau of Indian Education for a GPS clock system. No further details are provided on response dates, award dates, pricing terms, or other contract requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140A2323Q0615_Amd_0002.pdf | ||
| Sol_140A2323Q0615_Amd_0001.pdf | ||
| B09__Attachment-140A2323Q0615_(0001)_0001.pdf | ||
| Sol_140A2323Q0615.pdf | ||
| Attachment_2_-_SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
High School Primex Clock
| Project Title: | Clock System for School from Beacon |
| Location: | ST. STEPHENS INDIAN SCHOOL |
| Date: | March 14, 2023 |
| Subject: | Rough Order of Magnitude Cost Estimate |
| Basis of Estimate | Material Cost | Labor Cost | Equipment Cost | Material Unit Cost | Crew | Labor Hours | Labor Rates | Labor Unit Cost | Equipment Unit Cost | REFERENCES | ||||||||
| Item | Description | QTY | UOM | Unit Price USD | Total USD | RS MEANS | Web Reference | |||||||||||
| I. | 230031 St Stephen Indian School - High School - Primex Clocks | |||||||||||||||||
| FCC License | 1.00 | EA | $ 2,389.60 | $ 2,389.60 | $ 1,424.35 | $ 965.25 | $ - 0 | $ 1,424.35 | 24.240 | $ 965.25 | 275313500100 | |||||||
| Transmitter 1 Watt with Ethernet Port (with GPS) | 1.00 | EA | $ 3,078.54 | $ 3,078.54 | $ 2,918.75 | $ 159.79 | $ - 0 | $ 2,918.75 | 4.000 | $ 159.79 | 275313500600 | |||||||
| Transmitter Accessory Pack - Transmitter Rack | 1.00 | EA | $ 1,371.05 | $ 1,371.05 | $ 1,330.95 | $ 40.10 | $ - 0 | $ 1,330.95 | 1.000 | $ 40.10 | 271116200120 | |||||||
| Transmitter Accessory Pack - UPS | 1.00 | EA | $ 1,283.74 | $ 1,283.74 | $ 1,144.15 | $ 139.59 | $ - 0 | $ 1,144.15 | 3.500 | $ 139.59 | 263353100110 | |||||||
| GPS Extension Cable for XR Transmitters, Coaxial | 1.00 | CLF | $ 94.27 | $ 94.27 | $ 54.17 | $ 40.10 | $ - 0 | $ 54.17 | 1.000 | $ 40.10 | 271533103870 | |||||||
| 72Mhz Analog Clock, 12.5" Black | 95.00 | EA | $ 142.84 | $ 13,569.80 | $ 9,760.30 | $ 3,809.50 | $ - 0 | $ 102.74 | 1.000 | $ 40.10 | 275313504100 | |||||||
| Dual D-cell Alkaline Battery Pack | 95.00 | EA | $ 76.31 | $ 7,249.45 | $ 3,439.95 | $ 3,809.50 | $ - 0 | $ 36.21 | 1.000 | $ 40.10 | 275313504100 | https://www.grainger.com/product/DURACELL-D-Battery-Premium-21EK77 | ||||||
| 18" X 18" Analog Wire Guard | 6.00 | EA | $ 234.94 | $ 1,409.64 | $ 1,183.44 | $ 226.20 | $ - 0 | $ 197.24 | 0.800 | $ 37.70 | 055823900400 | |||||||
| Power Supply Outlets | 2.00 | Ea | $ 48.28 | $ 96.56 | $ 72.86 | $ 23.70 | $ - 0 | $ 36.43 | 0.296 | $ 11.85 | 262726202540 | |||||||
| Fire Blocking (Fire Caulk) | 10.00 | Ea | $ 37.34 | $ 373.40 | $ 199.10 | $ 174.30 | $ - 0 | $ 19.91 | 0.500 | $ 17.43 | 078413100200 | |||||||
| Multi Pair Non Plenum Shileded #18, 2pair PVC Jacketed Cables | 3.00 | C.L.F. | $ 208.59 | $ 625.77 | $ 470.73 | $ 155.04 | $ - 0 | $ 156.91 | 1.300 | $ 51.68 | 271513138502 | |||||||
| Wire, copper, stranded, 600 volt, #12AWG, type THWN, normal installation conditions in wireway, conduit, cable tray | 6.00 | C.L.F. | $ 88.75 | $ 532.50 | Electrical supply wiring | $ 329.64 | $ 202.86 | $ - 0 | $ 54.94 | 1 ELEC | 0.727 | $ 33.81 | 260519901200 | |||||
| Cat 6 #24 4pair Stranded PVC Jacket | 3.00 | C.L.F. | $ 77.83 | $ 233.49 | Signal wiring | $ 74.10 | $ 159.39 | $ - 0 | $ 24.70 | 1 ELEC | 1.143 | $ 53.13 | 271513137244 | |||||
| 3/4" Rigid Steel Conduit including fittings and supports | 450.00 | L.F. | $ 9.54 | $ 4,293.00 | Conduit for wiring | $ 2,196.00 | $ 2,097.00 | $ - 0 | $ 4.88 | 1 ELEC | 0.100 | $ 4.66 | 260533131770 | |||||
| J-Hook 4" | 25.00 | Ea | $ 14.12 | $ 353.00 | $ 233.50 | $ 119.50 | $ - 0 | $ 9.34 | 1 ELEC | 0.120 | $ 4.78 | 270529100140 | ||||||
| Lock out and Tag Out | 10.00 | Ea | $ 9.15 | $ 91.50 | $ 72.70 | $ 18.80 | $ - 0 | $ 7.27 | 1 ELEC | 0.040 | $ 1.88 | 013114200120 | ||||||
| System Testing and commissioning | 1.00 | Lot | $ 370.45 | $ 370.45 | $ - 0 | $ 370.45 | $ - 0 | $ 370.45 | 019113500250 | |||||||||
| $ 24,904.69 | $ 12,511.07 | $ - 0 | ||||||||||||||||
| $ 37,415.76 | $ 37,415.76 | |||||||||||||||||
| Contingencies 20% | $ 7,483.15 | 012116500050 | 20% | |||||||||||||||
| Security adjustment factor, Escort required to be with tradesperson during work effort | $ 781.94 | 012153600440 | 6.25% of labor | |||||||||||||||
| Total Direct Cost | $ 45,680.86 | |||||||||||||||||
| FEE 10% | $ 4,568.09 | |||||||||||||||||
| ESTIMATED TOTAL COST | $ 50,248.94 |
https://www.grainger.com/product/DURACELL-D-Battery-Premium-21EK77 High School Primex Clock Labor
| Project Title: | Clock System for School from Beacon |
| Location: | ST. STEPHENS INDIAN SCHOOL |
| Date: | March 16, 2023 |
| Subject: | Rough Order of Magnitude Cost Estimate |
| Basis of Estimate | Material Cost | Labor Cost | Equipment Cost | Material Unit Cost | Crew | Labor Hours | Labor Rates | Labor Unit Cost | Equipment Unit Cost | REFERENCES | ||||||||
| Item | Description | QTY | UOM | Unit Price USD | Total USD | RS MEANS | Web Reference | |||||||||||
| I. | 230031 St Stephen Indian School - High School - Primex Clocks | |||||||||||||||||
| FCC License | 1.00 | EA | $ - 0 | 24.240 | ||||||||||||||
| 1 Electrician | 24.24 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF FCC License | 1 ELEC | 24.240 | ||||||||||||
| Transmitter 1 Watt with Ethernet Port (with GPS) | 1.00 | EA | $ - 0 | 4.000 | ||||||||||||||
| 1 Electrician | 4.00 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF TRANSMITTER | 1ELEC | 4.000 | ||||||||||||
| Transmitter Accessory Pack - Transmitter Rack | 1.00 | EA | $ - 0 | 1.000 | ||||||||||||||
| 1 Electrician | 1.00 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF TRANSMITTER RACK | 1ELEC | 1.000 | ||||||||||||
| Transmitter Accessory Pack - UPS | 1.00 | EA | $ - 0 | 3.500 | ||||||||||||||
| 1 Electrician | 3.50 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF UPS | 1ELEC | 3.500 | ||||||||||||
| GPS Extension Cable for XR Transmitters, Coaxial | 1.00 | CLF | $ - 0 | 1.000 | ||||||||||||||
| 1 Electrician | 1.00 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF GPS Extension Cable | 1ELEC | 1.000 | ||||||||||||
| 72Mhz Analog Clock, 12.5" Black | 95.00 | EA | $ - 0 | 1.000 | ||||||||||||||
| 1 Electrician | 95.00 | HOURS | $ - 0 | LABOR FOR INSTALLATION Analog Clock | 1ELEC | 1.000 | ||||||||||||
| Dual D-cell Alkaline Battery Pack | 95.00 | EA | $ - 0 | 1.000 | ||||||||||||||
| 1 Electrician | 95.00 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF BATTERY | 1ELEC | 1.000 | ||||||||||||
| 18" X 18" Analog Wire Guard | 6.00 | EA | $ - 0 | 0.800 | ||||||||||||||
| CREW E-4 | 4.80 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF ANALOG WIRE GUARD, Crew E-4 composition: 1 STRUC. STEEL FOREMAN & 3 STRUC. STEEL WORKERS | E-4 | 0.800 | ||||||||||||
| Power Supply Outlets | 2.00 | Ea | $ - 0 | 0.296 | ||||||||||||||
| 1 Electrician | 0.59 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF Power Supply Outlets | 1ELEC | 0.296 | ||||||||||||
| Fire Blocking (Fire Caulk) | 10.00 | Ea | $ - 0 | 0.500 | ||||||||||||||
| 1 Carpenter | 5.00 | HOURS | $ - 0 | LABOR FOR INSTALLATION Fire Block | 1CARP | 0.500 | ||||||||||||
| Multi Pair Non Plenum Shileded #18, 2pair PVC Jacketed Cables | 3.00 | C.L.F. | $ - 0 | 1.300 | ||||||||||||||
| 1 Electrician | 3.90 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF Cables | 1ELEC | 1.300 | ||||||||||||
| Wire, copper, stranded, 600 volt, #12AWG, type THWN, normal installation conditions in wireway, conduit, cable tray | 6.00 | C.L.F. | $ - 0 | Electrical supply wiring | 0.727 | |||||||||||||
| 1 Electrician | 4.36 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF Electrical Supply Wiring | 1 ELEC | 0.727 | ||||||||||||
| Cat 6 #24 4pair Stranded PVC Jacket | 3.00 | C.L.F. | $ - 0 | Signal wiring | 1.143 | |||||||||||||
| 1 Electrician | 3.43 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF Signal Wiring | 1 ELEC | 1.143 | ||||||||||||
| 3/4" Rigid Steel Conduit including fittings and supports | 450.00 | L.F. | $ - 0 | Conduit for wiring | 0.100 | |||||||||||||
| 1 Electrician | 45.00 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF Conduit | 1 ELEC | 0.100 | ||||||||||||
| J-Hook 4" | 25.00 | Ea | $ - 0 | 0.120 | ||||||||||||||
| 1 Electrician | 3.00 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF J-Hook | 1 ELEC | 0.120 | ||||||||||||
| Lock out and Tag Out | 10.00 | Ea | $ - 0 | 0.040 | ||||||||||||||
| 1 Electrician | 0.40 | HOURS | $ - 0 | LABOR FOR INSTALLATION OF LOTO DEVICE | 1 ELEC | 0.040 | ||||||||||||
| System Testing and commissioning | 1.00 | Lot | $ - 0 |
| $ - 0 | ||
| Contingencies 20% | $ - 0 | |
| Security adjustment factor, Escort required to be with tradesperson during work effort | ||
| Total Direct Cost | $ - 0 | |
| FEE 10% | $ - 0 | |
| ESTIMATED TOTAL COST | $ - 0 |
Elem and Middle- Primex Clock
| Project Title: | Clock System for School from Beacon |
| Location: | ST. STEPHENS INDIAN SCHOOL |
| Date: | March 14, 2023 |
| Subject: | Rough Order of Magnitude Cost Estimate |
| Basis of Estimate | Material Cost | Labor Cost | Equipment Cost | Material Unit Cost | Crew | Labor Hours | Labor Rates | Labor Unit Cost | Equipment Unit Cost | REFERENCES | ||||||||
| Item | Description | QTY | UOM | Unit Price USD | Total USD | RS MEANS | Web Reference | |||||||||||
| I. | 230030 St Stephen Indian School - Elem and Middle School - Primex Clocks | |||||||||||||||||
| FCC License | 1.00 | EA | 24.240 | |||||||||||||||
| Transmitter 1 Watt with Ethernet Port (with GPS) | 1.00 | EA | 4.000 | |||||||||||||||
| Transmitter Accessory Pack - Transmitter Rack | 1.00 | EA | 1.000 | |||||||||||||||
| Transmitter Accessory Pack - UPS | 1.00 | EA | 3.500 | |||||||||||||||
| GPS Extension Cable for XR Transmitters, Coaxial | 1.00 | CLF | 1.000 | |||||||||||||||
| 72Mhz Analog Clock, 12.5" Black | 56.00 | EA | 1.000 | |||||||||||||||
| Dual D-cell Alkaline Battery Pack | 56.00 | EA | 1.000 | |||||||||||||||
| 18" X 18" Analog Wire Guard | 3.00 | EA | 0.800 | |||||||||||||||
| Power Supply Outlets | 2.00 | Ea | 0.296 | |||||||||||||||
| Fire Blocking (Fire Caulk) | 10.00 | Ea | 0.500 | |||||||||||||||
| Multi Pair Non Plenum Shileded #18, 2pair PVC Jacketed Cables | 3.00 | C.L.F. | 1.300 | |||||||||||||||
| Wire, copper, stranded, 600 volt, #12AWG, type THWN, normal installation conditions in wireway, conduit, cable tray | 6.00 | C.L.F. | Electrical supply wiring | 1 ELEC | 0.727 | |||||||||||||
| Cat 6 #24 4pair Stranded PVC Jacket | 3.00 | C.L.F. | Signal wiring | 1 ELEC | 1.143 | |||||||||||||
| 3/4" Rigid Steel Conduit including fittings and supports | 450.00 | L.F. | Conduit for wiring | 1 ELEC | 0.100 | |||||||||||||
| J-Hook 4" | 25.00 | Ea | 1 ELEC | 0.120 | ||||||||||||||
| Lock out and Tag Out | 10.00 | Ea | 1 ELEC | 0.040 | ||||||||||||||
| System Testing and commissioning | 1.00 | Lot |
| $ - 0 | ||
| Contingencies 20% | $ - 0 | |
| Security adjustment factor, Escort required to be with tradesperson during work effort | ||
| Total Direct Cost | $ - 0 | |
| FEE 10% | $ - 0 | |
| ESTIMATED TOTAL COST | $ - 0 |
Elem and Middle- Primex Clo Lab
| Project Title: | Clock System for School from Beacon |
| Location: | ST. STEPHENS INDIAN SCHOOL |
| Date: | March 16, 2023 |
| Subject: | Rough Order of Magnitude Cost Estimate |
| Basis of Estimate | Material Cost | Labor Cost | Equipment Cost | Material Unit Cost | Crew | Labor Hours | Labor Rates | Labor Unit Cost | Equipment Unit Cost | REFERENCES | ||||||||
| Item | Description | QTY | UOM | Unit Price USD | Total USD | RS MEANS | Web Reference | |||||||||||
| I. | 230030 St Stephen Indian School - Elem and Middle School - Primex Clocks | |||||||||||||||||
| FCC License | 1.00 | EA | 24.240 | |||||||||||||||
| 1 Electrician | 24.24 | HOURS | LABOR FOR INSTALLATION OF FCC License | 1 ELEC | 24.240 | |||||||||||||
| Transmitter 1 Watt with Ethernet Port (with GPS) | 1.00 | EA | 4.000 | |||||||||||||||
| 1 Electrician | 4.00 | HOURS | LABOR FOR INSTALLATION OF TRANSMITTER | 1ELEC | 4.000 | |||||||||||||
| Transmitter Accessory Pack - Transmitter Rack | 1.00 | EA | 1.000 | |||||||||||||||
| 1 Electrician | 1.00 | HOURS | LABOR FOR INSTALLATION OF TRANSMITTER RACK | 1ELEC | 1.000 | |||||||||||||
| Transmitter Accessory Pack - UPS | 1.00 | EA | 3.500 | |||||||||||||||
| 1 Electrician | 3.50 | HOURS | LABOR FOR INSTALLATION OF UPS | 1ELEC | 3.500 | |||||||||||||
| GPS Extension Cable for XR Transmitters, Coaxial | 1.00 | CLF | 1.000 | |||||||||||||||
| 1 Electrician | 1.00 | HOURS | LABOR FOR INSTALLATION OF GPS Extension Cable | 1ELEC | 1.000 | |||||||||||||
| 72Mhz Analog Clock, 12.5" Black | 56.00 | EA | 1.000 | |||||||||||||||
| 1 Electrician | 56.00 | HOURS | LABOR FOR INSTALLATION Analog Clock | 1ELEC | 1.000 | |||||||||||||
| Dual D-cell Alkaline Battery Pack | 56.00 | EA | 1.000 | |||||||||||||||
| 1 Electrician | 56.00 | HOURS | LABOR FOR INSTALLATION OF BATTERY | 1ELEC | 1.000 | |||||||||||||
| 18" X 18" Analog Wire Guard | 3.00 | EA | 0.800 | |||||||||||||||
| CREW E-4 | 2.40 | HOURS | LABOR FOR INSTALLATION OF ANALOG WIRE GUARD, Crew E-4 composition: 1 STRUC. STEEL FOREMAN & 3 STRUC. STEEL WORKERS | E-4 | 0.800 | |||||||||||||
| Power Supply Outlets | 2.00 | Ea | 0.296 | |||||||||||||||
| 1 Electrician | 0.59 | HOURS | LABOR FOR INSTALLATION OF Power Supply Outlets | 1ELEC | 0.296 | |||||||||||||
| Fire Blocking (Fire Caulk) | 10.00 | Ea | 0.500 | |||||||||||||||
| 1 Carpenter | 5.00 | HOURS | LABOR FOR INSTALLATION Fire Block | 1CARP | 0.500 | |||||||||||||
| Multi Pair Non Plenum Shileded #18, 2pair PVC Jacketed Cables | 3.00 | C.L.F. | 1.300 | |||||||||||||||
| 1 Electrician | 3.90 | HOURS | LABOR FOR INSTALLATION OF Cables | 1ELEC | 1.300 | |||||||||||||
| Wire, copper, stranded, 600 volt, #12AWG, type THWN, normal installation conditions in wireway, conduit, cable tray | 6.00 | C.L.F. | Electrical supply wiring | 0.727 | ||||||||||||||
| 1 Electrician | 4.36 | HOURS | LABOR FOR INSTALLATION OF Electrical Supply Wiring | 1 ELEC | 0.727 | |||||||||||||
| Cat 6 #24 4pair Stranded PVC Jacket | 3.00 | C.L.F. | Signal wiring | 1.143 | ||||||||||||||
| 1 Electrician | 3.43 | HOURS | LABOR FOR INSTALLATION OF Signal Wiring | 1 ELEC | 1.143 | |||||||||||||
| 3/4" Rigid Steel Conduit including fittings and supports | 450.00 | L.F. | Conduit for wiring | 0.100 | ||||||||||||||
| 1 Electrician | 45.00 | HOURS | LABOR FOR INSTALLATION OF Conduit | 1 ELEC | 0.100 | |||||||||||||
| J-Hook 4" | 25.00 | Ea | 0.120 | |||||||||||||||
| 1 Electrician | 3.00 | HOURS | LABOR FOR INSTALLATION OF J-Hook | 1 ELEC | 0.120 | |||||||||||||
| Lock out and Tag Out | 10.00 | Ea | 0.040 | |||||||||||||||
| 1 Electrician | 0.40 | HOURS | LABOR FOR INSTALLATION OF LOTO DEVICE | 1 ELEC | 0.040 | |||||||||||||
| System Testing and commissioning | 1.00 | Lot |
| $ - 0 | ||
| Contingencies 20% | $ - 0 | |
| Security adjustment factor, Escort required to be with tradesperson during work effort | ||
| Total Direct Cost | ||
| FEE 10% | ||
| ESTIMATED TOTAL COST |
Assumptions
| Assumptions: |
| 1.) Excluded scope from Beacon are included in these estimates: Grounding bus bars, Conduits, Boxes , Cat5E cables, power supply cables(THHN), and Twisted Pair cables 18/2. |
| 2.)Due to absence of layout drawings, Cat5E cables, power supply cables(THHN), Twisted Pair cables 18/2 are estimated 3 clf only for main control/equipments for Elem and Middle School. field clocks are wireless. |
| 3.)Due to absence of layout drawings, Cat5E cables, power supply cables(THHN), Twisted Pair cables 18/2 are estimated are estimated 3 clf only for main control/equipments for High School. Field clocks are wireless. |
| 4.)Conduits are based on the linear lengths of power and communication cable. |
Grand Totals
| High school |
| Elementary school |
| Grand Total |
RFI
| RFI | ||
| ITEM | RFI | Client's Response |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| 11 | ||
| 12 | ||
| 13 | ||
| 14 | ||
| 15 | ||
| 16 | ||
| 17 | ||
| 18 | ||
| 19 | ||
| 20 | ||
| 21 | ||
| 22 | ||
| 23 | ||
| 24 | ||
| 25 | ||
| 26 | ||
| 27 | ||
| 28 | ||
| 29 | ||
| 30 | ||
| 31 | ||
| 32 | ||
| 33 | ||
| 34 | ||
| 35 | ||
| 36 | ||
| 37 | ||
| 38 | ||
| 39 | ||
| 40 | ||
| 41 | ||
| 42 | ||
| 43 | ||
| 44 | ||
| 45 | ||
| 46 | ||
| 47 | ||
| 48 | ||
| 49 | ||
| 50 | ||
| 51 | ||
| 52 | ||
| 53 | ||
| 54 | ||
| 55 | ||
| 56 | ||
| 57 | ||
| 58 | ||
| 59 | ||
| 60 | ||
| 61 | ||
| 62 | ||
| 63 | ||
| 64 | ||
| 65 | ||
| 66 | ||
| 67 | ||
| 68 | ||
| 69 | ||
| 70 | ||
| 71 | ||
| 72 | ||
| 73 | ||
| 74 | ||
| 75 | ||
| 76 | ||
| 77 | ||
| 78 | ||
| 79 | ||
| 80 | ||
| 81 | ||
| 82 | ||
| 83 | ||
| 84 | ||
| 85 | ||
| 86 | ||
| 87 | ||
| 88 | ||
| 89 | ||
| 90 | ||
| 91 | ||
| 92 | ||
| 93 | ||
| 94 | ||
| 95 | ||
| 96 | ||
| 97 | ||
| 98 | ||
| 99 | ||
| 100 | ||
| 101 | ||
| 102 | ||
| 103 | ||
| 104 | ||
| 105 | ||
| 106 | ||
| 107 | ||
| 108 | ||
| 109 | ||
| 110 | ||
| 111 | ||
| 112 | ||
| 113 | ||
| 114 | ||
| 115 | ||
| 116 | ||
| 117 | ||
| 118 | ||
| 119 | ||
| 120 | ||
| 121 | ||
| 122 | ||
| 123 | ||
| 124 | ||
| 125 | ||
| 126 | ||
| 127 | ||
| 128 |
image1.png
File details come from the government source that posted it. Updated .