Attachment 1-Pricebook.xlsx
XLSX spreadsheet 105 KB Posted
- Solicitation number
- W912CM26QA007
About this file
This is a Pricebook (pricing template) for preventive maintenance and on-demand repair services of Emergency Power Systems (EPS), Uninterruptible Power Supply (UPS), and Photovoltaic (PV) systems at United States Army Garrison (USAG) Wiesbaden, Germany. The contract spans a base year (FY 2026) plus four one-year option periods (FY 2027-2030), with performance beginning approximately July 29, 2026.
The pricebook consists of two primary line items per fiscal period: CLIN XXX01 covers preventive maintenance services for 59-63 power generation systems across multiple locations including Clay Kaserne, Hainerberg, Kastel, Egelsbach, and McCully Barracks, with detailed inventory lists identifying 31 diesel generator systems, 20 UPS units, and 12 photovoltaic systems by manufacturer and capacity; CLIN XXX02 addresses on-demand repair services on a time-and-materials (T&M) basis, with pricing structured around 1,000 estimated labor hours per year plus material/spares costs, where vendors submit hourly labor rates and the government calculates material costs based on a fixed annual CLIN total that remains constant across all five contract years. All pricing must be submitted in euros (EUR), with conversion to U.S. dollars using an exchange rate of 0.9303. The pricebook requires vendors to populate cost fields for each preventive maintenance CLIN and the hourly labor rate for T&M repair CLINs, with the government providing fair cost estimates as reference guidance. The contract is a hybrid fixed-price and T&M arrangement with performance in the Federal Republic of Germany requiring contractor compliance with German law and applicable registration or business authorization requirements.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricebook_Base_Year
| Preisbuch fuer den Anbieter / Pricebook for the Vendors |
| Base Year |
CLIN Description Price
0001 Preventive Maintenance of Emergency Power and Power Generation Systems consisting of Emergency Power System (EPS), Uninterruptible Power Supply (UPS) and Photovoltaic (PV) within USAG Wiesbaden for 59 Power Generation Systems including Diesel Engine – Generator, Uninterruptible power supply Systems (battery based) and Photovoltaic in accordance with the descriptions of the PWS Specific Task, attachment 4 Inventory List EPS, attachment 5 Inventory List UPS and attachment 6 Inventory List PV. € 0.00
| # | Inventory # | installation | Bldg # | Floor | Manufacturer | Type/ Model: | Capacity: | remarks/comment | Price in EUR: | |||
| 1 | EPS 1 | Clay | 1060 | Container GEN13 | TNA/IVECO/mecc alte | TNA 60-4 IWE 70183 | 60 kVA; 48kW | |||||
| 2 | EPS 2 | Hainerberg | 7850 | PX | Perkins | 800 kVA; 640kW | ||||||
| 3 | EPS 3 | Clay | 3377 | North | MTU / Meccalte | 16V 2000 G65 | 1000 kW; 800kW | |||||
| 4 | EPS 4 | Clay | 1757 | Mobile Generator | Caterpillar | 3412 TT | 500 kVA; 400kW | |||||
| 5 | EPS 5 | Hainerberg | 7915 | Elementary | mecc alte | ECO38 2L4 | 300kVA; 240kW | |||||
| 6 | EPS 6 | Kastel Annex | 7560 | Guard Check | FPT/ NIDEC | NEF67TM4.S500 | 150kVA; 120kW | |||||
| 7 | EPS 7 | Clay | 1736 | Tower | FPT/Leroy-Somer | GX180F | 150kVA; 120kW | |||||
| 8 | EPS 8 | Clay | 1050 | DB | TA 3160S4 | 310 kVA; 248kW | ||||||
| 9 | EPS 9 | Clay | 1086 | Airfield | MAN | D2542MLE | 400 kVA: 320kW | |||||
| 10 | EPS 10 | Clay | 1059 | Container | FPT | NEF45AM1A.S500 | 40kVA; 32kW | |||||
| 11 | EPS 11 | Clay | 1217 | AFN | DB | 96 kVA; 77kW | ||||||
| 12 | EPS 12 | Clay | 1507 | Cont.-Weiler | Deutz | 47.2047C6/4 | 500 kVA; 400kW | |||||
| 13 | EPS 13 | AEC | 5315 | MTU | 800 kVA; 640kW | |||||||
| 14 | EPS 14 | Hainerberg | 7898 | Lodge | Iveco | 400 kVA: 320kW | ||||||
| 15 | EPS 15 | Clay | 3341 | White House | MTU | 12V 2000 G65 | 800 kVA; 640kW | |||||
| 16 | EPS 16 | Clay | 1569 | TACAN | IVECO/Leroy Somer | 160kVA; 128 kW | ||||||
| 17 | EPS 17 | Clay | 1205 | Head Quarter | Deutz | 130kVA; 104 kW | ||||||
| 18 | EPS 18 | Clay | 1627 | Container FD | Iveco | 105kVA; 84 kW | ||||||
| 19 | EPS 19 | Hainerberg | 7821 | Guard Check | Deutz | 130kVA; 104 kW | ||||||
| 20 | EPS 20 | Clay | 1571 | North/ Wilson | FG Wilson | 60kVA; 48 kW | ||||||
| 21 | EPS 21 | MCCully | 6208 | McCully Cont. | Iveco | 60kVA; 48 kW | ||||||
| 22 | EPS 22 | Kastel Station | 4062 | ADN Container | Himoinsa | HFW-75 T5 | 73kVA; 58kW | |||||
| 23 | EPS 23 | Kastel | 4508 | Kastel | Iveco | 40kVA; 32kW | ||||||
| 24 | EPS 24 | MCCully | 7203 | Guard Check | Iveco | 40kVA; 32kW | ||||||
| 25 | EPS 25 | Hainerberg | 7810 | Guard Check | Iveco | 40kVA; 32kW | ||||||
| 26 | EPS 26 | Clay | 1070 | North Cont. | Iveco | 60kVA; 48 kW | ||||||
| 27 | EPS 27 | Kastel Station | 4061 | ADN Container | Himoinsa | HFW-75 T5 | 73kVA; 58kW | |||||
| 28 | EPS 28 | Egelsbach | 2604 | GEN Building | Caterpillar | Please enter a price from ordering period 1 (2027) | € - 0 | |||||
| 29 | EPS 29 | Egelsbach | 2604 | GEN Building | Caterpillar | Please enter a price from ordering period 1 (2027) | € - 0 | |||||
| 30 | EPS 30 | Egelsbach | 2604 | GEN Building | Caterpillar | Please enter a price from ordering period 1 (2027) | € - 0 | |||||
| 31 | EPS 31 | Clay | 1761 | Mobile GEN | Polyma | 250 kVA; | Please enter a price from ordering period 2 (2028) | € - 0 | ||||
| # | Inventory # | installation | Bldg # | Floor | Manufacturer | Type/ Model: | Capacity: | remarks/comment | Price: | |||
| 1 | UPS 001 | Clay | 1038 | 20 kVA | ||||||||
| 2 | UPS 002 | Clay | 1086 | 20 kVA | ||||||||
| 3 | UPS 003 | Clay | 1090 | 20 kVA | ||||||||
| 4 | UPS 004 | Clay | 1217 | 60 kVA | ||||||||
| 5 | UPS 005 | Clay | 1761 | 20 kVA | ||||||||
| 6 | UPS 006 | Clay | 1569 | 20kVA | ||||||||
| 7 | UPS 007 | Clay | 1625 | 20kVA | ||||||||
| 8 | UPS 008 | Clay | 1647 | 20kVA | ||||||||
| 9 | UPS 009 | Clay | 3372 | Westhaus | Gleichrichter Transformerstation 20kV UPS (protection device) | |||||||
| 10 | UPS 010 | Clay | 3547 | Westhaus | Gleichrichter Transformerstation 20kV UPS (protection device) | |||||||
| 11 | UPS 011 | Clay | 1086 | Westhaus | Gleichrichter Transformerstation 20kV UPS (protection device) | |||||||
| 12 | UPS 012 | Clay | 1761 | Westhaus | Gleichrichter Transformerstation 20kV UPS (protection device) | |||||||
| 13 | UPS 013 | Clay | 1647 | Westhaus | Gleichrichter Transformerstation 20kV UPS (protection device) | |||||||
| 14 | UPS 014 | Clay | 1712 | Westhaus | Gleichrichter Transformerstation 20kV UPS (protection device) | |||||||
| 15 | UPS 015 | Clay | 1625 | Westhaus | Gleichrichter Transformerstation 20kV UPS (protection device) | |||||||
| 16 | UPS 016 | Clay | 1642 | Westhaus | Gleichrichter Transformerstation 20kV UPS (protection device) | |||||||
| 17 | UPS 017 | Clay | 1062 | Westhaus | Gleichrichter Transformerstation 20kV UPS (protection device) | |||||||
| 18 | UPS 018 | Clay | 1059 | SOCOMEC | 32 kVA | |||||||
| 19 | UPS 019 | Clay | 3340 | Riello | UPS MST 125 | 125 kVA | 40x SPGN 12-135 Batterien | |||||
| 20 | UPS 020 | Clay | 1507 | |||||||||
| # | Inventory # | installation | Bldg # | Manufacturer | Type/ Model: | Capacity: | Additional System Components | remarks/comment | Price: | |||
| 1 | PV 1.1 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 19 Panels String B1/B2 - 18 Panels | Total Power P=160kWp | |||||||
| 2 | PV 1.2 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 19 Panels String B1/B2 - 18 Panels | ||||||||
| 3 | PV 1.3 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 18 Panels String B1/B2 - 18 Panels | ||||||||
| 4 | PV 1.4 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 18 Panels String B1/B2 - 19 Panels | ||||||||
| 5 | PV 1.5 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 18 Panels String B1/B2 - 18 Panels | ||||||||
| 6 | PV 1.6 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 19 Panels String B1/B2 - 17 Panels | ||||||||
| 7 | PV 2.1 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | Total Power P=42.15kWp | |||||
| 8 | PV 2.2 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | ||||||
| 9 | PV 2.3 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | ||||||
| 10 | PV 3.1 | Clay | 1030 | SMA | STP | 110kW | String A1/A2/A3- 20 Panels String B- 12 Panels | Total Power P=113.28kWp | ||||
| 11 | PV 3.2 | Clay | 1030 | SMA | STP | 110kW | String A1/A2/A3- 20 Panels String B- 11 Panels | |||||
| 12 | PV 3.3 | Clay | 1030 | SMA | STP | 50kW | String A1/A2/A3- 20 Panels String B- 12 Panels | |||||
| 0002 | On-demand repair in accordance with T&M EPS, UPS &PV | |||||||||||
| for 63 Power Generation Systems including Diesel Engine – Generator, Uninterruptible power supply Systems (battery based) and Photovoltaic in accordance with the descriptions of the PWS Part 5 Specific Task, attachment 4 Inventory List EPS, attachment 5 Inventory List UPS and attachment 6 Inventory List PV. | Price: | |||||||||||
| € 0.00 | ||||||||||||
| SCLIN | CLIN Description | Qty | Unit | Price | Description or calculation of prices | |||||||
| 01 | Labor Hours | 1000 | hour | Bitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 1000 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. | ||||||||
| Please enter the rate of hourly labor. This is multiplied by the 1000 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. | € - 0 | |||||||||||
| 02 | Material/Spares | 1 | lot | / | Der Anbieter muss hierzu keine Angaben machen. |
Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 5 Jahre fest und unveränderlich ist. Die Differenz aus 1000 Stunden multipliziert mit dem vom Lieferanten angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.
The supplier does not have to provide any information here.
The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 5 years. The difference of 1000 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price.
Note:
Government Fair Cost Estimate Base Year USAG Wiesbaden Emergency Power Systems
PB_Ordering_Period_1
| Preisbuch fuer den Anbieter / Pricebook for the Vendors |
| Ordering Period 1 |
CLIN Description Price
1001 Preventive Maintenance of Emergency Power and Power Generation Systems consisting of Emergency Power Supply (EPS), Uninterruptible Power Supply (UPS) and Photovoltaic (PV) within USAG Wiesbaden for 62 Power Generation Systems including Diesel Engine – Generator, Uninterruptible power supply Systems (battery based) and Photovoltaic in accordance with the descriptions of the PWS Part 5 Specific Task, attachment 4 Inventory List EPS, attachment 5 Inventory List UPS and attachment 6 Inventory List PV. € 0.00
| # | Inventory # | installation | Bldg # | Floor | Manufacturer | Type/ Model: | Capacity: | remarks/comment | Price in EUR: | |||
| 1 | EPS 1 | Clay | 1060 | Container GEN13 | TNA/IVECO/mecc alte | TNA 60-4 IWE 70183 | 60 kVA; 48kW | |||||
| 2 | EPS 2 | Hainerberg | 7850 | PX | Perkins | 800 kVA; 640kW | ||||||
| 3 | EPS 3 | Clay | 3377 | North | MTU / Meccalte | 16V 2000 G65 | 1000 kW; 800kW | |||||
| 4 | EPS 4 | Clay | 1757 | Mobile Generator | Caterpillar | 3412 TT | 500 kVA; 400kW | |||||
| 5 | EPS 5 | Hainerberg | 7915 | Elementary | mecc alte | ECO38 2L4 | 300kVA; 240kW | |||||
| 6 | EPS 6 | Kastel Annex | 7560 | Guard Check | FPT/ NIDEC | NEF67TM4.S500 | 150kVA; 120kW | |||||
| 7 | EPS 7 | Clay | 1736 | Tower | FPT/Leroy-Somer | GX180F | 150kVA; 120kW | |||||
| 8 | EPS 8 | Clay | 1050 | DB | TA 3160S4 | 310 kVA; 248kW | ||||||
| 9 | EPS 9 | Clay | 1086 | Airfield | MAN | D2542MLE | 400 kVA: 320kW | |||||
| 10 | EPS 10 | Clay | 1059 | Container | FPT | NEF45AM1A.S500 | 40kVA; 32kW | |||||
| 11 | EPS 11 | Clay | 1217 | AFN | DB | 96 kVA; 77kW | ||||||
| 12 | EPS 12 | Clay | 1507 | Cont.-Weiler | Deutz | 47.2047C6/4 | 500 kVA; 400kW | |||||
| 13 | EPS 13 | AEC | 5315 | MTU | 800 kVA; 640kW | |||||||
| 14 | EPS 14 | Hainerberg | 7898 | Lodge | Iveco | 400 kVA: 320kW | ||||||
| 15 | EPS 15 | Clay | 3341 | White House | MTU | 12V 2000 G65 | 800 kVA; 640kW | |||||
| 16 | EPS 16 | Clay | 1569 | TACAN | IVECO/Leroy Somer | 160kVA; 128 kW | ||||||
| 17 | EPS 17 | Clay | 1205 | Head Quarter | Deutz | 130kVA; 104 kW | ||||||
| 18 | EPS 18 | Clay | 1627 | Container FD | Iveco | 105kVA; 84 kW | ||||||
| 19 | EPS 19 | Hainerberg | 7821 | Guard Check | Deutz | 130kVA; 104 kW | ||||||
| 20 | EPS 20 | Clay | 1571 | North/ Wilson | FG Wilson | 60kVA; 48 kW | ||||||
| 21 | EPS 21 | MCCully | 6208 | McCully Cont. | Iveco | 60kVA; 48 kW | ||||||
| 22 | EPS 22 | Kastel Station | 4062 | ADN Container | Himoinsa | HFW-75 T5 | 73kVA; 58kW | |||||
| 23 | EPS 23 | Kastel | 4508 | Kastel | Iveco | 40kVA; 32kW | ||||||
| 24 | EPS 24 | MCCully | 7203 | Guard Check | Iveco | 40kVA; 32kW | ||||||
| 25 | EPS 25 | Hainerberg | 7810 | Guard Check | Iveco | 40kVA; 32kW | ||||||
| 26 | EPS 26 | Clay | 1070 | North Cont. | Iveco | 60kVA; 48 kW | ||||||
| 27 | EPS 27 | Kastel Station | 4061 | ADN Container | Himoinsa | HFW-75 T5 | 73kVA; 58kW | |||||
| 28 | EPS 28 | Egelsbach | 2604 | GEN Building | Caterpillar | |||||||
| 29 | EPS 29 | Egelsbach | 2604 | GEN Building | Caterpillar | |||||||
| 30 | EPS 30 | Egelsbach | 2604 | GEN Building | Caterpillar | |||||||
| 31 | EPS 31 | Clay | 1761 | Mobile GEN | Polyma | Polyma | 250 kVA; | Please enter a price from ordering period 2 (2028) | ||||
| # | Inventory # | installation | Bldg # | Floor | Manufacturer | Type/ Model: | Capacity: | remarks/comment | Price: | |||
| 1 | UPS 001 | Clay | 1038 | 20 kVA | ||||||||
| 2 | UPS 002 | Clay | 1086 | 20 kVA | ||||||||
| 3 | UPS 003 | Clay | 1090 | 20 kVA | ||||||||
| 4 | UPS 004 | Clay | 1217 | 60 kVA | ||||||||
| 5 | UPS 005 | Clay | 1761 | 20 kVA | ||||||||
| 6 | UPS 006 | Clay | 1569 | 20kVA | ||||||||
| 7 | UPS 007 | Clay | 1625 | 20kVA | ||||||||
| 8 | UPS 008 | Clay | 1647 | 20kVA | ||||||||
| 9 | UPS 009 | Clay | 3372 | |||||||||
| 10 | UPS 010 | Clay | 3547 | |||||||||
| 11 | UPS 011 | Clay | 1086 | |||||||||
| 12 | UPS 012 | Clay | 1761 | |||||||||
| 13 | UPS 013 | Clay | 1647 | |||||||||
| 14 | UPS 014 | Clay | 1712 | |||||||||
| 15 | UPS 015 | Clay | 1625 | |||||||||
| 16 | UPS 016 | Clay | 1642 | |||||||||
| 17 | UPS 017 | Clay | 1062 | |||||||||
| 18 | UPS 018 | Clay | 1059 | SOCOMEC | 32 kVA | |||||||
| 19 | UPS 019 | Clay | 3340 | Riello | UPS MST 125 | 125 kVA | 40x SPGN 12-135 Batterien | |||||
| 20 | UPS 020 | Clay | 1507 | |||||||||
| # | Inventory # | installation | Bldg # | Manufacturer | Type/ Model: | Capacity: | Additional System Components | remarks/comment | Price: | |||
| 1 | PV 1.1 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 19 Panels String B1/B2 - 18 Panels | Total Power P=160kWp | |||||||
| 2 | PV 1.2 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 19 Panels String B1/B2 - 18 Panels | ||||||||
| 3 | PV 1.3 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 18 Panels String B1/B2 - 18 Panels | ||||||||
| 4 | PV 1.4 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 18 Panels String B1/B2 - 19 Panels | ||||||||
| 5 | PV 1.5 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 18 Panels String B1/B2 - 18 Panels | ||||||||
| 6 | PV 1.6 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 19 Panels String B1/B2 - 17 Panels | ||||||||
| 7 | PV 2.1 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | Total Power P=42.15kWp | |||||
| 8 | PV 2.2 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | ||||||
| 9 | PV 2.3 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | ||||||
| 10 | PV 3.1 | Clay | 1030 | SMA | STP | 110kW | String A1/A2/A3- 20 Panels String B- 12 Panels | Total Power P=113.28kWp | ||||
| 11 | PV 3.2 | Clay | 1030 | SMA | STP | 110kW | String A1/A2/A3- 20 Panels String B- 11 Panels | |||||
| 12 | PV 3.3 | Clay | 1030 | SMA | STP | 50kW | String A1/A2/A3- 20 Panels String B- 12 Panels | |||||
| 1002 | On-demand repair in accordance with T&M EPS, UPS &PV | |||||||||||
| for 63 Power Generation Systems including Diesel Engine – Generator, Uninterruptible power supply Systems (battery based) and Photovoltaic in accordance with the descriptions of the PWS Part 5 Specific Task, attachment 4 Inventory List EPS, attachment 5 Inventory List UPS and attachment 6 Inventory List PV. | Price: | |||||||||||
| € 0.00 | ||||||||||||
| SCLIN | CLIN Description | Qty | Unit | Price | Description or calculation of prices | |||||||
| 01 | Labor Hours | 1000 | hour | Bitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 1000 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. | ||||||||
| Please enter the rate of hourly labor. This is multiplied by the 1000 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. | € - 0 | |||||||||||
| 02 | Material/Spares | 1 | lot | / | Der Anbieter muss hierzu keine Angaben machen. |
Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 5 Jahre fest und unveränderlich ist. Die Differenz aus 1000 Stunden multipliziert mit dem vom Lieferanten angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.
The supplier does not have to provide any information here.
| The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 5 years. The difference of 1000 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price. | € - 0 | |
| Note: |
Base Year USAG Wiesbaden Emergency Power Systems
PB_OP_2
| Preisbuch fuer den Anbieter / Pricebook for the Vendors |
| Ordering Period 2 |
CLIN Description Price
2001 Preventive Maintenance of Emergency Power and Power Generation Systems consisting of Emergency Power Supply (EPS), Uninterruptible Power Supply (UPS) and Photovoltaic (PV) within USAG Wiesbaden for 63 Power Generation Systems including Diesel Engine – Generator, Uninterruptible power supply Systems (battery based) and Photovoltaic in accordance with the descriptions of the PWS Part 5 Specific Task, attachment 4 Inventory List EPS, attachment 5 Inventory List UPS and attachment 6 Inventory List PV. € 0.00
| # | Inventory # | installation | Bldg # | Floor | Manufacturer | Type/ Model: | Capacity: | remarks/comment | Price in EUR: | |||
| 1 | EPS 1 | Clay | 1060 | Container GEN13 | TNA/IVECO/mecc alte | TNA 60-4 IWE 70183 | 60 kVA; 48kW | |||||
| 2 | EPS 2 | Hainerberg | 7850 | PX | Perkins | 800 kVA; 640kW | ||||||
| 3 | EPS 3 | Clay | 3377 | North | MTU / Meccalte | 16V 2000 G65 | 1000 kW; 800kW | |||||
| 4 | EPS 4 | Clay | 1757 | Mobile Generator | Caterpillar | 3412 TT | 500 kVA; 400kW | |||||
| 5 | EPS 5 | Hainerberg | 7915 | Elementary | mecc alte | ECO38 2L4 | 300kVA; 240kW | |||||
| 6 | EPS 6 | Kastel Annex | 7560 | Guard Check | FPT/ NIDEC | NEF67TM4.S500 | 150kVA; 120kW | |||||
| 7 | EPS 7 | Clay | 1736 | Tower | FPT/Leroy-Somer | GX180F | 150kVA; 120kW | |||||
| 8 | EPS 8 | Clay | 1050 | DB | TA 3160S4 | 310 kVA; 248kW | ||||||
| 9 | EPS 9 | Clay | 1086 | Airfield | MAN | D2542MLE | 400 kVA: 320kW | |||||
| 10 | EPS 10 | Clay | 1059 | Container | FPT | NEF45AM1A.S500 | 40kVA; 32kW | |||||
| 11 | EPS 11 | Clay | 1217 | AFN | DB | 96 kVA; 77kW | ||||||
| 12 | EPS 12 | Clay | 1507 | Cont.-Weiler | Deutz | 47.2047C6/4 | 500 kVA; 400kW | |||||
| 13 | EPS 13 | AEC | 5315 | MTU | 800 kVA; 640kW | |||||||
| 14 | EPS 14 | Hainerberg | 7898 | Lodge | Iveco | 400 kVA: 320kW | ||||||
| 15 | EPS 15 | Clay | 3341 | White House | MTU | 12V 2000 G65 | 800 kVA; 640kW | |||||
| 16 | EPS 16 | Clay | 1569 | TACAN | IVECO/Leroy Somer | 160kVA; 128 kW | ||||||
| 17 | EPS 17 | Clay | 1205 | Head Quarter | Deutz | 130kVA; 104 kW | ||||||
| 18 | EPS 18 | Clay | 1627 | Container FD | Iveco | 105kVA; 84 kW | ||||||
| 19 | EPS 19 | Hainerberg | 7821 | Guard Check | Deutz | 130kVA; 104 kW | ||||||
| 20 | EPS 20 | Clay | 1571 | North/ Wilson | FG Wilson | 60kVA; 48 kW | ||||||
| 21 | EPS 21 | MCCully | 6208 | McCully Cont. | Iveco | 60kVA; 48 kW | ||||||
| 22 | EPS 22 | Kastel Station | 4062 | ADN Container | Himoinsa | HFW-75 T5 | 73kVA; 58kW | |||||
| 23 | EPS 23 | Kastel | 4508 | Kastel | Iveco | 40kVA; 32kW | ||||||
| 24 | EPS 24 | MCCully | 7203 | Guard Check | Iveco | 40kVA; 32kW | ||||||
| 25 | EPS 25 | Hainerberg | 7810 | Guard Check | Iveco | 40kVA; 32kW | ||||||
| 26 | EPS 26 | Clay | 1070 | North Cont. | Iveco | 60kVA; 48 kW | ||||||
| 27 | EPS 27 | Kastel Station | 4061 | ADN Container | Himoinsa | HFW-75 T5 | 73kVA; 58kW | |||||
| 28 | EPS 28 | Egelsbach | 2604 | GEN Building | Caterpillar | |||||||
| 29 | EPS 29 | Egelsbach | 2604 | GEN Building | Caterpillar | |||||||
| 30 | EPS 30 | Egelsbach | 2604 | GEN Building | Caterpillar | |||||||
| 31 | EPS 31 | Clay | 1761 | Mobile GEN | Polyma | Polyma | 250 kVA; | |||||
| # | Inventory # | installation | Bldg # | Floor | Manufacturer | Type/ Model: | Capacity: | remarks/comment | Price: | |||
| 1 | UPS 001 | Clay | 1038 | 20 kVA | ||||||||
| 2 | UPS 002 | Clay | 1086 | 20 kVA | ||||||||
| 3 | UPS 003 | Clay | 1090 | 20 kVA | ||||||||
| 4 | UPS 004 | Clay | 1217 | 60 kVA | ||||||||
| 5 | UPS 005 | Clay | 1761 | 20 kVA | ||||||||
| 6 | UPS 006 | Clay | 1569 | 20kVA | ||||||||
| 7 | UPS 007 | Clay | 1625 | 20kVA | ||||||||
| 8 | UPS 008 | Clay | 1647 | 20kVA | ||||||||
| 9 | UPS 009 | Clay | 3372 | |||||||||
| 10 | UPS 010 | Clay | 3547 | |||||||||
| 11 | UPS 011 | Clay | 1086 | |||||||||
| 12 | UPS 012 | Clay | 1761 | |||||||||
| 13 | UPS 013 | Clay | 1647 | |||||||||
| 14 | UPS 014 | Clay | 1712 | |||||||||
| 15 | UPS 015 | Clay | 1625 | |||||||||
| 16 | UPS 016 | Clay | 1642 | |||||||||
| 17 | UPS 017 | Clay | 1062 | |||||||||
| 18 | UPS 018 | Clay | 1059 | SOCOMEC | 32 kVA | |||||||
| 19 | UPS 019 | Clay | 3340 | Riello | UPS MST 125 | 125 kVA | 40x SPGN 12-135 Batterien | |||||
| 20 | UPS 020 | Clay | 1507 | |||||||||
| # | Inventory # | installation | Bldg # | Manufacturer | Type/ Model: | Capacity: | Additional System Components | remarks/comment | Price: | |||
| 1 | PV 1.1 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 19 Panels String B1/B2 - 18 Panels | Total Power P=160kWp | |||||||
| 2 | PV 1.2 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 19 Panels String B1/B2 - 18 Panels | ||||||||
| 3 | PV 1.3 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 18 Panels String B1/B2 - 18 Panels | ||||||||
| 4 | PV 1.4 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 18 Panels String B1/B2 - 19 Panels | ||||||||
| 5 | PV 1.5 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 18 Panels String B1/B2 - 18 Panels | ||||||||
| 6 | PV 1.6 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 19 Panels String B1/B2 - 17 Panels | ||||||||
| 7 | PV 2.1 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | Total Power P=42.15kWp | |||||
| 8 | PV 2.2 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | ||||||
| 9 | PV 2.3 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | ||||||
| 10 | PV 3.1 | Clay | 1030 | SMA | STP | 110kW | String A1/A2/A3- 20 Panels String B- 12 Panels | Total Power P=113.28kWp | ||||
| 11 | PV 3.2 | Clay | 1030 | SMA | STP | 110kW | String A1/A2/A3- 20 Panels String B- 11 Panels | |||||
| 12 | PV 3.3 | Clay | 1030 | SMA | STP | 50kW | String A1/A2/A3- 20 Panels String B- 12 Panels | |||||
| 2002 | On-demand repair in accordance with T&M EPS, UPS &PV | |||||||||||
| for 63 Power Generation Systems including Diesel Engine – Generator, Uninterruptible power supply Systems (battery based) and Photovoltaic in accordance with the descriptions of the PWS Part 5 Specific Task, attachment 4 Inventory List EPS, attachment 5 Inventory List UPS and attachment 6 Inventory List PV. | Price: | |||||||||||
| € 0.00 | ||||||||||||
| SCLIN | CLIN Description | Qty | Unit | Price | Description or calculation of prices | |||||||
| 01 | Labor Hours | 1000 | hour | Bitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 1000 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. | ||||||||
| Please enter the rate of hourly labor. This is multiplied by the 1000 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. | € - 0 | |||||||||||
| 02 | Material/Spares | 1 | lot | / | Der Anbieter muss hierzu keine Angaben machen. |
Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 5 Jahre fest und unveränderlich ist. Die Differenz aus 1000 Stunden multipliziert mit dem vom Lieferanten angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.
The supplier does not have to provide any information here.
| The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 5 years. The difference of 1000 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price. | € - 0 | |
| Note: |
Base Year USAG Wiesbaden Emergency Power Systems
PB_OP_3
| Preisbuch fuer den Anbieter / Pricebook for the Vendors |
| Ordering Period 3 |
CLIN Description Price
3001 Preventive Maintenance of Emergency Power and Power Generation Systems consisting of Emergency Power Supply (EPS), Uninterruptible Power Supply (UPS) and Photovoltaic (PV) within USAG Wiesbaden for 63 Power Generation Systems including Diesel Engine – Generator, Uninterruptible power supply Systems (battery based) and Photovoltaic in accordance with the descriptions of the PWS Part 5 Specific Task, attachment 4 Inventory List EPS, attachment 5 Inventory List UPS and attachment 6 Inventory List PV. € 0.00
| # | Inventory # | installation | Bldg # | Floor | Manufacturer | Type/ Model: | Capacity: | remarks/comment | Price in EUR: | |||
| 1 | EPS 1 | Clay | 1060 | Container GEN13 | TNA/IVECO/mecc alte | TNA 60-4 IWE 70183 | 60 kVA; 48kW | |||||
| 2 | EPS 2 | Hainerberg | 7850 | PX | Perkins | 800 kVA; 640kW | ||||||
| 3 | EPS 3 | Clay | 3377 | North | MTU / Meccalte | 16V 2000 G65 | 1000 kW; 800kW | |||||
| 4 | EPS 4 | Clay | 1757 | Mobile Generator | Caterpillar | 3412 TT | 500 kVA; 400kW | |||||
| 5 | EPS 5 | Hainerberg | 7915 | Elementary | mecc alte | ECO38 2L4 | 300kVA; 240kW | |||||
| 6 | EPS 6 | Kastel Annex | 7560 | Guard Check | FPT/ NIDEC | NEF67TM4.S500 | 150kVA; 120kW | |||||
| 7 | EPS 7 | Clay | 1736 | Tower | FPT/Leroy-Somer | GX180F | 150kVA; 120kW | |||||
| 8 | EPS 8 | Clay | 1050 | DB | TA 3160S4 | 310 kVA; 248kW | ||||||
| 9 | EPS 9 | Clay | 1086 | Airfield | MAN | D2542MLE | 400 kVA: 320kW | |||||
| 10 | EPS 10 | Clay | 1059 | Container | FPT | NEF45AM1A.S500 | 40kVA; 32kW | |||||
| 11 | EPS 11 | Clay | 1217 | AFN | DB | 96 kVA; 77kW | ||||||
| 12 | EPS 12 | Clay | 1507 | Cont.-Weiler | Deutz | 47.2047C6/4 | 500 kVA; 400kW | |||||
| 13 | EPS 13 | AEC | 5315 | MTU | 800 kVA; 640kW | |||||||
| 14 | EPS 14 | Hainerberg | 7898 | Lodge | Iveco | 400 kVA: 320kW | ||||||
| 15 | EPS 15 | Clay | 3341 | White House | MTU | 12V 2000 G65 | 800 kVA; 640kW | |||||
| 16 | EPS 16 | Clay | 1569 | TACAN | IVECO/Leroy Somer | 160kVA; 128 kW | ||||||
| 17 | EPS 17 | Clay | 1205 | Head Quarter | Deutz | 130kVA; 104 kW | ||||||
| 18 | EPS 18 | Clay | 1627 | Container FD | Iveco | 105kVA; 84 kW | ||||||
| 19 | EPS 19 | Hainerberg | 7821 | Guard Check | Deutz | 130kVA; 104 kW | ||||||
| 20 | EPS 20 | Clay | 1571 | North/ Wilson | FG Wilson | 60kVA; 48 kW | ||||||
| 21 | EPS 21 | MCCully | 6208 | McCully Cont. | Iveco | 60kVA; 48 kW | ||||||
| 22 | EPS 22 | Kastel Station | 4062 | ADN Container | Himoinsa | HFW-75 T5 | 73kVA; 58kW | |||||
| 23 | EPS 23 | Kastel | 4508 | Kastel | Iveco | 40kVA; 32kW | ||||||
| 24 | EPS 24 | MCCully | 7203 | Guard Check | Iveco | 40kVA; 32kW | ||||||
| 25 | EPS 25 | Hainerberg | 7810 | Guard Check | Iveco | 40kVA; 32kW | ||||||
| 26 | EPS 26 | Clay | 1070 | North Cont. | Iveco | 60kVA; 48 kW | ||||||
| 27 | EPS 27 | Kastel Station | 4061 | ADN Container | Himoinsa | HFW-75 T5 | 73kVA; 58kW | |||||
| 28 | EPS 28 | Egelsbach | 2604 | GEN Building | Caterpillar | |||||||
| 29 | EPS 29 | Egelsbach | 2604 | GEN Building | Caterpillar | |||||||
| 30 | EPS 30 | Egelsbach | 2604 | GEN Building | Caterpillar | |||||||
| 31 | EPS 31 | Clay | 1761 | Mobile GEN | Polyma | Polyma | 250 kVA; | |||||
| # | Inventory # | installation | Bldg # | Floor | Manufacturer | Type/ Model: | Capacity: | remarks/comment | Price: | |||
| 1 | UPS 001 | Clay | 1038 | 20 kVA | ||||||||
| 2 | UPS 002 | Clay | 1086 | 20 kVA | ||||||||
| 3 | UPS 003 | Clay | 1090 | 20 kVA | ||||||||
| 4 | UPS 004 | Clay | 1217 | 60 kVA | ||||||||
| 5 | UPS 005 | Clay | 1761 | 20 kVA | ||||||||
| 6 | UPS 006 | Clay | 1569 | 20kVA | ||||||||
| 7 | UPS 007 | Clay | 1625 | 20kVA | ||||||||
| 8 | UPS 008 | Clay | 1647 | 20kVA | ||||||||
| 9 | UPS 009 | Clay | 3372 | |||||||||
| 10 | UPS 010 | Clay | 3547 | |||||||||
| 11 | UPS 011 | Clay | 1086 | |||||||||
| 12 | UPS 012 | Clay | 1761 | |||||||||
| 13 | UPS 013 | Clay | 1647 | |||||||||
| 14 | UPS 014 | Clay | 1712 | |||||||||
| 15 | UPS 015 | Clay | 1625 | |||||||||
| 16 | UPS 016 | Clay | 1642 | |||||||||
| 17 | UPS 017 | Clay | 1062 | |||||||||
| 18 | UPS 018 | Clay | 1059 | SOCOMEC | 32 kVA | |||||||
| 19 | UPS 019 | Clay | 3340 | Riello | UPS MST 125 | 125 kVA | 40x SPGN 12-135 Batterien | |||||
| 20 | UPS 020 | Clay | 1507 | |||||||||
| # | Inventory # | installation | Bldg # | Manufacturer | Type/ Model: | Capacity: | Additional System Components | remarks/comment | Price: | |||
| 1 | PV 1.1 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 19 Panels String B1/B2 - 18 Panels | Total Power P=160kWp | |||||||
| 2 | PV 1.2 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 19 Panels String B1/B2 - 18 Panels | ||||||||
| 3 | PV 1.3 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 18 Panels String B1/B2 - 18 Panels | ||||||||
| 4 | PV 1.4 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 18 Panels String B1/B2 - 19 Panels | ||||||||
| 5 | PV 1.5 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 18 Panels String B1/B2 - 18 Panels | ||||||||
| 6 | PV 1.6 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 19 Panels String B1/B2 - 17 Panels | ||||||||
| 7 | PV 2.1 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | Total Power P=42.15kWp | |||||
| 8 | PV 2.2 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | ||||||
| 9 | PV 2.3 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | ||||||
| 10 | PV 3.1 | Clay | 1030 | SMA | STP | 110kW | String A1/A2/A3- 20 Panels String B- 12 Panels | Total Power P=113.28kWp | ||||
| 11 | PV 3.2 | Clay | 1030 | SMA | STP | 110kW | String A1/A2/A3- 20 Panels String B- 11 Panels | |||||
| 12 | PV 3.3 | Clay | 1030 | SMA | STP | 50kW | String A1/A2/A3- 20 Panels String B- 12 Panels | |||||
| 3002 | On-demand repair in accordance with T&M EPS, UPS &PV | |||||||||||
| for 63 Power Generation Systems including Diesel Engine – Generator, Uninterruptible power supply Systems (battery based) and Photovoltaic in accordance with the descriptions of the PWS Part 5 Specific Task, attachment 4 Inventory List EPS, attachment 5 Inventory List UPS and attachment 6 Inventory List PV. | Price: | |||||||||||
| € 0.00 | ||||||||||||
| SCLIN | CLIN Description | Qty | Unit | Price | Description or calculation of prices | |||||||
| 01 | Labor Hours | 1000 | hour | Bitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 1000 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. | ||||||||
| Please enter the rate of hourly labor. This is multiplied by the 1000 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. | € - 0 | |||||||||||
| 02 | Material/Spares | 1 | lot | / | Der Anbieter muss hierzu keine Angaben machen. |
Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 5 Jahre fest und unveränderlich ist. Die Differenz aus 1000 Stunden multipliziert mit dem vom Lieferanten angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.
The supplier does not have to provide any information here.
| The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 5 years. The difference of 1000 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price. | € - 0 | |
| Note: |
Base Year USAG Wiesbaden Emergency Power Systems
PB_OP_4
| Preisbuch fuer den Anbieter / Pricebook for the Vendors |
| Ordering Period 4 |
CLIN Description Price
4001 Preventive Maintenance of Emergency Power and Power Generation Systems consisting of Emergency Power Supply (EPS), Uninterruptible Power Supply (UPS) and Photovoltaic (PV) within USAG Wiesbaden for 63 Power Generation Systems including Diesel Engine – Generator, Uninterruptible power supply Systems (battery based) and Photovoltaic in accordance with the descriptions of the PWS Part 5 Specific Task, attachment 4 Inventory List EPS, attachment 5 Inventory List UPS and attachment 6 Inventory List PV. € 0.00
| # | Inventory # | installation | Bldg # | Floor | Manufacturer | Type/ Model: | Capacity: | remarks/comment | Price in EUR: | |||
| 1 | EPS 1 | Clay | 1060 | Container GEN13 | TNA/IVECO/mecc alte | TNA 60-4 IWE 70183 | 60 kVA; 48kW | |||||
| 2 | EPS 2 | Hainerberg | 7850 | PX | Perkins | 800 kVA; 640kW | ||||||
| 3 | EPS 3 | Clay | 3377 | North | MTU / Meccalte | 16V 2000 G65 | 1000 kW; 800kW | |||||
| 4 | EPS 4 | Clay | 1757 | Mobile Generator | Caterpillar | 3412 TT | 500 kVA; 400kW | |||||
| 5 | EPS 5 | Hainerberg | 7915 | Elementary | mecc alte | ECO38 2L4 | 300kVA; 240kW | |||||
| 6 | EPS 6 | Kastel Annex | 7560 | Guard Check | FPT/ NIDEC | NEF67TM4.S500 | 150kVA; 120kW | |||||
| 7 | EPS 7 | Clay | 1736 | Tower | FPT/Leroy-Somer | GX180F | 150kVA; 120kW | |||||
| 8 | EPS 8 | Clay | 1050 | DB | TA 3160S4 | 310 kVA; 248kW | ||||||
| 9 | EPS 9 | Clay | 1086 | Airfield | MAN | D2542MLE | 400 kVA: 320kW | |||||
| 10 | EPS 10 | Clay | 1059 | Container | FPT | NEF45AM1A.S500 | 40kVA; 32kW | |||||
| 11 | EPS 11 | Clay | 1217 | AFN | DB | 96 kVA; 77kW | ||||||
| 12 | EPS 12 | Clay | 1507 | Cont.-Weiler | Deutz | 47.2047C6/4 | 500 kVA; 400kW | |||||
| 13 | EPS 13 | AEC | 5315 | MTU | 800 kVA; 640kW | |||||||
| 14 | EPS 14 | Hainerberg | 7898 | Lodge | Iveco | 400 kVA: 320kW | ||||||
| 15 | EPS 15 | Clay | 3341 | White House | MTU | 12V 2000 G65 | 800 kVA; 640kW | |||||
| 16 | EPS 16 | Clay | 1569 | TACAN | IVECO/Leroy Somer | 160kVA; 128 kW | ||||||
| 17 | EPS 17 | Clay | 1205 | Head Quarter | Deutz | 130kVA; 104 kW | ||||||
| 18 | EPS 18 | Clay | 1627 | Container FD | Iveco | 105kVA; 84 kW | ||||||
| 19 | EPS 19 | Hainerberg | 7821 | Guard Check | Deutz | 130kVA; 104 kW | ||||||
| 20 | EPS 20 | Clay | 1571 | North/ Wilson | FG Wilson | 60kVA; 48 kW | ||||||
| 21 | EPS 21 | MCCully | 6208 | McCully Cont. | Iveco | 60kVA; 48 kW | ||||||
| 22 | EPS 22 | Kastel Station | 4062 | ADN Container | Himoinsa | HFW-75 T5 | 73kVA; 58kW | |||||
| 23 | EPS 23 | Kastel | 4508 | Kastel | Iveco | 40kVA; 32kW | ||||||
| 24 | EPS 24 | MCCully | 7203 | Guard Check | Iveco | 40kVA; 32kW | ||||||
| 25 | EPS 25 | Hainerberg | 7810 | Guard Check | Iveco | 40kVA; 32kW | ||||||
| 26 | EPS 26 | Clay | 1070 | North Cont. | Iveco | 60kVA; 48 kW | ||||||
| 27 | EPS 27 | Kastel Station | 4061 | ADN Container | Himoinsa | HFW-75 T5 | 73kVA; 58kW | |||||
| 28 | EPS 28 | Egelsbach | 2604 | GEN Building | Caterpillar | |||||||
| 29 | EPS 29 | Egelsbach | 2604 | GEN Building | Caterpillar | |||||||
| 30 | EPS 30 | Egelsbach | 2604 | GEN Building | Caterpillar | |||||||
| 31 | EPS 31 | Clay | 1761 | Mobile GEN | Polyma | Polyma | 250 kVA; | |||||
| # | Inventory # | installation | Bldg # | Floor | Manufacturer | Type/ Model: | Capacity: | remarks/comment | Price: | |||
| 1 | UPS 001 | Clay | 1038 | 20 kVA | ||||||||
| 2 | UPS 002 | Clay | 1086 | 20 kVA | ||||||||
| 3 | UPS 003 | Clay | 1090 | 20 kVA | ||||||||
| 4 | UPS 004 | Clay | 1217 | 60 kVA | ||||||||
| 5 | UPS 005 | Clay | 1761 | 20 kVA | ||||||||
| 6 | UPS 006 | Clay | 1569 | 20kVA | ||||||||
| 7 | UPS 007 | Clay | 1625 | 20kVA | ||||||||
| 8 | UPS 008 | Clay | 1647 | 20kVA | ||||||||
| 9 | UPS 009 | Clay | 3372 | |||||||||
| 10 | UPS 010 | Clay | 3547 | |||||||||
| 11 | UPS 011 | Clay | 1086 | |||||||||
| 12 | UPS 012 | Clay | 1761 | |||||||||
| 13 | UPS 013 | Clay | 1647 | |||||||||
| 14 | UPS 014 | Clay | 1712 | |||||||||
| 15 | UPS 015 | Clay | 1625 | |||||||||
| 16 | UPS 016 | Clay | 1642 | |||||||||
| 17 | UPS 017 | Clay | 1062 | |||||||||
| 18 | UPS 018 | Clay | 1059 | SOCOMEC | 32 kVA | |||||||
| 19 | UPS 019 | Clay | 3340 | Riello | UPS MST 125 | 125 kVA | 40x SPGN 12-135 Batterien | |||||
| 20 | UPS 020 | Clay | 1507 | |||||||||
| # | Inventory # | installation | Bldg # | Manufacturer | Type/ Model: | Capacity: | Additional System Components | remarks/comment | Price: | |||
| 1 | PV 1.1 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 19 Panels String B1/B2 - 18 Panels | Total Power P=160kWp | |||||||
| 2 | PV 1.2 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 19 Panels String B1/B2 - 18 Panels | ||||||||
| 3 | PV 1.3 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2- 18 Panels String B1/B2 - 18 Panels | ||||||||
| 4 | PV 1.4 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 18 Panels String B1/B2 - 19 Panels | ||||||||
| 5 | PV 1.5 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 18 Panels String B1/B2 - 18 Panels | ||||||||
| 6 | PV 1.6 | Clay | ||||||||||
| 1631 | SMA | STP 20000TL-30 | 20KW | String A1/A2/A3- 19 Panels String B1/B2 - 17 Panels | ||||||||
| 7 | PV 2.1 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | Total Power P=42.15kWp | |||||
| 8 | PV 2.2 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | ||||||
| 9 | PV 2.3 | Clay | PVCK01 | SMA | STP 20000TL-30 | 20KW | ||||||
| 10 | PV 3.1 | Clay | 1030 | SMA | STP | 110kW | String A1/A2/A3- 20 Panels String B- 12 Panels | Total Power P=113.28kWp | ||||
| 11 | PV 3.2 | Clay | 1030 | SMA | STP | 110kW | String A1/A2/A3- 20 Panels String B- 11 Panels | |||||
| 12 | PV 3.3 | Clay | 1030 | SMA | STP | 50kW | String A1/A2/A3- 20 Panels String B- 12 Panels | |||||
| 4002 | On-demand repair in accordance with T&M EPS, UPS &PV | |||||||||||
| for 63 Power Generation Systems including Diesel Engine – Generator, Uninterruptible power supply Systems (battery based) and Photovoltaic in accordance with the descriptions of the PWS Part 5 Specific Task, attachment 4 Inventory List EPS, attachment 5 Inventory List UPS and attachment 6 Inventory List PV. | Price: | |||||||||||
| € 0.00 | ||||||||||||
| SCLIN | CLIN Description | Qty | Unit | Price | Description or calculation of prices | |||||||
| 01 | Labor Hours | 1000 | hour | Bitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 1000 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. | ||||||||
| Please enter the rate of hourly labor. This is multiplied by the 1000 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. | - 0 | |||||||||||
| 02 | Material/Spares | 1 | lot | / | Der Anbieter muss hierzu keine Angaben machen. |
Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 5 Jahre fest und unveränderlich ist. Die Differenz aus 1000 Stunden multipliziert mit dem vom Lieferanten angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.
The supplier does not have to provide any information here.
| The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 5 years. The difference of 1000 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price. | € - 0 | |
| Note: |
Base Year USAG Wiesbaden Emergency Power Systems
Pricebook_Summary_2026-2031
| Price Book FY 26-30 |
| Preventive Maintenance of Emergency Power and Power Generation Systems |
consisting of Emergency Power Supply (EPS), Uninterruptible Power Supply (UPS) and Photovoltaic (PV) within USAG Wiesbaden
| Fiscal | |||||||
| Year | Ordering Period | CLIN | Total price per year | ||||
| € | Total | Total price per year | |||||
| $ | 0.9303 | ||||||
| FY 26 | Base Year | CLIN 0001 | € 0.00 | € 0.00 | $ - 0 | $ - 0 | |
| CLIN 0002 | € 0.00 | $ - 0 | |||||
| FY 27 | Ordering Period 1 | CLIN 1001 | € 0.00 | € 0.00 | $ - 0 | $ - 0 | |
| CLIN 1002 | € 0.00 | $ - 0 | |||||
| FY 28 | OP 2 | CLIN 2001 | € 0.00 | € 0.00 | $ - 0 | $ - 0 | |
| CLIN 2002 | € 0.00 | $ - 0 | |||||
| FY 29 | OP 3 | CLIN 3001 | € 0.00 | € 0.00 | $ - 0 | $ - 0 | |
| CLIN 3002 | € 0.00 | $ - 0 | |||||
| FY 30 | OP 4 | CLIN 4001 | € 0.00 | € 0.00 | $ - 0 | $ - 0 | |
| CLIN 4002 | € 0.00 | $ - 0 | |||||
| Total | € - 0 | $ - 0 |
File details come from the government source that posted it. Updated .