This document is a Special Contract Requirements document for Stream Crossing Improvements across the Bureau of Land Management's Glasgow Field Office. The specifications provide detailed technical requirements for a construction project involving decommissioning activities at Gutshot Dam, including breach stabilization, outlet works removal, and an improved low water crossing. The project will also address replacement of failing culverts along Cactus Flats Road and Triple Crossing Road.
The document modifies the standard Federal Highway Projects specifications (FP-14) to make them more applicable to Bureau of Land Management low-volume roads and rural construction environments. It includes extensive technical modifications across multiple sections, covering areas such as excavation, embankment, compaction, aggregate base courses, erosion control, and material specifications. The modifications often aim to reduce complexity, limit testing requirements, and loosen technical tolerances to suit the specific project environment. The specifications provide granular guidance on construction methods, material requirements, compaction techniques, and quality control processes for the stream crossing improvement project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Update_Attachment_3_-_Price_Schedule_0003.xlsx | XLSX spreadsheet | |
| Sol_140L3625R0011_Amd_0003.pdf | ||
| Update_Attachment_2_-_Glasgow_Stream_Crossing_Drawings__0003.pdf | ||
| Update_Attachment_1_-_FP14-BLM_Supplemental_Specifications_0003.pdf | ||
| Sol_140L3625R0011_Amd_0002.pdf | ||
| Sol_140L3625R0011_Amd_0001.pdf | ||
| Attachment_7_-_SF_24_Bid_Bond.pdf | ||
| Sol_140L3625R0011.pdf | ||
| Attachment_8_-_SF25_Performance_Bond.pdf | ||
| Attachment_6_-_140L3625R0011_Financial_Responsibility_Required_Documentation.pdf | ||
| Attachment_5_-_140L3625R0011_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_10_-_Wage_Determination.pdf | ||
| Attachment_3_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_4_-_140L3625R0011_Reference_List.pdf | ||
| Attachment_9_-_SF25A_Payment_Bond.pdf | ||
| Attachment_2_-_Glasgow_Stream_Crossing_Drawings.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Special Contract Requirements Glasgow Field Office GLASGOW STREAM CROSSINGS Bureau of Land Management
Special Contract Requirements for Stream Crossing Improvements across the Bureau of
Land Management’s Glasgow Field Office
Description of Work
The project consists of decommissioning activities at Gutshot Dam, including breach stabilization, outlet works removal, and an improved low water crossing. The project will also address replacement of failing culverts along Cactus Flats Road and Triple Crossing Road.
Applicable Standard Specifications
The following Special Contract Requirements (SCRs) are only a portion of the specifications for this project. These SCRs amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. The FP-14 is a separately published book. In order to understand the solicitation properly you need to have the FP-14 as well as this packet. Pay particular attention to the provisions of Subsection 104.04 in the FP-14 that explain how each of the many contract documents fit together.
One printed copy of the FP-14 will be distributed to the successful bidder.
To view the FP-14 electronically, go to: https://highways.dot.gov/federal-lands/specs A single paper copy can also be obtained from the Research & Technology Product Distribution Center (RTPDC) by e-mail report.center@dot.gov, phone 814-239-1160, or fax 814-239-2156.
Note: These Special Contract Requirements change, supplement, or modify the FP-14 specifications to make them more applicable to The Bureau of Land Management (BLM) low or very low volume roads and rural construction environments. Specifications are often changed to reduce their complexity, limit testing, and loosen tolerances. Specifications are called out in this way to call attention to where requirements are changed from the standard FP-14 specifications.
How to use the FP-14 specifications with the Special Contract Requirements and the contract’s bid schedule.
• Pay item no. 20401 means this work is defined in section 204 of the FP-14 specifications. For all pay items the first three digits correlate to the FP-14 section that describes that work.
• Next check Special Contract Requirements. If there is a matching section 204 then it modifies the
FP-14. If there is no section listed there are no changes, the FP-14 specification is utilized in its entirety. The change direction will be underlined and italicized; the specification text will be plain.
o Example: Section 204 is listed in the Special Contract Requirements with a direction to “Delete Section 204 in its entirety and replace with the following.”
Apply those changes. None of the original FP-14 specification will be used. Only use the content that is in the Special Contract Requirements.
https://highways.dot.gov/federal-lands/specs mailto:report.center@dot.gov
Special Contract Requirements Glasgow Field Office
STANDARD SPECIFICATIONS FOR THE CONSTRUCTION OF ROADS AND BRIDGES ON
FEDERAL HIGHWAY PROJECTS FP-14
SPECIFICATION SECTIONS
PREFACE
DIVISION 100
GENERAL REQUIREMENTS
Section 101 - Terms¸ Format¸ and Definitions
Section 102 - Bid¸ Award¸ and Execution of Contract
Section 103 - Scope of Work
Section 104 - Control of Work
Section 106 - Acceptance of Work
Section 107. – LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 108 - Prosecution and Progress
Section 109 - Measurement and Payment
DIVISION 150
Section 151 - Mobilization
Section 152 - Construction Survey and Staking
Section 153 - Contractor Quality Control
DIVISION 200
Section 204 - Excavation and Embankment
Section 209 - Structure Excavation and Backfill
DIVISION 300
Section 301 – Untreated Aggregate Base Courses
DIVISION 600
Section 629. —ROLLED EROSION CONTROL PRODUCTS AND CELLULAR CONFINEMENT SYSTEMS
DIVISION 700
Section 703 - Aggregate
Section 704 – Soil
Special Contract Requirements Glasgow Field Office
PREFACE
Delete the Preface and substitute the following:
These Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects are issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Bureau of Land Management. These specifications are cited as "FP-14" indicating "Federal Project" Standard Specifications issued in 2014 and contain both United States Customary and Metric units of measure.
When designated in a contract, the FP-14 becomes part of the contract and binding upon all parties to the contract. Construction contracts of the Bureau of Land Management are also governed by the following regulations:
● Federal Acquisition Regulation (FAR), Title 48, Code of Federal Regulations, Chapter 1 The FAR regulations are not included in the FP-14. A complete copy of the FAR is available from the Superintendent of Documents, Congressional Sales Office, U.S. Government Printing Office, Washington, DC 20402.
U.S. Customary units of measure are used in the FP-14 as provided in the November 25, 2008 Memorandum from Jeffrey F. Paniati entitled Update on Metric Use Requirements for FHWA Documents. Metric units are noted in parentheses following the U.S. Customary Units. The references to Metric or Metric units apply only when the project or portion of the project expressly calls for Metric units of measure.
Special Contract Requirements Glasgow Field Office
DIVISION 100
GENERAL REQUIREMENTS
Special Contract Requirements Glasgow Field Office
Section 101 - Terms¸ Format¸ and Definitions
101.01 Meaning of Terms. Add the following:
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03 Abbreviations. Add the following to (a) Acronyms
AA
AAN
AAR
ABA
ACPA
ADA
AFPA
AI
AIA
ARA
AREA
ASCE
ASCII
ASLA
BLM
FTMS
GSA
IEEE
MIL
MSHA
NESC
NFPA
PCA
SAE
USFS
USGS
USPS
WCLIB
WWPI
Aluminum Association American Association of Nurserymen Association of American Railroad Architectural Barriers Act American Concrete Pavement Association Americans with Disabilities Act American Forest and Paper Association Asphalt Institute American Institute of Architects American Railway Association American Railway Engineering Association American Society of Civil Engineers American Standard Code for Information Interchange American Society of Landscape Architects Bureau of Land Management Federal Test Method Standard General Services Administration Institute of Electrical and Electronic Engineers Military Specifications Mine Safety and Health Administration National Electrical Safety Code National Forest Products Association Portland Cement Association Society of Automotive Engineers United States Forest Service United States Geological Survey United States Postal Service West Coast Lumber Inspection Bureau Western Wood Preservers Institute
Add the following to (b) U.S. Customary unit abbreviations and symbols:
hr mp ppm
Hour Milepost Part Per Million
Special Contract Requirements Glasgow Field Office
101.04 Definitions. Delete the definitions for the following terms:
Bid Bidder
Modify the following definitions as follows:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contract Time – Delete this definition and substitute the following:
Period of Performance (POP) – The specified time allowed for completion of contract work.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Maximum Particle Size – The smallest sieve opening through which all particles in the material will pass
Neat Line – A line defining the proposed or specified limits of an excavation or structure.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Utilization Standards – The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Special Contract Requirements Glasgow Field Office
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
BLM — The United States of America, acting through the Bureau of Land Management, U.S.
Department of the Interior.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Bureau of Land Management jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.
Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.
Special Contract Requirements Glasgow Field Office
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
Special Contract Requirements Glasgow Field Office
Section 102 - Bid¸ Award¸ and Execution of Contract
102 Bid, Award, and Execution of Contract. Delete in its entirety.
Special Contract Requirements Glasgow Field Office
Section 103 - Scope of Work
103.02 Disputes. Delete in its entirety.
103.03 Value Engineering. Delete in its entirety.
103.04 Contractor Records. Delete in its entirety.
Special Contract Requirements Glasgow Field Office
Section 104 - Control of Work
104.01 Authority of the Contracting Officer (CO). Delete in its entirety.
104.02 Authority of Inspectors. Delete in its entirety.
104.03 Specifications and Drawings.
(c) As-built drawings. Modify the first sentence to read as follows:
Use one set of Contractor-provided plans exclusively for as-built drawings.
(d) Submittals. Add this section:
1. Material Gradation and Test Results (105.02, 154.05, 208, 209, 214, 251, 301
2. Site specific Quality Control Plan (153.03)
3. Traffic Control Plan (156.04)
4. Erosion Control Plan (157.05)
5. Manufacturer’s literature on geotextile and geotextile seam assembly (207)
6. Dewatering Plan (208.07)
7. Concrete Mix Design (552.03)
8. Reinforcing steel order list and bending diagrams (554.03)
9. Manufacturer’s assembly instructions (603.4)
10. Manufacturer’s literature on fertilizer and mulch (625)
11. Salvage and Planting Plan (626.03)
104.04 Coordination of Contract Documents. Delete in its entirety.
Special Contract Requirements Glasgow Field Office
Section 106 - Acceptance of Work
106.02 Visual Inspection. Delete and replace with the following:
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.
106.05 Statistical Evaluation of Work and Determination of Pay Factor. Delete in its entirety, including all references to Statistical Evaluation. All references to Section 106.05 shall be replaced with references to Section 106.04 Measured or Tested Conformance.
Special Contract Requirements Glasgow Field Office
Section 107. – LEGAL RELATIONS AND RESPONSIBILITY TO THE
PUBLIC
107.03 Bulletin Board. Delete in its entirety.
107.05 Responsibility for Damage Claims. Delete in its entirety.
107.06 Contractor’s Responsibility for Work. Delete in its entirety.
107.09 Legal Relationship of the Parties. Delete in its entirety.
107.10 Environmental Protection.
(b) Oil and hazardous substances. Delete in its entirety and add the following:
Submit a Hazardous Spill Plan, prior to construction, stating what actions will be taken in case of a spill, notification procedures, and specific cleanup and disposal instructions for different products. This plan will also incorporate preventive measures to be implemented, such as the placement of refueling facilities, storage and handling of hazardous materials, etc. Immediately notify the Contracting Officer of all hazardous spills. Spill plan will be available on site at all times, in addition; at least one worker on site will be trained in spill containment.
Power equipment shall be refueled at least 200 feet from any stream, or as far away as possible.
Immobile equipment shall have absorbent pads placed under them to capture any petroleum products that may leak and be stored a minimum of 200 feet from any stream. All vehicles operating within 150 feet of a live stream shall be inspected daily for fluid leaks before leaving the staging area. Any leaks will be repaired before the vehicle resumes operation. Inspections shall be documented, and a copy provided to the COR
Contractor shall have a SPILL RESPONSE KIT on the project whenever equipment is operating. The spill kit shall be sufficient to absorb 34 gallons of oil and designed to float on the surface while absorbing oil and repelling water. The kit shall meet or exceed the physical properties of “new pig products spill kit #408”. Oil-absorbing, floating booms shall be installed at both sites just downstream of construction activities.
Any and all spills of chemicals, including petroleum products, shall be immediately contained, cleaned up and shall be disposed of, in accordance with State and Federal regulations.
(c) Dirt, plant, and foreign material. Delete in its entirety and add the following:
All equipment shall be power washed and inspected by COR or a COR-designated Representative for compliance prior to mobilizing onto BLM lands to prevent transference of noxious weeds. All mechanized equipment shall be steam-cleaned before being used below ordinary high water until all visible external oil, grease, mud, and other visible contaminants are removed. The Contractor shall take reasonable precautions to prevent the spread of known noxious weeds from the project area by cleaning
Special Contract Requirements Glasgow Field Office all off-highway vehicles and equipment, before leaving infested areas and entering uninfested areas, when operating in areas infested with noxious weeds.
Numerous noxious weeds have been mapped in the area. Due to ground disturbance and continued road use, the following statements and stipulations apply:
1. Take care where vehicles are parked and where staff is working/walking;
2. Take care to check personnel, tools, and vehicles for plant parts before leaving the site, and wash vehicles if necessary;
3. Minimize soil disturbance outside of road prism as much as possible.
(e) Project specific Environmental Protection. Add this section:
The Government may direct the Contractor to discontinue all operations in the event that:
1. Threatened, or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, may be affected by the operation, and a determination is made that consultation or reinitiating of consultation is required concerning the species prior to continuing operation, or;
2. Federal candidate (Categories 1 and 2), sensitive or State listed species protected under BLM
Manual 6840 - Special Status Species Management, have been discovered, and a determination is made that continued operations would affect the species or its habitat, or;
Special Contract Requirements Glasgow Field Office
Section 108 - Prosecution and Progress
Section 108. Delete Section 108 in its entirety.
Special Contract Requirements Glasgow Field Office
Section 109 - Measurement and Payment
109.03 Weighing Procedures and Devices.
(c) Project weighing system. Add the following:
Manual scales may be used if approved in writing by the CO and if the method of weighing meets all other contract requirements. For aggregates weighed for payment, adjust scale weights of material to deduct the daily average moisture content in excess of 2 percentage points over optimum moisture as determined by AASHTO T 99 or the designated compaction method. If moisture determination is necessary, determine the daily average moisture content in accordance with AASHTO T 255, from not less than three representative samples of aggregate taken at random intervals each day that aggregate is being weighed.
109.06 Pricing of Adjustments. Delete in its entirety.
109.07 Eliminated Work. Delete in its entirety.
109.08 Progress Payments. Delete in its entirety.
109.09 Final Payment. Delete in its entirety.
Special Contract Requirements Glasgow Field Office
DIVISION 150
PROJECT REQUIREMENTS
Special Contract Requirements Glasgow Field Office
Section 151 - Mobilization
151.03 Payment
(b) Replace with the following:
Up to 25 percent of the original contract amount may be paid upon mobilization to the jobsite prior to any other work being completed. Any portion of the mobilization pay item in excess of 25 percent of the original contract amount will be paid after final acceptance.
(c) Delete in its entirety
(d) Delete in its entirety
Special Contract Requirements Glasgow Field Office
Section 152 - Construction Survey and Staking
Table 152-1 Construction Survey and Staking Tolerances Replace Table 152-1 with the following:
Table 152-1 Construction Survey and Staking Tolerances (1)
Staking Phase Horizontal Vertical
Control points set from existing Government control points- Tolerance Class A
±0.03 feet (±10 millimeters)
±0.01 feet × N
(±3 millimeters × N )(2)
Mapping, topography, and cross-section Points- Tolerance Class A
±0.16 feet (±50 millimeters)
±0.16 feet (±50 millimeters)
Centerline points (3) including (PC), (PT), (POT),(POC), and references- Tolerance Class A
±0.06 feet (±20 millimeters)
±0.06 feet (±20 millimeters)
Slope-stake and slope-stake references- Tolerance Class A (4)
±0.16 feet (±50 millimeters)
±0.16 feet ±50 millimeters)
Culverts, ditches, and minor drainage structures stakes- Tolerance Class A
±0.16 feet (±50 millimeters)
±0.06 feet (±20 millimeters)
Retaining walls stakes ±0.06 feet (±20 millimeters)
±0.03 feet (±10 millimeters)
Curb and gutter stakes ±0.06 feet (±20 millimeters)
±0.03 feet (±10 millimeters)
Bridge substructures stakes ±0.03 feet (±10 millimeters)(5)
±0.03 feet (±10 millimeters)
Bridge superstructures stakes ±0.03 feet (±10 millimeters)(5)
±0.03 feet (±10 millimeters)
Clearing and grubbing limit stakes- Tolerance Class A
±1.00 feet (±300 millimeters)
Roadway subgrade finish stakes- Tolerance Class A (6)
±0.16 feet (±50 millimeters)
±0.03 feet (±10 millimeters)
Roadway finish grade stakes (6) ±0.16 feet (±50 millimeters)
±0.03 feet (±10 millimeters)
Special Contract Requirements Glasgow Field Office
Table 152-1 Construction Survey and Staking Tolerances (continued) (1)
Control points set from existing Government control points –Tolerance Class B (7)
±0.16 feet (±20 millimeters)
±0.16 feet × (±20 millimeters × )(2)
Mapping, topography, and cross-section points–Tolerance Class B (7)
±1.00 feet (±300 millimeters)
±0.50 feet (±150 millimeters)
Centerline points including (PC), (PT), (POT),(POC), and references–Tolerance Class B (7)
±0.16 feet (±20 millimeters)
±0.16 feet (±20 millimeters)
Slope-stake and slope-stake references– Tolerance Class B (7)
±0.50 feet (±50 millimeters)
±0.16 feet ±50 millimeters)
Culverts, ditches, and minor drainage structures stakes–Tolerance Class B (7)
±0.50 feet (±150 millimeters)
±0.16 feet (±20 millimeters)
Clearing and grubbing limit stakes– Tolerance Class B (7)
±2.00 feet (±600 millimeters)
Roadway subgrade finish stakes– Tolerance Class B (7)
±0.50 feet (±50 millimeters)
±0.16 feet (±10 millimeters)
Roadway finish grade stakes–Tolerance Class B (7)
±0.50 feet (±50 millimeters)
±0.16 feet (±10 millimeters)
(1) At statistical 95 percent confidence level. Tolerances are relative to existing Government control points.
(2) N is the number of instrument setups.
(3) Centerline points: PC - point of curve, PT - point of tangent, POT - point on tangent, POC - point on curve.
(4) Take the cross-sections normal to the centerline ±1 degree.
(5) Bridge control is established as a local network and the tolerances are relative to that network.
(6) Includes paved ditches.
(7) Tolerance Class B for Very Low Volume Roads with an aggregate or native finished surface.
N
N
Special Contract Requirements Glasgow Field Office
Section 153 - Contractor Quality Control
153.02 Qualifications. Delete and replace with the following:
Submit the following for approval with the quality control plan:
(a) Quality control manager (QCM). Furnish a QCM who has at least 2 years’ experience in construction, inspector, quality control and material testing on construction projects of similar type and scope.
(b) Testers. Provide testers with at least one year experience in the type of sampling and testing required, and with one of the following for the type of sampling and testing performed:
(1) NICET Level II certification in highway material or equivalent state or industry certification;
(2) Certification by a regional certification program (such as Western Alliance for Quality Transportation Construction (WAQTC), Northeast Transportation Technician Certification Program (NETTCP), Southeast Task Force for Technician Training and Qualification (STFTTQ), or Multi Regional Training and Certification (M-TRAC)); or
(3) At least one year employment by an AASHTO accredited laboratory performing equivalent sampling and testing.
153.03 Quality Control Plan. Add the following paragraph to the end of Subsection 153.03(b):
(b) Quality Control Procedures.
Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.
153.07 Records and control charts. Delete Subsection 153.07 and replace with the following:
Maintain complete testing and inspection records by pay item number and make them accessible to the
CO.
153.04 (2) (a) Submittal Log Add the following Subsection:
At a minimum the contractor shall provide project submittals as shown on the Submittal Log below.
Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.
Special Contract Requirements Glasgow Field Office
Submittal Log
Log No.
Indirect paymen t to Pay
Item(s) Description of Submittal Type of
Submittal
Requirement found in
Specification No.
/Drawings
Additional Specificatio n References
1 <fill in> <fill in> <fill in> <fill in> <fill in>
Special Contract Requirements Glasgow Field Office
DIVISION 200
EARTHWORK
Special Contract Requirements Glasgow Field Office
Section 204 - Excavation and Embankment
204.11 Compaction. Delete Section 204.11 in its entirety and replace with the following:
Compact the embankment using one of the following methods as specified:
(a) Placement Method 1. Use AASHTO T 27 to determine the quantity of material retained on a No. 4 (4.75-millimeter) sieve. Compact as follows:
(1) More than 80 percent retained on a No. 4 (4.75-millimeter) sieve. Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation:
(a) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds (180 kilonewtons) impact per vibration and a minimum frequency of 1000 vibrations per minute;
(b) Eight roller passes of a 20-ton (20-metric ton) compression-type roller; or
(c) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration and a minimum frequency of 1000 vibrations per minute.
Increase the compactive effort for layers deeper than 12 inches (300 millimeters) as follows:
• For each additional 6 inches (150 millimeters) or fraction thereof, increase the number of roller passes in Subsection 204.11(a)(1)(a), by four passes; or
• For each additional 6 inches (150 millimeters) or fraction thereof, increase the number of roller passes in Subsection 204.11(a)(1)(b) and (c), by eight passes.
(2) 50 to 80 percent retained on a No. 4 (4.75-millimeter) sieve. Classify the material according to AASHTO M 145. Adjust the moisture content of material classified A-1 through A- 5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content. Use AASHTO T 99 to determine the optimum moisture content of the portion of the material passing a No. 4 (4.75-millimeter) sieve. Multiply this number by the percentage of material passing a No. 4 (4.75-millimeter) sieve, and add 2 percent to determine the optimum moisture content of the material.
Use nonvibratory rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet(1 meter) per second. Compact each layer of material full width according to Subsection 204.11(a)(1).
Special Contract Requirements Glasgow Field Office
(3) Less than 50 percent retained on a No. 4 (4.75-millimeter) sieve. Classify the material according to AASHTO M 145. For material classified A-1 or A-2-4, determine the maximum density according to AASHTO T 99, Method C.
Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures. When required, use AASHTO T 224 to correct for coarse particles.
(b) Placement Method 2. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate roller compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Ensure rollers meet the following requirements:
(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch (4.5 kilogram/millimeter) of width of the compression roll or rolls.
(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration, specifically designed to compact the material on which it is used.
(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi (550 Kilopascals).
(4) Sheepsfoot, tamping, or grid rollers capable of exerting a force of 250 pounds per inch (4.5 kilogram/millimeter) of width of roller drum.
(c) Placement Method 3. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer until there is no visible evidence of further consolidation. Make at least three complete passes.
(d) Placement Method 4. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer.
(e) Placement Method 5. Adjust the moisture content of the material to a moisture content suitable for compaction. Compact the complete surface with a bucket of an excavator larger than 39,000 pounds (18 metric ton) Gross Vehicle Weight using a minimum of three blows. Overlap compaction by ½ width of bucket.
(f) Placement Method 6. Adjust the moisture content of the material to a moisture content suitable for compaction. Compact using an approved mechanical tamper for a minimum of three complete passes.
Special Contract Requirements Glasgow Field Office
When compacting with rollers or hauling and spreading equipment is not practical, use approved mechanical tampers for a minimum of three complete passes.
Special Contract Requirements Eastern Montana District, Montana Glasgow Stream Crossing Improvement Bureau of Land Management
Section 209 - Structure Excavation and Backfill
209.10 Compacting. Delete Subsection 209.10 and replace with the following:
Compact the embankment using one of the following methods as specified.
(a) Compaction Method 1. Use AASHTO T 27 to determine the quantity of material retained on a No.
4 (4.75-millimeter) sieve. Compact as follows:
(1) More than 80 percent retained on a No. 4 (4.75-millimeter) sieve. Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation:
(a) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds (180 kilonewtons) impact per vibration and a minimum frequency of 1000 vibrations per minute;
(b) Eight roller passes of a 20-ton (20-metric ton) compression-type roller; or
(c) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration and a minimum frequency of 1000 vibrations per minute.
Increase the compactive effort for layers deeper than 12 inches (300 millimeters) as follows:
• For each additional 6 inches (150 millimeters) or fraction thereof, increase the number of roller passes in Subsection 209.10(a)(1)(a), by four passes; or
• For each additional 6 inches (150 millimeters) or fraction thereof, increase the number of roller passes in Subsection 209.10(a)(1)(b) and (c), by eight passes.
(2) 50 to 80 percent retained on a No. 4 (4.75-millimeter) sieve. Classify the material according to AASHTO M 145. Adjust the moisture content of material classified A-1 through A- 5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content. Use AASHTO T 99 to determine the optimum moisture content of the portion of the material passing a No. 4 (4.75-millimeter) sieve. Multiply this number by the percentage of material passing a No. 4 (4.75-millimeter) sieve, and add 2 percent to determine the optimum moisture content of the material.
Use nonvibratory rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet(1 meter) per second. Compact each layer of material full width according to Subsection 209.10(a)(1).
(3) Less than 50 percent retained on a No. 4 (4.75-millimeter) sieve. Classify the material according to AASHTO M 145. For material classified A-1 or A-2-4, determine the maximum density according to AASHTO T 99, Method C..
Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density. Determine the in-place density and moisture content
Glasgow Stream Crossing Improvement Bureau of Land Management according to AASHTO T 310 or other approved test procedures. When required, use AASHTO T 224 to correct for coarse particles.
(b) Compaction Method 2. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate roller compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Ensure rollers meet the following requirements:
(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch (4.5 kilogram/millimeter) of width of the compression roll or rolls.
(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration, specifically designed to compact the material on which it is used.
(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi (550 Kilopascals).
(4) Sheepsfoot, tamping, or grid rollers capable of exerting a force of 250 pounds per inch (4.5 kilogram/millimeter) of width of roller drum.
(c) Compaction Method 3. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer until there is no visible evidence of further consolidation. Make at least three complete passes.
(d) Compaction Method 4. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer.
(e) Compaction Method 5. Adjust the moisture content of the material to a moisture content suitable for compaction. Compact the complete surface with a bucket of an excavator larger than 39,000 pounds (18 metric ton) Gross Vehicle Weight using a minimum of three blows. Overlap compaction by ½ width of bucket.
(f) Compaction Method 6. Adjust the moisture content of the material to a moisture content suitable for compaction. Compact using an approved mechanical tamper for a minimum of three complete passes.
When compacting with rollers or hauling and spreading equipment is not practical, use approved mechanical tampers for a minimum of three complete passes.
Glasgow Stream Crossing Improvement Bureau of Land Management
DIVISION 300
EARTHWORK
Glasgow Stream Crossing Improvement Bureau of Land Management
Section 301 – Untreated Aggregate Base Courses
301.05 Compacting. Delete Subsection 301.05 and replace with the following:
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road.
Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
(a) Compaction A. Operating spreading and hauling equipment over the full width of the travel way.
(b) Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).
(c) Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).
(d) Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
(e) Compaction E. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures.
Glasgow Stream Crossing Improvement Bureau of Land Management
DIVISION 600
INCIDENTAL CONSTRUCTION
Glasgow Stream Crossing Improvement Bureau of Land Management
Section 629. —Rolled Erosion Control Products and Cellular Confinement Systems
629.06. Cellular Confinement Systems Add the following Subsection 629.06:
(a) Design Basis – Rutguard load support and erosion control (or approved equal)
(b) Height: 8”
(c) Tensile Strength: 1800 lbs min
(d) Material:
a. UV stabilized
b. 100% recyclable materials
c. Manufactured in USA
d. Anchoring:
i. Embed per manufacturer’s specifications below 6” lift of aggregate and concrete planks as shown in plans.
e. Underlayment: Install 6 oz non-woven geotextile fabric as specified by the manufacturer as underlayment through geocell footprint. Rutguard installation overview found here… https://cdn.shopify.com/s/files/1/0558/9414/7246/files/RutGuard_Installation_Guide.pdf?
v=1623100079 https://cdn.shopify.com/s/files/1/0558/9414/7246/files/RutGuard_Installation_Guide.pdf?v=1623100079 https://cdn.shopify.com/s/files/1/0558/9414/7246/files/RutGuard_Installation_Guide.pdf?v=1623100079
Glasgow Stream Crossing Improvement Bureau of Land Management
DIVISION 700
MATERIAL
Glasgow Stream Crossing Improvement Bureau of Land Management
Section 703 - Aggregate
703.05 (c) Surface Course Aggregate. Delete Subsection 703.05(c)(3) and Replace with the following:
(3) Plasticity Index, AASHTO T 90 If the percent passing the No. 200 sieve is less than 12% 2 to 9 If the percent passing the No. 200 sieve is greater than 12% Less than 2
Glasgow Stream Crossing Improvement Bureau of Land Management
Section 704 – Soil
704.01. Foundation Fill. Delete the subsection and replace with the following:
Furnish a suitable material conforming to the following:
(a) Material passing 6 inch sieve 100%
(b) Material passing 3 inch sieve 75%-100%
(c) Material passing No. 200 sieve 0-15%
(d) Maximum Plasticity Index 6
704.02 Bedding Material. Delete Subsection 704.02(a) and replace with the following:
(a) Maximum particle size
3 in (75 millimeters) or half the corrugation depth, whichever is smaller
704.03 Backfill Material. Delete the subsection and replace with the following:
Furnish granular material or fine compactible soil free of excess moisture, muck, frozen lumps, roots, sod, and other deleterious material.
704.04 Structural Backfill. Delete the subsection and replace with the following:
Furnish a suitable, free draining material. Remove all rock particles and hard earth clods larger than 9 inches in the longest dimension. Ensure material conforms with the following:
(a) Material passing No 200 sieve, AASHTO T 27 and T 11 5% max.
(b) Liquid limit, AASHTO T 89 30% max.
| PREFACE |
| DIVISION 100 |
| GENERAL REQUIREMENTS |
| Section 101 - Terms¸ Format¸ and Definitions |
| 101.01 Meaning of Terms. Add the following: |
| 101.03 Abbreviations. Add the following to (a) Acronyms |
| 101.04 Definitions. Delete the definitions for the following terms: |
| Modify the following definitions as follows: |
| Add the following definitions: |
| Section 102 - Bid¸ Award¸ and Execution of Contract |
| 102 Bid, Award, and Execution of Contract. Delete in its entirety. |
| Section 103 - Scope of Work |
| 103.02 Disputes. Delete in its entirety. |
| 103.03 Value Engineering. Delete in its entirety. |
| 103.04 Contractor Records. Delete in its entirety. |
| Section 104 - Control of Work |
| 104.01 Authority of the Contracting Officer (CO). Delete in its entirety. |
| 104.02 Authority of Inspectors. Delete in its entirety. |
| 104.03 Specifications and Drawings. |
| (c) As-built drawings. Modify the first sentence to read as follows: |
| (d) Submittals. Add this section: |
| 104.04 Coordination of Contract Documents. Delete in its entirety. |
| Section 106 - Acceptance of Work |
| 106.02 Visual Inspection. Delete and replace with the following: |
| Section 107. – LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
| 107.03 Bulletin Board. Delete in its entirety. |
| 107.05 Responsibility for Damage Claims. Delete in its entirety. |
| 107.06 Contractor’s Responsibility for Work. Delete in its entirety. |
| 107.09 Legal Relationship of the Parties. Delete in its entirety. |
| 107.10 Environmental Protection. |
| Section 108 - Prosecution and Progress |
| Section 108. Delete Section 108 in its entirety. |
| Section 109 - Measurement and Payment |
| 109.03 Weighing Procedures and Devices. |
| 109.06 Pricing of Adjustments. Delete in its entirety. |
| 109.07 Eliminated Work. Delete in its entirety. |
| 109.08 Progress Payments. Delete in its entirety. |
| 109.09 Final Payment. Delete in its entirety. |
| DIVISION 150 |
| Section 151 - Mobilization |
| 151.03 Payment |
| Section 152 - Construction Survey and Staking |
| Table 152-1 Construction Survey and Staking Tolerances Replace Table 152-1 with the following: |
| Section 153 - Contractor Quality Control |
| 153.02 Qualifications. Delete and replace with the following: |
| 153.03 Quality Control Plan. Add the following paragraph to the end of Subsection 153.03(b): |
| 153.07 Records and control charts. Delete Subsection 153.07 and replace with the following: |
| 153.04 (2) (a) Submittal Log Add the following Subsection: |
| DIVISION 200 |
| Section 204 - Excavation and Embankment |
| 204.11 Compaction. Delete Section 204.11 in its entirety and replace with the following: |
| Section 209 - Structure Excavation and Backfill |
| 209.10 Compacting. Delete Subsection 209.10 and replace with the following: |
| DIVISION 300 |
| Section 301 – Untreated Aggregate Base Courses |
| 301.05 Compacting. Delete Subsection 301.05 and replace with the following: |
| DIVISION 600 |
| Section 629. —Rolled Erosion Control Products and Cellular Confinement Systems |
| 629.06. Cellular Confinement Systems Add the following Subsection 629.06: |
| DIVISION 700 |
| Section 703 - Aggregate |
| 703.05 (c) Surface Course Aggregate. Delete Subsection 703.05(c)(3) and Replace with the following: |
| Section 704 – Soil |
| 704.01. Foundation Fill. Delete the subsection and replace with the following: |
| 704.02 Bedding Material. Delete Subsection 704.02(a) and replace with the following: |
| 704.03 Backfill Material. Delete the subsection and replace with the following: |
| 704.04 Structural Backfill. Delete the subsection and replace with the following: |
File details come from the government source that posted it. Updated .