LEAD AND ASBESTOS REMEDIATION ON USCG CUTTERS AND
BARGES
SPECIFICATION
Developed By: James Luck
(Rev-0, 06 Jun 2019)
LEAD AND ASBESTOS ABATEMENT / ASSESSMENTS ON USCG CUTTERS AND BARGES
ii (Rev -0)
TABLE OF CONTENTS
Revisions Record ...................................................................................................................................................... iii Consolidated List of References ............................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................................ vii General Requirements WORK ITEM 1: WORK ITEM 1: Interferences, Remove and Reinstall WORK ITEM 2: WORK ITEM 2: Contaminated Loose Gear, Dispose WORK ITEM 3: WORK ITEM 3: Ship Structures, Test for Presence of Hazardous Material WORK ITEM 4: WORK ITEM 5: Lead Dust, Clean WORK ITEM 5: WORK ITEM 6: Lead-Based Paint and Asbestos-Containing Material, Abate or
Encapsulate WORK ITEM 6: WORK ITEM 7: Lead-Based Paint, Abate or Encapsulate WORK ITEM 7: WORK ITEM 8: Ship Structures, Perform ACM Condition Assessment iii (Rev -0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev -0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
Commandant Instruction Manuals: https://www.dcms.uscg.mil/Our-Organization/Assistant- Commandant-for-C4IT-CG-6/The-Office-of-Information-Management-CG-61/About-CG-Directives- System/Commandant-Instructions/
Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
American Welding Society (AWS): http://www.awspubs.com/index.php
ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
NFPA: http://www.nfpa.org
SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 65 BUS 103-7, Rev B, Booklet of General Plans (65400)
Coast Guard Drawing 65 BUS 103-6, Rev D, Booklet of General Plans (65401)
Coast Guard Drawing 65 WYT 0103-3, Rev -, Booklet of General Plans
Coast Guard Drawing 65B WYT 0103-3, Rev -, Booklet of General Plans (65607-09)
Coast Guard Drawing 65B WYT 0103-14, Rev -, Booklet of General Plans (65610-12)
Coast Guard Drawing 65B WYT 0103-8, Rev D, Booklet of General Plans (65613-15)
Coast Guard Drawing 65 WD 103-5, Rev D, Booklet of General Plans
Coast Guard Drawing 65B WD 103-7, Rev C, Booklet of General Plans
Coast Guard Drawing 75 WAGL 0103-006, Rev C, Booklet of General Plans
Coast Guard Drawing 75C WAGL 0103-23, Rev 4, Gen Design Plans & Outboard Profile (75401-05)
Coast Guard Drawing 75D WAGL 0103-4, Rev D, Gen Arrg Main Deck &Hold
Coast Guard Drawing 75D WAGL 0103-7, Rev D, Inboard Profile
Coast Guard Drawing 75E WLR 0103-1, Rev 1, Outboard Profile & Arrg Plan
Coast Guard Drawing 75E WLR 0103-2, Rev 2, Inboard Profile & Hold Arrg Plan
Coast Guard Drawing 75F WLR 070-001, Rev 2, Booklet Of General Plans
Coast Guard Drawing 642 WAGL 0103-4, Rev F, Booklet Of General Plans
Coast Guard Drawing 180 TE 103-5, Rev J, Booklet of Plans (BLUEBELL) (313)
Coast Guard Drawing 180 TE 0103-007, Rev 3, Booklet Of General Plans
Coast Guard Drawing 101 WTGB 801-008, Rev N, Booklets of General Plans v (Rev -0)
Coast Guard Drawing 160 WLIC 0103-2, Rev A, Booklet of General Plans
Coast Guard Drawing 68B CGB 0103-8, Rev 1, General Arrangement Plan and Outboard Profile
Coast Guard Drawing 70 CGB 0103-1, Rev 1, Outboard Profile and Deck Plans
Coast Guard Drawing 84 CGB 0103-2, Rev 4, General Arrangement Plan, and Outboard Profile
Coast Guard Drawing 90B CGB 0103-1, Rev C, Outboard Profile and Arrangement for 90’x 24’x 6’-6” Barge
Coast Guard Drawing 100A CGB 0103-1, Rev 1, Booklet of General Plans
Coast Guard Drawing 120 BARGE 601-001, Rev C, General Arrangement and Profile
Coast Guard Drawing 130 CGB 71-77 085-001, Rev B, General Arrangements Main Deck Plan
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST)_M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) 6966, 2013, Standard Practice for Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Determination of Metals
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2016, Occupational Safety and Health Standards
Code of Federal Regulations (CFR) Title 40, 2017, Protection of the Environment
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2013, Power Tool Cleaning to Bare Metal vi (Rev -0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
This section is not applicable to this package.
vii (Rev -0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
This section page is not applicable to this specification package.
1 (Rev -0)
00000_1214_FLT
REC_00000_FLT_ MATOC Dockside (1014)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting Vessel repairs performed for assets under MATOC by Commercial Contractor at CG Facility for Coast Guard vessels.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST)_M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) 6966, 2013, Standard Practice for Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Determination of Metals
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2016, Occupational Safety and Health Standards
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2013, Power Tool Cleaning to Bare Metal
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev -0)
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with (COMDTINST) M10360.3D , Chapter 5 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 5 of COMDTINST MI0360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is as designated in the Task Order.
3.5.2.2 Plans and permits. As designated in the Task Order, the CG Facility has unit specific permits including the following:
3.5.3 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3 (Rev -0)
3.5.4 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.5 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to adequately accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.6 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.7 Additional Requirements. The Contractor shall be aware of the following:
3.5.7.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.7.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.7.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4 (Rev -0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name Hull # Work Item # Work Item Title
Location of Work (incl. frame #’s) Area (sqft)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1/NACE Inspector Signature Cert. # Date / Time
5 (Rev -0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE &
TIME
ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
(Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL.
HUMID-
ITY DEW
PT.
SURFACE AMBIENT
ΔT
| DP -
Surface |
6 (Rev -0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Location of Work (Frame References) Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
7 (Rev -0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
_____ mils _____ mils _____ mils _____ mils _____ mils
8 (Rev -0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
DATE TEST LOCATIONS
CONDUCTIVITY
(microsiemens/cm)
9 (Rev -0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
Coating Mfg Product Name Batch # Induction
Time Coating System Sequence
(Primer/Touchup/3rd Coat, etc.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before Adjustments
After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before Adjustments
After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before Adjustments
After Adjustments
Avg.
Application Method (Airless, Conventional Spray, Rolled) Average DFT
10 (Rev -0)
2_MATOC__07000_Intrfrnc_PWB_1214_ALLDDDSS
WORK ITEM 1: Interferences, Remove and Reinstall
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to remove and reinstall interferences, as designated in the Task Order.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the
11 (Rev -0)
Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Be aware of the following:
List of interferences will be provided in the Task Order.
Cost of interference removal and reinstallation will be negotiated upon receipt of the Task Order.
Insulation shall be renewed, if removal is required to perform remediation services.
4. NOTES
This section is not applicable to this work item.
12 (Rev -0)
3_MATOC_00021_MscGrDspsl_ PWB_0115_ALLDDDSS
WORK ITEM 2: Contaminated Loose Gear, Dispose
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to test and dispose of various Lead dust and/or ACM-contaminated loose gear, as designated in the Task Order.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 40, Jul 2013, Protection of the Environment
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and
13 (Rev -0)
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Gear disposal particulars. The Contractor shall accomplish the following tasks, for the designated gear, using in accordance with SFLC Std Spec 0000, Appendix A or B, as applicable.
3.2.1 Gear suspected of being lead-contaminated.
3.2.1.1 Remove all designated loose gear to a suitable and secure location, away from weather.
3.2.1.2 Perform Toxicity Characteristics Leaching Procedures (TCLP) sampling for gear, to determine hazard classification, in accordance with 40 CFR Part 261. Inventory and provide detailed list of all contaminated gear; Submit CFR with results.
3.2.1.3 Segregate contaminated gear and non-contaminated gear, separately.
3.2.1.4 Dispose of removed gear as approved by CFRR, in accordance with all applicable Federal, state, and local regulations – based on hazard classification. Be aware that the Government reserves the right to retain gear that is not contaminated.
3.2.2 Gear designated as being asbestos-contaminated.
3.2.2.1 Remove all designated ACM-contaminated loose gear to a suitable and secure location, away from weather.
3.2.2.2 Dispose of removed gear in accordance with all applicable Federal, state, and local regulations.
NOTES
1. SFLC Std Spec 0000, Appendix A applies to availabilities performed at contractor operated (non-USCG) facilities; Appendix B pertains to work accomplished at USCG facilities.
2. Equipment designated as ACM-contaminated will not require hazardous classification determination.
14 (Rev -0)
4_MATOC_59300_HZMTTstng_ PWB_0115_ALLDDDS
WORK ITEM 3: Ship Structures, Test for Presence of Hazardous Material
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to test for the presence of the following hazardous materials (HAZMAT) onboard various vessels, as designated in the Task Order.
Lead dust.
Lead-based paint (LBP).
Asbestos-containing material (ACM).
Airborne asbestos.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 65 BUS 103-7, Rev B, Booklet of General Plans (65400)
Coast Guard Drawing 65 BUS 103-6, Rev D, Booklet of General Plans (65401)
Coast Guard Drawing 65 WYT 0103-3, Rev -, Booklet of General Plans
Coast Guard Drawing 65B WYT 0103-3, Rev -, Booklet of General Plans (65607-09)
Coast Guard Drawing 65B WYT 0103-14, Rev -, Booklet of General Plans (65610-12)
Coast Guard Drawing 65B WYT 0103-8, Rev D, Booklet of General Plans (65613-15)
Coast Guard Drawing 65 WD 103-5, Rev D, Booklet of General Plans
Coast Guard Drawing 65B WD 103-7, Rev C, Booklet of General Plans
Coast Guard Drawing 75 WAGL 0103-006, Rev C, Booklet of General Plans
Coast Guard Drawing 75C WAGL 0103-23, Rev 4, Gen Design Plans & Outboard Profile (75401-05)
Coast Guard Drawing 75D WAGL 0103-4, Rev D, Gen Arrg Main Deck &Hold
Coast Guard Drawing 75D WAGL 0103-7, Rev D, Inboard Profile
Coast Guard Drawing 75E WLR 0103-1, Rev 1, Outboard Profile & Arrg Plan
Coast Guard Drawing 75E WLR 0103-2, Rev 2, Inboard Profile & Hold Arrg Plan
Coast Guard Drawing 75F WLR 070-001, Rev 2, Booklet Of General Plans
Coast Guard Drawing 642 WAGL 0103-4, Rev F, Booklet Of General Plans
Coast Guard Drawing 180 TE 103-5, Rev J, Booklet of Plans (BLUEBELL) (313)
15 (Rev -0)
Coast Guard Drawing 68B CGB 0103-8, Rev 1, General Arrangement Plan and Outboard Profile
Coast Guard Drawing 70 CGB 0103-1, Rev 1, Outboard Profile and Deck Plans
Coast Guard Drawing 84 CGB 0103-2, Rev 4, General Arrangement Plan, and Outboard Profile
Coast Guard Drawing 90B CGB 0103-1, Rev C, Outboard Profile and Arrangement for 90’x 24’x 6’-6” Barge
Coast Guard Drawing 100A CGB 0103-1, Rev 1, Booklet of General Plans
Coast Guard Drawing 120 BARGE 601-001, Rev C, General Arrangement and Profile
Coast Guard Drawing 130 CGB 71-77 085-001, Rev B, General Arrangements Main Deck Plan
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2013, Occupational Safety and Health Standards
Code of Federal Regulations (CFR) Title 40, Jul 2013, Protection of the Environment
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5 Location identification. As part of testing process for LBP and ACM, ensure that deck numbers, compartment names and frame numbers are used to document locations where each sample has been
16 (Rev -0) taken. Be aware that the frames are the ribs of the ship and serve as vertical boundaries for compartments.
Compartment numbers consist of four parts, separated by hyphens, in the following sequence (example:
2-20-3-L):
1) Deck number
2) Frame number
3) Position relative to ship centerline
4) Use of compartment
3.1.6 Report submissions. Expedite shipment and analysis of all sample results for receipt within two business days. Contractor shall submit all laboratory test results in electronic file either by E-mail or by CD/DVD format to include an executive summary report at the beginning, give a description of where positive samples were located (frame/bulkhead/deck/ovhd), the level of positive sample (include numeric reading), and contractor recommendations, as a CFR.
3.2 Testing particulars. The Contractor shall accomplish the following tasks:
3.2.1 Lead dust. Take lead dust wipe samples in the designated locations, as specified in the sub-paragraph paragraph titled “Lead dust wipe sampling” SFLC Std Spec 0000, Appendix A or B, as applicable, in locations designated by the Coast Guard inspector.
3.2.2 LBP. Remove paint chip samples in each designated location, ensuring each sample is approximately one square inch in size; and of a uniform cross section of all layers of paint, down to the metal substrate. In addition, ensure the following:
Each paint chip is secured in a sterile container or bag.
Each location of removed samples is marked with a suitable chalked identifier immediately adjacent to it, and the container or bag is also marked with the same identifier.
Ensure testing equipment and/or method is capable of providing results down to a lead level below .009 percent by weight (0.018 mg/cm2, or 90 ppm).
3.2.2.1 Wipe down a one square foot area surrounding each paint chip sample using a suitable lead dust cleaning solution. Dispose of all consumables in accordance with the requirements and all federal, state, and local regulations.
3.2.2.2 Ship all samples for analysis by a laboratory certified by the National Lead Laboratory Accreditation Program (NLLAP) or the American Industrial Hygiene Association.
NOTE
For a listing of certified laboratories, go to www.aiha.org.
3.2.3 ACM - bulk sampling. Conduct bulk asbestos sampling, in locations where damage and failure are observed. Do not obtain samples in locations where coatings are found in an intact condition, unless otherwise authorized by the KO.
3.2.3.1 Method. Bulk samples shall be collected, in accordance with 29 CFR 1910.1001 and 40 CFR 763.86, submitted to an independent laboratory accredited by the National Voluntary Laboratory Approval Program (NVLAP), and analyzed using EPA Method 600/R-93/116 by Polarized Light Microscopy (PLM). Samples shall be placed in container, sealed, assigned unique sample identification number, and shipped.
17 (Rev -0)
3.2.3.2 Sample. Each bulk sample shall be one square inch or one cubic inch - depending on the type of material.
3.2.4 Airborne asbestos.
3.2.4.1 Take aggressive air samples in each designated compartment only after abatement has been completed, using the Phase Contrast Microscopy (PCM) method to determine that the level of airborne fibers for each sample.
NOTE
Past performance of aggressive air sampling in a space that has not received normal routine cleaning has historically resulted in inconclusive sample results.
3.2.4.2 Perform aggressive air sampling in accordance with EPA 600/4-85-049. Ensure asbestos samples are analyzed by a laboratory certified by the National Voluntary Laboratory Accreditation Program (NVLAP) or the Environmental Laboratory Approval Program (ELAP).
3.3 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.). In lieu of abiding by the feathering guidance provided in SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs), build up new coating to overlap all existing adjacent coating edges in order to prevent generating lead dust.
3.4 Chain of custody. The Contractor shall document a complete chain of custody record of the removed paint chips from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
18 (Rev -0)
5_MATOC_59300_LeadDustCln_ PWB_1214_ALLDDDS
WORK ITEM 4: Lead Dust, Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and remove lead dust contamination in various locations, as designated in the Task Order.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 65 BUS 103-7, Rev B, Booklet of General Plans (65400)
Coast Guard Drawing 65 BUS 103-6, Rev D, Booklet of General Plans (65401)
Coast Guard Drawing 65 WYT 0103-3, Rev -, Booklet of General Plans
Coast Guard Drawing 65B WYT 0103-3, Rev -, Booklet of General Plans (65607-09)
Coast Guard Drawing 65B WYT 0103-14, Rev -, Booklet of General Plans (65610-12)
Coast Guard Drawing 65B WYT 0103-8, Rev D, Booklet of General Plans (65613-15)
Coast Guard Drawing 65 WD 103-5, Rev D, Booklet of General Plans
Coast Guard Drawing 65B WD 103-7, Rev C, Booklet of General Plans
Coast Guard Drawing 75 WAGL 0103-006, Rev C, Booklet of General Plans
Coast Guard Drawing 75C WAGL 0103-23, Rev 4, Gen Design Plans & Outboard Profile (75401-05)
Coast Guard Drawing 75D WAGL 0103-4, Rev D, Gen Arrg Main Deck &Hold
Coast Guard Drawing 75D WAGL 0103-7, Rev D, Inboard Profile
Coast Guard Drawing 75E WLR 0103-1, Rev 1, Outboard Profile & Arrg Plan
Coast Guard Drawing 75E WLR 0103-2, Rev 2, Inboard Profile & Hold Arrg Plan
Coast Guard Drawing 75F WLR 070-001, Rev 2, Booklet Of General Plans
Coast Guard Drawing 642 WAGL 0103-4, Rev F, Booklet Of General Plans
Coast Guard Drawing 180 TE 103-5, Rev J, Booklet of Plans (BLUEBELL) (313)
Coast Guard Drawing 180 TE 0103-007, Rev 3, Booklet Of General Plans
Coast Guard Drawing 101 WTGB 801-008, Rev N, Booklets of General Plans
Coast Guard Drawing 160 WLIC 0103-2, Rev A, Booklet of General Plans
Coast Guard Drawing 68B CGB 0103-8, Rev 1, General Arrangement Plan and Outboard Profile
Coast Guard Drawing 70 CGB 0103-1, Rev 1, Outboard Profile and Deck Plans
Coast Guard Drawing 84 CGB 0103-2, Rev 4, General Arrangement Plan, and Outboard Profile
19 (Rev -0)
Coast Guard Drawing 90B CGB 0103-1, Rev C, Outboard Profile and Arrangement for 90’x 24’x 6’-6” Barge
Coast Guard Drawing 100A CGB 0103-1, Rev 1, Booklet of General Plans
Coast Guard Drawing 120 BARGE 601-001, Rev C, General Arrangement and Profile
Coast Guard Drawing 130 CGB 71-77 085-001, Rev B, General Arrangements Main Deck Plan
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5 Applicable drawings. The Contractor shall use Coast Guard Drawing (s) identified in Section 2 as guidance during the performance of the work specified herein.
3.2 Lead dust cleaning particulars. The Contractor shall accomplish all lead dust clean-up tasks for the surfaces designated in the Task Order, in accordance with SFLC Std Spec 0000, Appendix A or B.
Additional applicable requirements include, but are not limited to the following:
Additional protective measures.
Lead dust wipe sampling.
Waste disposal.
20 (Rev -0)
Appendix A of SFLC Std Spec 0000 pertains to work performed at Contractor Operated (Non-USCG) Facilities; Appendix B applies to work performed at USCG Facilities.
21 (Rev -0)
6_MATOC_63000_100PrcntLdAsbstsCtngAbtmnt_ PWB_1214_ALLDDDS
WORK ITEM 5: Lead-Based Paint and Asbestos-Containing Material, Abate or Encapsulate
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to abate or encapsulate lead-based paint (LBP) and asbestos-containing material (ACM), as designated in the Task Order.
Interior surfaces:
o Bulkheads and overheads.
o Decks.
o Miscellaneous Surfaces – See 4.1.1 (Miscellaneous Surfaces).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 65 BUS 103-7, Rev B, Booklet of General Plans (65400)
Coast Guard Drawing 65 BUS 103-6, Rev D, Booklet of General Plans (65401)
Coast Guard Drawing 65 WYT 0103-3, Rev -, Booklet of General Plans
Coast Guard Drawing 65B WYT 0103-3, Rev -, Booklet of General Plans (65607-09)
Coast Guard Drawing 65B WYT 0103-14, Rev -, Booklet of General Plans (65610-12)
Coast Guard Drawing 65B WYT 0103-8, Rev D, Booklet of General Plans (65613-15)
Coast Guard Drawing 65 WD 103-5, Rev D, Booklet of General Plans
Coast Guard Drawing 65B WD 103-7, Rev C, Booklet of General Plans
Coast Guard Drawing 75 WAGL 0103-006, Rev C, Booklet of General Plans
Coast Guard Drawing 75C WAGL 0103-23, Rev 4, Gen Design Plans & Outboard Profile (75401-05)
Coast Guard Drawing 75D WAGL 0103-4, Rev D, Gen Arrg Main Deck &Hold
Coast Guard Drawing 75D WAGL 0103-7, Rev D, Inboard Profile
Coast Guard Drawing 75E WLR 0103-1, Rev 1, Outboard Profile & Arrg Plan
Coast Guard Drawing 75E WLR 0103-2, Rev 2, Inboard Profile & Hold Arrg Plan
Coast Guard Drawing 75F WLR 070-001, Rev 2, Booklet Of General Plans
Coast Guard Drawing 642 WAGL 0103-4, Rev F, Booklet Of General Plans
Coast Guard Drawing 180 TE 103-5, Rev J, Booklet of Plans (BLUEBELL) (313)
22 (Rev -0)
Coast Guard Drawing 68B CGB 0103-8, Rev 1, General Arrangement Plan and Outboard Profile
Coast Guard Drawing 70 CGB 0103-1, Rev 1, Outboard Profile and Deck Plans
Coast Guard Drawing 84 CGB 0103-2, Rev 4, General Arrangement Plan, and Outboard Profile
Coast Guard Drawing 90B CGB 0103-1, Rev C, Outboard Profile and Arrangement for 90’x 24’x 6’-6” Barge
Coast Guard Drawing 100A CGB 0103-1, Rev 1, Booklet of General Plans
Coast Guard Drawing 120 BARGE 601-001, Rev C, General Arrangement and Profile
Coast Guard Drawing 130 CGB 71-77 085-001, Rev B, General Arrangements Main Deck Plan
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2015, Solvent Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5 Hazardous material disclosure. The Contractor shall be aware of the following hazardous conditions, for the existing system being abated:
Asbestos in excess of 1% is present in the following systems:
23 (Rev -0) o Top-coat for the existing anti-sweat coating system.
o Deck vinyl tiles.
WARNING
Treat all asbestos as "friable" during removal.
Lead is present at or in excess of 0.009 percent by weight (0.018 mg/cm2, or 90 ppm), in primer coat.
3.2 Abatement particulars.
3.2.1 Accomplish ACM and LBP abatement requirements, as specified in SFLC Std Spec 0000, Appendix A or B, as designated in the Task Order. Be aware that surfaces to be abated also include all structural members associated with/adjacent to designated surfaces. Use all applicable drawings as listed in Section 2 herein.
NOTES
1. SFLC Std Spec 0000, Appendix A applies to availabilities performed at contractor operated (non-USCG) facilities; Appendix B pertains to work accomplished at USCG facilities.
2. Abatement specific requirements in Appendix A or B of SFLC Std Spec 0000 include, but are not limited to the following:
+ Additional protective measures.
+ HAZMAT removal/surface preparation.
+ Post-surface preparation clearance sampling and inspection.
+ Lead dust clean-up.
+ Waste disposal.
3.2.2 After satisfactory results of lead dust concentration have been achieved, do the following, as designated in the Task Order:
3.2.2.1 Prime and coat all affected bulkhead , deck, overhead, and/or miscellaneous surfaces using the coating system specified IAW SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting System).
3.2.2.2 Install new deck covering iaw Task Order in way of original if applicable, in accordance with SFLC Std Spec 6341.
3.3 Encapsulation particulars. Perform the below-specified tasks, for all surfaces, designated for encapsulation. Abide by all applicable HAZMAT abatement-related requirements, as specified in SFLC Std Spec 0000, Appendix A or B.
3.3.1 Remove and dispose of all loose ACM, where existing, in accordance with all applicable Federal, state, and local regulations.
3.3.2 Solvent-clean surfaces, in accordance with SSPC-SP 1. Capture, contain, and dispose of all wastes from solvent cleaning, in accordance with all Federal, state and local regulations.
3.3.3 Coat surfaces in accordance with SFLC Std Spec 6310, using the coating system specified “Bulkheads and Overheads, Uninsulated Metal- (Wet areas such as washrooms, water closets, shower
24 (Rev -0) space, food prep areas and exits to weather)” in Appendix B (Cutter and Boat Interior Painting Systems).
Select top coat color to match original finish color coat.
4. NOTES
4.1 Surface definitions.
4.1.1 Miscellaneous Surfaces . Interior vertical and horizontal surfaces requiring spot abatement/encapsulation; additional surfaces include, but not limited to, as applicable: cable hangers, piping, penetrations, bulkheads, overheads, decks, stand offs, brackets, stuffing tubes, angles and/or gussets.
LEAD AND ASBESTOS ABATEMENT / ASSESSMENTS ON USCG CUTTERS AND
25 (Rev -0)
7_MATOC_63000_100PrcntLdCtngAbtmnt_ PWB_1214_ALLDDDS
WORK ITEM 6: Lead-Based Paint, Abate or Encapsulate
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to abate or encapsulate lead based paint (LBP) on the below-listed surfaces as designated in the Task Order.
Interior surfaces:
o Bulkheads and overheads.
o Bilges – See 4.1.1 (Bilges).
o Decks.
o Miscellaneous Surfaces – See 4.1.2 (Miscellaneous Surfaces).
Exterior surfaces:
o Freeboard - See 4.1.4 (Freeboard).
o Superstructure - see 4.1.5 (Superstructure).
o Miscellaneous Surfaces – See 4.1.3 (Miscellaneous Surfaces).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 65 BUS 103-7, Rev B, Booklet of General Plans (65400)
Coast Guard Drawing 65 BUS 103-6, Rev D, Booklet of General Plans (65401)
Coast Guard Drawing 65 WYT 0103-3, Rev -, Booklet of General Plans
Coast Guard Drawing 65B WYT 0103-3, Rev -, Booklet of General Plans (65607-09)
Coast Guard Drawing 65B WYT 0103-14, Rev -, Booklet of General Plans (65610-12)
Coast Guard Drawing 65B WYT 0103-8, Rev D, Booklet of General Plans (65613-15)
Coast Guard Drawing 65 WD 103-5, Rev D, Booklet of General Plans
Coast Guard Drawing 65B WD 103-7, Rev C, Booklet of General Plans
Coast Guard Drawing 75 WAGL 0103-006, Rev C, Booklet of General Plans
Coast Guard Drawing 75C WAGL 0103-23, Rev 4, Gen Design Plans & Outboard Profile (75401-05)
Coast Guard Drawing 75D WAGL 0103-4, Rev D, Gen Arrg Main Deck &Hold
Coast Guard Drawing 75D WAGL 0103-7, Rev D, Inboard Profile
Coast Guard Drawing 75E WLR 0103-1, Rev 1, Outboard Profile & Arrg Plan
Coast Guard Drawing 75E WLR 0103-2, Rev 2, Inboard Profile & Hold Arrg Plan
26 (Rev -0)
Coast Guard Drawing 75F WLR 070-001, Rev 2, Booklet Of General Plans
Coast Guard Drawing 642 WAGL 0103-4, Rev F, Booklet Of General Plans
Coast Guard Drawing 180 TE 103-5, Rev J, Booklet of Plans (BLUEBELL) (313)
Coast Guard Drawing 180 TE 0103-007, Rev 3, Booklet Of General Plans
Coast Guard Drawing 101 WTGB 801-008, Rev N, Booklets of General Plans
Coast Guard Drawing 160 WLIC 0103-2, Rev A, Booklet of General Plans
Coast Guard Drawing 68B CGB 0103-8, Rev 1, General Arrangement Plan and Outboard Profile
Coast Guard Drawing 70 CGB 0103-1, Rev 1, Outboard Profile and Deck Plans
Coast Guard Drawing 84 CGB 0103-2, Rev 4, General Arrangement Plan, and Outboard Profile
Coast Guard Drawing 90B CGB 0103-1, Rev C, Outboard Profile and Arrangement for 90’x 24’x 6’-6” Barge
Coast Guard Drawing 100A CGB 0103-1, Rev 1, Booklet of General Plans
Coast Guard Drawing 120 BARGE 601-001, Rev C, General Arrangement and Profile
Coast Guard Drawing 130 CGB 71-77 085-001, Rev B, General Arrangements Main Deck Plan