Update_Attachment_2_-_Glasgow_Stream_Crossing_Drawings__0003.pdf

PDF 9 MB Posted

Attached to
GAOA - Glasgow Stream Crossing Improvements Federal contract opportunity
Solicitation number
140L3625R0011
Issued by
Department of the Interior Bureau of Land Management

About this file

These are engineering and design drawings for the Glasgow Stream Crossing Improvements project by the Bureau of Land Management (BLM) in Valley County, Montana. The comprehensive set of 19 detailed sheets includes site surveys, culvert installation plans, and technical specifications for improvements at three locations: Cactus Flats Road, Triple Crossing Road, and Gutshot Dam.

The project involves multiple critical infrastructure enhancements, including: installing a 24-foot box culvert on Cactus Flats Road, replacing three culverts on Triple Crossing Road to improve drainage and road stability, decommissioning outlet works at Gutshot Dam, and constructing a low-water crossing. Technical details cover excavation, culvert installation, riprap armoring, erosion control, and roadway reconstruction, with specific requirements for material types, installation methods, and environmental considerations. The drawings provide precise engineering specifications, site layouts, cross-sections, and installation details for each project component, indicating a comprehensive approach to stream crossing and road infrastructure improvements.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRIPLE CROSSING

ROAD CULVERTS

GUTSHOT DAM

CACTUS FLATS BOX CULVERT

IDAHO

CANADA

UNITED STATES

SASKATCHEWAN

ALBERTA

BRITISH COLUMBIA

N O

R

TH

D

AK

O

TA

SO

U

TH

D

AK

O

TA

WYOMING

ALT

2 89

191 89

90 90

212 310 87

MISSOULA

KALISPELL

GREAT FALLS

HAVRE

HELENA

BUTTE

BILLINGS

MILES CITY

LEWISTOWN

MONTANACHOTEAU

MALTA

GLASGOW

CHESTER

FT BENTON

STATE REFERENCE MAP

(N.T.S)

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

GLASGOW STREAM CROSSING IMPROVEMENTS

VALLEY COUNTY

GLASGOW FIELD OFFICE

VICINITY MAP

(N.T.S)

GENERAL ENGINEER'S NOTES

1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY

CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS

SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEQHERE IN THE

CONTRACT DOCUMENTS.

2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND

REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.

3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL

PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.

4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR

INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.

CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE

CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION COVERED BY

THIS PLAN.

5 A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING

PUBLIC OR PRIVATE UNDERGROUND FACILITIES AND UTILITIES IN THE

CONSTRUCTION AREA. THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO

UTILITIES AND/OR FACILITES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.

THE CONTRACTOR SHALL CALL 48 HOURS IN ADVANCE FOR BLUE STAKE

(1-800-STAE-IT) PRIOR TO ANY EXCAVATION.

6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL

EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW

CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN

ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE ENGINEER WITH

DISCREPANCY.

7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE

LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT

ENGINEER WITH ANY DISCREPANCIES.

8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.

9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO

WORK WITH WEATHER CONDITIONS, AS THE SITE MAY BE LOCATED IN AN AREA WITH

EXTREME WEATHER CONDITIONS OR WITHIN A FLOOD PRONE AREA.

PROJECT LOCATION

DIRECTIONS TO TRIPLE CROSSING ROAD:

FROM GLASGOW, MT, FOLLOW MT-24 S FOR 9.4 MILES. TURN RIGHT

AND FOLLOW THE FRONTAGE ROAD FOR 3.0 MILES. TURN RIGHT

ONTO MAXNESS ROAD/WILLOW CREEK ROAD AND FOLLOW FOR 15.5

MILES. TURN RIGHT ONTO TRIPLE CROSSING ACCESS ROAD.

C O

VE

R

Xref ..\05_BASE FILES\Gutshot Dam - BRDR.dwg

PREPARED BY:

CIVIL ENGINEER:

GRADY ANDERSON

BUREAU OF LAND MANAGEMENT'S

WESTERN DISTRICT OFFICE

106 N. PAKRMONT

BUTTE, MT 59701

MONTANA/DAKOTAS

ENGINEERING APPROVAL:

SEAN P. CLANCY

MONTANA/DAKOTAS

STATE ENGINEER

APPROVAL:

CASEY R. TRANG

FIELD OFFICE MANAGER

APPROVAL:

MICHAEL J. BORGREEN

PROJECT DESCRIPTION

PROJECT CONSISTS OF REMOVING THE EXISTING OUTLET WORKS, STABILIZING THE

BREACH, AND IMPROVING ACCESS AT GUTSHOT DAM, AS WELL AS INSTALLING

VARIOUS CULVERTS ALONG TRIPLE CROSSING AND CACTUS FLATS ROAD.

[1] EARTHWORK QUANTITIES ARE "IN PLACE"

ESTIMATES. NO SHRINK OR SWELL IS ASSUMED.

NO GROUND LOSS IS INCLUDED

[2] THE QUANTITIES ARE AN ESTIMATE OF THE

ENGINEER. THE CONTRACTOR SHALL MAKE THEIR

OWN INDEPENEDENT ESTIMATE OF QUANTITIES

AND BID THEREON.

G1

WILLOW CREEK ROAD

TO

G

LA

SG

O W

M

IL

ES

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

WILLOW CREEK

LONE TREE CREEK

TRIPLE CROSSING ROAD

TRIPLE CROSSING RESERVOIR

Drawing Index List Sheet Number Sheet Title Sheet Description

01 COVER G1

02 NOTES, ABBEREVIATIONS, & SITE MAP G2

03 GUTSHOT DAM SITE SURVEY C1

04 CACTUS FLATS SITE SURVEY C2

05 TRIPLE CROSSING ROAD SITE SURVEY C3

06 GUTSHOT OUTLET WORKS DEMOLITION C4

07 GUTSHOT DAM LOW WATER CROSSING C5

08 GUTSHOT DAM LOW WATER CROSSING C6

09 GUTSHOT DAM ACCESS ROAD C7

10 GUTSHOT DAM ACCESS ROAD C8

11 GUTSHOT DAM STABILIZATION C9

12 CACTUS FLATS BOX CULVERT C10

13 WEST TRIPLE CROSSING CULVERT C11

14 WHITETAIL CULVERT C12

15 UPPER TRIPLE CROSSING CULVERT C13

16 EROSION CONTROL DETAILS D1

17 CULVERT DETAILS D2

18 SILT FENCING D3

19 IN STREAM DETAILS D4

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

INTERSTATE HIGHWAY

AutoCAD SHX Text

U.S. HIGHWAY

AutoCAD SHX Text

STATE CAPITOL

AutoCAD SHX Text

BLM STATE OFFICE

AutoCAD SHX Text

BLM DISTRICT OFFICE

AutoCAD SHX Text

© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW

FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT

SHEETS\GUTSHOT-NOTES.DWG

PUBLIC SAFETY & TRAFFIC CONTROL NOTES

1. CONTRACTOR TO TAKE ALL NECESSARY PRECAUTIONS TO ENSURE PROTECTION OF

THE PUBLIC AND SAFE GUARDING OF WORK.

SITE PLAN NOTES

1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY

CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS

SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEWHERE IN THE

CONTRACT DOCUMENTS.

2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND

REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.

3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL

PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.

4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR

INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.

CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE

CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION COVERED BY

THIS PLAN.

5 A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING

PUBLIC OR PRIVATE UNDERGROUND FACILITIES AND UTILITIES IN THE

CONSTRUCTION AREA. THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO

UTILITIES AND/OR FACILITES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.

THE CONTRACTOR SHALL CALL 48 HOURS IN ADVANCE FOR BLUE STAKE

(1-800-STAKE-IT) PRIOR TO ANY EXCAVATION.

6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL

EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW

CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN

ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE ENGINEER WITH

DISCREPANCY.

7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE

LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT

ENGINEER WITH ANY DISCREPANCIES.

8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.

9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO

WORK WITH WEATHER CONDITIONS, AS THE SITE MAY BE LOCATED IN AN AREA WITH

EXTREME WEATHER CONDITIONS OR WITHIN A FLOOD PRONE AREA.

GRADING & DRAINAGE NOTES

1. PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES

AT ALL LOCATIONS.

2. PITCH EVENLY BETWEEN CONTOUR LINES AND BETWEEN

SPOT ELEVATIONS.

3. THE CONTRACTOR SHALL VERIFY EXISTING GRADES IN THE

FIELD AND REPORT ANY DISCREPANCIES TO THE ENGINEER

PRIOR TO COMMENCING CONSTRUCTION.

4. REFER TO THE EARTHWORK SECTION OF THE SPECIFICATION

FOR BACKFILL AND GRADING PROCEDURES.

5. EXCESS MATERIALS SHALL NOT BE REMOVED FROM THE SITE

UNLESS DIRECTED BY THE GOVERNMENT. SEE EARTHWORK

SPECIFICATIONS FOR DETAILS

DEMOLITION NOTES

1. PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES TO REMAIN IN PLACE

DURING DEMOLITION.

2. THE CONTRACTOR IS REQUIRED TO PRESERVE THE NATURAL LANDSCAPE AND

PROTECT EXISTING VEGETATION NOT REQUIRED OR OTHERWISE AUTHORIZED TO

BE REMOVED. CONTRACTOR TO REFERENCE PLAN FOR EXCAVATION AND REMOVAL

LIMITS.

3. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED SHALL BE RESTORED

TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE GOVERNMENT.

4. EXCAVATION AND FINISH GRADE AREAS, TO BE COVERED BY EMBANKMENTS, SHALL

BE THOROUGHLY CLEARED AND STRIPPED OF VEGETATIVE MATTER, BRUSH, TREES,

STUMPS, ROOTS, AND ROCK AS INDICATED ON THE PLAN. CLEARING AND GRUBBING

MATERIAL SHALL BE WASTED IN DESIGNATED AREAS IDENTIFIED ON THE PLAN OR

ON SITE PER THE GOVERNMENTS DIRECTIONS.

5. EXCAVATION MATERIAL NOT USED FOR THE CONSTRUCTION OF EMBANKMENTS

SHALL BE WASTED IN DESIGNATED WASTE AREA(S) AS IDENTIFIED ON THE PLANS

OR AS DIRECTED BY GOVERNMENT. WASTE MATERIAL SHALL BE SHAPED AND

BLENDED INTO THE SURROUNDING TERRAIN AND SHALL NOT EXCEED 3:1 SLOPES

UNLESS OTHERWISE SPECIFIED BY THE GOVERNMENT.

6. CONTRACTOR TO SEPARATE ANY SALVAGEABLE TOPSOIL AND USE MATERIAL TO

CAP WASTE SITE DURING EXCAVATION AND CLEARING.

7. ALL ROCK REMOVAL CONSIDERED INCIDENTAL TO SITE GRADING.

8. CONTRACTOR SHALL SUPPLY AND MAINTAIN, FOR THE DURATION OF CONTRACT,

ALL NECESSARY DEVICES FOR EROSION, SEDIMENT, AND DUST CONTROL, AND

DEWATERING WHEN REQUIRED.

9. CARE SHOULD BE TAKEN IN ALL EXCAVATION DUE TO POSSIBLE EXISTENCE OF

UNRECORDED UTILITIES.

10. CONSULT ALL DRAWING AND SPECIFICATIONS FOR COORDINATION PRIOR TO

COMMENCING DEMOLITION.

N

N O

TE

S, A

BB

ER

EV

IA

TI

O N

S, S

IT

E M

AP

UPPER TRIPLE CROSSING CULVERT

SHEET C3 & C13

WHITETAIL CULVERT

SHEET C3 & C12

WEST TRIPLE CROSSING CULVERT

SHEET C3 & C11

GUTSHOT DAM

SHEET C1, C4-C9

CACTUS FLATS

SHEET C2 & C10

G2

TRIPLE CROSSING RESERVOIR

BUREAU OF LAND

MANAGEMENT

STATE

OF MT

PRIVATE

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

CALCULATION AND DESIGN NOTES

ALL CULVERT STRUCTURES DESIGNED FOR HL-93 LOADING IN

ACCORDANCE WITH THE CURRENT EDITION OF AASHTO

STANDARD SPECIFICATIONS

ROADWAY(CULVERT) DESIGN SPEED: 35 MPH

ROADWAY (LOW WATER CROSSING) DESIGN SPEED: 15 MPH

ABBREVIATIONS

AB AGGREGATE BASE LP LOW POINT

ABUT ABUTMENT MAX MAXIMUM

AC ACRE MH MANHOLE

BLDR BOULDER MID MID POINT

BLM BUREAU OF LAND MANAGEMENT MIN MINIMUM

BM BENCHMARK MP MILE POST

BNDRY BOUNDARY MPH MILES PER HOUR

BP BEGIN POINT N NORTH, NORTHING

BTM BOTTOM OC ON CENTER

CF CUBIC FEET OFF OFFSET

CL CENTERLINE PC POINT OF CURVATURE

CMP CORRUGATED METAL PIPE POC POINT ON CURVE

CTRL CONTROL POINT PROP PROPOSED

CY CUBIC YARD PT POINT OF TANGENCY

DEMO DEMOLITION PVI POINT OF VERTICAL

INTERSECTION

DET DETAIL Q PEAK DISCHARGE VOLUME

DIA DIAMETER R RADIUS

E EAST, EASTING RDWY ROADWAY

ELEV ELEVATION S SLOPE

EP END POINT SF SQUARE FEET

EX EXISTING STA STATION

FES FLAIRED END SECTION SY SQUARE YARD

FG FINISHED GRADE TS TOP SOIL

GB GRADE BREAK TYP TYPICAL

INV INVERT VC VERTICAL CURVE

L LENGTH VOL VOLUME

LF LINEAR FEET YD YARD

TRIPLE CROSSING ROAD

CACTUS FLATS ROAD

WILLOW CREEK ROAD

ctrl 100 ctrl 200

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW

FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT

SHEETS\GUTSHOT-NOTES.DWG

N

0 100 200

FULL SCALE (22" X 34") 1 IN . = 100 FT.

HALF SCALE (11" X 17") 1 IN . = 200 FT.

BASIS OF SURVEY

THIS PROJECT WAS SURVEYED ON THE MONTANA ZONE 2500 STATE PLANE COORDINATE SYSTEM USING RTX GPS. THE PROJECT WAS BROUGHT TO GROUND AT SURVEY CONTROL POINT 100. THE GEODETIC DATUM IS NAD83(CONUS). THE VERTICAL DATUM IS NAVD88 (GEOID18). HORIZONTAL AND

VERTICAL UNITS ARE INTERNATIONAL FT.

PROJECT CONTROL WAS ESTABLISHED USING TRIMBLE CENTERPOINT POSITIONING AT ALL CONTROL.

LIDAR MAPPING INFO

LIDAR POINT CLOUD SURFACE WAS COLLECTED FROM THE MONTANA STATE LIDAR LIBRARY DATABASE. TITLE: "VALLEY_2018_VACNTY".

CONTROL POINT COORDINATE TABLE

POINT NUMBER NORTHING EASTING ELEVATION DESCRIPTION

100 1362571.739 2597651.423 2294.921 CONCRETE "X"

200 1362645.524 2597559.454 2276.445 1

2" REBAR (BLM)

G U

TS

H

O T

D

AM

S

IT

E

SU

R

VE

Y

GUTSHOT DAM - EXISTING SITE SURVEY

1" = 100'

*NOTE: CARE SHOULD BE TAKEN TO PROTECT ALL CONTROL POINTS THROUGHOUT THE DURATION OF THE PROJECT. THE BLM SHOULD BE NOTIFIED IF CONTROL POINTS ARE DISTURBED, MOVED, OR DESTROYED

DETENTION BASIN

DAM BREACH LOCATION

EXISTING ACCESS ROUTE

EXISTING ACCESS ROUTE

EXISTING ACCESS ROUTE

GUTSHOT DAM CREST

EXISTING OUTLET WORKS

LONE TREE CREEK

C1

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

2215 2220 2225

CTRL 500

CTRL 400

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW

FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT

SHEETS\GUTSHOT-NOTES.DWG

N

0 100 200

FULL SCALE (22" X 34") 1 IN . = 100 FT.

HALF SCALE (11" X 17") 1 IN . = 200 FT.

BASIS OF SURVEY

THIS PROJECT WAS SURVEYED ON THE MONTANA ZONE 2500 STATE PLANE COORDINATE SYSTEM USING RTX GPS. THE PROJECT WAS BROUGHT TO GROUND AT SURVEY CONTROL POINT 100. THE GEODETIC DATUM IS NAD83(CONUS). THE VERTICAL DATUM IS NAVD88 (GEOID18). HORIZONTAL AND

VERTICAL UNITS ARE INTERNATIONAL FT.

PROJECT CONTROL WAS ESTABLISHED USING TRIMBLE CENTERPOINT POSITIONING AT ALL CONTROL.

LIDAR MAPPING INFO

LIDAR POINT CLOUD SURFACE WAS COLLECTED FROM THE MONTANA STATE LIDAR LIBRARY DATABASE. TITLE: "VALLEY_2018_VACNTY".

CONTROL POINT COORDINATE TABLE

POINT NUMBER NORTHING EASTING ELEVATION DESCRIPTION

400 1358150.456 2623211.544 2226.06 1

2" REBAR (BLM)

500 1358434.719 2623457.217 2226.887 1

2" REBAR (BLM)

C

AC

TU

S

FL

AT

S

SI

TE

S

U R

VE

Y

CACTUS FLATS - EXISTING SITE SURVEY

1" = 100'

*NOTE: CARE SHOULD BE TAKEN TO PROTECT ALL CONTROL POINTS THROUGHOUT THE DURATION OF THE PROJECT. THE BLM SHOULD BE NOTIFIED IF CONTROL POINTS ARE DISTURBED, MOVED, OR DESTROYED

EXISTING DEBRIS/CULVERTS

FROM BREACH EVENT

EXISTING BREACH LOCATION

(IN ROADWAY)

PEARSON COULEE

USER-CREATED LOW WATER CROSSING

EXISTING STOCK PONDS

C2

CACTUS FLATS ROAD

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

CTRL 100

CTRL 300

CTRL 200

35 24

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW

FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT

SHEETS\GUTSHOT-NOTES.DWG

BASIS OF SURVEY

THIS PROJECT WAS SURVEYED ON THE MONTANA ZONE 2500 STATE PLANE COORDINATE SYSTEM USING RTX GPS. THE PROJECT WAS BROUGHT TO GROUND AT SURVEY CONTROL POINT 100. THE GEODETIC DATUM IS NAD83(CONUS). THE VERTICAL DATUM IS NAVD88 (GEOID18). HORIZONTAL AND

VERTICAL UNITS ARE INTERNATIONAL FT.

PROJECT CONTROL WAS ESTABLISHED USING TRIMBLE CENTERPOINT POSITIONING AT ALL CONTROL.

LIDAR MAPPING INFO

LIDAR POINT CLOUD SURFACE WAS COLLECTED FROM THE MONTANA STATE LIDAR LIBRARY DATABASE. TITLE: "VALLEY_2018_VACNTY".

CONTROL POINT COORDINATE TABLE

POINT NUMBER NORTHING EASTING ELEVATION DESCRIPTION

300 1365315.26 2553148.322 2424.69 1

2" REBAR (BLM)

TR

IP

LE

C

R O

SS

IN

G R

O

AD

S

IT

E

SU

R

VE

Y

WHITETAIL CULVERT

EXISTING SITE SURVEY

1" = 20'

UPPER TRIPLE CROSSING CULVERT

EXISTING SITE SURVEY

1" = 20'

WEST TRIPLE CROSSING CULVERT

EXISTING SITE SURVEY

1" = 20'

N

C3

CONTROL POINT COORDINATE TABLE

POINT NUMBER NORTHING EASTING ELEVATION DESCRIPTION

200 1362160.547 2553064.921 2434.835 1

2" REBAR (BLM)

CONTROL POINT COORDINATE TABLE

POINT NUMBER NORTHING EASTING ELEVATION DESCRIPTION

100 1355906.298 2539809.599 2504.761 CONCRETE "X"

*NOTE: CARE SHOULD BE TAKEN TO PROTECT ALL CONTROL POINTS THROUGHOUT THE DURATION OF THE PROJECT. THE BLM SHOULD BE NOTIFIED IF CONTROL POINTS ARE DISTURBED, MOVED, OR DESTROYED

N N

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

90°

6°

Skew #96

90°

5°

Skew #86

90°

Skew #90

DEMO NOTE: EXISTING CULVERTS SHOWN TO BE REMOVED. IMPROVED CULVERTS SHOW IN PLANS SHALL

BE INSTALLED AT THE SAME SKEW AS REMOVED STRUCTURES.

AutoCAD SHX Text

SKEW NO.

AutoCAD SHX Text

DEGREE

AutoCAD SHX Text

SKEW

AutoCAD SHX Text 90%%d

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

ROAD

AutoCAD SHX Text 90%%d

AutoCAD SHX Text

DEGREE

AutoCAD SHX Text

SKEW

SKEW NO.

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW

FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT

SHEETS\GUTSHOT-SITE.DWG

G U

TS

H

O T

O U

TL

ET

W O

R

KS

D

EM

O

LI

TI

O

N

DEMOLITION NOTES

[1] OUTLET WORKS CULVERT DIAMETER ≈ 5'.

DIAMETER AND DEPTH SHALL BE VERIFIED BY

CONTRACTOR UPON MOBILIZATION

[2] EXCAVATION SHALL BE IN ACCORDANCE WITH

SPECIFICATION SECTION 204. THE CONTRACTOR IS

EXPECTED TO MINIMIZE DISTURBANCE TO

IMMEDIATE AREA DURING EXCAVATION AND

EMBANKMENT OPERATIONS

[3] CONCRETE AND FENCING MATERIALS SHALL BE

DISPOSED OF OFF-SITE IN ACCORDANCE WITH

SPECIFICATION SECTION 203.05.(a)

EXISTING OUTLET STRUCTURE

PROFILE VIEW

NO SCALE

REMOVE AND DISPOSE OF

EXISTING STEEL FENCING

EXCAVATE, CUT, AND

DISPOSE OF CONDUIT

DECOMMISSIONED OUTLET STRUCTURE

PROFILE VIEW

NO SCALE

BACKFILL WITH EXISTING

ON-SITE MATERIAL.

COMPACT AND CONTOUR

TO SURFACE

≈ 60"

C4

C4

C4

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

REMOVE AND DISPOSE OF

EXISTING CONCRETE PAD

BROKEN BACK CULVERT

APP. 10' BELOW EXISTING GROUND SURFACE

(ABANDON IN PLACE) BLM PROVIDED SEED. INSTALL PER

SPECIFICATION SECTION 625.07(a)

R

EM

O

VE

A N

D D

IS

PO

SE

O

F D

R O

P

PI

PE

DEMOLITION

ITEM QUANTITY UNIT

STEEL FENCE REMOVAL &

DISPOSAL

48 LF

CONCRETE REMOVAL &

DISPOSAL

10 CY

5' Ø OUTLET WORKS

REMOVAL & DISPOSAL

20 LF

EARTHWORK FOR

DECOMMISSIONED OUTLET

STRUCTURE

20 CY

HAND SEEDING 0.25 ACRES

GUTSHOT DAM OUTLET WORKS

REMOVAL ESTIMATED QUANTITIES

GENERAL NOTES:

1. FILL MATERIAL FOR CAPPED OUTLET WORKS SHALL BE SOURCED ON SITE FROM NEARBY

EXCAVATION WORK.

2. MATERIAL SHALL BE FREE OF LARGE BOULDERS (>6" IN) DIA. AND COMPACTED IN LIFTS TO

ENSURE STABILIZATION.

3. IMPACTED AREA SHALL BE HAND-SEEDED WITH BLM PROVIDED SEED MIX PER SPECIFICATION

SECTION 625.

EXISTING OUTLET WORKS INTAKE STRUCTURE

PROFILE VIEW

NO SCALE

C4

2260 2262

17+00

18+00

19+00

STA:17+00.00 TO STA:19+00.00

HORZ: 1"=20'

VERT: 1"=10'

2245.00

2250.00

2255.00

2260.00

2265.00

2270.00

FG

: 2

0.

EG

: 2

0.

ST

A:

7+

.0

EG

: 2

9.

FG

: 2

0.

ST

A:

7+

.0

EG

: 2

9.

FG

: 2

0.

ST

A:

7+

.0

EG

: 2

9.

FG

: 2

8.

ST

A:

7+

.0

FG

: 2

5.

EG

: 2

6.

ST

A:

8+

.0

EG

: 2

7.

FG

: 2

7.

ST

A:

8+

.0

EG

: 2

0.

FG

: 2

0.

ST

A:

8+

.0

EG

: 2

0.

FG

: 2

0.

ST

A:

8+

.0

FG

: 2

0.

EG

: 2

0.

ST

A:

9+

.0

0.65%

14.17%

0.58%

11.46%

16.54%

BV

C

ST

A:

7+

.2

EL

EV

: 2

0.

BV

C

ST

A:

8+

.8

EL

EV

: 2

8.

BV

C

ST

A:

7+

.4

EL

EV

: 2

8.

BV

C

ST

A:

7+

.1

EL

EV

: 2

6.

BV

C

ST

A:

8+

.1

EL

EV

: 2

0.

LEGEND

GRASS/SEEDING

AREA

WASTE

TOP SOIL

RIP RAP (GRADE 3)

CONCRETE

NATIVE MATERIAL

GEOCELL

ROADWAY -

NATURAL SURFACE

EROSION CONTROL

BLANKET

N

0 10 20

FULL SCALE (22" X 34") 1 IN . = 10 FT.

HALF SCALE (11" X 17") 1 IN . = 20 FT.

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW

FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT

SHEETS\GUTSHOT-SITE.DWG

G U

TS

H

O T

D

AM

L O

W W

AT

ER

C R

O

SS

IN

G

LOW WATER CROSSING

CONSTRUCTION NOTES

[1] LOW WATER CROSSING FINISHED DRIVING

SURFACE WIDTH = 12'

[2] LOW WATER CROSSING TO BE ANCHORED BY

IMPORTED RIPRAP INSTALLED IN 2' TRENCH

OVER NON-WOVEN GEOTEXTILE AS SHOWN IN

DETAILS ON SHEET C6 AND IN ACCORDANCE

WITH SPECIFICATION SECTION 251.04.

SUBGRADE TO BE BLADED AND COMPACTED

PRIOR TO INSTALLATION OF GEOCELL.

[3] GEOCELL (8" THICKNESS) TO BE INSTALLED PER

SPECIFICATION SECTION 629.06 AND

MANUFACTURER'S INSTRUCTIONS. FILL

MATERIAL (IMPORTED AGGREGATE) TO BE

INSTALLED FLUSH TO GEOCELL HEIGHT PRIOR

TO CONCRETE PLANK INSTALLATION

[4] CONCRETE PLANKS TO BE INSTALLED OVER

GEOCELL AND CONSTRUCTED PER DETAILS ON

SHEET D4

LOW WATER CROSSING

PLAN VIEW

SCALE 1:20

M A

T C

H L

IN

E

ST

A

7+

M A

TC

H

LIN

E

STA

19+00

EXISTING GROUND

FINISH GROUND

(TOP OF CONCRETE PLANKS)

MATERIALS

TYPE QUANTITY UNIT

GEOCELL (8" DEPTH) 155 SY

IMPORTED AGGREGATE

(CLASS B SUBGRADE

MATERIAL)

44 CY

PRECAST CONCRETE PLANKS

(SHEET D4)

70 EA

NON-WOVEN GEOTEXTILE 180 SY

CLASS 2 RIP RAP 45 CY

C5

LOW WATER CROSSING

PROFILE VIEW

SCALE 1:20

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

BEGIN LOW WATER CROSSING

CONSTRUCTION

STA 17+50.00

END LOW WATER CROSSING

CONSTRUCTION

STA 18+50.00

EARTHWORK

ITEM QUANTITY UNIT

EXCAVATION (CUT) 180 CY

FILL (NATIVE) 380 CY

GUTSHOT DAM LOW WATER

CROSSING ESTIMATED QUANTITIES

RIP RAP ARMORING

(NOT SHOWN FOR CLARITY)

KEY-IN 2' BELOW FINISH GRADE

REFER TO DETAIL (1/C6))

CONCRETE PLANKS INSTALLED

PER DETAILS ON SHEET D4

STA 17+60 TO 18+40

40'≈30'

4'

≈30' 12'

14"

6"

DR

AW

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW

FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT

SHEETS\GUTSHOT-SITE.DWG

G U

TS

H

O T

D

AM

L O

W W

AT

ER

C R

O

SS

IN

G

STA 17+50 TO 18+50

12'-0"

TRAVELED WAY

CONCRETE PLANK

SLOPE≈.002

SUBGRADE

UNCLASSIFIED BORROW,

NATIVE FILL, OR 3" BASE COURSE

LOW WATER CROSSING TYPICAL SECTION

NO SCALE

MATCH STREAM BED SLOPESLOPE≈.002

KEY-IN RIP RAP 2' DEPTH

6" GEOCELL

C6

C6

LOW WATER CROSSING

CONSTRUCTION NOTES

[1] LOW WATER CROSSING SHALL DRAIN OUTSIDE

EDGE OF ROAD WITHOUT IMPEDING NATURAL

STREAM DYNAMICS.

[2] RIPRAP SHALL BE PLACED ON EACH SIDE OF

STRUCTURE AT 2' DEPTH BELOW FINISH GRADE IN

ACCORDANCE WITH SPECIFICATION SECTION 251.04

[3] ALL STREAM WORK SHALL BE DONE IN

ACCORDANCE WITH 124 PERMITTING AND

PERMORMED IN THE DRY WHEN FEASIBLE. CARE

SHALL BE TAKEN TO AVOID DISTURBANCE OF

EXISTING VEGETATION OUTSIDE THE FOOTPRINT OF

THE LOW WATER CROSSING STRUCTURE AND ALL

WASTE MATERIAL SHALL BE HAULED OUTSIDE OF

THE FLOODPLAIN PER BLM DIRECTION.

LOW WATER CROSSING

PLAN & PROFILE CONCEPTUAL VIEW

NO SCALE

CONCRETE PLANKS

DETAILS ON SHEET D4

RECONDITIONED ROADWAY

GEOCELL

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

EXISTING

CUT SLOPE

DEPOSIT FILL

MATERIAL ON

ROADBED, TYP.

EXISTING

FILL SLOPE

LOW WATER CROSSING EXAMPLE

NO SCALE

GEOCELL EXAMPLE

NO SCALE

STA 17+60 TO 18+40

*NOTE: RIPRAP NOT SHOWN FOR CLARITY

*NOTE: ANCHOR GEOCELL PER

MANUFACTURER'S RECOMMENDATIONS

AutoCAD SHX Text C

L

0+00

1+00

2+00

3+00 4+005+00

6+00

7+00

8+00

9+00

10+00

11+00

12+00

2240.00

2244.00

2248.00

2252.00

2256.00

2260.00

2264.00

2268.00

2272.00

2276.00

2280.00

2284.00

2288.00

2292.00

2296.00

2300.00

2304.00

2308.00

0+00.002240.00

2244.00

2248.00

2252.00

2256.00

2260.00

2264.00

2268.00

2272.00

2276.00

2280.00

2284.00

2288.00

2292.00

2296.00

2300.00

2304.00

2308.00

0+00.001+00.002+00.003+00.004+00.005+00.006+00.007+00.008+00.009+00.0010+00.0011+00.0011+50.002240.00

2244.00

2248.00

2252.00

2256.00

2260.00

2264.00

2268.00

2272.00

2276.00

2280.00

2284.00

2288.00

2292.00

2296.00

2300.00

2304.00

2308.00

11+50.00

VERT: 1"=8'

FG

: 2

5.

EG

: 2

5.

ST

A:

+0

0.

EG

: 2

0.

FG

: 2

0.

ST

A:

+5

0.

FG

: 2

6.

EG

: 2

6.

ST

A:

+0

0.

EG

: 2

3.

FG

: 2

3.

ST

A:

+5

0.

FG

: 2

1.

EG

: 2

1.

ST

A:

+0

0.

EG

: 2

0.

FG

: 2

0.

ST

A:

+5

0.

FG

: 2

9.

EG

: 2

9.

ST

A:

+0

0.

EG

: 2

8.

FG

: 2

8.

ST

A:

+5

0.

FG

: 2

8.

EG

: 2

8.

ST

A:

+0

0.

EG

: 2

8.

FG

: 2

8.

ST

A:

+5

0.

FG

: 2

7.

EG

: 2

7.

ST

A:

+0

0.

EG

: 2

6.

FG

: 2

7.

ST

A:

+5

0.

FG

: 2

7.

EG

: 2

6.

ST

A:

+0

0.

EG

: 2

7.

FG

: 2

7.

ST

A:

+5

0.

FG

: 2

7.

EG

: 2

7.

ST

A:

+0

0.

EG

: 2

7.

FG

: 2

7.

ST

A:

+5

0.

FG

: 2

7.

EG

: 2

7.

ST

A:

+0

0.

EG

: 2

7.

FG

: 2

8.

ST

A:

+5

0.

FG

: 2

8.

EG

: 2

8.

ST

A:

+0

0.

EG

: 2

8.

FG

: 2

9.

ST

A:

+5

0.

FG

: 2

9.

EG

: 2

9.

ST

A:

0+

.0

EG

: 2

8.

FG

: 2

8.

ST

A:

0+

.0

FG

: 2

7.

EG

: 2

6.

ST

A:

1+

.0

EG

: 2

5.

FG

: 2

5.

ST

A:

1+

.0

10.36%

6.32% 2.38%

0.68%0.19% 1.09%

3.05%

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW

FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT

SHEETS\GUTSHOT-SITE.DWG

G U

TS

H

O T

D

AM

A C

C

ES

S R

O

AD

N

0 40 80

FULL SCALE (22" X 34") 1 IN . = 40 FT.

HALF SCALE (11" X 17") 1 IN . = 80 FT.

GUTSHOT DAM ACCESS ROAD PLAN VIEW

SCALE 1:40

BEGINNING OF ROAD RECONDITIONING

STA 0+00.00

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

GUSTHOT DAM ACCES ROAD PROFILE VIEW

SCALE 1:40

ROAD CONSTRUCTION NOTES

[1] PREPARE AND GRADE ROADWAY PER

SPECIFICATION SECTIONS 204 AND 212

[2] GRUB AND SCARIFY ROADWAY 6" IN DEPTH.

GRADE TO MATCH EXISTING PRISM ELEVATION.

COMPACT PER SPECIFICATION SECTION 204.11

STA 0+00 TO 17+50

STA 18+50 TO 23+00

12'-0" MIN AND VARIES,

TRAVELED WAY

6" RECONDITIONED SURFACE

CUT S

LO

PE

≈3 :1

SLO

PE

≈2:1

SUBGRADE

UNCLASSIFIED BORROW,

NATIVE FILL, OR 3" BASE COURSE

SITE ROAD CONSTRUCTION TYPICAL SECTION

NO SCALE

2% SLOPE

C7

EXISTING GROUND

FINISH GROUND

SCARIFY AND REDEFINE ROADWAY. GRADE ROADWAY SURFACE TO DRAIN

12+00.0013+00.0014+00.0015+00.0016+00.0017+00.0018+00.0019+00.0020+00.0021+00.0022+00.0023+00.0023+50.00

ST

A:

2+

.0

EG

: 2

2.

FG

: 2

2.

ST

A:

2+

.0

FG

: 2

7.

EG

: 2

7.

ST

A:

3+

.0

EG

: 2

3.

FG

: 2

4.

ST

A:

3+

.0

FG

: 2

1.

EG

: 2

1.

ST

A:

4+

.0

EG

: 2

0.

FG

: 2

0.

ST

A:

4+

.0

FG

: 2

0.

EG

: 2

9.

ST

A:

5+

.0

EG

: 2

9.

FG

: 2

0.

ST

A:

5+

.0

FG

: 2

0.

EG

: 2

9.

ST

A:

6+

.0

EG

: 2

0.

FG

: 2

0.

ST

A:

6+

.0

FG

: 2

0.

EG

: 2

0.

ST

A:

7+

.0

EG

: 2

9.

FG

: 2

0.

ST

A:

7+

.0

FG

: 2

5.

EG

: 2

6.

ST

A:

8+

.0

EG

: 2

0.

FG

: 2

0.

ST

A:

8+

.0

FG

: 2

0.

EG

: 2

0.

ST

A:

9+

.0

EG

: 2

1.

FG

: 2

2.

ST

A:

9+

.0

FG

: 2

5.

EG

: 2

4.

ST

A:

0+

.0

EG

: 2

0.

FG

: 2

1.

ST

A:

0+

.0

FG

: 2

9.

EG

: 2

9.

ST

A:

1+

.0

EG

: 2

9.

FG

: 2

8.

ST

A:

1+

.0

FG

: 2

5.

EG

: 2

5.

ST

A:

2+

.0

EG

: 2

8.

FG

: 2

8.

ST

A:

2+

.0

FG

: 2

0.

EG

: 2

0.

ST

A:

3+

.0

FG

EG

ST

A:

3+

.0

12.15% 7.35%

3.27% 0.24%0.65%

14.17%0.58%2.10%

6.64%

14.87%

18.20%

10.23%2.87%

4.14%

11.46%

16.54% ctrl 100

12+00

13+00

14+00

15+00

16+00

17+00

18+00

19+00

20+00

21+00

22+00

23+00 23+22

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW

FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT

SHEETS\GUTSHOT-SITE.DWG

G U

TS

H

O T

D

AM

A C

C

ES

S R

O

AD

LOW WATER CROSSING

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

GUSTHOT DAM ACCES ROAD PROFILE VIEW

NO SCALE

N

0 40 80

FULL SCALE (22" X 34") 1 IN . = 40 FT.

HALF SCALE (11" X 17") 1 IN . = 80 FT.

ROAD CONSTRUCTION NOTES

[1] PREPARE AND GRADE ROADWAY PER

SPECIFICATION SECTIONS 204 AND 212

[2] SCARIFY ROADWAY 6" IN DEPTH AND GRADE

TO MATCH EXISTING PRISM ELEVATION.

COMPACT PER SPECIFICATION SECTION 204.11

END OF ROAD RECONDITIONING

STA 23+22.00

C8

STA 0+00 TO 17+50

STA 18+50 TO 23+00

12'-0" MIN AND VARIES,

TRAVELED WAY

6" RECONDITIONED SURFACE

CUT S

LO

PE

≈3 :1

SLO

PE

≈2:1

SUBGRADE

UNCLASSIFIED BORROW,

NATIVE FILL, OR 3" BASE COURSE

SITE ROAD CONSTRUCTION TYPICAL SECTION

NO SCALE

2% SLOPE

SCARIFY AND REDEFINE ROADWAY. GRADE ROADWAY SURFACE TO DRAINSCARIFY AND REDEFINE ROADWAY. GRADE ROADWAY SURFACE TO DRAIN LOW WATER CROSSING ctrl 100 ctrl 200

226022

70 22

16+00

17+0018+00

19+00 20+00 ctrl 100 ctrl 200

226022

70 22

16+00

17+0018+00

19+00 20+00

LEGEND

GRASS/SEEDING

AREA

WASTE

TOP SOIL

EROSION CONTROL

BLANKET

STA:15+00.00 TO STA:19+50.00

HORZ: 1"=40'

VERT: 1"=20'

2245.00

2250.00

2255.00

2260.00

2265.00

2270.00

2275.00

2280.00

2285.00

2290.00

2295.00

2300.00

2305.00

2310.00

FG

EG

: 2

5.

ST

A:

5+

.0

EG

: 2

5.

04 FG

ST

A:

5+

.0

FG

: 2

3.

EG

: 2

3.

ST

A:

6+

.0

EG

: 2

0.

FG

: 2

8.

ST

A:

6+

.0

FG

: 2

1.

EG

: 2

8.

ST

A:

7+

.0

EG

: 2

7.

FG

: 2

1.

ST

A:

7+

.0

FG

: 2

8.

EG

: 2

0.

ST

A:

8+

.0

EG

: 2

0.

98 FG

ST

A:

8+

.0

FG

EG

: 2

5.

ST

A:

9+

.0

FG

EG

: 2

5.

ST

A:

9+

.0

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW

FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT

SHEETS\GUTSHOT-SITE.DWG

G U

TS

H

O T

D

AM

S

TA

BI

LI

ZA

TI

O N

GRADING NOTES

[1] ALL EXCAVATED MATERIAL TO BE WASTED ON

SITE, OUTSIDE OF EXISTING FLOOD PLAIN, IN

LOCATIONS DESIGNATED BY BLM

[2] IF ENCOUNTERED DURING EXCAVATION, REMOVE

AND DISPOSE OF OUTLET WORKS CONDUIT

DURING EXCAVATION EFFORTS. DISPOSE OF OFF

SITE PER SPECIFICATION SECTION 203.05(a).

[3] ALL GRADED MATERIAL ASSUMED TO BE AN

ASSORTMENT OF COMPACTED SILT AND CLAY.

BLEND ALL FINAL GRADE BREAKS TO MATCH

EXISTING CONTOURS.

[4] SURVEY GRADE STAKES TO BE PROVIDED BY

CONTRACTOR AND VERIFIED BY BLM ENGINEER

[5] PROTECT ALL CONTROL, BENCHMARKS, OR

MONUMENTS DURING EXCAVATION. CONFINE

HEAVY EQUIPMENT OPERATION TO PREVIOUSLY

DISTURBED AREAS WHEN POSSIBLE

[6] MINIMIZE WORK AND EQUIPMENT OPERATION IN

THE STREAM CHANNEL AND AVOID CROSSING

DURING WET CONDITIONS. ALL WORK SHOULD BE

COMPLETED IN THE DRY, AND CONTRACTOR

SHALL MAINTAIN AN EFFORT TO MINIMIZE

SEDIMENTATION OR DEBRIS FROM ENTERING THE

STREAM CHANNEL. INSTALL SILT FENCE ALONG

TOE OF ALL NON-STABILIZED SLOPES.

[7] INSTALL EROSION CONTROL MAT CONFORMING TO

SPECIFICATION SECTION 629, AND HAND SEED ALL

DISTURBED AREAS PER SPECIFICATION SECTION

625.07.(a).

N

0 40 80

FULL SCALE (22" X 34") 1 IN . = 40 FT.

HALF SCALE (11" X 17") 1 IN . = 80 FT.

BREACH STABILIZATION

PLAN VIEW

EXISTING BREACH

PLAN VIEW

SCALE 1:40 SCALE 1:40

GRADE AT 3:1 SLOPE

TIE-IN TO EXISTING GROUND

CUT BOUNDARY

ASSUMED BROKEN-BACK

CULVERT LOCATION

C9

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

3:1 SLOPE

3:1 SLOPE

EARTHWORK

ITEM QUANTITY UNIT

CUT 8600 CY

FILL 400 CY

WASTE 8200 CY

EROSION CONTROL MATERIALS

ITEM QUANTITY UNIT

EROSION CONTROL

BLANKET

2780 SY

SILT FENCE 400 LF

SEEDING AREA 0.5 ACRE

GUTSHOT DAM STABILIZATION

ESTIMATED QUANTITIES

BREACH PROFILE VIEW

SCALE 1:20

DAM CREST

TOP OF CUT

ASSUMED OUTLET WORKS

LOCATION (NOT TO SCALE)

FINISH GROUND

(INSTALL EROSION CONTROL

MATTING AND SEED)

EXISTING GROUND

EXISTING STREAM BED

2-YR FLOW ELEV. = 2558.3'

10-YR FLOW ELEV. = 2562.2'

100-YR FLOW ELEV. = 2567.5'

MAT AND SEED ALL

DISTURBED AREAS PER

DETAILS ON SHEET D1

10 2210

2205.00

2208.00

2212.00

2216.00

2220.00

2224.00

2228.00

2232.00

1+00.00 2+00.00 3+00.00 4+00.00 4+50.00

FG

: 2

6.

EG

: 2

5.

ST

A:

+0

0.

EG

: 2

6.

FG

: 2

6.

ST

A:

+2

5.

EG

: 2

6.

FG

: 2

6.

ST

A:

+5

0.

EG

: 2

7.

FG

: 2

6.

ST

A:

+7

5.

FG

: 2

6.

EG

: 2

7.

ST

A:

+0

0.

EG

: 2

8.

FG

: 2

6.

ST

A:

+2

5.

EG

: 2

8.

FG

: 2

6.

ST

A:

+5

0.

EG

: 2

2.

FG

: 2

6.

ST

A:

+7

5.

FG

: 2

6.

EG

: 2

8.

ST

A:

+0

0.

EG

: 2

8.

FG

: 2

6.

ST

A:

+2

5.

EG

: 2

7.

FG

: 2

6.

ST

A:

+5

0.

EG

: 2

7.

FG

: 2

6.

ST

A:

+7

5.

FG

: 2

6.

EG

: 2

6.

ST

A:

+0

0.

EG

: 2

6.

FG

: 2

6.

ST

A:

+2

5.

FG

: 2

6.

EG

: 2

5.

ST

A:

+5

0.

0.11%

2204.00

2208.00

2212.00

2216.00

2220.00

2224.00

2228.00

3+75.00 4+00.00 5+00.00

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\CACTUS FLATS

ROUND - SITE.DWG

C

AC

TU

S

FL

AT

S R

O U

N D

CONSTRUCTION NOTES

[1] CULVERT SIZED TO 10-YEAR STORM EVENT.

[2] CULVERT TO BE SET ON PREPARED SUBGRADE IN ACCORDANCE WITH

SPECIFICATION SECTION 208. REFER TO DETAILS ON SHEET D2.

[3] INSTALL POLYMER COATED 12 GAUGE CMP CULVERT CENTERED AT ROAD

STATIONING 2+82.89 PER MANUFACTURER'S SPECIFICATIONS AND MONTANA

DEPARTMENT OF TRANSPORTATION HYDRAULICS MANUAL

(https://www.mdt.mt.gov/other/webdata/external/hydraulics/manuals/Chapter-11-Culverts .pdf).

[4] FURNISH CLASS 2 RIPRAP IN ACCORDANCE WITH SPECIFICATION TABLE 705-01

AND INSTALL OVER GEOTEXTILE UNDERLAYMENT TO ELEVATION (2216.0'). ALL

EXCESS RIPRAP MATERIAL SHALL BE USED IN THE STREAM CHANNEL AS A

CULVERT APRON.

[5] ROCK WEIRS TO BE CONSTRUCTED AT 50' INTERVALS FROM EXISTING CLASS II

RIP RAP ON SITE. CONSTRUCT PER DETAILS ON SHEET D4

[6] TEMPORARY ROAD CLOSURES WILL BE IDENTIFIED BY THE BLM IN THE FIELD

DURING CULVERT CONSTRUCTION. ALL TEMPORARY ROADS SHALL BE

RESTORED TO ORIGINAL CONDITION AS BEST POSSIBLE AFTER CULVERT

CONSTRUCTION HAS BEEN COMPLETED.

N

0 20 40

FULL SCALE (22" X 34") 1 IN . = 20 FT.

HALF SCALE (11" X 17") 1 IN . = 40 FT.

CACTUS FLATS CULVERT

PLAN VIEW

1:20

CACTUS FLATS CULVERT ROAD PROFILE

1:20

M A

T C

H L

IN

E

ST

A

+5

M A

T C

H L

IN

E

ST

A

1+00

EXISTING GROUND

FINISH GROUND

C10

CULVERT STREAM PROFILE

1:20

'-0

ROCK WEIR

RIPRAP ARMORING

EARTHWORK

ITEM QUANTITY UNIT

CUT 850 CY

FILL 800 CY

WASTE 50 CY

MATERIALS

ITEM QUANTITY UNIT

ROCK WEIR (ON SITE RIPRAP) 5 CY

POLYMER-COATED

CORRUGATED METAL

CULVERT (72" Ø)

80 LF

GEOTEXTILE FABRIC 50 SY

IMPORTED RIPRAP 25 CY

CACTUS FLATS

ESTIMATED QUANTITIES

INV STREAM STA: 3+96.63

INV. ELEV: 2208.35

INV STREAM

STA: 4+76.87

INV. ELEV: 2207.75

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

RIPRAP HEADWALL

RIPRAP ARMORING

ROADWAY SURFACE

EXISTING BYPASS

REHABILITATE ROADWAY PER

SPECIFICATION SECTION 211

'-0

72" Ø POLYMER-COATED CMP

90°Skew #90

2418.00

2420.00

2424.00

2428.00

2432.00

1+25.00 2+00.00 2+50.00

FG

: 2

7.

EG

: 2

7.

ST

A:

+2

5.

EG

: 2

6.

FG

: 2

6.

ST

A:

+5

0.

EG

: 2

6.

FG

: 2

6.

ST

A:

+7

5.

FG

: 2

6.

EG

: 2

6.

ST

A:

+0

0.

EG

: 2

6.

FG

: 2

6.

ST

A:

+2

5.

FG

: 2

6.

EG

: 2

6.

ST

A:

+5

0.

2408.00

2412.00

2416.00

2420.00

2424.00

2428.00

2432.00

2436.00

0+00.00 1+00.00 2+00.00 3+00.00

FG

EG

: 2

1.

ST

A:

+0 0.

EG

: 2

0.

65 FG

ST

A:

+2

5.

EG

: 2

1.

23 FG

ST

A:

+5

0.

EG

: 2

0.

49 FG

ST

A:

+7

5.

00 FG

EG

: 2

1.

ST

A:

+0

0.

EG

: 2

1.

26 FG

ST

A:

+2

5.

EG

: 2

6.

FG

: 2

9.

ST

A:

+5

0.

EG

: 2

2.

FG

: 2

9.

ST

A:

+7

5.

00 FG

EG

: 2

7.

ST

A:

+0

0.

EG

: 2

8.

07 FG

ST

A:

+2

5.

EG

: 2

8.

93 FG

ST

A:

+5

0.

EG

: 2

8.

37 FG

ST

A:

+7

5.

00 FG

EG

: 2

7.

ST

A:

+0

0.

0.40%

1.21%

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\TC CULVERTS -

SITE.DWG

W

ES

T

TR

IP

LE

C R

O

SS

IN

G

C U

LV

ER

T

CONSTRUCTION NOTES

[1] CULVERT TO BE INSTALLED AT INVERT

ELEVATIONS SHOWN IN PLANS AND COMPACTED

AS SHOWN ON SHEET D2

[2] EXISTING CULVERTS TO BE REMOVED AND

DISPOSED OF OFF-SITE

[3] INSTALL POLYMER COATED 12 GAUGE CMP

CULVERT PER MANUFACTURER'S SPECIFICATIONS

AND MONTANA DEPARTMENT OF

TRANSPORTATION HYDRAULICS MANUAL

(https://www.mdt.mt.gov/other/webdata/external/hydraulic s/manuals/Chapter-11-Culverts.pdf).

[4] INSTALL ROCK HEADWALL AROUND CULVERT

ENDS. HAND PLACE WITH CLASS 3 RIPRAP

MATERIAL IN ACCORDANCE WITH DETAILS ON

SHEET D2.

[5] TEMPORARY ROAD CLOSURES WILL BE IDENTIFIED

BY THE BLM IN THE FIELD DURING CULVERT

CONSTRUCTION. ALL TEMPORARY ROADS SHALL

BE RESTORED TO ORIGINAL CONDITION AS BEST

POSSIBLE AFTER CULVERT CONSTRUCTION HAS

BEEN COMPLETED.

N

0 20 40

FULL SCALE (22" X 34") 1 IN . = 20 FT.

HALF SCALE (11" X 17") 1 IN . = 40 FT.

WEST TRIPLE CROSSING CULVERT PLAN VIEW

NO SCALE

WEST TC CROSSING CULVERT STREAM PROFILE

NO SCALE

M A

T C

H L

IN

E

ST

A

50M A

T C

H L

IN

E

ST

A

0+

TRIPLE CROSSING ROAD

FINISH GROUND

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

WEST TC CROSSING CULVERT ROAD PROFILE

NO SCALE

FLOW

FLOW

FL

O

W

FL

O

W

STREAM (THALWEG)

ALIGNMENT

TRIPLE CROSSING ROAD

EXISTING GROUND

EXISTING CMP

CULVERT

PROPOSED RCP

CULVERT

LEGEND

INSTALL NEW CMP AT SAME SKEW

AS SHOWN ON SHEET C3

EXISTING CMP

CULVERT (72")

PROPOSED CULVERT

(72")

STREAM STATIONING: 1+86.54

INV ELEV: 2418.40

STREAM STATIONING: 1+36.80

INV ELEV: 2419.00

ITEM QUANTITY UNIT

EARTHWORK CUT/FILL 130 CY

REMOVE AND DISPOSE

EXISTING CMP (72")

40 LF

INSTALL POLYMER COATED

CMP (72" Ø, 12 GAUGE

THICKNESS)

50 LF

WEST TRIPLE CROSSING CULVERT

ESTIMATED QUANTITIES

C11

'-0

C O

VE

R

1.

RIPRAP HEADWALL

2424.00

2428.00

2432.00

2436.00

2440.00

2+75.00 3+00.00 4+00.00

FG

: 2

2.

EG

: 2

2.

ST

A:

+7

5.

FG

: 2

1.

EG

: 2

1.

ST

A:

+0

0.

EG

: 2

0.

FG

: 2

0.

ST

A:

+2

5.

EG

: 2

9.

FG

: 2

9.

ST

A:

+5

0.

EG

: 2

9.

FG

: 2

9.

ST

A:

+7

5.

FG

: 2

8.

EG

: 2

8.

ST

A:

+0

0.

C

TR

L

2416.00

2420.00

2424.00

2428.00

2432.00

2436.00

2440.00

2444.00

0+00.00 1+00.00 2+00.00 3+00.00 3+75.00

FG

: 2

0.

EG

: 2

0.

ST

A:

+0

0.

EG

: 2

9.

FG

: 2

9.

ST

A:

+2

5.

EG

: 2

1.

FG

: 2

1.

ST

A:

+5

0.

EG

: 2

9.

FG

: 2

9.

ST

A:

+7

5.

FG

: 2

9.

EG

: 2

9.

ST

A:

+0

0.

EG

: 2

7.

FG

: 2

7.

ST

A:

+2

5.

EG

: 2

9.

FG

: 2

9.

ST

A:

+5

0.

EG

: 2

7.

FG

: 2

7.

ST

A:

+7

5.

FG

: 2

7.

EG

: 2

7.

ST

A:

+0

0.

EG

: 2

7.

FG

: 2

7.

ST

A:

+2

5.

EG

: 2

7.

FG

: 2

7.

ST

A:

+5

0.

EG

: 2

7.

FG

: 2

7.

ST

A:

+7

5.

FG

: 2

7.

EG

: 2

7.

ST

A:

+0

0.

EG

: 2

9.

FG

: 2

9.

ST

A:

+2

5.

EG

: 2

8.

FG

: 2

8.

ST

A:

+5

0.

FG

: 2

8.

EG

: 2

8.

ST

A:

+7

5.

1.10%

1.07%

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\TC CULVERTS -

SITE.DWG

W H

IT

ET

AI

L

C U

LV

ER

T

N

0 20 40

FULL SCALE (22" X 34") 1 IN . = 20 FT.

HALF SCALE (11" X 17") 1 IN . = 40 FT.

WHITETAIL CROSSING CULVERT

PLAN VIEW

1:20

WHITETAIL CROSSING CULVERT STREAM PROFILE

NO SCALE

M A

T C

H L

IN

E

ST

A

M A

T C

H L

IN

E

ST

A

2+

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

WHITETAIL CROSSING CULVERT ROAD PROFILE

NO SCALE

FLOW

FLOW

EXISTING CMP

CULVERT

PROPOSED RCP

CULVERT

LEGEND

EXISTING CMP

CULVERT (48")

PROPOSED RCP

CULVERT

(72")

ITEM QUANTITY UNIT

EARTHWORK CUT/FILL 320 CY

REMOVE AND DISPOSE

EXISTING CMP (48")

60 LF

INSTALL POLYMER COATED

CMP (72" Ø, 12 GAUGE

THICKNESS)

60 LF

WHITETAIL CULVERT ESTIMATED

QUANTITIES

TRIPLE CROSSING ROAD

FINISH GROUND

FLOW

FL

O

W

STREAM (THALWEG)

ALIGNMENT

TRIPLE CROSSING ROAD

EXISTING GROUND

INSTALL NEW CMP AT SAME SKEW

AS SHOWN ON SHEET C3

STREAM STATIONING: 1+95.50

INV ELEV: 2427.81

STREAM STATIONING: 1+35.81

INV ELEV: 2428.45

C12

60'-0" C

O

VE

R 6.

RIPRAP HEADWALL

CONSTRUCTION NOTES

[1] CULVERT TO BE INSTALLED AT INVERT

ELEVATIONS SHOWN IN PLANS AND COMPACTED

AS SHOWN ON SHEET D2

[2] EXISTING CULVERTS TO BE REMOVED AND

DISPOSED OF OFF-SITE

[3] INSTALL POLYMER COATED 12 GAUGE CMP

CULVERT PER MANUFACTURER'S SPECIFICATIONS

AND MONTANA DEPARTMENT OF

TRANSPORTATION HYDRAULICS MANUAL

(https://www.mdt.mt.gov/other/webdata/external/hydraulic s/manuals/Chapter-11-Culverts.pdf).

[4] INSTALL ROCK HEADWALL AROUND CULVERT

ENDS. HAND PLACE WITH CLASS 3 RIPRAP

MATERIAL IN ACCORDANCE WITH DETAILS ON

SHEET D2.

[5] TEMPORARY ROAD CLOSURES WILL BE IDENTIFIED

BY THE BLM IN THE FIELD DURING CULVERT

CONSTRUCTION. ALL TEMPORARY ROADS SHALL

BE RESTORED TO ORIGINAL CONDITION AS BEST

POSSIBLE AFTER CULVERT CONSTRUCTION HAS

BEEN COMPLETED.

2496.00

2500.00

2504.00

2508.00

2512.00

3+75.00 4+00.00 5+00.00 5+25.00

FG

: 2

7.

EG

: 2

7.

ST

A:

+7

5.

FG

: 2

7.

EG

: 2

7.

ST

A:

+0

0.

EG

: 2

7.

FG

: 2

7.

ST

A:

+2

5.

EG

: 2

7.

FG

: 2

7.

ST

A:

+5

0.

EG

: 2

7.

FG

: 2

7.

ST

A:

+7

5.

FG

: 2

7.

EG

: 2

7.

ST

A:

+0

0.

FG

: 2

7.

EG

: 2

7.

ST

A:

+2

5.

CTRL 100

2490.00

2492.00

2496.00

2500.00

2504.00

2508.00

2512.00

2516.00

0+00.00 1+00.00 2+00.00 3+00.00

FG

EG

: 2

4.

ST

A:

+0 0.

EG

: 2

4.

26 FG

ST

A:

+2

5.

EG

: 2

4.

05 FG

ST

A:

+5

0.

EG

: 2

3.

80 FG

ST

A:

+7

5.

00 FG

EG

: 2

3.

ST

A:

+0

0.

EG

: 2

1.

08 FG

ST

A:

+2

5.

EG

: 2

7.

FG

: 2

0.

ST

A:

+5

0.

EG

: 2

5.

FG

: 2

9.

ST

A:

+7

5.

FG

: 2

8.

EG

: 2

0.

ST

A:

+0

0.

EG

: 2

8.

02 FG

ST

A:

+2

5.

EG

: 2

8.

14 FG

ST

A:

+5

0.

EG

: 2

8.

52 FG

ST

A:

+7

5.

00 FG

EG

: 2

8.

ST

A:

+0

0.

3.42%

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\TC CULVERTS -

SITE.DWG

U

PP

ER

T

R

IP

LE

C

R O

SS

IN

G C

U

LV

ER

T

N

0 20 40

FULL SCALE (22" X 34") 1 IN . = 20 FT.

HALF SCALE (11" X 17") 1 IN . = 40 FT.

UPPER TRIPLE CROSSING CULVERT

PLAN VIEW

NO SCALE

UPPER TRIPLE CROSSING CULVERT PROFILE VIEW

NO SCALE

M A

T C

H L

IN

E

ST

A

M A

T C

H L

IN

E

ST

A

2+

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

UPPER TRIPLE CROSSING CULVERT PROFILE VIEW

NO SCALE

FLOW

FLOW

EXISTING CMP

CULVERT

PROPOSED RCP

CULVERT

LEGEND

EXISTING CMP

CULVERT (42")

PROPOSED RCP

CULVERT

(60")

ITEM QUANTITY UNIT

EARTHWORK CUT/FILL 210 CY

REMOVE AND DISPOSE

EXISTING CMP (42")

80 LF

INSTALL POLYMER COATED

CMP (60" Ø, MIN. 12 GAUGE

THICKNESS)

80 LF

UPPER TRIPLE CROSSING CULVERT

ESTIMATED QUANTITIES

TRIPLE CROSSING ROAD

FINISH GROUND

FLOW

FL

O

W

STREAM (THALWEG)

ALIGNMENT

TRIPLE CROSSING ROAD

EXISTING GROUND

INSTALL NEW CMP AT SAME SKEW

AS SHOWN ON SHEET C3

STREAM STATIONING: 2+05.58

INV ELEV: 2498.20

STREAM STATIONING: 1+26.86

INV ELEV: 2500.85

C13

'-0

C O

VE

R

1.

RIPRAP HEADWALL

RIPRAP ARMORING

CONSTRUCTION NOTES

[1] CULVERT TO BE INSTALLED AT INVERT

ELEVATIONS SHOWN IN PLANS AND COMPACTED

AS SHOWN ON SHEET D2

[2] EXISTING CULVERTS TO BE REMOVED AND

DISPOSED OF OFF-SITE

[3] INSTALL POLYMER COATED 12 GAUGE CMP

CULVERT PER MANUFACTURER'S SPECIFICATIONS

AND MONTANA DEPARTMENT OF

TRANSPORTATION HYDRAULICS MANUAL

(https://www.mdt.mt.gov/other/webdata/external/hydraulic s/manuals/Chapter-11-Culverts.pdf).

[4] INSTALL ROCK HEADWALL AROUND CULVERT

ENDS. HAND PLACE WITH CLASS 3 RIPRAP

MATERIAL IN ACCORDANCE WITH DETAILS ON

SHEET D2.

[5] TEMPORARY ROAD CLOSURES WILL BE IDENTIFIED

BY THE BLM IN THE FIELD DURING CULVERT

CONSTRUCTION. ALL TEMPORARY ROADS SHALL

BE RESTORED TO ORIGINAL CONDITION AS BEST

POSSIBLE AFTER CULVERT CONSTRUCTION HAS

BEEN COMPLETED.

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\GSC-DETAILS.DWG

ER

O

SI

O

N C

O N

TR

O

L D

ET

AI

LS

D1

D R

AW

N

B Y:

L

IS

A C

YF

O

R D

FLOW

ASHINGLE SPLICE ~ SECTION

FASTENER

(TYP.)

6" MIN. EDGE

OVERLAP

6" MIN. END

OVERLAP

ISOMETRIC VIEW

6"

6" 4"

6" 4"

6"

(TYP.)

6"

6"

4"

B

EROSION CONTROL

BLANKET

NATIVE SOIL ~ FOLLOW

INSTALLATION STEPS

6" × 6" TRENCH

EXTEND BLANKET FAR ENOUGH OVER

CREST OF SLOPE TO EFFECTIVELY

PREVENT UNDERCUTTING AND TO

PROVIDE SECURE ANCHORING

BIODEGRADABLE EROSION

CONTROL BLANKET

PLACEMENT FOR SLOPES

EROSION CONTROL

BLANKET

4"

2 ROWS OF STAPLES

4" APART, STAGGERED,

6" O. C. PLACED WITHIN

6" OF BLANKET EDGE.

EXTEND BLANKET 24" BEYOND

TOE OF SLOPE OR TO EDGE

OF VEGETATION ~ WHICHEVER

IS CLOSER

18" MAX.

(TYP.)

36" MAX.

(TYP.)

36" MAX.

(TYP.)

18" MAX.

(TYP.)

INITIAL ANCHOR ~ DETAIL

(TYP.)

STAPLES ~ 4" APART,

STAGGERED, 6" O. C.

4"

6"

2 ROWS OF STAPLE (TYP.) ~

4" APART, STAGGERED, 6" O. C.

CONSTRUCTION NOTES

[1] More than the minimum of one fastener per square yard may be required due to conditions such as blanket composition, soil type, surface uniformity, and slope steepness.

[2] See Standard Specification 629.

Use manufacturer's requirements. When manufacturer's requirements are not provided, use installation requirements shown on Standard Plans.

[3] Additional staples may be required on slopes greater than 3H : 1V.

INSTALLATION STEPS

[1] Prepare smooth slope.

[2] Dig anchor trench. Set aside native soil removed from trench.

[3] Secure blanket in anchor trench, staking or stapling blanket as shown.

[4] Replace native soil previously removed from trench.

[5] Roll blanket down the slope in a controlled manner, taking care to remove excess slack, and taking care not to stretch blanket.

[6] Stake or staple blanket as shown so there are no gaps between the blanket and the soil.

Staple while unrolling blanket to minimize walking on blanket.

FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\GSC-DETAILS.DWG

C U

LV

ER

T D

ET

AI

LS

BEDDING [3]

NATIVE OR IMPORT

BACKFILL [4]

T

ROUND CULVERT INSTALLATION NOTES

[1] CONTRACTOR TO PERFORM EXCAVATION IN ACCORDANCE

WITH FHA FP-14 SPEC SEC 208.03. EXCAVATION SHALL

PROVIDE A SAFE WORKING ENVIRONMENT AND ALLOW FOR

ALL INSTALLATION AND COMPACTION REQUIREMENTS.

CONTRACTOR TO SLOPE, BENCH OR PROVIDE SHORING IN

ACCORDANCE WITH THE U.S. DEPARTMENT OF LABOR,

OCCUAPTION SAFETY AND HELTH ADMINISTRATION (OSHA)

TECHINAL MANUAL, SECTION 5 CHAPER 2.

[2] CONTRACTOR TO FURNISH AND INSTALL COUPLING BAND

WHEN MULTIPLE PIPE SEGEMENTS ARE REQUIRED TO

ACHIEVE CULVERT LENGTH. REFERENCE " ROUND

CORRUGATED METAL PIPE COUPLING BAND DETAIL" ON THIS

SHEET. COUPLING BAND TO BE CONTECH HUGGER BAND,

WITH GASKETS, OR APPROVED EQUAL. INSTALL PER

MANUFACTURER'S INSTRUCTIONS.

[3] CONTRACTOR TO FURNISH AND INSTALL BEDDING MATERIAL

PER FHA FP-14 SPEC SEC 209.08(B). BEDDING MATERIAL

SHALL CONFORM TO FHA FP-14 SPEC SEC 704.02.

[4] CONTRACTOR TO FURNISH & INSTALL BACKFILL MATERIAL

PER FHA FP-14 SPEC SEC 209.09(B)(1). BACKFILL MATERIAL

SHALL CONFORM TO FHA FP-14 SPEC SEC 704.03. 3. NO

BACKFILL SHALL BE PLACED UNTIL CULVERT SECTIONS HAVE

BEEN CONNECTED, PLACED, AND APPROVED BY THE

GOVERNMENT.

[5] CONTRACTOR TO PLACE AND COMPACT NATIVE BACKFILL

AND COVER MATERIAL PER FHA FP-14 SPEC SEC 209.09(B)(1).

MATERIAL TO BE NATIVE SOIL, FREE OF STONES LARGER

THAN 1' DIAMETER. 3. NO BACKFILL SHALL BE PLACED UNTIL

CULVERT SECTIONS HAVE BEEN CONNECTED, PLACED, AND

APPROVED BY THE GOVERNMENT.

[6] CONTRACT TO FURNISH AND INSTALL CMP CULVERT PER FHA

FP-14 SPEC SEC 602.03 & 602.05. DIAMETER, LENGTH, & SLOPE

PER PLAN. MATERIAL SHALL CONFORM TO FHA FP-14 SPEC

SEC 707 UNLESS OTHERWISE SPECIFIED. CONTRACTOR

SHALL BE RESPONSIBLE FOR ANY DAMAGE TO CULVERT

SECTIONS, BANDS, BENDS, AND ANY OTHER ACCESSORIES

REQUIRED FOR INSTALLATION DURING CONSTRUCTION.

1.5 :1

(M

AX)

[6]

D + 2T + 6'

DEPTH VARIES

MIN. COVER PER

MANUFACTURER'S INSTRUCTIONS

2'

MIN

2D MIN

D

UNDISTURBED NATIVE MATERIAL

CONSTRUCT ROADWAY PER

PLAN WHEN REQUIRED

MATCH CENTERLINE OF CULVERT INLET TO CENTERLINE OF

WASH/STREAM. INLET PLACEMENT TO BE APPROVED BY THE

GOVERNMENT PRIOR TO BACKFILLING. WASH/STREAM WIDENING

AT INLET MAY BE REQUIRED. INLET LOCATION PER PLAN.

PROPOSED CULVERT [6]

ROUND CULVERT INSTALLATION DETAIL

N.T.S.

COUPLER AS REQUIRED [2]

EXCAVATE AS REQUIRED [1]

MATCH CENTERLINE OF CULVERT INLET TO CENTERLINE OF

WASH/STREAM. INLET PLACEMENT TO BE APPROVED BY THE

GOVERNMENT PRIOR TO BACKFILLING. WASH/STREAM WIDENING

AT INLET MAY BE REQUIRED. INLET LOCATION PER PLAN.

NATIVE BACKFILL[5]

TYPICAL INSTALLATION IN STREAM CHANNELCULVERT HEADWALL OF HAND PLACED RIPRAP ARMOR

NO SCALENO SCALE

NOTE: LAY CULVERT ON NATURAL FLOWLINE

CL RD.

RIPRAP ARMOR WHEN

IDENTIFIED IN

WORKLIST

STREAM

CHANNEL

TOP OF SUBGRADE

RIPRAP WHEN IDENTIFIED

IN WORKLIST

A MIN. OF 1 FT. OR

1/2 DIA. ABOVE TOP

OF PIPE-WHICHEVER

IS GREATER

GEOTEXTILE WHEN

SPECIFIED

DIA.

FILL SLOPE

AS STAKED

6 FT OR AS

STAKED TO UTILIZE

SPECIFIED RIPRAP

1.5 FT OR

AS STAKED

3 FT OR

AS STAKED

CULVERT INLET

CULVERT OUTLET

ROAD SURFACE

FILL SLOPE

AS STAKED

CULVERT OUTLET

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

ROUND CULVERT BEDDING DETAIL

N.T.S.

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\GSC-DETAILS.DWG

SI

LT

F

EN

C

IN

G

D3

D R

AW

N

B Y:

L

IS

A C

YF

O

R D

FABRIC (GEOTEXTILE)

(TYPICAL)

SPLICE DETAIL

ISOMETRIC

TYPICAL SILT FENCE

WITHOUT BACKUP SUPPORT

SILT FENCE

(WOOD POSTS SHOWN)

SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH

TOGETHER TO PREVENT SILT LADEN WATER FROM

ESCAPING THROUGH THE FENCE AT THE OVERLAP.

SEE NOTE 1

SEE NOTE 1

SHEET FLOW

(TYPICAL)

6' - 0 " M

AX. SPACING

PROTECTED AREA

PROTECTED AREA

PROTECTED AREA

GEOTEXTILE FOR SILT FENCE ~ SEE STANDARD

SPECIFICATION SECTION

713.16(c)

(STEEL POSTS SHOWN)

NOTE

(STEEL POSTS SHOWN)

POST ~ SEE STD.

SPEC. 713.16(b)

GEOTEXTILE

FLOW

BURY GEOTEXTILE

IN TRENCH

4"

2'

0" M

IN

2'

0" M

IN

FASTEN GEOTEXTILE TO

POST EVERY 6" (IN.) O.C.

4"

BACKFILLED &

COMPACTED

NATIVE SOIL

FASTEN TO POST

EVERY 6" O.C

SELF-LOCKING TIE~NYLON 6/6 (MIN. GRADE),

120# MIN. TENSILE STRENGTH, UV STABILIZED

TYPICAL INSTALLATION DETAIL

POST

~ WOOD OR STEEL

(TYPICAL)

DURING EXCAVATION, MINIMIZE DISTURBING THE GROUND

AROUND TRENCH AS MUCH AS IS FEASIBLE, AND SMOOTH

SURFACE FOLLOWING EXCAVATION TO AVOID CONCENT-

RATING FLOWS. COMPACTION MUST BE ADEQUATE TO

PREVENT UNDERCUTTING FLOWS.

CONSTRUCTION NOTES

[1] Install the ends of the silt fence to point slightly upslope to prevent sediment from flowing around the ends of the fence.

[2] Perform maintenance in accordance with BLM direction

[3] Splices shall never be placed in low spots or sump locations. If splices are located in low or sump areas, the fence may need to be reinstalled unless the Project Engineer approves the installation.

[4] Install silt fencing parallel to mapped contour lines.

FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\GSC-DETAILS.DWG

IN

S

TR

EA

M D

ET

AI

LS

CONCRETE PLANK DETAIL

D4

G

LA

SG

O

W S

TR

EA

M C

R O

SS

IN

G

IM

PR

O

VE

M

EN

TS

BU

R

EA

U

O F

LA

N

D M

AN

AG

EM

N

ET

IS

SU

E D

AT

E:

M

AR

K R

EV

IS

IO

N

D

AT

E

AP

PR

O

VE

D

___ OF ___

SHEET

4/

/2

U .S

. D

EP

AR

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)

D

IS

TR

IC

T:

D

ES

IG

N

O

FF

IC

E:

IS

SU

ED

F

O R

:C O

N

ST

R U

C

TI

O N

EA

ST

ER

N

M O

N

TA

N A

D

IS

TR

IC

T

W

ES

TE

R

N M

O N

TA

N

A D

IS

TR

IC

T

12'-0"

14"

6"

#5 REBAR INSTALLED PER

SPECIFICATION SECTION 554

1 - 2 "

3 16

3" OVERHANG

0.75" Ø

NO SCALE

CONNECTION TAB DETAIL

NO SCALE

HEADER

BOULDER

FOOTING

BOULDER

CHINKING ROCKS

CHANNEL

CROSS

SECTION BANKFULL

ELEV

HEADER

BOULDER

FOOTER

BOULDER

CHINK ROCK INTO VOID

SPACE (SEE CHINKING

DETAIL)

EXTEND GRADE

CONTROL TO 1' ABOVE

BANKFULL ELEV

CHANNEL

MATERIAL MIX, 2'

THICK IN CHANNEL

SUBBASE

RECONSTRUCTED

CHANNEL

SLOPE = 6.5%

HEADER

BOULDER

FOOTER

BOULDER

BANKFULL ELEV

HEADER

BOULDER

FOOTER

BOULDER

THALWEG

TOP BANK

(BANKFULL

ELEV)

FL

O

W

FL

O W

CHINKING DETAIL

NO SCALE

ROCK WEIR CROSS SECTION VIEW

NO SCALE

ROCK WEIR PROFILE VIEW

NO SCALE

ROCK WEIR PLAN VIEW

NO SCALE

D R

AW

N

B Y:

G . A

N D

ER

SO

N

N . P

LA

TT

BROOM FINISH PER

SPECIFICATION SECTION 501.09

INSTALL STEEL CONNECTION TAB

AS CONTINUOUS PIECE WITH 3"

OVERHANG ON EACH EDGE.

TOTAL CONNECTION TAB LENGTH = 19"

NOTE:

CONNECTION TABS ARE A RECOMMENDATION BY THE BLM, BUT

T…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .