This is a Performance Work Statement (PWS) for the inspection, maintenance, and servicing of the Fire Rescue Training Facility (FRTF) at Joint Base Andrews, Maryland, effective April 28, 2026. The contractor shall provide all tools, supplies, labor, and equipment necessary to maintain and repair building 2491 in a manner ensuring its serviceability and preventing operational deterioration. Services must comply with Air Force Technical Order 35E1-2-13-1, manufacturer recommendations, and applicable National Fire Protection Association standards including NFPA 54, 58, 70, 405, 1003, 1402, and 1403. The contractor must be knowledgeable in handling liquefied petroleum gas (LPG) and coordinate with the Air Force Civil Engineer Center (AFCEC) regarding major maintenance issues or safety-critical conditions.
The PWS requires quarterly inspections not exceeding 90 days, including winterization and de-winterization activities. Key maintenance tasks include igniter replacement (18 total units), cutout panel replacement, water pump replacement, regulator adjustments, storage tank maintenance for the 10,000-gallon propane tank, and biweekly propane supply checks during the active training season (March-October) and within 48 hours of scheduled live-fire events. The contractor shall conduct comprehensive quarterly safety inspections covering burn area condition, burner and igniter status, aircraft mock-up structural integrity, propane system inspection per specifications, water system testing, compressed air system checks, and cathodic protection system inspection with written reporting within five days. Emergency service calls are limited to a maximum of four per year at a fixed rate of $2,000 per call, with propane leak response requiring immediate verbal assistance within three hours and site mobilization within two business days. Reimbursable parts expenditures shall not exceed $30,000 annually, with items over $1,000 requiring COR technical review and Contracting Officer written approval prior to purchase. The initial contract period runs from September 27, 2026 through September 28, 2027, with option years available thereafter. Work hours are standard duty hours (0700-1600) Monday through Friday, excluding federal holidays, and the contractor must obtain AF Form 103 approval from 316 CES before any digging commences. All personnel require base identification cards and security clearances per JBA requirements, and the contractor shall maintain a Quality Control Plan submitted within 15 days of contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FRTF_Combo Solicitation 27 July 2026.pdf | ||
| FRTF_Combo Solicitation 13 July 2026.pdf | ||
| Attachment 4 RFI Worksheet.xlsx | XLSX spreadsheet | |
| Attachment 3 JBA FRTF 2026 - Pricing Matrix.xlsx | XLSX spreadsheet | |
| Attachment 5 Clauses and Provisions.pdf | ||
| Attachment 2 SCA Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
THE INSPECTION, MAINTENANCE AND SERVICING OF THE
FIRE RESCUE TRAINING FACILITY (FRTF)
AT
(Joint Base Andrews)
(April 28, 2026)
1. DESCRIPTION OF SERVICES. The contractor shall provide all tools, supplies, labor equipment and labor/management necessary to maintain and repair the Fire Rescue Training Facility (FRTF) building 2491 at Joint Base Andrews (JBA) in a manner that will ensure its serviceability and prevent deterioration in operational effectiveness. Components of the FRTF System are listed in Appendix A.
1.1. The contractor shall comply with manufacturer’s recommendations and procedures, Air Force Technical Order (TO) 35E1-2-13-1 Operation and Maintenance Instructions for Aircraft Fire Training Facilities, 25 June 2013 Edition with Change 2 dated 6 February 2015, and all Federal, State and local guidelines as applicable to the work involved.
1.2. Additionally, all work being performed will ensure compliance with the applicable National Fire Protection Association national consensus standards listed below.
NFPA 54, National Fuel Gas Code NFPA 58, Liquefied Petroleum Gas Code
NFPA 70, National Electrical Code® NFPA 405, Standard for the Recurring Proficiency of Airport Fire Fighters NFPA 1003, Standard for Airport Fire Fighter Professional Qualifications NFPA 1402, Standard on Facilities for Fire Training and Associated Props NFPA 1403, Standard on Live Fire Training Evolutions
1.3. Installation, testing and replacement of gas piping, gas utilization equipment or accessories, repair and servicing of equipment, shall be performed only by qualified personnel. In the interest of safety, all persons employed handling Liquified Petroleum Gas (LPG) shall be trained in the proper handling and operating procedures which the employer shall document. After major maintenance or a major problem is discovered, the owner is obligated to contact the Air Force Civil Engineer Center (AFCEC), the commissioning authority to determine what actions will be taken. AFCEC will determine if the FRTF will remain out-of-service and determine if a site visit is necessary. Examples of major problems include: Any safety related condition that could lead to an imminent hazard such as: LPG piping or tank corrosion that has reduced the wall thickness to less than that required for the maximum allowable operating pressure. Any crack or other material defect that impairs the structural integrity or reliability of an LPG tank or piping. Any abnormal movement by environmental causes, such as earthquakes, landslides or floods that may impair the serviceability of a pipeline, tank, or controls. Any malfunction or operating error that causes the pressure of an LPG pipeline or tank to rise above its maximum allowable working pressure or a leak in the LPG pipeline or tank that constitutes an emergency.
2. INSPECTION, TESTING AND MAINTENANCE SERVICES. The contractor shall maintain the FRTF by scheduling and conducting quarterly inspections (not to exceed 90 days) in conjunction with winterization/de-winterization (Appendix B) activities where applicable. The contractor shall perform all inspections, testing and maintenance in accordance with (IAW) the current edition of TO 35E1-2-13-1. The inspections shall be IAW Table 1 Work Package (WP)
006 and Table 3 WP 007 of the TO. The contractor shall provide a written summary of the conditions found during the inspection. The contractor shall provide a cost estimate to repair/replace all items identified as discrepancies. The estimated labor cost to repair the FRTF, shall be quoted to the installation prior to conducting any repairs. Materials, supplies, and parts needed for FRTF maintenance and/or repairs, which are not readily available from government stock/supply may be purchased by the contractor if approved by the contracting officer. Any item(s) purchased costing over ($1000.00) shall be reimbursed to the contractor but must be approved by the contracting officer prior to purchase.
2.0.1 Igniter Replacement. The contractor shall remove and replace the igniters in accordance with manufacture instructions, industry practices and procedures. There are 18 igniters that may require replacement, six are located on the ground in the burner area and 12 are located on the mock-up.
2.0.2 Cutout Panel Replacement. If the training scenario included forced entry extrication through cutout panels, the contractor shall install new cutout panels. The contractor shall remove and replace damaged, cutout panels in accordance with manufacturer's instructions and standard industry practices. Cutout panels are located on the left and right sides of the mock-up. The panels are 36 inches wide by 85.5 inches high and constructed of .036-inch-thick sheet metal.
2.0.3 Water Pump Replacement. The contractor shall remove and replace the water pump in accordance with manufacturer's instruction and standard industry practices.
2.0.4 Regulator Adjustment. Contractor shall adjust regulator pressure as follows:
Burner Location Optimal Flame Height Engine Burners Fully Engulfed Internal Burners 6-8 Feet
2.0.5 Storage Tank Maintenance and Repair. Ensure proper maintenance and repair of the 10,000-gallon propane storage tank, in accordance with specification and regulations provided.
2.0.6 Propane Supply. The contractor shal l physical ly check the tank’s f loat and roto gauges bi -weekly dur ing the act ive t ra ining season (March-October) and wi thin 48 hours pr ior to any scheduled l ive-f i re t ra ining event . Al l checks shal l be logged and provided to the COR upon request .
2.0.7 Quarterly Safety Inspections. As a minimum, the contractor shall conduct quarterly inspections on the following items.
2.0.7.1 Inspect burn area. Ensure rocks are level so when flooded a continuous film of water covers area from side to side. Ensure that rock level is ½ inch to 1 inch below top of burn area drain.
2.0.7.2 Inspect burn area drain valve and wire drain valve for freedom of operation and absence of obstruction.
2.0.7.3 Inspect exterior and interior burners to ensure that burner grates are not excessively corroded or warped and that igniter protective covers are in place.
2.0.7.4 Inspect igniters to ensure electrode is clean and that the ceramic insulator is not cracked or damaged. Ensure igniter tips are free of carbonization.
2.0.7.5 Inspect aircraft mock-up for excessive corrosion and structural integrity.
2.0.7.6 Inspect mock-up doors to ensure freedom of operation and no excessive corrosion.
2.0.7.7 Inspect all lighting for proper operation. Ensure all area lighting and cab lighting are operable.
2.0.7.8 Inspect propane system to specifications, to include a minimum, tank, gauges, valves, piping, compress air system, manual safety system and regulators for corrosion, wear, or serviceable limits.
2.0.7.9 Inspect control stands to include electrical and mechanical components, piping, valves, and regulators. Check for corrosion, wear, or serviceable limits. Inspect markings on valves and switches for legibility. Ensure all pressure gauges are operable.
2.0.7.10 Inspect the condition of the ignition and ground wires of each circuit.
Twice per year check for and annotate voltage on each wire to ensure 10,000 volts at the igniters.
2.0.7.11 Inspect water conservation pond area. Examine visible portion of liner for damage.
2.0.7.12 Open the washout, sprinkler, and engine water valves and then apply power to water conservation pond pump and test for adequate operation and water pressure. Close all valves when test is complete.
2.0.7.13 Charge compressed air system and examine for leaks.
2.0.7.14 Ensure compressed air system and emergency shut-off pneumatic burner valves are functioning properly at all locations. Verify emergency shutdown system operability, through a function test and propane burner-off. Ensure that all pneumatic burner valve boxes are clearly accessible and uncovered (i.e. free of rock cover).
2.0.7.15 Pressurize propane piping for one (1) hour and examine valves for leaks at burners with flammable gas detector.
2.0.7.16 Inspect cathodic protection system. Report the cathodic protection potential readings for the system along with voltmeter and readings of the rectifier. A written report of the findings shall be submitted to the COR within 5 days after inspection complete.
2.0.7.17 Inspect driving area around burn area for ruts. Level all ruts before proceeding.
2.0.8 Winterize Facility. November of each year, winterize the facility. Purge propane back to angle valve at 10,000-gallon tank. Shut-off power and bleed compress air system.
Open all water jacket ball valves at the base of the water jackets.
2.0.9 De-winterize Facility. March of each year, de-winterize the facility. As a minimum the contractor shall turn on power to compressed air system, check for leaks, and close all water jacket ball valves at the base of the water jackets.
2.0.10 Provide a written report of findings. The report shall include a detailed cost estimate for any repairs required. The contractor shall provide a written report to the COR within 5 days, detailing the inspection findings and a cost estimate of any repairs outside the normal maintenance that is required.
2.1. High-Density Polyethylene (HDPE) Liner Maintenance. The 80-mil thick HDPE liners are located in the water conservation pond, burn area, and trench. The liners in the trench and burn pit are buried. The contractor shall locate the liner leak and repair it IAW extrusion welder manufacturer's instructions (National Seal Company, 1245 Corporate Blvd., Suite 300, Aurora, IL 60504. Telephone (708) 898-1161 or (800) 323-3820. The contractor shall submit for Civil Engineer Quality Assurance (QA) personnel approval the repair procedures, materials, and techniques prior to the specific repair of the HDPE liner(s). Additionally, the contractor shall adhere to the following general guidelines.
2.1.1. Use yellow plastic warning tape, buried 12-inches below the surface, and indicates underground wiring, anodes, grounding cells, or reference electrodes. The contractor shall properly replace the warning tape prior to backfilling.
2.1.2. Examine all seams and non-seam areas of the geomembrane to identify holes, blisters, defects, unsupervised raw materials, and any signs of contamination by foreign matter. Record repair/corrective action.
2.1.3. Will not weld or replace the geomembrane during precipitation or if excessive moisture, blowing dust, high winds, or standing water are present.
3. Non-Emergency Maintenance Calls. The contractor shall adhere to the emergency response timelines specified in Section 5 for all Emergency Service Calls. For all non-emergency repairs, the contractor shall respond within five (5) business days.
4. Quarterly Reports: The Contractor shall submit a complete report of all inspections, maintenance and servicing accomplished to the Records Management (RM) Point of Contact (POC) within five (5) days of inspection. The reports shall include a record of conditions found, discrepancies needing repairs, repairs accomplished, recharging, and all replacement parts used.
All records, files, documents, regardless of media (e.g., paper, electronic, etc.), as described in the PWS, that are the responsibility of the contractor are the property of the Government and shall remain so upon termination or completion of the contract. The contractor shall keep these items current and maintain and dispose of them in accordance with the requirements established in Air Force Instruction (AFI) 33-322, Records Management Program, and the Air Force Records Disposition Schedule, found in the Air Force Records Information Management System (AFRIMS), which can be provided by the RM POC upon request. Records shall be turned over to the Government upon completion of the contract unless otherwise stated. All records are subject to the Freedom of Information and Privacy Act. The Joint Base Andrews Records Management Office (301) 981- 8350 will provide assistance and training to the contractor to ensure compliance with Federal record keeping requirements.
5. Emergency Service Calls: Limited to propane‑related emergencies and any safety‑critical LPG system hazards that require the contractor to act immediately to protect personnel and equipment.
The contractor shall provide emergency response services under this contract for a maximum of four (4) emergency calls per year. When a propane leak occurs, the contractor must provide immediate verbal assistance within 3 hours of receiving notification, coordinate with the COR, and mobilize to the site without delay to stop the leak and begin repairs by the next two business days. Upon assessment, the on-site technician shall create a formal diagnostic report identifying the root cause of the emergency; the generation of this report, along with the site mobilization, shall be fully inclusive within the $2,000.00 fixed rate for the emergency call. Any reimbursable parts needed to complete the emergency repair must be fully documented, itemized, and submitted to the COR and the Contracting Officer for formal review and approval prior to purchase.
Situations such as LPG piping or tank defects, over‑pressure conditions, structural cracks, abnormal movement, or any leak that constitutes an imminent hazard also fall into this emergency category, requiring urgent notification to AFCEC and rapid contractor support. Environmental spills involving hazardous substances must be reported immediately and may trigger emergency containment and cleanup. Base‑declared emergencies—such as unsafe conditions during training—require the contractor to cease work and clear the area on command. In short, emergency service calls involve any propane leak, LPG system hazard, or safety‑critical condition requiring immediate response, coordination, and corrective action to maintain safe FRTF operations. Should any conditions arise that fall outside those listed above, they shall be subject to the sole discretion of the Contracting Officer.
6. Reimbursable Parts: Any materials, supplies, or components the contractor must purchase to maintain or repair the FRTF that are not available through government stock, and they require prior approval, itemized documentation, and cost-supported invoicing. The total expenditure for reimbursable parts under this contract shall not exceed $30,000.00 per year.
Any item over $1,000 must be technically reviewed by the COR and formally approved in writing by the Contracting Officer before purchase, and all reimbursable billing must include an itemized list of parts, unit cost, total cost, and copies of all invoices or sales slips. The contractor must also maintain original delivery tickets and receipts for audit and COR review.
Reimbursable parts include items such as igniters, cutout panels, regulators, valves, HDPE liner materials, propane (at cost), and any other consumables or repair components needed to keep the FRTF operational. In short, reimbursable parts are government-approved, contractor-purchased materials required for FRTF maintenance, documented with full cost transparency and invoiced strictly in accordance with contract line items and COR approval requirements.
7. Winterization/De-Winterization Procedures: The contractor shall perform all required winterization shutdown activities for the Fire Rescue Training Facility (FRTF). This includes, but is not limited to, testing, cleaning, and sealing all igniters; verifying the functionality of the cathodic protection system rectifier; and lubricating all switches and cabinet hardware. The contractor will winterize all water and propane systems by using compressed air to purge the lines of moisture, draining the burn area, servicing all valves, and ensuring pumps are properly protected or stored as directed. All nitrogen/air systems will be leak-tested and drained of moisture. Upon completion, the contractor shall provide a comprehensive report detailing all work performed, the results of all system tests (including propane, nitrogen/air, and burner emergency shutdowns), and a list of any required repairs with cost estimates for the spring start-
up. All required information, deliverables, and scheduling for winterization and de-winterization procedures must be fully coordinated with and approved by the Contracting Officer's Representative (COR). Please refer to Appendix C for the complete list of winterization/de-winterization requirements and detailed procedural steps.
8. Environmental Controls. The contractor shall be knowledgeable of and comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection. The contractor shall ensure policies and procedures are established that protect the health and safety of employees and the community and minimize/eliminate the risk of environmental pollution.
9. Notification of Environmental Spills. If the contractor spills or releases any hazardous substance into the environment, the contractor shall immediately report the incident to the QA, base fire department, and base civil engineering. The contractor shall be liable for containment and environmental cleanup of the spill or release of such substance.
10. Safety. Liquid propane used in the facility is potentially explosive. Personnel shall practice proper grounding procedures IAW the National Electrical Code (NEC). Personnel working with or near high voltage equipment should be familiar with modern methods of resuscitation.
Personnel shall wear appropriate protective clothing and be aware of emergency procedures to perform emergency shutdown and start-up procedures.
11. SERVICE DELIVERY SUMMARY.
Performance Objective PWS Para Performance Threshold Maintain and Repair the FRTF.
Items requiring maintenance are timely and correctly repaired or replaced. Submit accurate and timely reports.
2 The FRTF is operational at all times to permit ARFF, Structural, and all other fire rescue training when needed. Submit reports within 5 days. No more than 1 deficiency per quarter.
Quarterly Safety Inspection. All areas of the FRTF are inspected to ensure safe operation. Submit accurate and timely reports.
2.0.7- 2.0.7.17
The FRTF can be safely operated at all times to permit fire rescue training when needed. Submit reports within 5 duty days. No more than 1 deficiency per quarter.
Igniter System Maintenance Igniters inspected and replaced as necessary per TO 35E1-2-13-1.
2.07- 2.0.7.17
All igniters are functional. Any failed igniter must be replaced and reported within 5 days.
Check twice a year for and annotate voltage on each wire to ensure 10,000 volts at the igniters. No repeat failures within the same quarter.
Propane Leak Response Emergency response to propane leak events.
3 Provide immediate verbal assistance and respond to propane leaks as soon as practical. Contractor shall coordinate with the COR to mobilize immediately to perform repairs.
HDPE Liner Repairs Inspection and repair of buried liners and exposed geomembrane.
2.1, 2.1.1., 2.1.2, 2.1.3., Contractor shall coordinate with the COR immediately to perform maintenance. Respond to liner maintenance as conditions dictate.
Mock-up Structure Integrity
Structural and corrosion checks including access doors and stairs.
2.0.7, - 2.0.7.17
Zero critical safety deficiencies. Minor corrosion is addressed within 10 duty days. Any safety hazard Environmental and Safety Compliance.
Contractor shall take appropriate measures to protect personnel, property, and materials from chemical, electrical, and other mishaps.
1.1, 1.2, 1.3, 2, 5, 7, 10.6, 10.7, Appendix D
Personnel, property, environment and materials are protected at all times.
12. GENERAL INFORMATION.
12.1. PERIOD OF PERFORMANCE: The initial period of performance will be 27 September 2026 – 28 September 2027, and option years for this task may be exercised thereafter.
12.2. QUALITY CONTROL. The contractor shall develop and maintain a quality control program to ensure maintenance and repair services are performed IAW the TO and the manufacturer’s instructions. The contractor shall develop and implement procedures to identify and prevent defective services from reoccurring. At a minimum, the contractor shall develop quality control procedures that address the areas identified in Paragraph 8, Service Delivery Summary. The contractor must submit their Quality Control Plan (QCP) to the Contracting Officer's Representative (COR) and Contracting Officer within 15 days of contract award for approval.
12.3. QUALITY ASSURANCE. The government will periodically evaluate the contractor’s performance IAW the Quality Assurance Surveillance Plan.
12.3.1 Damages. The contractor shall repair or replace any Government property that is properly marked, and damaged by the contractor at no additional expense to the Government. For any work that may require digging, an AF Form 103 must be obtained and approved by 316 CES before any digging begins. Yellow plastic warning tape, buried 12 inches below the surface, indicates underground wiring, grounding cell, etc. The contractor shall properly replace the warning tape prior to backfilling. The contractor will not be liable for damage to equipment that isn't properly marked.
12.4. GOVERNMENT REMEDIES. The contracting officer shall follow the requirements of FAR 52.212-4, Contract Terms and Conditions for Commercial Items (October 2018), for contractor’s failure to correct nonconforming services.
12.5. HOURS OF OPERATION. The contractor shall schedule with the Training and Logistics office 15 working days prior to arrival to coordinate escort and fire department training area gate access. Work hours shall be during normal duty hours (0700 to 1600), Monday thru Friday and weekends, excluding: New Year’s Day, Martin Luther King, Jr. Day, Presidents Day, Memorial Day, Independence Day, Columbus Day, Thanksgiving Day, Veterans Day, Christmas.
12.5.1 Emergencies. In the case of an emergency, the COR, Base Installation Fire Chief, base operations officer or their representative, shall have the authority to order the contractor to terminate work and clear the area of personnel and equipment.
12.6. SECURITY REQUIREMENTS. The contractor shall conform to all Base Regulations and Directives that pertain to security, safety, traffic, fire and personnel clearances. To obtain passes for all work on JBA, MD the contractor shall submit the following information on each employee before expected arrival on base after award of contract to the COR.
- U.S. Citizens: Real I.D. / Social Security Number / U.S. Passport
- U.S. Residents: Real I.D. / Resident Card / Social Security Card
12.6.1. A base identification card/vehicle pass shall be obtained for all employees including any subcontractor. It is the intent of the Government that each employee has possession of his/her pass at all times while working on this contract. The pass shall be displayed at all times below shoulders and above the waist. The contractor shall be responsible for the return of any pass when employment/and the contract is terminated.
12.6.2. All Government issued identification must be returned to the COR upon expiration of the contract or employee termination, whichever comes first. Failing to do so will result in the withholding of the final payment.
12.6.3. The Contractor shall be responsible for safeguarding all Government property provided for Contractor's use. At the end of each shift, all Government facilities, equipment, and materials shall be secured. The Contractor shall be responsible for providing and placing all barricades and safety devices during any activities and comply with all Occupational Safety and Health Standards (OSHA).
12.6.4. The contractor shall be responsible for the action of any of his subcontractors and his employees who are working on JBA, MD.
12.7. WEAPONS. Weapons of any sort are not authorized on JBA, this includes guns, knives, swords, numb chucks, brass knuckles, or any other weapon that has a sole purpose to injure or maim. Combination tools such as Leatherman and small pocket knives with folding blades less than four inches are authorized if used in the performance of duty. Those found in violation of this directive are subject to apprehension, criminal charges, and debarment from the installation.
12.8. ILLEGAL CONTROLLED SUBSTANCE. The U.S. Federal Government is the most vocal opponent of the drug industry and it has set the de facto international standards regarding the legality and illegality of different drugs. Illegal controlled substance and narcotics are not authorized on JBA what so ever, controlled substances may not be transported on the installation via vehicle or on an individual person, i.e., marijuana/Cannabis, cocaine, crack cocaine, LSD, Methamphetamine (Meth), Heroin, Anabolic steroids, Psilocybin mushrooms, are some of forbidden substances ( this list is not all inclusive). Prescription medications are authorized for the person the medication is issued to; however the medication must not be expired and the label must clearly indicate the name of the person the medication is issued to. Otherwise the prescription medication may be deemed illegal by the law enforcement officials. Those found in violation of this directive are subject to apprehension, criminal charges and debarment from the installation.
12.9. PERFORMANCE OF SERVICES DURING A CRISIS DECLARED BY THE
NATIONAL COMMAND AUTHORITY OR OVERSEAS COMBATANT
COMMANDER. In the event the contractor is unable to perform his daily operation due to peacetime emergency and /or wartime contingency disturbances, etc., neither the Government nor the contractor shall take action for non-compliance with contract requirements.
12.9.1 Invoicing/payment for Reimbursable Items. The contractor shall invoice for payment of reimbursable items. Each invoice must identify the chargeable contract line intern. The billing shall be supported by an itemized list of all reimbursable parts and material used showing the items, unit cost, and total cost and copy of all invoices and sales slips. The contractor shall maintain original sales slips. The contractor shall maintain original delivery tickets, sales slips, or other documents identifying items purchased under the reimbursable parts portion of this contract. The COR shall review and approve accurate invoices for Government accepted work.
12.10. Ceremonial Events. IAW Air Force District of Washington (AFDW) I 90- 1,The Contractor shall be required to observe quiet hours during outdoor ceremonial events. Quiet hours shall be in effect 30 minutes prior to commencement and one hour after the start of all outdoor ceremonial events.
11. APPENDICES.
A. Equipment Listing B. System Particulars C. Winterization/De-Winterization Procedure D. Joint Base Andrews Environmental Protection Standards for Contracts
APPENDIX A
5.0 Appendix
A Equipment
Listing:
• AFTF Crash Trainer
• Fire Training Simulation System - Tower Section #FC4 l LT & Residential Section
#FCR3624 Structural Trainer
• Fire Training Simulation System FCLA3000 & FCLA1000 Automated Live
Fire Systems (4 total)
• Fire Training Simulation Systems FCA206 Vehicle Fire Trainer
• Fire Training Simulation Systems FCCST42 Confined Space Trainer
• Fire Training Simulation Systems FCF/040 Flash Over Identification Trainer
• Fire Training Simulation Systems FCHM306 Tractor Trailer Roll Over Hazmat
Trainer
• Helo Fire Trainer
• Fire Fighter Challenge Stair Tower
• Storage Building
• Pump Room and Pumps
• Compressor Building and Compressor
• Propane Tank
• All Related Infrastructure and Parts
Appendix B System Particulars
1. This theory of operation is based on the generic design. The Aircraft Fire Training Facility (AFTF) consists of an aircraft mock-up, burn area, control stand, liquid propane fuel system, cathodic protection system and a water conservation pond.
2. The aircraft mock-up, located in the burn area, is constructed of non-coated/unpainted carbon steel. It is approximately 72 feet long, 25 feet high at tip of tail, with a wingspan of 72 feet. The mock-up is configured with three simulated aircraft engines, two on the right wing and one located on the vertical stabilizer. Each engine contains one burner assembly and two ignitors. The wiring to the engine ignitors is enclosed in a protective water jacket that protects it from possible failure due to extreme heat. Water injection is located in both wing engines and at some sites in the tail engine. The wing engines also have dams installed to simulate a three-dimensional flowing fuel type fire. Wheel well/brake and auxiliary power unit fires are simulated on the right side of the fuselage adjacent to the inboard engine. In the interior of the mock-up, ignitors and burners are installed to simulate flight deck, passenger compartment, and baggage/cargo hold fires. There is also a standalone aircraft debris fire located away from the main fuselage of the aircraft. A water sprinkler system is installed in the top of the mock-up to cool and washout the mock-up. An expansion joint is located midway on the fuselage to allow for expansion and contraction during training. Cutout panels are located on the left and right aft sides of the fuselage. These 36-inch x 84-inch replaceable panels are constructed of .036-inch-thick sheet metal. The panels are used to simulate emergency entrance into an aircraft. Two steel hinged doors are located at the forward left and left amid ship.
3. The burn area is 100 feet in diameter. It is recessed and lined with one 80-mil thick HDPE liner. The liner is sandwiched between 6-inch-thick layers of sand and then covered by a layer of geotextile fabric and then an 18-inch layer of compacted aggregate crushed stone.
4. There are eight ignitors and burners installed in the burn area to simulate seven exterior ground fires which includes the debris fire and one running fuel fire with pool fire on the outboard engine.
The ground fires are located on the left and right sides of the forward fuselage, between the right-wing engines, under the left-wing, and on the left and right sides of the aft fuselage. The weir is used to maintain the proper water level in the burn area. Opening the burn area drain valve allows all the water in the burn area to drain to the water conservation pond.
5. Located on the control stand are the valves, solenoids, and switches used to control the propane flow and ignitors during training events. Turning off the master/emergency switch located on the control stand will turn off power to all ignitors and close the internal valve located on the propane tank via the pneumatic control system, if applicable. The propane piping, water piping, and electrical conduits from the control stand to the burn area are located in an underground HDPE lined trench.
6. The liquid propane system supplies fuel for training exercises. Propane is supplied from a 10,000 gallon-WC (water capacity) tank to the various burners in the burn area through a series of pipes and valves.
7. A propane pump may be installed to obtain adequate pressure, if applicable. A corresponding valve located on the control stand, controls propane flow to each individual burner. Safety features of the propane system are provided to stop the flow of fuel to the burners, and will include a pneumatic or manual control system, and an emergency shut-off valve located on the control stand.
Pressure relief valves are installed on the piping as required by the current edition of National Fire Protection Association Standard 58, Liquified Petroleum Gas Code. A cathodic protection system is used to protect below ground piping from corrosion through sacrificial anodes inside the trench from the control stand to the burn area.
8. The water conservation pond is a 72 feet by 72 feet square area that is 9 feet deep. It is lined with an 80-mil thick HDPE liner. Unlike the burn area, the liner is not covered. A pump located in the pond is used to supply necessary water for the training area.
APPENDIX C
Winterization/De-Winterization Procedures
a. Winterization shutdown activities will consist of:
� Test all igniters and verify their proper operation, (identify repairs needed for the spring start up).
� Winterize each igniter by cleaning them with compressed air and applying non-freezing liquid to dissipate any moisture that may be collected by the igniter throughout the winter.
� Cover and securely seal each individual igniter.
� Verify that the rectifier for the impressed current cathodic protection system is operational.
� Lubricate and service all switches, cabinet hinges, latches, etc.
� Remove and store the water pond aerator as directed by the owner.
� Verify that the water conservation pond pump has a minimum of three feet of water for cover or remove it from the pond and store as directed by the owner.
� Disconnect the water-cooling pump in the burn area and store if applicable.
� Introduce a minimum of 90 Cubic Feet per Minute (CFM) of compressed air into the water system to blow out all water lines. Maintain air until all moisture is out of the lines to keep them from freezing during the winter.
� Exercise, service and lubricate all valves for the water system.
� Drain the burn area to an absolute minimum and install a temporary sump pump if practicable to prevent freezing of electric, propane and nitrogen systems.
� Verify that all automatic pumping systems are functional for the winter.
� Check all burner locations for performance and emergency shutdown, (identify repairs needed for the spring start up).
� Exercise the thermal cycles on the propane system and perform a soap test at all propane connections, (identify repairs needed for spring start up).
� Introduce a minimum of 90 CFM compressed air into the propane system and remove all water from the propane lines and coax valves. Maintain air until all moisture is out of lines to keep them from freezing during the winter.
� Pressurize the nitrogen/air system and perform a leak test on all nitrogen/air connections, (identify repairs needed for spring start up).
� Drain the nitrogen/air accumulator tank of all moisture.
� Service all nitrogen/air pilot valves.
� Provide a complete semiannual inspection report IAW TO 35E1-2-13-1.
� Provide a complete report of all work performed and minor repairs made.
� Brief and provide a written report to the Fire Chief or representative of all minor and major repairs required for the spring start up. Provide the user with a cost estimate for repairs to allow time for the using agency to secure funds by the spring start up.
b. De-winterization/spring start up activities will consist of:
� Verify that the rectifier is in service for the cathodic protection system.
� Lubricate all electrical panel hinges, switches, etc.
� De-winterize all igniters and assure good solid (functional) ignition.
� Check that any applicable pumps and/or lift stations are fully operational.
� Check and verify that all identification and warning labels are installed, clear and legible.
� Exercise the water system and adjust to assure that all functions are operating at the proper pressures.
� Fill the burn pit to the operating level and assure that the igniter coolers are adjusted properly.
� Install the water aerator (if applicable) in the pond.
� Treat the water in the water conservation pond to help prevent algae growth if necessary.
� Verify that the mechanical emergency shutdown valves associated with filling the propane tank are functioning properly and serviced.
� Check that the propane tank float gauge is operational.
� Check that the propane tank roto gauge is operational.
� Check that the propane tank pressure gauge is functioning.
� Perform maintenance per the manufacturer’s recommendations on all propane valves and equipment.
� Operate the entire propane system assuring that all burners are functioning properly and that all emergency shutdown times are achieved.
� Cycle all propane system valves and perform leak tests at all connections.
� Perform common maintenance on all propane parts and equipment as recommended by the manufacturer.
� Perform a pressure test on the nitrogen/air system.
� Service and cycle all nitrogen/air pilot valves.
� Have a fire truck and crew stand by while testing live fire scenarios and making any burner adjustments, minor repairs, etc.
� Generate a complete report of all work performed and minor repairs made.
� Provide a complete semiannual inspection report IAW TO 35E1-2-13-1.
� Debrief and provide a written report to the Fire Chief or representative of all work performed and any findings.
APPENDIX D
JOINT BASE ANDREWS ENVIRONMENTAL PROTECTION STANDARDS for
CONTRACTS
PART 1 GENERAL
1.1 SUMMARY
These standards address general environmental protection requirements for all construction, renovation, repair, and service contracts at Joint Base Andrews (JBA), MD.
The U.S. Government, The U.S. Air Force, and (JBA), require that all contractors (to include all subcontractors) involved in the planning and execution of projects shall apply the general requirements identified herein to their specific projects and ensure compliance as applicable. This plan is not intended to be all-inclusive, but is to be used for all applicable contracts. It is the responsibility of the contractor to comply with all federal, state and local environmental laws and regulations in carrying out tasks associated with their project and it is the Air Force’s responsibility to ensure that these standards are adhered to. This is a living document which is intended to be updated on a periodic basis as needed.
1.2 REFERENCES
All contractors and subcontractors shall comply with all applicable local, state (Code of Maryland Regulations), and federal regulations; all relevant Department of Defense and Air Force Instructions (AFI); and all (JBA) policies, plans, and programs. These include but are not limited to the following:
Regulation Topic
40 CFR Parts 1500-1508 National Environmental Policy Act 32 CFR Part 989 Air Force Environmental Impact Analysis
Process 40 CFR Parts 260-282 Hazardous Waste Management 49 CFR Parts 105-180 Transportation of Hazardous Material
COMAR Title 26 Subtitle 13 Hazardous Waste Management AFMAN 32-7002; Chapter 5 Hazardous Waste Management
316 AW SPLAN 32-7042 Hazardous Waste Management Plan AFMAN 32-7002; Chapter 3 Hazardous Materials Management
AAFBI 32-9003 Hazardous Materials Management 40 CFR Parts 61.115 & 763 Asbestos
AFI 32-1052 Facility Asbestos Management COMAR Title 26 Subtitle 16 Lead
40 CFR Parts 112.1 – 112.3 & 300 Oil Pollution COMAR Title 26 Subtitle 10 Oil Pollution and Tank Management
COMAR Title 26 Subtitle 10.01.12 Aboveground Storage Tanks (JBA), Spill Prevention, Control, &
Countermeasure Plan and Facility Response Plan
Emergency Response 40 CFR Part 761 Polychlorinated Biphenyls (PCBs), Manufacturing, Processing, Distribution in Commerce and Use
Prohibitions 40 CFR Parts 60, 61, 63, 68 & 80 Air Quality
AFMAN 32-7002, Chapter 4 Air Quality COMAR Title 26 Subtitle 11 Air Quality
40 CFR Parts 122 & 141 Water Quality COMAR Title 26 Subtitle 08 Water Pollution
COMAR 26 Subtitle 17 Storm Water Management (JBA) Storm Water Pollution Prevention Plan
(SWPPP)
Storm Water Management
COMAR Title 26 Subtitle 17 Erosion and Sediment Control 2011 MD Standards and Specifications Soil
Erosion & Sediment Control Sediment Management
MD Erosion & Sediment Control Guidelines for State & Federal Projects 15 April 2010
Storm Water Management
JBA Storm Water Management Plan (SWMP) Storm Water Management Clean Water Act Section 404 Wetlands
AFI 32-7080 Pollution Prevention (JBA) P2 Plan Pollution Prevention
40 CFR Part 247 Affirmative Procurement (JBA) Green Procurement Plan Green Procurement
Executive Order 13101 Recycling and Acquisition COMAR Title 26 Subtitle 04 Solid Waste
(JBA) ISWMP Integrated Solid Waste Management Plan 29 CFR Part 1910.1200 Hazard Communication
40 CFR Part 230 Wetlands COMAR Title 26 Subtitle 23 Non-tidal Wetlands
50 CFR Part 17 Endangered & Threatened Wildlife & Plants COMAR Title 8 Subtitle 3 Threatened & Endangered Species, Wildlife
Management (Lethal and Non-Lethal) AFI 32-7064 Integrated Natural Resources Management
COMAR Title 8 Subtitle 19 Forest Conservation Memorandum of Understanding, MD & DoD Coastal Zone Management, Forest
Conservation 36 CFR Part 800 Protection of Historic Properties 32 CFR Part 229 Protection of Archeological Resources
AFI 32-7065 Cultural Resources Management Executive Order 11990 Protection of Wetlands
AFI 64-117, Section 2.10 Affirmative Procurement Executive Order 13423 Strengthening Federal Environmental, Energy, and Transportation Management JBA Environmental Management System Management of Environmental Risk
Executive Order 13990 Protecting Public Health and the Environment and Restoring Science To Tackle the Climate
Crisis AFMAN 32-1067 Water and Fuel Systems
| PERFORMANCE WORK STATEMENT |
| NFPA 58, Liquefied Petroleum Gas Code |
| 5. Emergency Service Calls: Limited to propane‑related emergencies and any safety‑critical LPG system hazards that require the contractor to act immediately to protect personnel and equipment. The contractor shall provide emergency response services u... |
| 6. Reimbursable Parts: Any materials, supplies, or components the contractor must purchase to maintain or repair the FRTF that are not available through government stock, and they require prior approval, itemized documentation, and cost-supported invo... |
| 5.0 Appendix A Equipment Listing: |
File details come from the government source that posted it. Updated .