Attachment 1 Performance Work Statement.pdf
PDF 154 KB Posted
- Solicitation number
- 12805B25Q0028
About this file
This Performance Work Statement outlines requirements for replacing a chiller condenser and heat exchanger system at a facility in Miles City, Montana. The project requires replacing an original Trane R-22 refrigerant chiller system that has been experiencing regular failures, making replacement more cost-effective than continued repairs.
The technical requirements specify installation of a new 50-ton unit charged with R410A refrigerant, including replacement of the heat exchanger, refrigerant piping, TX valves, solenoids and solenoid coils, filter driers and filter cores. The new system must integrate with the existing Metasys automation system. All work must be performed by certified technicians and include proper disposal of old components. The contractor will be responsible for travel to the equipment location, with no government-furnished equipment or materials provided. No specific deliverables schedule is outlined, though the related solicitation indicates all work must be completed by December 31, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1 RFQ 12805B25Q0028.pdf | ||
| 12805B25Q0028 SAP Sol Services.pdf | ||
| Attachment 2 Wage Determination MT 2015-5395.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Project: Replace Chiller Condenser and Heat Exchanger
GENERAL INFORMATION
1.0 Scope of Work: Replace Chiller Condenser and Heat Exchanger
2.0 Background: The current systems is original to the building and has been failing on a regular basis. Due to the cost of continued repairs to the current system replacement is required.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
Replacement of Trane R-22 refrigerant chiller as well as heat exchange and refrigerant piping. Proper disposal and removal of all components associated.
These updates must be integrated with the current Metasys automation system. The vendor will install new chiller, heat exchanger, refrigerant piping. To also include new TX valves, solenoids and solenoid coils, filter driers and filter cores. The new system must be a 50 ton unit charged with R410A refrigerant and be fully operational. Final objective is a fully functioning system with complete replacement of components.
All repair and replacement to the systems must be done by a certified technician.
4.0 Government Furnished: none
5.0 Deliverables / Schedule: none
6.0 Travel: Service technician will travel to the location of the equipment.
7.0 Contractor’s Key Personnel: none
8.0 Security Requirements: none
9.0 Data Rights: none
10.0 Section 508 – Electronic and Information Technology Standards: none
| CONTRACTOR REQUIREMENTS |
| 3.0 Technical Requirements/Tasks: |
| 6.0 Travel: Service technician will travel to the location of the equipment. |