Attachment 1 Past Performance Questionnaire.pdf
PDF 123 KB Posted
- Solicitation number
- SSBR202500001
- Issued by
- Not on record
About this file
This is a Past Performance Questionnaire template that will be used to evaluate contractor performance for solicitation SSBR202500001 for the U.S. Capitol Police's Vehicle Barrier Maintenance Support Services. The questionnaire includes rating criteria across four performance categories: Quality of Product/Service, Timeliness of Performance, Price/Cost Control, and Customer Satisfaction.
The rating scale consists of five levels: Exceptional, Very Good, Satisfactory, Marginal, and Unsatisfactory, with detailed definitions provided for each rating level. To justify an Exceptional rating, evaluators must identify multiple significant beneficial events, while a Very Good rating requires identification of at least one significant beneficial event. The document includes specific guidance for justifying each rating level and emphasizes that contractors should not be rated below Satisfactory solely for not exceeding contract requirements. Any Marginal or Unsatisfactory ratings must be supported by documentation of deficiencies through management tools like quality or safety reports.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - SSBR202500001 - RFP QA Dec 13 2024.pdf | ||
| QSU SSBR202500001 Revised Sections L and M.pdf | ||
| QSU SSBR202500001 - publish.pdf | ||
| Pricing Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference:
Reference POC:
Attachment 1
QSU SSBR202500001
Past Performance Check:
Offeror:
Date:
CO:
Signature:
Project:
Period of Performance – Contract Number –
Ratings: Exceptional; Very Good; Satisfactory; Marginal; Unsatisfactory; and N/A
The following responses are provided:
1. Quality of Product/Service Rating –
2. Timeliness of Performance Rating –
3. Price/Cost Control Rating –
4. Customer Satisfaction Rating –
5. Additional Comments
Attachment 1
QSU SSBR202500001
Exceptional Performance meets contractual requirements and exceeds many to the Governments benefit.
The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good Performance meets contractual requirements and exceeds some to the Government's benefit.
The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance does not meet most contractual requirements. Recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
N.A. Not applicable or do not know.
NOTE:
To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.
To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.
To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).
Attachment 3
QSU SSBR202500001
To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).
N/A (not applicable) should be used if the ratings are not going to be applied to a particular area for evaluation.
File details come from the government source that posted it. Updated .