Attachment 1_Performance Work Statement_PWS_final.pdf
PDF 1 MB Posted
- Attached to
- Vehicle Lease Federal contract opportunity
- Solicitation number
- N40192-20-R-9004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4019220R9004_AMD2R.pdf | ||
| Encl_1_NOTICE_2_N4019220R9004_Amend_0002.pdf | ||
| N4019220R9004_AMD2.pdf | ||
| N4019220R9004_AMD1.pdf | ||
| Encl_1_EXHIBITS A_E VEHICLE LEASE ELINs_Amend_0001.xlsx | XLSX spreadsheet | |
| Encl_2_NOTICE_1_N4019220R9004_Amend_0001.pdf | ||
| Attachment 2_PPQ Form P0_final.pdf | ||
| N40192-20-R-9004 Vehicle Lease.pdf | ||
| Attachment 3_Pre-proposal Inquiry (PPI) Form.pdf | ||
| ANNEX 0200000_ATTACHMENTS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.
N40192-20-R-9004
VEHICLE LEASE FOR VARIOUS
DEPARTMENT OF DEFENSE (DOD) /
FEDERAL ACTIVITIES ON NAVAL BASE
GUAM
ATTACHMENT-1
PERFORMANCE WORK
STATMENT(PWS)
Vehicle Lease N40192-20-R-9004
Various Department of Defense and Federal Activities, Guam
Annex 0100000 – General Information
Spec Item Title
1 General Information
1.1 Outline of Services
1.2 Project Location
1.3 Acquisition of Additional Work
1.4 Background Information
1.5 Verification of Workload and Conditions
1.6 Climate Patterns
1.7 Related Information
1.8 Navy Approach to Service Contracting
1.8.1 Partnering Philosophy
1.8.2 Contractor's Knowledge
1.8.3 Industry Best Practices
1.9 Standard Template
1.10 Navy PBSA Approach
1.11 Technical Proposal Certification
0100000 – General Information
Spec Item Title Description
1 General Information The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to provide Vehicle Lease to various
Department of Defense (DOD)/Federal activities in Guam. It is anticipated that award of a Non-Recurring Type contract will result from this solicitation. The quantities of supplies or services specified in the Schedule are estimated only and are not purchased, nor guaranteed, by any such resulting contract. Except as such contract may otherwise provide, if the
Government’s requirements do not result in orders in the quantities described as “estimated” in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
Services shall be provided by means of Non-Recurring work.
1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this
Performance Work Statement (PWS). The PWS is organized into annexes. Annex 1 is “General Information”. Annex 2 contains the on-site project management and administration requirements.
Annexes 3 through 18 contain the technical requirements.
Annex 1 General Information
Annex 2 Management and Administration
Annex 3 Command and Staff N/A
Annex 4 Public Safety N/A
Annex 5 Air Operations N/A
Annex 6 Port Operations N/A
Annex 7 Ordnance N/A
Annex 8 Range Operations N/A
Annex 9 Health Care Support N/A
Annex 10 Supply N/A
Annex 11 Personnel Support N/A
Annex 12 Morale, Welfare, and Recreation Support N/A
Annex 13 Galley N/A
Annex 14 Housing N/A
Annex 15 Facilities Support N/A
Annex 16 Utilities N/A
Annex 17 Base Support Vehicles and Equipment
Annex 18 Environmental N/A
1.2 Project Location The work shall be performed at various locations and could vary from location to location. The following is an example of work location at various areas of military facilities, Guam.
(1) Naval Base Guam Apra Harbor (NBGAH)
(2) Naval Base Guam Telecommunication Site (NBGTS)
1.3 Acquisition of
Additional Work
The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in
Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with Federal Acquisition
Regulation (FAR) clause 52.212-4 – Contract Terms and Conditions –
Commercial Items, or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.4 Background Information Guam, the largest and southernmost island of the Marianas archipelago, is the westernmost possession of the United States. The island is approximately 6,000 miles west of San Francisco, 3,700 miles west-southwest of Honolulu, 1,500 miles southeast of Tokyo, 2,100 miles southwest of Hong Kong, 1,500 miles east of Manila, and 3,100 miles northwest of Sydney at 13 degrees north latitude and 144 degrees west longitude. The Marianas Trench, the deepest known ocean depth, is located southeast of Guam.
1.5 Verification of
Workload and
Conditions
Throughout the PWS, the workload data is generally referred to as being located in Exhibits A through E. The PWS provides data such as descriptions, specifications, and the statement of work. The exhibits provides data such as system descriptions to represent the type and quantity of services to be provided.
1.6 Climate Patterns Guam's climate is pleasantly warm year-round. The mean annual temperature is 81 degrees; the range is from the low 70s to the mid-80s. The coolest and least humid months are in December through February.
The annual rainfall totals 80 to 110 inches. Guam experiences two seasons, dry and rainy. The dry season, "fanumnangan," begins in
December through June. The rainy season, "fanuchanan," falls within the remaining months.
Typhoons, the most intense tropical cyclones observed anywhere, form over the open ocean areas of the Western Pacific. Generally, most of these tropical cyclones are in their formative stages while near Guam.
Located in the middle of "Typhoon Alley," Guam usually averages four to five storm threats each year. On average, Guam is affected by a tropical cyclone with 40-mile-per-hour winds or higher every season. About every 5 to 10 years, Guam gets hit directly by a super-typhoon. However, the ever-changing patterns can bring a strong typhoon any year.
1.7 Related Information There are four types of Related Information that can be found in the
Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked
“Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in
"Informational Notes" does not create a contractual requirement on either party to this contract.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.8 Navy Approach to
Service Contracting
The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the
Contracting Activity (HCA) of the Naval Facilities Engineering Command
(NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations. The Navy also supports the following principles:
1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.
Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.
1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The
Navy's use of performance-based objectives evidences this principle.
Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. To that end, the
Navy's emphasis will be in evaluating performance objectives (end results).
1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.
The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.
Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the management and administrative requirements. Specification
Item 3 will always contain the Recurring Work requirements. Specification
Item 4 will always contain the Non-Recurring Work requirements.
Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items. Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 must be priced and their price must be allocated across the Exhibit Line Items.
1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.
1.11 Technical Proposal
Certification
The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.
VEHICLE LEASE N40192-20-R-9004
VARIOUS DEPARTMENT OF DEFENSE/FEDERAL ACTIVITIES, GUAM
ANNEX 0200000 MANAGEMENT AND ADMINISTRATION
Spec Item Title
2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.2 Wage Determinations
2.2.3 Warranty
2.2.4 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Partnering
2.3.2.1 Informal Partnering
2.3.2.2 Contract Partnering Administration
2.3.2.3 Contract Partnering Session Attendees
2.3.4 Permits and Licenses
2.3.5 Insurance
2.3.5.1 Certificate of Insurance
2.3.5.2 Minimum Insurance Amounts
2.3.6 Protection of Government Property
2.3.7 Directives, Instructions, and References
2.3.8 Invoicing Procedures
2.3.9 Forms
2.4 Government-Furnished Property, Materials and Services
2.4.1 Government-Furnished Facilities (GFF)
2.4.2 Government-Furnished Utilities
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Work Reception
2.6.2 Work Control
2.6.3 Work Schedule
2.6.4 Deliverables
2.6.5 Quality Management System (QMS)
2.6.5.1 Quality Management (QM) Plan
2.6.5.2 Quality Inspection and Surveillance
2.6.5.3 Quality Inspection and Surveillance Report
2.6.6 Records and Reports
2.6.7 RESERVED
2.6.8 Property Management Plan
2.6.9 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Manager
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 RESERVED
2.7.2.4 Employee Conduct
2.7.2.5 Identification as Contractor Employee
2.7.2.6 Removal of Employees
2.7.2.7 Proof of Citizenship
2.7.3 Enterprise-wide Contractor Manpower Reporting Application (Ecmra)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1. DBIDS Program (Defense Biometric Identification System)
2.8.4.1.1 DBIDS Program – Andersen Air Force Base
2.8.4.1.2 DBIDS Program – Naval Base Guam
2.8.4.2 DBIDS Credentials
2.8.4.3 RESERVED
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.7 Security Clearances
2.8.8 Access to Sensitive Unclassified Information
2.8.9 RESERVED
2.8.10 Employee Status
2.9 Contractor Safety Program
2.9.1 Accident Prevention Plan (APP)
2.9.2 Activity Hazard Analysis (AHA)
2.9.3 NAVFAC Contractor Incident Reporting System (CIRS)
2.9.3.1 Alcohol and Drug Abuse Prevention Plan
2.9.3.2 Confined Space Program
2.9.4 Accident and Damage Reporting
2.9.4.1 Accident Reporting and Notification Criteria
2.9.5 Fire Prevention Program
2.9.6 Fire Protection
2.9.7 Monthly On-Site Labor Report
2.9.8 OSHA Citations and Violations
2.9.9 RESERVED
2.9.10 Safety Certification
2.10 Environmental Protection
2.11 Disaster Preparedness
2.11.1 Storm Protection
2.12 Recurring Work Procedures (NONE)
2.13 Non-Recurring Work
2.13.1 Unit Priced Labor (UPL)Work (Negotiated)
2.13.1.1 Acceptance and Performance
2.13.1.2 Invoicing and Receiving Payment
2.13.2 Non-Recurring Preparation of Proposals
2.13.2.1 Labor Requirements
2.13.2.2 Material and Equipment Requirements
2.13.2.3 Issuance of Final Task Order
2.13.3 Non-Recurring ELINS
0200000 - Management and Administration
2 Management and
Administration
2.1 Definitions and Acronyms Definitions and Acronyms are listed in J-0200000-01
2.2 General Information
2.2.1 Government Regular
Working Hours
The Government's regular working hours are from 0730-1630, five days per week, Monday through Friday, except observed Federal holidays.
Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require
Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior
Contracting Officer (KO) approval.
2.2.1.1 Observed Federal
Holidays
Observed Federal Holidays:
New Year's Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
Washington's Birthday Veteran's Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day
2.2.2 Wage Determinations A "wage determination" is the listing of wage rates and fringe benefit rates for each classification of laborers which the Administrator of the Wage and Hour Division of the U.S. Department of Labor have determined to be prevailing in a particular geographic area for a given class of labor and type of projects. The latest rate is available on line.
2.2.3 Warranty The Contractor agrees that the materials and services furnished under this contract shall be covered not less than a minimum of ninety (90) calendar days warranty. The Contractor agrees that the rights and remedies provided herein are in addition to and do not limit any rights afforded to the Government by any other clause of this contract.
2.2.4 Requirements Hierarchy Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 2.2 would apply to spec items 2.2.1, 2.2.2, and 2.2.2.1 and so on.
2.3 General Administrative
Requirements
2.3.1 Required Conferences and
Meetings
The Contractor may be required to attend administrative and coordination meetings. Examples of meetings include client liaison and partnering sessions.
2.3.2 Partnering To increase the likelihood of successful performance of this contract, the
Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractors teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
Partnering should accomplish three goals:
- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.
- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.
- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.
A project’s characteristics determine the process level to be used. As such the following partnering level applies to this contract:
2.3.2.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and
Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.
The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying form) provided by
Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.
The Partners will determine the frequency of the follow-on sessions.
2.3.2.2 Contract Partnering
Administration
Upon award, the KO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. Commence discussions with the Contractor to select a facilitator and location that are acceptable to both partners. The initial session must be scheduled as soon as possible after award of the contract. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core
Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
For more information concerning Partnering refer to NAVFACINST
11013.40, which can be viewed in the Government’s Contracts Office.
2.3.2.3 Contract Partnering
Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
* President/Vice President
* Project Manager
* Quality Manager
* Site Safety and Health Officer Sub-contractor Reps
2.3.4 Permits and Licenses The Contractor shall obtain without additional expense to the
Government, all required permits, licenses, clearances, and authorizations to perform work under this contract and comply with all the applicable
DoD, DoN, Federal, state and local laws and regulations. In addition, the contractor shall provide evidence of such permits and licenses to the
Contracting Officer before work commences and at other times as requested by the Contracting Officer or Government representative. The
Contractor shall submit copies of Permits and Licenses per Section F.
2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR
Clause 52.228-8, LIABILITY AND INSURANCE – LEASED MOTOR
VEHICLES. This insurance must be maintained during the performance period.
2.3.5.1 Certificate of Insurance The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2 Minimum Insurance
Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage or loss
2.3.6 Protection of Government
Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the
Government.
2.3.7 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-02. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.3.8 Invoicing Procedures Refer to Defense Federal Acquisition Regulations Supplement (DFARS)
Clause 252.232-7006 for invoicing/payment instructions.
2.3.9 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are provided in J-0200000-05.
2.4 Government-Furnished
Property, Materials and
Services
NONE
2.4.1 Government-Furnished
Facilities (GFF)
NONE
2.4.2 Government-Furnished
Utilities
NONE
2.5 Contractor-Furnished
Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect
Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available.
The KO may at any time require Samples, Safety Data Sheets (SDS) or
Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards.
Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide a staff with the necessary management expertise to assure performance objectives and standards are met.
2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during
Government regular working hours and provide a point of contact at a local number who can perform the above function during other than
Government regular working hours.
2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure materials, labor and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and status reports shall be provided when requested by the KO.
A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.
2.6.3 Work Schedule NONE
2.6.4 Deliverables Records and reports are specified in the Performance Work Statement
(PWS), and within the Directives, Instructions, and References. The
Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify records and reports, as directed by the KO, at no additional cost to the Government.
Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
2.6.5 Quality Management
System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The
Contractor's QMS program shall address:
Accurate documentation of work processes, procedures, and output measures.
A systematic procedure for assessing compliance with performance objectives and standards.
Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
2.6.5.1 Quality Management
(QM) Plan
The Contractor shall develop and submit a QM Plan in accordance with
PWS. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.
The Contractor’s QM Plan shall include, at a minimum, the following:
• Policy and objectives of Quality Management System (QMS)
• Quality organization o List of personnel o Responsibilities & lines of authority o Training and qualifications
• Approach to assuring quality of services provided and conformance with performance objectives and standards
• Methods and procedures for effective planning, operation and control of processes and performance of work
• Procedures for inspection and surveillance of services o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work
• Documentation and records management
• Communication with government (customers)
2.6.5.2 Quality Inspection and
Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.212-4 – Contract Terms and Conditions- Commercial Items, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the
Government’s regular working hours. The file shall be submitted to the
KO after termination of the contract per Section F.
2.6.5.3 Quality Inspection and
Surveillance Report
The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per PWS. The Contractor Quality Inspection and
Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month.
The Government may adjust the frequency of the submittal based on the
Contractor’s quality of performance.
2.6.6 Records and Reports The Contractor shall submit a copy of the Contractor Production Report
(See J-0200000-03) to the Contracting Officer or government designated authority (GDA), no later than 0900 daily for the work performed during the previous day. The Contractor shall maintain records and reports of all services performed and shall provide it to the Contracting Officer or
Government representative upon request. Upon contract completion, the
Contractor shall provide the Contracting Officer with all documentation relevant to this contract.
2.6.7 RESERVED
2.6.8 Property Management
Plan
The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished
Property, Materials and Services, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. The Property Management Plan shall be submitted as the request of the Contracting Officer.
2.6.9 System and Equipment
Replacement
The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced.
Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.
2.7 Personnel Requirements The Contractor shall comply with the personnel requirements stated below.
2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per PWS. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.
The Contractor shall submit an Organizational Chart per PWS showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.
2.7.1.1 Manager The Contractor shall provide a PM and designated alternate, as applicable, who has to have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government's regular working hours and shall be available within one hour after the Government's regular working hours.
The PM shall have at least three years of experience in managing a workforce providing services on contracts of similar size, scope and complexity
2.7.2 Employee Requirements The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.
2.7.2.1 Employee Certification
and Training
The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for
Government review within 4 hours of request.
2.7.2.2 Employee Appearance The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.
2.7.2.3 RESERVED
2.7.2.4 Employee Conduct Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.
2.7.2.5 Identification as
Contractor Employee
Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
2.7.2.6 Removal of Employees The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.
2.7.2.7 Proof of Citizenship No employee or representative of the Contractor will be admitted to the site of work unless satisfactory Proof of Legal Residency is submitted per
PWS.
2.7.3 Enterprise-wide
Contractor Manpower
Reporting Application
(eCMRA)
The Contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://doncmra.nmci.navy.mil.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs
October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.
2.8 Security Requirements The Contractor shall comply with all DoD, DoN, Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.
2.8.1 Employee Listing The Contractor shall maintain a current Employee List and submit to the
Contracting Officer per PWS. The list shall include employee’s name, supervisor, company, and level of security clearance.
2.8.2 Vehicles The company name and phone number shall be prominently displayed on the driver and passenger side on each of the Contractor's vehicles utilized to perform work on this contract. All vehicles shall display a valid state license plate that complies with State Vehicle Code. Vehicles shall meet all other requirements of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable.
2.8.3 Passes and Badges All Contractor employees shall obtain the required employee badge and vehicle passes. The Contractor employees must be able to obtain
Common Access Cards (CAC) in accordance with security requirements.
Each employee shall wear the Government issued badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's Passes and Badges shall be returned immediately and no more than ten (10) calendar days.
https://doncmra.nmci.navy.mil/
2.8.4 Access to Installation All Contractor personnel shall obtain access to the installation by participating in the Defense Biometric Identification System (DBIDS) or by obtaining passes each day from the Base Pass and Identification Office.
Cost for obtaining passes through the DBIDS program is the responsibility of the contractor. One-day passes, issued through the Base Pass and
Identification Office, will be furnished without charge.
The Contractor shall furnish a completed EMPLOYMENT ELIGIBILITY
VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer.
All Contractor personnel shall obtain access to the installation by obtaining passes from the Visitor Control Center in Andersen Air Force
Base, Guam for Andersen Air Force Base, Guam or the Visitor Control
Center in Naval Base Guam.
2.8.4.1 DBIDS Program (Defense
Biometric
Identification
System)
DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification
Office for each visit. There are no fees associated with obtaining a
DBIDS credential.
The Government performs background screening and credentialing.
Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
2.8.4.1.1 Defense Biometric
Identification System
(DBIDS)
Andersen Air Force
Base
To improve management and force protection at AAFB installations, the
AAFB is transitioning from using the Navy Commercial Access Control
System (NCACS) to the Defense Biometric Identification System
(DBIDS) for contractors and vendors requiring access to an installation.
DBIDS is a DoD-owned and operated system developed by Defense
Manpower Data Center as a force protection program to manage personnel identity and access at DoD installations. DBIDS is a network database system designed to easily verify access authorization of personnel entering military installations by using barcodes and fingerprint biometric identifications. Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit.
In order to obtain base access, an individual needs to acquire DoD sponsorship, have a thorough identity check, be properly vetted, and have a legitimate reason for base access. Identity checks require a passport, ID card issued by federal, state or local government agencies or entities, provided it contains a photograph or information such as name, date of birth, gender, height, eye color, and address, school ID card with a photograph, U.S. Military card or draft record, U.S. Coast Guard
Merchant Mariner Card, or a Native American tribal document. Other requirements are 1.) Base Access Request Form, 2.) Affidavit, 3.) III Log.
All items (scanned and signed) are to be submitted to the Contract
Specialist for processing (hard copy or email). The Contract Specialist will forward the documents to AAFB 36th Security Forces Squadron
(SFS) for review and approval. A tracking number will be provided by 36
SFS which the Contract Specialist will forward to the Contractor.
Investigation occurs when the individual’s background and ID are compared against authoritative criminal justice data bases, and the individual has a letter or official document from the sponsoring organization which articulates the reason for access. When the above criteria are satisfactorily met, DBIDS credentials are issued.
2.8.4.1.2 Defense Biometric
Identification System
(DBIDS)
Naval Base Guam
DBIDS is a program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one (1) year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification
Office for each visit.
To obtain a DBIDS credential, the contractor must present a letter or official document from the government sponsoring organization that provides the purpose for your access. Present a passport, ID card issued by federal, state or local government agencies or entities, provided it contains a photograph or information such as name, date of birth, gender, height, eye color, and address, school ID card with a photograph, U.S.
Military card or draft record, U.S. Coast Guard Merchant Mariner Card, or a Native American tribal document. Present a completed copy of the
SECNAV 5512/1 form to obtain your background check. Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments.
The Government performs background screening and vetting. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges.
Under the DBIDS program, no commercial vehicle inspection is required, other than for Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON).
2.8.4.2 DBIDS Credentials Contractor employees shall furnish a completed copy of the SECNAV
5512/1 form to obtain the required background check and visit the local
Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at: https://www.cnic.navy.mil/om/dbids.html.
The Contractor may initiate the adjudication process when a background screen failure results in disqualification from participation in DBIDS and the Contractor employees do not agree with the reason for disqualification.
The Contractor may also apply for a waiver when a background screening failure results in disqualification from participation in DBIDS. The
Commanding Officer will be the final waiver determination authority.
The Contractor shall immediately collect employee DBIDS credentials and notify the KO in writing:
(1) That an employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) That there is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.
2.8.4.3 RESERVED
2.8.5 Access to Buildings The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The
Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.
2.8.6 Access Arrangements The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government may issue keys to the Contractor.
The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.
2.8.7 Security Clearances The Contractor shall obtain all required corporate and personnel Security
Clearances prior to commencement of work. The Contractor shall ensure that a list of all personnel with Security Clearances is maintained current, including clearances that are pending.
2.8.8 Access to Sensitive
Unclassified Information
The Contractor personnel whose work involves access to sensitive unclassified information shall undergo a Tier 3 Investigation to verify their trustworthiness. If the Contractor personnel currently have a favorably adjudicated Tier 3 Investigation the Contractor shall notify the
Government Command Security Manager who will validate this in the
Joint Personnel Adjudication System (JPAS).
The Contractor shall request from the Government for access to the E-QIP
Direct program for the Contractor employees to complete the SF-86 form on line for a Tier 3 Investigation. The Security Manager will determine suitability. Upon a favorable Tier 3 Investigation, the Contractor personnel shall submit the original signed release statements, applicant fingerprint card (FD87), and an OF-306 Declaration for Federal
Employment to the Security Manager. The Contractor shall be responsible for providing the fingerprint card.
The request shall be renewed annually or for the duration of the contract if less than one year.
2.8.9 RESERVED
2.8.10 Employee Status The Contractor shall notify the KO of any changes to any employee’s status to include, but not limited to, termination, convictions/arrests, adverse actions taken on the job for any reason or any other documented misbehavior that may affect, or have the potential to affect, security standing in terms of access to federal facilities or IT systems.
2.9 Contractor Safety
Program
The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, UFC 3-560-01 Operation and Maintenance Electrical Safety, and Public Law 91-596, Occupational
Safety and Health Act.
Any reference to “USACE" facilities, property, or equipment specified in
EM 385-1-1 should be interpreted as Government facilities, property, and equipment.
2.9.1 Accident Prevention Plan
(APP)
The Contractor shall develop and implement a site Accident Prevention
Plan (APP). The APP shall be prepared by the Contractor’s SSHO and shall be followed by all Contractor employees, subcontractors, and vendors at each service site.
For low risk or limited scope contracts, e.g., single function custodial, grounds maintenance and landscaping, integrated solid waste management, pavement clearance, pest control – “The APP shall follow the abbreviated format and include, as a minimum, elements addressed in paragraph 3.k. of Appendix A of EM 385-1-1.”
The Contractor shall submit an APP for acceptance per PWS. The
Contractor shall review, update, and submit revisions to the APP whenever a change in work conditions, hazards, or activities occur.
Submittal of the APP shall include Activity Hazard Analyses (AHAs) and applicable compliance plans, programs, and procedures as specified below.
The Contractor shall not commence work until the APP has been accepted and no activity shall be started on site until the applicable AHAs and compliance plans have been accepted.
Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.
2.9.2 Activity Hazard Analysis
(AHA)
The Contractor shall prepare Activity Hazard Analyses (AHAs) for all applicable common recurring work activities performed under this contract. AHAs for recurring work shall be submitted with the APP and shall be updated as work activities or conditions change and additional
AHAs prepared as new work activities are required. AHAs for non-recurring and one-time (e.g., non-recurring work task orders) work occurrences shall be submitted at least two working days prior to start of work. Specifically:
For contract modifications to recurring work requirements where changes are germane to the original contract, the Contractor shall revise applicable
AHAs within 15 calendar days after modification is signed.
For contracts with non-recurring work ELINs, the Contractor shall submit an AHA on non-recurring work task orders, with the associated proposal, whenever the service environment or required task is different from the recurring work priced services.
The Contractor shall follow the Risk Management Process for the development of Activity Hazard Analysis (AHA) in accordance with paragraph 01.A.14 and Appendix A of EM 385-1-1. A formatted outline of an AHA is provided in Figure 1-2 of EM 385-1-1.
During performance of services, the SSHO shall periodically review the
AHA at each service site and for each sub-annex to assess the effectiveness of the Contractor’s overall APP. If changes to the AHAs are required, such changes shall be submitted to the KO for review and acceptance.
2.9.3 NAVFAC Contractor
Incident Reporting
System…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .