This Performance Work Statement (PWS) details a hazard fuel reduction and invasive species control project for the US Fish and Wildlife Service's Savannah Coastal Refuges Complex in Jasper County, South Carolina. The project involves a 400-acre aerial herbicide treatment on the Savannah National Wildlife Refuge (NWR) scheduled for August 1 through September 30, 2025, with the primary objectives of reducing fuel loads by 95%, replacing 95% of non-native invasive vegetation, and improving wildlife habitat conditions.

The project will use approved herbicides like Clearcast (imazamox) and RoundUp Custom (glyphosate), applied by helicopter with strict environmental and safety protocols. Contractors must be fully licensed, bonded, and insured in South Carolina, follow best management practices, and pay close attention to refuge visitor safety. The treatment will target specific invasive species including cattails, cutgrass, water hyacinth, alligator weed, and Chinese tallow trees, while explicitly excluding desirable live oak and native hardwood areas. Bids will be evaluated on a per-acre treatment price, with a not-to-exceed total project funding amount.

View the file

Other files for this federal contract opportunity

Other files attached to Herbicide Application Savannah NWR, SC, newest first.
File Type Posted
Sol_140FS325Q0081_Amd_0002.pdf PDF
Sol_140FS325Q0081_Amd_0001.pdf PDF
Attachment_2-Quote_Schedule.docx DOCX document
Sol_140FS325Q0081.pdf PDF
Attachment_3-_SCA_Wage_Determination.pdf PDF
Attachment_4-_Past_Performance_Data_Document.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

US Fish and Wildlife Service Savannah Coastal Refuges Complex

694 Beech Hill Lane Hardeeville, SC 29927

Scope of Work and Performance Work Statement

Hazard Fuel Reduction and Invasive Species Control Project (2025)

Primary POC: Shaw Davis, Deputy Project Leader shaw_davis@fws.gov

843-784-9911 (office) 912-312-5227 (mobile)

Alternate POC: Wayne Harris, Wildlife Biologist billy_harris@fws.gov 912-660-0779 (mobile)

Chuck Hayes, Supervisory Wildlife Biologist chuck_hayes@fws.gov 912-210-7366 (mobile)

Project summary:

The project is located on Savannah National Wildlife Refuge (NWR) (Jasper County, SC) (Map 1). Completion of this project will result in everlasting improvements in hazard fuel reduction, invasive species control, and habitat management.

Summary of herbicide treatment (20245

- 400 acre treatment area of aerial herbicide application using helicopter on Savannah

NWR

Scope of Work

Overview:

Completion of this herbicide application should reduce overall fuel loads by 95%, replace 95% of all non-native invasive vegetation with desirable vegetation, and greatly improve the control and efficacy of future prescribed burns that minimize wildfire hazard and smoke related concerns in a wildland-urban interface. Once completed, the resulting vegetation structure should be such mailto:shaw_davis@fws.gov mailto:billy_harris@fws.gov mailto:chuck_hayes@fws.gov to reduce future wildfire hazards, create optimum wildlife habitat conditions, and improve refuge visitor wildlife viewing opportunities.

Stand specific treatment (2025):

The treatment will involve the application of suitable herbicides, primarily Clearcast or other similar product with imazamox as an active ingredient and RoundUp Custom or other similar product with glyphosate as an active ingredient, applied aerially to ensure complete coverage of undesirable fuel loads on the treatment area. Herbicide application contractors will be fully licensed, bonded, and insured in South Carolina.

• Use of soil active herbicides is strictly prohibited.

• Herbicides with glyphosate and imazamox as active ingredients are approved for use.

• All areas of desirable live oak and other native hardwood dominated hammocks scattered around the project site are to be excluded from all operations.

• All cattail, cutgrass, water hyacinth, alligator weed, and Chinese tallow tree located with the treatment area will be herbicide treated.

• Contractor is responsible for transport of all equipment, herbicides, adjuvants, and water to and from the project site.

• Contractor will ensure that all applicators have labeled Personal Protective

Equipment.

• Refuge Biologists will provide a shapefile defining the boundaries of the project.

• All contracted personnel will pay close attention to avoid harm to curious Refuge visitors that may wander into the area of operations.

• Operations will be suspended if weather conditions are such to cause damage to access roads and trails and/or reduce herbicide efficacy.

• Refuge Biologists and Refuge Manager have the authority to halt operations anytime for unfavorable weather, damage to non-target vegetation, or non-cooperative operators.

• Contractor shall be responsible for repairing any damage done to gates, fences, access roads, signs, structures, and any other infrastructure.

• Refuge Biologists and Refuge Managers shall monitor all operations with frequent, on-site inspections.

• No littering will be tolerated and all garbage, including empty herbicide and adjuvant containers, food waste, and other materials must be removed daily.

• All bids should be based on treatment price per acre, knowing that exact acreages of various treatments will differ somewhat within the project area.

• All operations should follow South Carolina’s Best Management Practices for Forestry as minimum standards for environmental protection (best-management-practices-manual.pdf (scfc.gov)).

• All bids should be based on treatment price per acre, as there will be a not to exceed amount of funding for the total project.

https://www.scfc.gov/wp-content/uploads/2021/03/best-management-practices-manual.pdf https://www.scfc.gov/wp-content/uploads/2021/03/best-management-practices-manual.pdf

Period of Performance:

All herbicide applications should be completed during the period of August 1, 2025 through September 30, 2025. This period may be extended due to unforeseen circumstances related to weather and other variables, as approved by the Refuge Managers or Wildlife Biologists and contracting officer.