Attachment 1- Performance Work Statement.pdf

PDF 335 KB Posted

Attached to
World Wide Expeditionary Multiple Award Contract (WEXMAC)
Solicitation number
N6264921R0038
Issued by

About this file

This is a request for proposal for a Worldwide Expeditionary Multiple Award Contract. The Navy seeks proposals for logistics management, utilities, force protection, communications, transportation, and other services to support humanitarian assistance, contingency operations, exercises, and ashore support globally. Proposals are due by April 1, 2021, and the contract will have multiple awardees. Services will include material handling, utilities, waste removal, security, transportation, and communications support. Pricing is to be fixed for task order proposals, with services ordered from standard lists. The scope of work covers all Navy areas of responsibility worldwide.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Worldwide Expeditionary Multiple Award Contract (WEXMAC) Performance Work Statement (PWS)

1. The SUBCLIN and ELIN structure in this contract follows the below listed conventions:

The SubCLINs match the categories of funding required/provided. For Example:

Funding SubCLIN Logistics Management and Integration Services 0001AA Material Handling Equipment and Crane Services 0001AB Lodging Services 0001AC Utilities Services 0001AD Force Protection Services 0001AE Communications Services 0001AF Transportation Services 0001AG Other Services 0001AH Class I – Food, Rations, and Water Supplies 0001AJ Class II – Clothing Supplies 0001AK Class III – Petroleum, Oils, and Lubricants Supplies 0001AL Class IV – Fortification and Barrier Materials Supplies 0001AM Class VI – Personal Items Supplies 0001AN Class VIII – Medical Supplies 0001AP Other Supplies 0001AQ

The ELINs will further identify the specific requirement for the overarching category for the region as follows:

REGION

5 YEAR

ORDERING

PERIOD

MAXIMUM

AMOUNT

5 YEAR OPTION

ORDERING PERIOD

MAXIMUM AMOUNT

MAXIMUM ORDERING

AMOUNT

1 $5,500,000.00 $5,500,000.00 $11,000,000.00

2 $5,500,000.00 $5,500,000.00 $11,000,000.00

3 $5,500,000.00 $5,500,000.00 $11,000,000.00

4 $5,500,000.00 $5,500,000.00 $11,000,000.00

5 $5,500,000.00 $5,500,000.00 $11,000,000.00

6 $5,500,000.00 $5,500,000.00 $11,000,000.00

7 $5,500,000.00 $5,500,000.00 $11,000,000.00

8 $5,500,000.00 $5,500,000.00 $11,000,000.00

9 $5,500,000.00 $5,500,000.00 $11,000,000.00

10 $5,500,000.00 $5,500,000.00 $11,000,000.00

11 $5,500,000.00 $5,500,000.00 $11,000,000.00

12 $5,500,000.00 $5,500,000.00 $11,000,000.00

13 $5,500,000.00 $5,500,000.00 $11,000,000.00

14 $5,500,000.00 $5,500,000.00 $11,000,000.00

15 $5,500,000.00 $5,500,000.00 $11,000,000.00

REGION

5 YEAR

ORDERING

PERIOD

MAXIMUM

AMOUNT

5 YEAR OPTION

ORDERING PERIOD

MAXIMUM AMOUNT

MAXIMUM ORDERING

AMOUNT

16 $5,500,000.00 $5,500,000.00 $11,000,000.00

17 $5,500,000.00 $5,500,000.00 $11,000,000.00

18 $5,500,000.00 $5,500,000.00 $11,000,000.00

19 $5,500,000.00 $5,500,000.00 $11,000,000.00

20 $5,500,000.00 $5,500,000.00 $11,000,000.00

21 $5,500,000.00 $5,500,000.00 $11,000,000.00

22 $5,500,000.00 $5,500,000.00 $11,000,000.00

ELIN XX00:

XX= Region 00 = Specific requirement

Throughout the PWS below an “X” is used as a placeholder in the ELIN to show that the ELIN numbers will vary by region.

SECTION 1 - DESCRIPTION OF CONTRACTUAL SCOPE

1.1 The services and supplies provided through performance of this contract are to support Humanitarian Assistance/Disaster Relief (HA/DR) Support, Contingency Support, Exercise Support, Lodging Support, Logistics Support, and Ashore Support. These supplies and services consist of the following broad categories: logistics management and integration services, utilities, force protection, communications, land transportation services, other services, and other supplies. The contractor shall provide logistic management and integration services, utilities, force protection, communications, land transportation services, other services and other supplies, which include but are not limited to: trash removal, force protection, material handling, interpreters, fresh potable water, power supply, transportation, vehicle rental, forklift services, and communications.

1.2 Logistics management and integration services, utilities, force protection, communications, land transportation services, other services, and other supplies provided by a contractor from a standard list of services and supplies at a Firm-Fixed-Price. The contractor is required to manage and integrate all services provided by, to include but not limited to, subcontractor and Host Nations authorities. Firm- Fixed-Prices shall be established during the Request for Task Order Proposals (RTOP). The contractor shall ensure that ordered services and supplies conform to the general requirements of the contract pursuant to this PWS. If the RTOP includes services and supplies that are not within the general scope of this contract, the RTOP shall include a separate performance work statement for those services and supplies.

1.3 In performing this contract, the contractor shall comply with its terms and with laws or regulations of the country where performance occurs, to include applicable safety and health regulations, and shall obtain any insurances, licenses, or permits required by these laws or regulations. If there is a difference between the terms of this contract and laws or regulations of the country where performance occurs, the contractor shall promptly notify the Government if it believes that it will be unable to fully perform the specified tasks or provide the specified requirements because of problems, disputes, or complications with the respective country where performance occurs. The contractor’s proposal shall reflect and account for country specific price considerations known at the time of the proposal submission.

1.4 Authorized Ordering Activities of the U.S. Department of Defense (DoD) shall have authority to use this contract. If these activities are authorized, orders will be placed by any warranted Contracting Officer in the Authorized Ordering Activity. Contractors will be notified of the addition of an authorized ordering activity by contract modification to “Authorized Ordering Activity.”

1.5 The geographic scope and regions covered by this contract for contingency, exercises, humanitarian assistance, disaster relief, and logistics services includes ALL locations identified in Table 1 “Region and Locations” to include Foreign Locations located in Commander, U.S. 2nd Fleet (C2F);

Commander, U.S. 3rd Fleet (C3F); Commander, U.S. 4th Fleet (C4F); Commander, U.S. 5th Fleet (C5F);

Commander, U.S. 6th Fleet (C6F); and Commander, U.S. 7th Fleet (C7F) Areas of Operations (AOR).

The Table 1 “Region and Locations” identifies each region and the locations that are considered as part of that region:

Region 1: North America

MEXICO

CANADA

GREENLAND

Region 2: Caribbean & Bermuda

ARUBA

ANGUILLA

BAHAMAS, THE

BONAIRE, SAINT EUSTATIUS, AND SABA

CURACAO

BARBADOS

BERMUDA

BRITISH VIRGIN ISLANDS

CAYMAN ISLANDS

CUBA

DOMINICAN REPUBLIC

DOMINICA

ANTIGUA AND BARBUDA

GRENADA

GUADELOUPE (FRANCE)

HAITI

JAMAICA

MARTINIQUE

MONSERRAT

NETHERLANDS ANTILLES

SAINT-BARHELEME

SAINT LUCIA

SAINT KITTS AND NEVIS

ST. MAARTEN

SAINT VINCENT AND THE GRENADINES

TURKS AND CAICOS

TRINIDAD AND TOBAGO

Region 3: Central America

BELIZE

COSTA RICA

EL SALVADOR

GUATEMALA

HONDURAS

NICARAGUA

PANAMA

Region 4: South America

ARGENTINA

BOLIVIA

BRAZIL

CHILE

COLOMBIA

CURACAO (NETHERLANDS ANTILLES)

ECUADOR

FRENCH GUIANA

GUYANA

PARAGUAY

PERU

SURINAME

URUGUAY

VENEZUELA

Region 5: Middle East

IRAQ

ISRAEL

KUWAIT

LEBANON

OMAN

QATAR

SAUDI ARABIA

SYRIA

TURKEY

YEMEN

AFGHANISTAN

PAKISTAN

JORDAN

Region 6: Bahrain BAHRAIN Region 7: United Arab Emirates UNITED ARAB EMIRATES

Region 8: Africa

ALGERIA

EGYPT

LIBYA

MOROCCO

TUNISIA

WESTERN SAHARA

BURUNDI

COMOROS

DJIBOUTI

ERITREA

ETHIOPIA

KENYA

MADAGASCAR

MALAWI

MAURITIUS

MAYOTTE

MOZAMBIQUE

RÉUNION

RWANDA

SEYCHELLES

SOMALIA

SUDAN

UGANDA

TANZANIA

ZAMBIA

ZIMBABWE

ANGOLA

CAMEROON

CENTRAL AFRICAN REPUBLIC

CHAD

CONGO

DEMOCRATIC REPUBLIC OF THE CONGO

EQUATORIAL GUINEA

GABON

SAO TOME AND PRINCIPE

SOUTHERN AFRICA

BOTSWANA

LESOTHO

CABO VERDE

COTE D'IVOIRE

NAMIBIA

SOUTH AFRICA

ESWATINI

BENIN

SOUTH SUDAN

BURKINA FASO

GAMBIA, THE

GHANA

GUINEA

GUINEA-BISSAU

LIBERIA

MALI

MAURITANIA

NIGER

NIGERIA

SENEGAL

SIERRA LEONE

TOGO

Region 9: Eastern Europe & Western Asia

ALBANIA

BELARUS

CYPRUS

BOSNIA AND HERZEGOVINA

KAZAKHSTAN

KYRGYZSTAN

TAJIKISTAN

TURKMENISTAN

UZBEKISTAN

ARMENIA

AZERBAIJAN

BULGARIA

KOSOVO

CROATIA

GEORGIA

CZECH REPUBLIC

ESTONIA

MOLDOVA

GREECE

HUNGARY

LATVIA

LITHUANIA

MONTENEGRO

POLAND

RUSSIA

SERBIA

SLOVAKIA

SLOVENIA

ROMANIA

MACEDONIA

UKRAINE

Region 10: Western Europe

AUSTRIA

ANDORRA

BELGIUM

FAROE ISLANDS

DENMARK

FINLAND

FRANCE

GERMANY

ICELAND

IRELAND

ITALY

LUXEMBOURG

MALTA

LIECHTENSTEIN

NETHERLANDS

NORWAY

PORTUGAL

SAN MARINO

SPAIN

SWEDEN

SWITZERLAND

GIBRALTAR

UNITED KINGDOM

Region 11: Mainland Asia

CHINA

TAIWAN

HONG KONG

KOREA, SOUTH

NEPAL

MONGOLIA

Region 12: Japan JAPAN

Region 13: Indian Ocean

BANGLADESH

BHUTAN

BRITISH INDIAN OCEAN TERRITORY

INDIA

DIEGO GARCIA

MALDIVES

MYANMAR

Region 14: Sri Lanka SRI LANKA

Region 15: Australia & Oceania

ANTARCTICA

TIMOR-LESTE

NEW ZEALAND

AUSTRALIA

Region 16: Pacific Islands

PALAU

FIJI

FRENCH POLYNESIA

KIRIBATI

MARSHALL ISLANDS

MICRONESIA, FEDERATED STATES OF

NAURU

NEW CALEDONIA

PAPUA NEW GUINEA

SOLOMON ISLANDS

TONGA

TUVALU

VANUATU

SAMOA

Region 17: Philippines PHILIPPINES Region 18: Indonesia INDONESIA

Region 19: Malaysia & Singapore

SINGAPORE

MALAYSIA

Region 20: Thailand THAILAND

Region 21: Vietnam VIETNAM

Region 22: Southeastern Asia

BRUNEI

CAMBODIA

LAOS

Table 1 “Region and Locations”

SECTION 2 – LOGISTICS MANAGEMENT AND INTEGRATION SERVICES (SUBCLIN

0001AA)

2.1 LOGISTICS MANAGEMENT AND INTEGRATION SERVICES (ELIN XXXX)

2.1.1. The contractor shall provide logistics management and integration services to requesting activities covered by this contract. Logistics management and integration services requires the contractor to integrate, manage, and perform all services and provide all supplies necessary to fully comply with the tasks and responsibilities described in this contract unless a task or responsibility is specifically included in a separately-priced ELIN herein. Contractor’s responsibilities under the Logistics Management and Integration Services ELIN start with the period of performance.

2.1.2 The following ELINs are included:

ELIN XXXX LOGISTICS MANAGEMENT AND INTEGRATION SERVICES

2.1.3 OTHER DIRECT AND INDIRECT COSTS

2.1.3.1 The services and supplies represented on RTOP exhibits are the only services and supplies that shall be included on RTOP proposals. RTOP exhibits only provide requested services and supplies from the requesting activity. All other direct/indirect costs, to include services and supplies not included in the RTOP exhibit but required to execute the task order visit, shall be incorporated into the Logistics Management and Integration Services.

2.1.3.2 The contractor shall not include any other direct or indirect costs as separate exhibit line items in RTOP proposals.

2.1.4 CONTRACTOR’S RESPONSIBILITIES FOR PERFORMANCE ARRANGEMENTS

2.1.4.1 If requested by the Government, the contractor shall ensure all services (land based and afloat) are available for inspection on the scheduled date and time requested by the Government. The Government shall provide the Contractor 48 hours’ notice prior to requested inspection.

2.1.4.2 FORCE PROTECTION. The exhibit spreadsheets and specific portions of this PWS include force protection services and equipment, which the contractor shall bid on a fixed-price basis with their initial offer for the basic contract. Once a task order has been awarded, the contractor shall reconfirm with the requesting activity that these force protection requirements meet the requesting activity’s requirements prior to beginning performance. Any requests for additional force protection requirements shall be coordinated through the KO or Authorized Ordering Officer via Contracting Officer’s Representative (COR). If any other activity or individual orders force protection services (e.g. NCIS, DAO) not covered in the task order, contractors are required to immediately inform the requesting activity and KO or Authorized Ordering Officer of such and must obtain written or verbal confirmation prior to beginning performance of those services. Organizations such as NCIS and DAO are not Authorized Ordering Officers under this contract unless specific authorization has been given by the KO in writing. Therefore, they have no contractual authority to place orders. The contractor shall ensure compliance with Section 4 – Force Protection in PWS.

2.1.4.3 MORALE, WELFARE, AND RECREATION (MWR) SERVICES. If an MWR contract has been awarded which covers the location of the requesting activity’s visit, then the contractor must refer all MWR requests to the authorized MWR contractor. If there is an MWR contract, the MWR contractor is the requesting activity’s sole representative for this service. Under no circumstances shall the contractor assist the requesting activities’ personnel in booking these services if an MWR representative is servicing the requesting activity. In the absence of an MWR contract, the contractor shall provide advance information on the full scope of all recreational/liberty activities available in local area and assist the requesting activity, as necessary, to identify the vendors. Information (with associated costs) shall include, but is not limited to, visitor tips, transportation, sightseeing tours, entertainment, sporting events, and lodging. Payment for services shall be made by the requesting activity to the vendor rather than through contractor. Any potential issue shall be resolved directly between the requesting activity and the local vendor. This service is included under the Logistics Management and Integration Services ELIN and the contractor shall not charge additional fees for this service. Under no circumstances shall the contractor assist the requesting activity’s personnel in booking these services. If MWR information is required to be provided by the contractor, the Government will identify during the RTOP solicitation.

2.1.4.4 NOTIFICATION. Within 72 hours after the task order award, the contractor shall provide the Requesting Activity, COR, and KO the following information:

1. All emergency telephone numbers: police, hospitals, firefighters.

2. Closest local hospital address, phone number, and Hospital’s Echelons to Care.

3. Local, State, and National agencies that must be called for hazardous material and/or spills.

4. Contractor Point of Contact (POC) information, including 24-hour contact phone numbers for the duration of the period of performance.

5. Mobilization plan

6. Subcontractor information (Company Name, Address, Point of Contact Name, Email Address) for all services not performed by the contractor.

2.1.5 CONTRACTOR RESPONSIBILITIES FOR REQUESTING ACTIVITY’S DURING PERIOD

OF PERFORMANCE

2.1.5.1 Contractor shall brief the requesting activity about ordered services upon start of the period of performance. This briefing shall include what was ordered and scheduled times and dates for delivery. The contractor shall coordinate with the requesting activity on the schedule and mobilization plan.

2.1.5.2 Contractor shall ensure the Government is able to inspect all services (land based and afloat) during the period of performance including the mobilization and preparations taken to perform such services.

2.1.5.3 Contractor shall be available on call at all times (24 hours per day, seven days per week) to assist the requesting activity with requirements and to resolve problems within the context of this PWS. When requested in the RTOP solicitation and task order, contractor shall have one (1) representative present throughout the period of performance that is authorized to execute change orders and new orders with subcontractor. The contractor’ representative shall have the authority to act on the behalf of the contractor. When requested in the RTOP solicitation and task order, contractor shall visit the place of performance at least once a day when requested.

2.1.6 CONTRACTOR’ RESPONSIBILITIES PRIOR TO THE END OF THE PERIOD OF

PERFORMANCE

2.1.6.1 Written receipt for inspection of all completed services shall be obtained during the performance of the task order. The invoicing instructions are contained in section G-2 Invoicing Instructions of the contract.

2.1.7 ENVIRONMENTAL REQUIREMENTS.

2.1.7.1 Contractor shall exercise due diligence to prevent, contain, and respond to spills of hazardous material, hazardous substances, hazardous waste, sewage, regulated gas, petroleum, lubrication oil, and other substances regulated by environmental law. Contractor shall maintain spill cleanup equipment and materials at the work site. In the event of a contractor caused spill, contractor shall take prompt, effective action to stop, contain, curtail, or otherwise limit the amount, duration, and severity of the spill/release, and shall contain and clean up these spills without cost to Government.

2.1.7.2 Contractor are responsible for verbal and written notifications. Spill response shall be in accordance with local regulations.

2.1.7.3 If Government assistance is requested or required, contractor shall reimburse Government for such assistance. If the Government must initiate its own spill cleanup procedures, contractor shall reimburse Government for all costs incurred, including sample analysis of materials, equipment, labor, and spill waste disposal for contractor responsible spills when:

1. Contractor has not begun spill cleanup procedure within one hour of spill discovery/occurrence; or

2. If, in Government's judgment, contractor’ spill cleanup is not adequately abating life threatening situation and/or is a threat to any body of water or environmentally sensitive areas.

2.1.7.4 All equipment which contains liquid and/or liquid containers on the work sites shall be placed on secondary containment and such containment system shall be free of any uncontained liquid/residue and debris. Any leaking equipment shall be removed from the place of performance until the unit is fixed. All drips, drops and spills shall be cleaned immediately when detected and reported.

2.1.8 RECEIPT DOCUMENTATION

2.1.8.1 Contractor shall provide standard receipt documents for all supplies, materials, and services provided to the requesting activity. The standard receipt shall include the following:

1. Contractor official company name, address, email and phone contact information

2. Contract Number

3. Delivery/Task Order Number

4. Requesting Activity’s name

5. Location of Services

6. Subcontractor/vendor (providing the service) official name and contact information

7. Type of service, material, or equipment provided

8. Quantity provided

9. Method of delivery of service, material, or equipment provided

10. Date service provided

11. Applicable “legible” Receipt Inspector and contractor POC names and signatures

2.1.8.2 Contractor shall sign the receipt document validating that the services were delivered.

Neither the requesting activity Receipt Inspector nor contractor shall collect and hold receipts to validate all at once at the end of the period of performance. Receipt of services, material, and equipment shall be validated and signed for each day they are received, on the day received. This certification of receipts does not replace or supersede the contract process of accepting contractor’ invoices as detailed in contract section G-2 Invoicing Instructions.

2.1.9 ELIN XXXX - XXXX Logistics Management and Integration Services Unit of Issue is DAY

(DY).

2.2 FLEET LANDING LOT (ELIN XXXX)

2.2.1 The Fleet Landing Lot consists of the following:

1. 250 chairs;

2. 50 long tables (approximately 2 meters in length);

3. One (1) large BBQ grill with the supporting supplies and equipment (at least 576 square inches);

4. Open or Closed Tents (assorted sizes) which, when combined, shall cover a zone of 300 square meters, with lights that shall provide sufficient uniform illumination of the space between 750-1000 lux. The tents must be anchored down and strong enough to withstand inclement weather;

5. Three (3) Ice Coolers (70 liters);

6. Three (3) Mist Fans or Space Heaters;

7. 20 110-220VAC US outlets with surge protection;

8. Four (4) Portable Sanitary Facility;

9. Four (4) Portable Hand Washing Station;

10. Daily cleaning of the equipment and the fleet landing area; and

11. Transportation, repositioning, mobilization, demobilization, stand-by fee, and labor required to perform the above.

2.2.2 Contractor shall provide a power source capable of supplying power to lighting, 20 110-220VAC US outlets with surge protection and miscellaneous portable electrical equipment (radios, stereos, hand tools, etc.). The power source shall emit sound levels of less than 84 decibels. Unit Price shall include transportation, set-up, dismantling and labor, necessary consumables to include fuel to operate the power source, mobilization and demobilization.

2.2.3 ELIN XXXX Fleet Landing Lot Unit of Issue is DAY (DY).

2.3 REFRIGERATOR UNIT (ELIN XXXX)

2.3.1 Contractor shall provide one (1) 40-FT refrigerator unit or two (2) 20-FT refrigerator units, with required power to operate the units.

2.3.2 ELIN XXXX Refrigerator Unit of Issue is DAY (DY).

2.4 CHAIRS (ELIN XXXX - XXXX)

2.4.1 Contractor shall provide chairs that are clean and sturdy with maximum weight capacity at least 250 lbs.

2.4.2 The following ELINs are included:

ELIN XXXX: SET OF 5 CHAIRS

ELIN XXXX: SET OF 10 CHAIRS

2.4.3 ELIN XXXX - XXXX Chairs Unit of Issue is DAY (DY).

2.5 TABLES (ELIN XXXX - XXXX)

2.5.1 Contractor shall provide tables that are clean and sturdy. Tables shall be at least 6 feet in length and 2 feet in width.

2.5.2 The following ELINs are included:

ELIN XXXX: SET OF 5 LONG TABLES

ELIN XXXX: SET OF 10 LONG TABLES

2.5.3 ELIN XXXX - XXXX Tables Unit of Issue is DAY (DY).

2.6 LARGE BBQ GRILLS (ELIN XXXX)

2.6.1 Contractor shall provide one (1) large BBQ Grill with the supporting supplies and equipment included. BBQ Grill shall be at least 576 square inches (3,716 square centimeters). The large BBQ Grill shall be electric or propane grill. Supplies and equipment shall include, but are not limited to, stainless steel spatula, fork, basting brush, and tongs. Contractor shall ensure large BBQ Grill and equipment is cleaned in accordance with CDC guidelines prior and after the period of performance.

2.6.2 ELIN XXXX Large BBQ Grills Unit of Issue is DAY (DY).

2.7 OPEN TENT (NON-FORCE PROTECTION) (ELIN XXXX)

2.7.1 One (1) unit encompasses assorted sizes that, when combined, shall cover a zone of 300 square meters, with lights that shall provide sufficient uniform illumination of the space between 750-1000 lux.

The open tent shall have 20 110-220VAC US outlets with surge protection. Contractor shall provide a power source capable of supplying power to lighting, 20 110-220VAC US outlets with surge protection and miscellaneous portable electrical equipment (radios, stereos, hand tools, etc.). The power source shall emit sound levels of less than 84 decibels. The tent shall be anchored down and strong enough to withstand inclement weather.

2.7.2 ELIN XXXX Open Tent Unit of Issue is DAY (DY).

2.8 CLOSED TENT (NON-FORCE PROTECTION) (ELIN XXXX)

2.8.1 One (1) unit encompasses assorted sizes that, when combined, shall cover a zone of 300 square meters, with lights that shall provide sufficient uniform illumination of the space between 750-1000 lux.

The closed tent shall have 20 110-220VAC US outlets with surge protection. Contractor shall provide a power source capable of supplying power to lighting, 20 110-220VAC US outlets with surge protection and miscellaneous portable electrical equipment (radios, stereos, hand tools, etc.). The power source shall emit sound levels of less than 84 decibels. The tent shall be enclosed on all sides with an entry door. The tent shall be anchored down and strong enough to withstand inclement weather.

2.8.2 ELIN XXXX Closed Tent Unit of Issue is DAY (DY).

2.9 20-FT TRAILER OFFICE (ELIN XXXX)

2.9.1 Contractor shall provide a 20-FT Trailer Office to include two (2) desks, 10 chairs, air conditioning, and 20 110-220VAC US outlets with surge protection. Contractor shall provide a power source capable of supplying power to lighting and 20 110-220VAC US outlets with surge protection to power miscellaneous portable electrical equipment (radios, stereos, hand tools, etc.). 20 110-220VAC US outlets with surge protection shall have surge protection. Power strips/boards may be used. Power strips/boards shall have surge protection. The power source shall emit sound levels of less than 84 decibels.

2.9.2 ELIN XXXX 20-FT Trailer Office Unit of Issue is DAY (DY).

2.10 ICE COOLER (ELIN XXXX)

2.10.1 Contractor shall provide one (1) Ice Cooler with a capacity of least 70 liters. Ice cooler shall have lid and locking mechanism.

2.10.2 ELIN XXXX Ice Cooler Unit of Issue is DAY (DY).

2.11 MIST FANS (PORTABLE COOLING DEVICES) (ELIN XXXX)

2.11.1 Contractor shall provide one (1) Mist fan to include tank, water, and power source to operate the Mist Fan. Unit Price shall include transportation, set-up, dismantling and labor, necessary consumables to include fuel to operate the power source, repositioning, mobilization, and demobilization.

2.11.2 Mist Fans shall be rated 600 cubic feet per minute (CFM).

2.11.3 ELIN XXXX Mist Fans (Portable Cooling Devices) Unit of Issue is DAY (DY).

2.12 PORTABLE SANITARY FACILITIES (ELIN XXXX)

2.12.1 Contractor shall provide one (1) portable sanitary facility, which includes one (1) western style toilet and one (1) urinal to include toilet paper and hand sanitizer. Contractor shall ensure facilities are continuously monitored to ensure portable sanitary facilities are clean, sanitary, and toilet paper is available. Contractor shall check portable sanitary facilities at least every three (3) hours to ensure cleanliness and re-stock supplies (i.e. toilet paper). Evidence such as keeping and updating an inspection checklist inside the portable sanitary facilities units is required. Unit Price shall include cleaning and waste removal to ensure clean and sanitary conditions. Unit Price shall include toilet paper and hand sanitizer. Contractor shall dispose of waste in accordance with local government’s laws.

2.12.2 Contractor shall provide American Disabilities Act (ADA) compliant portable sanitary facilities when requested on the RTOP.

2.12.3 ELIN XXXX Portable Sanitary Facilities Unit of Issue is DAY (DY).

2.13 PORTABLE HAND WASH STATION (ELIN XXXX)

2.13.1 Contractor shall provide one (1) hand wash station. Portable hand wash station shall include faucet body, necessary plumbing, potable water, and hand paper dispenser. Unit Price shall include sanitizing hand liquid soap and potable water to operate the hand wash station. Contractor shall ensure facilities are continuously monitored to ensure portable hand wash stations are clean, sanitary, and liquid soap is available. Unit Price shall include hand paper and hand paper dispenser to allow personnel to dry hands.

2.13.2 ELIN XXXX Portable Hand Wash Station Unit of Issue is DAY (DY).

2.14 PORTABLE ELECTRIC GENERATORS (ELIN XXXX - XXXX)

2.14.1 Contractor shall provide portable, gasoline powered, electric generator capable of supplying power to portable lighting and miscellaneous portable electrical equipment (radios, stereos, hand tools, etc.). Generators shall include a circuit breaker protector including four (4) 50-FT extension cords with enough power boards to support 20 110-220VAC US outlets with surge protection. Contractor shall ensure portable electric generator is available for inspections and testing prior to arrival of requesting activity.

2.14.2 Contractor shall provide uninterrupted power. Contractor shall ensure generators are delivered with all necessary parts in accordance with the operator’s manual and must have a full tank of fuel. The U.S. Government shall not be responsible for returning generators with a full tank or pay to refuel the equipment at the end of the Period of Performance. Contractor shall be responsible to refueling generators. The contractor shall provide 24 hour repair and /or replacement services for the equipment.

2.14.3 The following ELINs are included:

ELIN XXXX 5 KILOWATT GENERATOR

ELIN XXXX 12.5 KILOWATT GENERATOR

ELIN XXXX 50 KILOWATT GENERATOR

ELIN XXXX 100 KILOWATT GENERATOR

2.14.4 ELIN XXXX - XXXX Portable Electric Generators Unit of Issue is DAY (DY).

2.15 EVENT LOT (INCLUDES TENTS, TABLES, CHAIRS, LIGHTING, AND CEILING

FANS) (ELIN XXXX - XXXX)

2.15.1 Contractor shall provide open/closed tents with accessory equipment. The tent package shall include an open/closed tent, lighting, trash cans, ceiling fans, tables and chairs, electrical hookups, cable for power supply, and a generator with fuel already filled to maximum capacity that emits sound levels of less than 84 decibels. Contractor shall provide daily cleaning of the tent and a three-meter perimeter around the tent. Cleaning includes removing trash, sweeping, and mopping up spills. Contractor shall remove all provided equipment upon completion of services.

2.15.2 Event Lot shall include:

1. 20 chairs at least 250 lbs. capacity;

2. 10 long tables (at least 6 feet in length and 2 feet in width);

3. Three (3) Mist Fans or Space Heaters;

4. 20 110-220VAC US outlets with surge protection;

5. One (1) Portable Sanitary Facility;

6. One (1) Portable Hand Washing Station;

7. Transportation, repositioning, mobilization, demobilization, stand-by fee and labor required to perform the above.

2.15.3 The following ELINs are included:

ELIN XXXX EVENT LOT (OPEN TENTS) - MINIMUM 20 PERSON CAPACITY

ELIN XXXX EVENT LOT (OPEN TENTS) - MINIMUM 50 PERSON CAPACITY

ELIN XXXX EVENT LOT (OPEN TENTS) - MINIMUM 100 PERSON CAPACITY

ELIN XXXX EVENT LOT (OPEN TENTS) - MINIMUM 150 PERSON CAPACITY

ELIN XXXX EVENT LOT (OPEN TENTS) - MINIMUM 300 PERSON CAPACITY

ELIN XXXX EVENT LOT (CLOSED TENTS) - MINIMUM 20 PERSON CAPACITY

ELIN XXXX EVENT LOT (CLOSED TENTS) - MINIMUM 50 PERSON CAPACITY

ELIN XXXX EVENT LOT (CLOSED TENTS) - MINIMUM 100 PERSON CAPACITY

ELIN XXXX EVENT LOT (CLOSED TENTS) - MINIMUM 150 PERSON CAPACITY

ELIN XXXX EVENT LOT (CLOSED TENTS) - MINIMUM 300 PERSON CAPACITY

2.21.4 ELIN XXXX - XXXX Event Lot Unit of Issue is DAY (DY).

2.16 PORTABLE HEATERS (ELIN XXXX-XXXX)

2.16.1 Contractor shall provide one (1) portable heater to include tank(s), power supply and/or fuel to operate the portable heater. Portable heater shall be able to provide heat 200 square foot area. Portable heater shall have control valve adjust temperature to desired level. Portable heater shall have automatic emergency shut-off.

2.16.2 The following ELINs are included:

ELIN XXXX INDOOR PORTABLE HEATER. At least 6000 British thermal unit (BTU) ELIN XXXX OUTDOOR PORTABLE HEATER. At least 12000 BTU

2.16.3 ELIN XXXX Portable Heaters Unit of Issue is DAY (DY).

2.17 CONCRETE MIXER (ELIN XXXX)

2.17.1 Contractor shall provide concrete mixer with mixing drum capacity of 6-7 cubic foot (when required, the specific size will be specified with each deliver order/task order), meaning it can mix stated volume of concrete at one time for US Government personnel to operate. Contractor shall be responsible for cleaning concrete mixer.

2.17.2 ELIN XXXX Concrete Mixer Unit of Issue is DAY (DY).

2.18 PRATIQUE AGRICULTURAL (ELIN XXXX)

2.18.1 Contractor shall provide for quarantine services to include equipment and personnel inspections as required by local authorities.

2.18.2 ELIN XXXX Pratique Agricultural Unit of Issue is DAY (DY).

2.19 CUSTOMS DUTY/CLEARANCE - BILL OF LADING (ELIN XXXX)

2.19.1 Contractor shall receive the package for the requesting activity and clear it through customs when the requesting activity has arrived and berthed or anchored in the respective port. Any damages shall be reported to the requesting activity prior to acceptance.

2.19.2 Each Bill of Lading shall be separated.

2.19.3 ELIN XXXX Customs Duty/Clearance – Bill of Lading Unit of Issue is EACH (EA).

2.20 INTERPRETER SERVICES (ELIN XXXX)

2.20.1 Contractor shall provide interpreter services when ordered. Interpreters shall have sufficient proficiency in both written and spoken English and the predominant local language and have the ability to carry on a casual, fluent conversation in both languages. For specific engagements (as outlined at the task order level), the interpreter shall have adequate proficiency to translate technical aspects of the assigned engagement. The minimum amount of hours for interpreter services shall be four (4) hours. If the unit of issue is DAY (DY), the contractor shall provide interpreter services for 24 hours per day. If any interpreter is required to be replaced, the Contractor shall provide a replacement interpreter within 24 hours. If an interpreter is deemed unacceptable by the Government, the contractor shall replace the unacceptable interpreter within 24-hours of Government’s notice at no additional cost to the Government.

The Government will provide a start time and location for each interpreter the day prior to service start date. The contractor shall not deviate from the start time and location unless approved by a Government representative or DKO.

2.20.2 The contractor shall provide meals and lodging for all interpreters. The contractor shall ensure interpreters are granted access to all places of performance in support of this requirement. The contractor shall ensure interpreters have transportation to all events if required. The contractor shall ensure interpreters are prepared to perform work on time at each event. Contractor shall ensure interpreters working hours and schedule complies with all local laws.

2.20.3 The contractor shall provide a list of interpreters to the Government Representative and DKO at least two (2) days before the assignment for each engagement. The list shall contain names, phone numbers, emails, and specific qualifications of the approved interpreters. The Government reserves the right to provide a required template for the contractor to provide the list of interpreters per engagement.

2.20.4 ELIN XXXX Interpreter Services units of issues are HOUR (HR) or DAY (DY).

2.21 LOGISTICS SUPPORT TO GOVERNMENT TEAMS (ELIN XXXX)

2.21.1 Contractor shall provide logistics support during the requesting activity’s visits to a place of performance. Government teams may conduct surveys in a variety of ports in the area of responsibility.

Government may require the assistance of contractor in the ports to be surveyed. Contractor assistance shall include providing logistical support as requested by the Government, coordinating access and interviews with local officials and support Contractor, and coordinating necessary translation services for the team,.

2.21.2 Logistics Management and Integration (ELIN XX01-XX02) shall not be priced in conjunction with Logistics Support to Government Teams (ELIN XX93).

2.21.3 ELIN XXXX Logistics Support to Support Teams Unit of Issue is LOT (LT).

2.22 FILLED SANDBAGS (ELIN XXXX)

2.22.1 Contractor shall provide five 15 pound filled sandbags.

2.22.2 Price is to be per sandbag per DAY (DY).

2.22.3 ELIN XXXX Sandbags Unit of Issue is DAY (DY).

2.23 CONSTRUCTION SITE FENCING (ELIN XXXX)

2.23.1 Contractor shall provide construction site fencing that is orange in color and no less than 4 feet high. Contractor shall include all necessary equipment to ensure construction site fencing is able to free stand. Construction site fencing shall be provided in accordance with ASTM F3342-19 or equivalent local standard.

2.23.2 ELIN XXXX Construction Site Fencing Unit of Issue is Meter (MR)

2.24 PORTABLE AIR CONDITIONER UNIT (ELIN XXXX)

2.24.1 Contractor shall provide one (1) portable air conditioner unit to power supply and/or fuel to operate. Portable air conditioner shall be able to provide cooling 200 square foot area. Portable air conditioner shall have control valve adjust temperature to desired level. Portable conditioner shall have automatic emergency shut-off.

2.24.2 ELIN XXXX Air Conditioner Unit of Issue is DAY (DY).

2.25 TUG/TOW BOATS (ELIN XXXX)

2.25.1 Vessel with sufficient bollard pull capable of towing 300-1200 sq. /m, and or weighing up to 200 tons of varying configurations.

2.25.2 Contractor shall provide rental of Tug boats, tow boats and or tender vessels, with or without operators as determined by the customer.

2.25.3 ELIN XXXX Tug/Tow Boats Unit of Issue is DAY (DY).

2.26 TUG SERVICES (ELIN XXXX)

2.26.1 Contractor shall arrange Tug Services as requested in RTOP. Contractor shall coordinate with the Tug Services as necessary to ensure that the services are available as required and at the times requested.

Tugs shall be properly fendered.

2.26.2 ELIN XXXX Tug Services Unit of Issue is JOB (JB)

2.27 BARGE (ELIN XXXX)

2.27.1 The Contractor shall furnish barges as specified at the RTOP level and shall furnish all labor, materials, equipment, transportation, supervision and incidental or related work and services necessary to provide a barge (also referred to as a floating pier, a jetty or platform pontoon or dock).

2.27.2 The Contractor may be required to use barge to transport US Government property from one location to another. Additional information shall be provided at the RTOP level.

2.27.3 ELIN XXXX Unit of Issue will be determined on the RTOP solicitation.

2.28 WATER FERRY/TAXI SERVICES (ELIN XXXX – XXXX)

2.28.1 The Contractor shall provide water taxis to transfer personnel from one location to another, pursuant to local procedures and ordinances. Location(s) will be provided at the RTOP level. At the commencement of service, the contractor will be required to advise the requesting activity of scheduled breaks and any changes to the taxi service schedule. Except during inclement weather, water taxi service shall be continuous.

2.28.2 The hourly rate shall include a qualified driver and an operator, any other helpers or crew members required by local authorities, all insurance, fuel, holiday surcharges, overtime and other operating expenses. Service begins when the first water taxi is alongside the designated pick-up point and ends when the last passenger disembarks from the water taxi at the designated drop-off point as ordered by the requesting activity. However, when required to arrive early for inspection as a force protection measure, service begins at time of inspection.

2.28.3 If contractor cannot provide the size of water taxi ordered, contractor shall provide a larger size water taxi, or a combination of water taxis, that in total capacity equates to the size of the water taxi ordered at no additional cost to the government

2.28.4 The contractor shall ensure that all water taxis are fully licensed, registered, and insured, including adequate liability insurance, in accordance with local laws and regulations. The contractor shall ensure that the water taxi is in sound mechanical condition and meets all safety standards required by local laws and regulations to preclude breakdown and injury. Maintenance, safety, and other periodical inspections shall be performed as required by the applicable local laws and regulations. Apart from compliance with local laws and regulations, contractor shall meet all additional requirements as set forth in the RTOP.

2.28.5 The following ELINs are included:

ELIN XXXX: WATER TAXI, MINIMUM 10 PERSON

ELIN XXXX: WATER TAXI MINIMUM 36 PERSON

ELIN XXXX: WATER TAXI MINIMUM 75 PERSON

ELIN XXXX: WATER TAXI MINIMUM 125 PERSON

ELIN XXXX: WATER TAXI MINIMUM 250 PERSON

ELIN XXXX: WATER TAXI MINIMUM 500 PERSON

2.28.6 ELIN XXXX – XXXX Water Ferry/Taxi Services Unit of Issue is HOUR (HR).

2.29 MOBILE CRANE SERVICES FOR BARGE LIFT (ELIN XXXX)

2.29.1 Contractor shall provide mobile crane services (shore and or floating cranes) for loading and offloading of barge vessels 300-1200 sq. /m with operator(s) and safety observer(s).

2.29.2 ELIN XXXX Mobile Crane Services for Barge Lift Unit of Issue is DAY (DY).

2.30 BARGES AND LIGHTERS CARGO PURPOSES

2.30.1 Contractor shall provide 300-1200 sq. /m Barge vessel variations including but not limited to:

Front Loading Ramp, Beach Landing Capability, Ship to Shore, Shore to Shore, Flat Bottom, etc.

2.30.2 The contractor shall provide rental of Car Floats and other Transportation Barges, Depot Barges;

Scows, with or without operators as determined on RTOP solicitation and task order.

2.30.3 ELIN XXXX Barges and Lighters Cargo Purposes Unit of Issue is DAY (DY).

2.31 OTHER LOGISTICS MANAGEMENT AND INTEGRATION SERVICES (ELIN XXA1-

XXA9)

2.31.1 Other Logistics Management and Integration Services may be other additional services not established in the expressed in the named ELIN(s). These services and shall be identified on the RTOP.

The identified services on the RTOP shall either cite the applicable paragraph in the PWS or provide a separate PWS.

2.31.2 ELIN XXA1-XXA9 Other Logistics Management and Integration Services Unit of Issue shall be determined on RTOP.

SECTION 3 – MATERIAL HANDLING EQUIPMENT, CRANE SERVICES, AND

CONSTRUCTION EQUIPMENT (SUBCLIN 0001AB)

3.1 FORKLIFT AND K LOADER SERVICES (ELIN XXXX – XXXX)

3.1.1 Contractor shall provide forklift services with operator(s). Upon request, contractor shall provide information concerning forklift/lifting capacity to the requesting activity. The forklifts provided shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). The forklifts shall be suitable for their intended use and shall be operated with due care and within all operating safety limits.

3.1.2 The following ELINs are included:

ELIN XXXX: FORKLIFT SERVICES – UP TO 4 TONS

ELIN XXXX: FORKLIFT SERVICES WITH 8 FOOT FORKS– 5 TO 8 TONS

ELIN XXXX: FORKLIFT SERVICES WITH 8 FOOT FORKS - 9 TO 20 TONS

ELIN XXXX: ALL TERRAIN FORKLIFT SERVICES WITH 8 FOOT FORKS – UP TO 4

TONS

ELIN XXXX: ALL TERRAIN FORKLIFT SERVICES WITH 8 FOOT FORKS – 5 TO 8 TONS

ELIN XXXX: ALL TERRAIN FORKLIFT SERVICES – 9 TO 20 TONS

ELIN XXXX: K LOADER - 10-20 TONS

3.1.3 ELIN XXXX – XXXX Forklift Services Unit of Issue is DAY (DY).

3.2 MOBILE CRANE SERVICES (ELIN XXXX - XXXX)

3.2.1 Contractor shall provide mobile crane services (shore and floating cranes) with operator(s) and safety observer(s). The cranes provided shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). The cranes shall be suitable for their intended use and shall be operated with due care and within all operating safety limits.

3.2.2 The following ELINs are included:

ELIN XXXX: MOBILE CRANE SERVICES - UP TO 15 TONS

ELIN XXXX: MOBILE CRANE SERVICES - 16 TO 40 TONS

ELIN XXXX: MOBILE CRANE SERVICES - 41 TO 75 TONS

ELIN XXXX: MOBILE CRANE SERVICES - 76 TO 100 TONS

ELIN XXXX: MOBILE CRANE SERVICES - 101 TO 120 TONS

ELIN XXXX: MOBILE CRANE SERVICES - 121 TO 160 TONS

ELIN XXXX: MOBILE CRANE SERVICES - 161 TO 200 TONS

3.2.3 The contractor shall ensure the requested crane capacity takes into account location of requesting activity, boom length, and all other variables. The contractor’ failure to account for all known variables shall not warrant an equitable adjustment.

3.2.4 The Mobile Crane Services shall be suitable for their intended use, to include but not limited to all necessary equipment, (such as crane pallet bars/slings, and platform etc.), and shall be operated with due care and within all operating safety limits.

3.2.5 ELIN XXXX - XXXX Mobile Crane Services Unit of Issue is DAY (DY).

3.3 CRANE PALLET BARS/SLINGS AND CRANE PLATFORM (ELIN XXXX - XXXX)

3.3.1 Contractor shall provide crane pallet bars/slings and platform capable of handling multiple pallet lifts at a time. Pallet bars/slings and all other rigging equipment shall comply with the appropriate host country safety standards; operational limitations and any applicable restrictions shall be posted on the equipment. The pallet bars/slings and platform provided shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). Compatibility requirements and accessories will be specified at the RTOP level.

3.3.2 The following ELINs are included:

ELIN XXXX: CRANE PALLET BARS/SLINGS SERVICES - UP TO 15 TONS

ELIN XXXX: CRANE PALLET BARS/SLINGS SERVICES - 16 TO 40 TONS

ELIN XXXX: CRANE PALLET BARS/SLINGS SERVICES - 41 TO 75 TONS

ELIN XXXX: CRANE PALLET BARS/SLINGS SERVICES - 76 TO 100 TONS

ELIN XXXX: CRANE PLATFORM

3.3.3 ELIN XXXX - XXXX Crane Pallet Bars/Slings and Crane Platform Unit of Issue is DAY (DY).

3.4 MANLIFT SERVICES WITHOUT OPERATOR (ELIN XXXX – XXXX)

3.4.1 Contractor shall provide a manlift without operator. The contractor shall provide manlift for the conveyance of persons which consists of platforms or brackets mounted on, or attached to, an endless belt, cable, chain or similar method of suspension; such belt, cable, or chain operating in a substantially vertical direction and being supported by and driven through pulleys, sheaves, or sprockets at the top and bottom. Contractor shall perform daily maintenance checks on the manlift prior to 0730 each morning.

Contractor shall conduct training on safety and operating procedures for requesting activity personnel.

The manlift shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). Contractor shall maintain documentation of requesting activity personnel acknowledgement of the training. Weight capacity of least 1000 lbs. Government may change weight capacity at the RTOP solicitation and task order.

3.4.2 The following ELINs are included:

ELIN XXXX: MANLIFT SERVICES WITHOUT OPERATOR – UP TO 60 FT REACH

ELIN XXXX: MANLIFT SERVICES WITHOUT OPERATOR – UP TO 90 FT REACH

ELIN XXXX: MANLIFT SERVICES WITHOUT OPERATOR – UP TO 120 FT REACH

ELIN XXXX: MANLIFT SERVICES WITHOUT OPERATOR – UP TO 135 FT REACH

3.4.3 ELIN XXXX - XXXX Manlift Services without Operator Unit of Issue is DAY (DY).

3.5 MANLIFT OPERATOR (ELIN XXXX)

3.5.1 If the requesting activity orders the manlift operator or if the operator is required by local laws and regulations (it shall be noted in response to the RTOP), the price for the operator is per hour for a minimum of four (4) hours of continuous service. Operator shall have all local licenses and training required to operate Manlift.

3.5.2 ELIN XXXX Manlift Operator Unit of Issue is HOUR (HR).

3.6 SCISSOR LIFTS (ELIN XXXX)

3.6.1 Contractor shall provide scissor lifts also known as a sky lift, fully fueled, that have been properly maintained and serviced. If a scissor lift does not meet the requirements of this contract, the Government shall have the right to reject the scissor lift for performance of services. Contractor shall ensure that each scissor lift is jointly inspected before and after use by contractor and an authorized representative of the Government. The Government shall not consider any claim for damage to a scissor lift, which has not been inspected. If the scissor lift is not operable when required under this contract, contractor shall provide, at no additional expense, a replacement scissor lift within three (3) hours that complies in all respects with this contract. Contractor shall replenish the fuel and perform daily maintenance checks on the scissor lift prior to 0730 AM each morning. Contractor shall conduct training on safety and operating procedures for requesting activity personnel. Contractor shall maintain documentation of requesting activity personnel acknowledgement of the training. The scissor lift shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). Minimum height is 20 feet. Weight capacity of least 1000 lbs.

Government may change weight capacity at the RTOP solicitation and task order.

3.6.2 ELIN XXXX Scissor Lifts Unit of Issue is DAY (DY).

3.7 MANBASKET (ELIN XXXX)

3.7.1 Contractor shall provide a manbasket, also known as a crane basket that has been properly maintained, serviced, and certified. The manbasket shall be used with either a crane or forklift and have a self-closing swing door with a safety chain to secure to the forklift carriage. If a manbasket does not meet the requirements of this contract, the Government shall have the right to reject the manbasket for performance of services. Contractor shall ensure that each manbasket is jointly inspected before and after use by contractor and an authorized representative of the Government. The Government shall not consider any claim for damage to a manbasket which has not been inspected. If the manbasket is not operable when required under this contract, contractor shall provide, at no additional expense, a replacement man lift within three (3) hours that complies in all respects with this contract shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). Weight capacity of least 1000 lbs. Government may change weight capacity at the RTOP solicitation and task order.

3.7.2 ELIN XXXX Manbasket Unit of Issue is DAY (DY).

3.8 CONSTRUCTION EQUIPMENT SERVICES WITH OPERATOR (ELIN XXXX – XXXX)

3.8.1 Contractor shall provide construction equipment services with operator(s). The construction equipment provided shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). The construction equipment shall be suitable for their intended use and shall be operated with due care and within all operating safety limits.

3.8.2 The following ELINs are included:

ELIN XXXX: D8 BULLDOZER

ELIN XXXX: D7 BULLDOZER

ELIN XXXX: D9 BULLDOZER

ELIN XXXX: SKID STEER WITH BUCKET AND AUGER ATTACHMENT

ELIN XXXX: FRONT END LOADER WITH

ELIN XXXX: EXCAVATOR

ELIN XXXX: FUEL TRUCK

ELIN XXXX: WATER DISTRIBUTOR TRUCK

ELIN XXXX: SCRAPER 22 CYD

ELIN XXXX: GRADER

ELIN XXXX: ARC WELDER TRAILER

ELIN XXXX: DUMP TRUCK 15 TON

ELIN XXXX: CONCRETE SAW FOR SKID STEER

ELIN XXXX: VIBRATORY ROLLER 4 TON

ELIN XXXX: VIBRATORY ROLLER 10 TON

ELIN XXXX: VIBRATORY ROLLER 9 WHEEL

ELIN XXXX: MILLING MACHINE

ELIN XXXX: ASPHALT PAVER

ELIN XXXX: EMULSION DISTRIBUTOR TRUCK

ELIN XXXX: SAW RADIAL WOOD TRAILER

3.8.3 ELIN XXXX – XXXX Construction Equipment Services Unit of Issue is DAY (DY).

3.9 CONSTRUCTION EQUIPMENT SERVICES WITHOUT OPERATOR (ELIN XXXX –

XXXX)

3.9.1 Contractor shall provide construction equipment services without operator(s). The construction equipment provided shall be in sound mechanical condition and shall meet all applicable safety laws and regulations (DOD regulations and country laws where services are being provided). The construction equipment shall be suitable for their intended use and shall be operated with due care and within all operating safety limits.

3.9.2 The following ELINs are included:

ELIN XXXX: D8 BULLDOZER

ELIN XXXX: D7 BULLDOZER

ELIN XXXX:…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .