Attachment 1 List of Maintained Equipment.doc
DOC document 64 KB Posted
- Attached to
- Fire Alarm System Maintenance Federal contract opportunity
- Solicitation number
- 60RRBH21R0013
- Issued by
- Railroad Retirement Board
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 60RRBH21R0013 Amendment 0001 Q_A signed.pdf | ||
| 60RRBH21TR0013 Fire Alarm System Maintenance FINAL.pdf | ||
| Attachment 2 Past Performance Questionnaire.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. 60RRBH21R0013
FIRE ALARM MAINTENANCE SERVICES
ATTACHMENT 1
List of Maintained Equipment
| Equipment Category |
| Equipment SubCategory |
| Equipment |
| Qty |
| Serial Number |
| Location |
| Mfg/Model |
| Control & Annunciation |
| Control & Annunciation |
| EST Control Panels |
| 6 |
EST 3
R & R Labor & Material (as needed) , Test and Inspection (Annually)
| Control & Annunciation |
| Control & Annunciation |
| Remote Control/Annunciator Panel |
| 2 |
Siemens
R & R Labor & Material (as needed), Test and Inspection (Annually)
| Detectors |
| Detectors |
| Addressable Heat Detector |
| 0 |
Siemens
R & R Labor & Material (as needed), Test and Inspection (Annually)
| Detectors |
| Detectors |
| Addressable Smoke Detector |
| 190 |
Siemens
R & R Labor & Material (as needed), Test and Inspection (Annually)
| Detectors |
| Detectors |
| Duct Smoke Detectors |
| 21 |
Siemens
R & R Labor & Material (as needed), Test and Inspection (Annually)
| Field Peripherals |
| Field Peripherals |
| Addressable Pull Station |
| 54 |
Siemens
R & R Labor & Material (as needed) , Test and Inspection (Annually)
| Field Peripherals |
| Field Peripherals |
| Phone Jack or Warden Stations |
| 58 |
Siemens
R & R Labor & Material (as needed), Test and Inspection (Annually)
| Field Peripherals |
| Field Peripherals |
| Speakers or Horns with Strobes |
| 597 |
Siemens
R & R Labor & Material (as needed), Test and Inspection (Annually)
| Field Peripherals |
| Field Peripherals |
| Tamper Switch Monitor Module |
| 59 |
Siemens
R & R Labor & Material (as needed), Test and Inspection (semi-annually)
| Field Peripherals |
| Field Peripherals |
| Waterflow Switch Monitor Module |
| 43 |
Siemens
R & R Labor & Material (as needed), Test and Inspection (semi-annually)
| Field Peripherals |
| Field Peripherals |
| Misc. Supervisory Inputs. Example- (Fire Pump Room Power Loss) |
| 10 |
Siemens
R & R Labor & Material (as needed), Test and Inspection (Annually)
| Field Peripherals |
| Field Peripherals |
| Kitchen Hood System Monitor Modules |
| 3 |
Siemens
R & R Labor & Material (as needed), Test and Inspection (Annually)
R&R –Repair and Replacement
Fire System originally installed in November of 2001