About this file
These are engineering and design drawings for the Glasgow Stream Crossing Improvements project by the Bureau of Land Management (BLM) in Valley County, Montana. The comprehensive set of 19 detailed sheets includes site surveys, culvert installation plans, and technical specifications for improvements at three locations: Cactus Flats Road, Triple Crossing Road, and Gutshot Dam.
The project involves multiple critical infrastructure enhancements, including: installing a 24-foot box culvert on Cactus Flats Road, replacing three culverts on Triple Crossing Road to improve drainage and road stability, decommissioning outlet works at Gutshot Dam, and constructing a low-water crossing. Technical details cover excavation, culvert installation, riprap armoring, erosion control, and roadway reconstruction, with specific requirements for material types, installation methods, and environmental considerations. The drawings provide precise engineering specifications, site layouts, cross-sections, and installation details for each project component, indicating a comprehensive approach to stream crossing and road infrastructure improvements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3625R0011_Amd_0003.pdf | ||
| Update_Attachment_3_-_Price_Schedule_0003.xlsx | XLSX spreadsheet | |
| Update_Attachment_1_-_FP14-BLM_Supplemental_Specifications_0003.pdf | ||
| Sol_140L3625R0011_Amd_0002.pdf | ||
| Sol_140L3625R0011_Amd_0001.pdf | ||
| Attachment_7_-_SF_24_Bid_Bond.pdf | ||
| Attachment_1_-_FP14-BLM_Supplemental_Specifications.pdf | ||
| Attachment_10_-_Wage_Determination.pdf | ||
| Attachment_3_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_4_-_140L3625R0011_Reference_List.pdf | ||
| Sol_140L3625R0011.pdf | ||
| Attachment_8_-_SF25_Performance_Bond.pdf | ||
| Attachment_6_-_140L3625R0011_Financial_Responsibility_Required_Documentation.pdf | ||
| Attachment_5_-_140L3625R0011_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_9_-_SF25A_Payment_Bond.pdf | ||
| Attachment_2_-_Glasgow_Stream_Crossing_Drawings.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRIPLE CROSSING
ROAD CULVERTS
GUTSHOT DAM
CACTUS FLATS BOX CULVERT
IDAHO
CANADA
UNITED STATES
SASKATCHEWAN
ALBERTA
BRITISH COLUMBIA
N O
R
TH
D
AK
O
TA
SO
U
TH
D
AK
O
TA
WYOMING
ALT
2 89
191 89
90 90
212 310 87
MISSOULA
KALISPELL
GREAT FALLS
HAVRE
HELENA
BUTTE
BILLINGS
MILES CITY
LEWISTOWN
MONTANACHOTEAU
MALTA
GLASGOW
CHESTER
FT BENTON
STATE REFERENCE MAP
(N.T.S)
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
GLASGOW STREAM CROSSING IMPROVEMENTS
VALLEY COUNTY
GLASGOW FIELD OFFICE
VICINITY MAP
(N.T.S)
GENERAL ENGINEER'S NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY
CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS
SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEQHERE IN THE
CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND
REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.
3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL
PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.
4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR
INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.
CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE
CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION COVERED BY
THIS PLAN.
5 A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING
PUBLIC OR PRIVATE UNDERGROUND FACILITIES AND UTILITIES IN THE
CONSTRUCTION AREA. THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO
UTILITIES AND/OR FACILITES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.
THE CONTRACTOR SHALL CALL 48 HOURS IN ADVANCE FOR BLUE STAKE
(1-800-STAE-IT) PRIOR TO ANY EXCAVATION.
6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL
EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW
CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN
ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE ENGINEER WITH
DISCREPANCY.
7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE
LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT
ENGINEER WITH ANY DISCREPANCIES.
8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.
9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO
WORK WITH WEATHER CONDITIONS, AS THE SITE MAY BE LOCATED IN AN AREA WITH
EXTREME WEATHER CONDITIONS OR WITHIN A FLOOD PRONE AREA.
PROJECT LOCATION
DIRECTIONS TO TRIPLE CROSSING ROAD:
FROM GLASGOW, MT, FOLLOW MT-24 S FOR 9.4 MILES. TURN RIGHT
AND FOLLOW THE FRONTAGE ROAD FOR 3.0 MILES. TURN RIGHT
ONTO MAXNESS ROAD/WILLOW CREEK ROAD AND FOLLOW FOR 15.5
MILES. TURN RIGHT ONTO TRIPLE CROSSING ACCESS ROAD.
C O
VE
R
Xref ..\05_BASE FILES\Gutshot Dam - BRDR.dwg
PREPARED BY:
CIVIL ENGINEER:
GRADY ANDERSON
BUREAU OF LAND MANAGEMENT'S
WESTERN DISTRICT OFFICE
106 N. PAKRMONT
BUTTE, MT 59701
MONTANA/DAKOTAS
ENGINEERING APPROVAL:
SEAN P. CLANCY
MONTANA/DAKOTAS
STATE ENGINEER
APPROVAL:
CASEY R. TRANG
FIELD OFFICE MANAGER
APPROVAL:
MICHAEL J. BORGREEN
PROJECT DESCRIPTION
PROJECT CONSISTS OF REMOVING THE EXISTING OUTLET WORKS, STABILIZING THE
BREACH, AND IMPROVING ACCESS AT GUTSHOT DAM, AS WELL AS INSTALLING
VARIOUS CULVERTS ALONG TRIPLE CROSSING AND CACTUS FLATS ROAD.
[1] EARTHWORK QUANTITIES ARE "IN PLACE"
ESTIMATES. NO SHRINK OR SWELL IS ASSUMED.
NO GROUND LOSS IS INCLUDED
[2] THE QUANTITIES ARE AN ESTIMATE OF THE
ENGINEER. THE CONTRACTOR SHALL MAKE THEIR
OWN INDEPENEDENT ESTIMATE OF QUANTITIES
AND BID THEREON.
G1
WILLOW CREEK ROAD
TO
G
LA
SG
O W
M
IL
ES
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
WILLOW CREEK
LONE TREE CREEK
TRIPLE CROSSING ROAD
TRIPLE CROSSING RESERVOIR
Drawing Index List Sheet Number Sheet Title Sheet Description
01 COVER G1
02 NOTES, ABBEREVIATIONS, & SITE MAP G2
03 GUTSHOT DAM SITE SURVEY C1
04 CACTUS FLATS SITE SURVEY C2
05 TRIPLE CROSSING ROAD SITE SURVEY C3
06 GUTSHOT OUTLET WORKS DEMOLITION C4
07 GUTSHOT DAM LOW WATER CROSSING C5
08 GUTSHOT DAM LOW WATER CROSSING C6
09 GUTSHOT DAM ACCESS ROAD C7
10 GUTSHOT DAM ACCESS ROAD C8
11 GUTSHOT DAM STABILIZATION C9
12 CACTUS FLATS BOX CULVERT C10
13 WEST TRIPLE CROSSING CULVERT C11
14 WHITETAIL CULVERT C12
15 UPPER TRIPLE CROSSING CULVERT C13
16 EROSION CONTROL DETAILS D1
17 CULVERT DETAILS D2
18 SILT FENCING D3
19 IN STREAM DETAILS D4
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
INTERSTATE HIGHWAY
AutoCAD SHX Text
U.S. HIGHWAY
AutoCAD SHX Text
STATE CAPITOL
AutoCAD SHX Text
BLM STATE OFFICE
AutoCAD SHX Text
BLM DISTRICT OFFICE
AutoCAD SHX Text
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW
FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT
SHEETS\GUTSHOT-NOTES.DWG
PUBLIC SAFETY & TRAFFIC CONTROL NOTES
1. CONTRACTOR TO TAKE ALL NECESSARY PRECAUTIONS TO ENSURE PROTECTION OF
THE PUBLIC AND SAFE GUARDING OF WORK.
SITE PLAN NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY
CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS
SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEWHERE IN THE
CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND
REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.
3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL
PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.
4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR
INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.
CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE
CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION COVERED BY
THIS PLAN.
5 A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING
PUBLIC OR PRIVATE UNDERGROUND FACILITIES AND UTILITIES IN THE
CONSTRUCTION AREA. THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO
UTILITIES AND/OR FACILITES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.
THE CONTRACTOR SHALL CALL 48 HOURS IN ADVANCE FOR BLUE STAKE
(1-800-STAKE-IT) PRIOR TO ANY EXCAVATION.
6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL
EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW
CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN
ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE ENGINEER WITH
DISCREPANCY.
7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE
LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT
ENGINEER WITH ANY DISCREPANCIES.
8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.
9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO
WORK WITH WEATHER CONDITIONS, AS THE SITE MAY BE LOCATED IN AN AREA WITH
EXTREME WEATHER CONDITIONS OR WITHIN A FLOOD PRONE AREA.
GRADING & DRAINAGE NOTES
1. PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES
AT ALL LOCATIONS.
2. PITCH EVENLY BETWEEN CONTOUR LINES AND BETWEEN
SPOT ELEVATIONS.
3. THE CONTRACTOR SHALL VERIFY EXISTING GRADES IN THE
FIELD AND REPORT ANY DISCREPANCIES TO THE ENGINEER
PRIOR TO COMMENCING CONSTRUCTION.
4. REFER TO THE EARTHWORK SECTION OF THE SPECIFICATION
FOR BACKFILL AND GRADING PROCEDURES.
5. EXCESS MATERIALS SHALL NOT BE REMOVED FROM THE SITE
UNLESS DIRECTED BY THE GOVERNMENT. SEE EARTHWORK
SPECIFICATIONS FOR DETAILS
DEMOLITION NOTES
1. PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES TO REMAIN IN PLACE
DURING DEMOLITION.
2. THE CONTRACTOR IS REQUIRED TO PRESERVE THE NATURAL LANDSCAPE AND
PROTECT EXISTING VEGETATION NOT REQUIRED OR OTHERWISE AUTHORIZED TO
BE REMOVED. CONTRACTOR TO REFERENCE PLAN FOR EXCAVATION AND REMOVAL
LIMITS.
3. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED SHALL BE RESTORED
TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE GOVERNMENT.
4. EXCAVATION AND FINISH GRADE AREAS, TO BE COVERED BY EMBANKMENTS, SHALL
BE THOROUGHLY CLEARED AND STRIPPED OF VEGETATIVE MATTER, BRUSH, TREES,
STUMPS, ROOTS, AND ROCK AS INDICATED ON THE PLAN. CLEARING AND GRUBBING
MATERIAL SHALL BE WASTED IN DESIGNATED AREAS IDENTIFIED ON THE PLAN OR
ON SITE PER THE GOVERNMENTS DIRECTIONS.
5. EXCAVATION MATERIAL NOT USED FOR THE CONSTRUCTION OF EMBANKMENTS
SHALL BE WASTED IN DESIGNATED WASTE AREA(S) AS IDENTIFIED ON THE PLANS
OR AS DIRECTED BY GOVERNMENT. WASTE MATERIAL SHALL BE SHAPED AND
BLENDED INTO THE SURROUNDING TERRAIN AND SHALL NOT EXCEED 3:1 SLOPES
UNLESS OTHERWISE SPECIFIED BY THE GOVERNMENT.
6. CONTRACTOR TO SEPARATE ANY SALVAGEABLE TOPSOIL AND USE MATERIAL TO
CAP WASTE SITE DURING EXCAVATION AND CLEARING.
7. ALL ROCK REMOVAL CONSIDERED INCIDENTAL TO SITE GRADING.
8. CONTRACTOR SHALL SUPPLY AND MAINTAIN, FOR THE DURATION OF CONTRACT,
ALL NECESSARY DEVICES FOR EROSION, SEDIMENT, AND DUST CONTROL, AND
DEWATERING WHEN REQUIRED.
9. CARE SHOULD BE TAKEN IN ALL EXCAVATION DUE TO POSSIBLE EXISTENCE OF
UNRECORDED UTILITIES.
10. CONSULT ALL DRAWING AND SPECIFICATIONS FOR COORDINATION PRIOR TO
COMMENCING DEMOLITION.
N
N O
TE
S, A
BB
ER
EV
IA
TI
O N
S, S
IT
E M
AP
UPPER TRIPLE CROSSING CULVERT
SHEET C3 & C13
WHITETAIL CULVERT
SHEET C3 & C12
WEST TRIPLE CROSSING CULVERT
SHEET C3 & C11
GUTSHOT DAM
SHEET C1, C4-C9
CACTUS FLATS
SHEET C2 & C10
G2
TRIPLE CROSSING RESERVOIR
BUREAU OF LAND
MANAGEMENT
STATE
OF MT
PRIVATE
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
CALCULATION AND DESIGN NOTES
ALL CULVERT STRUCTURES DESIGNED FOR HL-93 LOADING IN
ACCORDANCE WITH THE CURRENT EDITION OF AASHTO
STANDARD SPECIFICATIONS
ROADWAY(CULVERT) DESIGN SPEED: 35 MPH
ROADWAY (LOW WATER CROSSING) DESIGN SPEED: 15 MPH
ABBREVIATIONS
AB AGGREGATE BASE LP LOW POINT
ABUT ABUTMENT MAX MAXIMUM
AC ACRE MH MANHOLE
BLDR BOULDER MID MID POINT
BLM BUREAU OF LAND MANAGEMENT MIN MINIMUM
BM BENCHMARK MP MILE POST
BNDRY BOUNDARY MPH MILES PER HOUR
BP BEGIN POINT N NORTH, NORTHING
BTM BOTTOM OC ON CENTER
CF CUBIC FEET OFF OFFSET
CL CENTERLINE PC POINT OF CURVATURE
CMP CORRUGATED METAL PIPE POC POINT ON CURVE
CTRL CONTROL POINT PROP PROPOSED
CY CUBIC YARD PT POINT OF TANGENCY
DEMO DEMOLITION PVI POINT OF VERTICAL
INTERSECTION
DET DETAIL Q PEAK DISCHARGE VOLUME
DIA DIAMETER R RADIUS
E EAST, EASTING RDWY ROADWAY
ELEV ELEVATION S SLOPE
EP END POINT SF SQUARE FEET
EX EXISTING STA STATION
FES FLAIRED END SECTION SY SQUARE YARD
FG FINISHED GRADE TS TOP SOIL
GB GRADE BREAK TYP TYPICAL
INV INVERT VC VERTICAL CURVE
L LENGTH VOL VOLUME
LF LINEAR FEET YD YARD
TRIPLE CROSSING ROAD
CACTUS FLATS ROAD
WILLOW CREEK ROAD
ctrl 100 ctrl 200
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW
FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT
SHEETS\GUTSHOT-NOTES.DWG
N
0 100 200
FULL SCALE (22" X 34") 1 IN . = 100 FT.
HALF SCALE (11" X 17") 1 IN . = 200 FT.
BASIS OF SURVEY
THIS PROJECT WAS SURVEYED ON THE MONTANA ZONE 2500 STATE PLANE COORDINATE SYSTEM USING RTX GPS. THE PROJECT WAS BROUGHT TO GROUND AT SURVEY CONTROL POINT 100. THE GEODETIC DATUM IS NAD83(CONUS). THE VERTICAL DATUM IS NAVD88 (GEOID18). HORIZONTAL AND
VERTICAL UNITS ARE INTERNATIONAL FT.
PROJECT CONTROL WAS ESTABLISHED USING TRIMBLE CENTERPOINT POSITIONING AT ALL CONTROL.
LIDAR MAPPING INFO
LIDAR POINT CLOUD SURFACE WAS COLLECTED FROM THE MONTANA STATE LIDAR LIBRARY DATABASE. TITLE: "VALLEY_2018_VACNTY".
CONTROL POINT COORDINATE TABLE
POINT NUMBER NORTHING EASTING ELEVATION DESCRIPTION
100 1362571.739 2597651.423 2294.921 CONCRETE "X"
200 1362645.524 2597559.454 2276.445 1
2" REBAR (BLM)
G U
TS
H
O T
D
AM
S
IT
E
SU
R
VE
Y
GUTSHOT DAM - EXISTING SITE SURVEY
1" = 100'
*NOTE: CARE SHOULD BE TAKEN TO PROTECT ALL CONTROL POINTS THROUGHOUT THE DURATION OF THE PROJECT. THE BLM SHOULD BE NOTIFIED IF CONTROL POINTS ARE DISTURBED, MOVED, OR DESTROYED
DETENTION BASIN
DAM BREACH LOCATION
EXISTING ACCESS ROUTE
EXISTING ACCESS ROUTE
EXISTING ACCESS ROUTE
GUTSHOT DAM CREST
EXISTING OUTLET WORKS
LONE TREE CREEK
C1
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
2215 2220 2225
CTRL 500
CTRL 400
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW
FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT
SHEETS\GUTSHOT-NOTES.DWG
N
0 100 200
FULL SCALE (22" X 34") 1 IN . = 100 FT.
HALF SCALE (11" X 17") 1 IN . = 200 FT.
BASIS OF SURVEY
THIS PROJECT WAS SURVEYED ON THE MONTANA ZONE 2500 STATE PLANE COORDINATE SYSTEM USING RTX GPS. THE PROJECT WAS BROUGHT TO GROUND AT SURVEY CONTROL POINT 100. THE GEODETIC DATUM IS NAD83(CONUS). THE VERTICAL DATUM IS NAVD88 (GEOID18). HORIZONTAL AND
VERTICAL UNITS ARE INTERNATIONAL FT.
PROJECT CONTROL WAS ESTABLISHED USING TRIMBLE CENTERPOINT POSITIONING AT ALL CONTROL.
LIDAR MAPPING INFO
LIDAR POINT CLOUD SURFACE WAS COLLECTED FROM THE MONTANA STATE LIDAR LIBRARY DATABASE. TITLE: "VALLEY_2018_VACNTY".
CONTROL POINT COORDINATE TABLE
POINT NUMBER NORTHING EASTING ELEVATION DESCRIPTION
400 1358150.456 2623211.544 2226.06 1
2" REBAR (BLM)
500 1358434.719 2623457.217 2226.887 1
2" REBAR (BLM)
C
AC
TU
S
FL
AT
S
SI
TE
S
U R
VE
Y
CACTUS FLATS - EXISTING SITE SURVEY
1" = 100'
*NOTE: CARE SHOULD BE TAKEN TO PROTECT ALL CONTROL POINTS THROUGHOUT THE DURATION OF THE PROJECT. THE BLM SHOULD BE NOTIFIED IF CONTROL POINTS ARE DISTURBED, MOVED, OR DESTROYED
EXISTING DEBRIS/CULVERTS
FROM BREACH EVENT
EXISTING BREACH LOCATION
(IN ROADWAY)
PEARSON COULEE
USER-CREATED LOW WATER CROSSING
EXISTING STOCK PONDS
C2
CACTUS FLATS ROAD
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
CTRL 100
CTRL 300
CTRL 200
35 24
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW
FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT
SHEETS\GUTSHOT-NOTES.DWG
BASIS OF SURVEY
THIS PROJECT WAS SURVEYED ON THE MONTANA ZONE 2500 STATE PLANE COORDINATE SYSTEM USING RTX GPS. THE PROJECT WAS BROUGHT TO GROUND AT SURVEY CONTROL POINT 100. THE GEODETIC DATUM IS NAD83(CONUS). THE VERTICAL DATUM IS NAVD88 (GEOID18). HORIZONTAL AND
VERTICAL UNITS ARE INTERNATIONAL FT.
PROJECT CONTROL WAS ESTABLISHED USING TRIMBLE CENTERPOINT POSITIONING AT ALL CONTROL.
LIDAR MAPPING INFO
LIDAR POINT CLOUD SURFACE WAS COLLECTED FROM THE MONTANA STATE LIDAR LIBRARY DATABASE. TITLE: "VALLEY_2018_VACNTY".
CONTROL POINT COORDINATE TABLE
POINT NUMBER NORTHING EASTING ELEVATION DESCRIPTION
300 1365315.26 2553148.322 2424.69 1
2" REBAR (BLM)
TR
IP
LE
C
R O
SS
IN
G R
O
AD
S
IT
E
SU
R
VE
Y
WHITETAIL CULVERT
EXISTING SITE SURVEY
1" = 20'
UPPER TRIPLE CROSSING CULVERT
EXISTING SITE SURVEY
1" = 20'
WEST TRIPLE CROSSING CULVERT
EXISTING SITE SURVEY
1" = 20'
N
C3
CONTROL POINT COORDINATE TABLE
POINT NUMBER NORTHING EASTING ELEVATION DESCRIPTION
200 1362160.547 2553064.921 2434.835 1
2" REBAR (BLM)
CONTROL POINT COORDINATE TABLE
POINT NUMBER NORTHING EASTING ELEVATION DESCRIPTION
100 1355906.298 2539809.599 2504.761 CONCRETE "X"
*NOTE: CARE SHOULD BE TAKEN TO PROTECT ALL CONTROL POINTS THROUGHOUT THE DURATION OF THE PROJECT. THE BLM SHOULD BE NOTIFIED IF CONTROL POINTS ARE DISTURBED, MOVED, OR DESTROYED
N N
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
90°
6°
Skew #96
90°
5°
Skew #86
90°
Skew #90
DEMO NOTE: EXISTING CULVERTS SHOWN TO BE REMOVED. IMPROVED CULVERTS SHOW IN PLANS SHALL
BE INSTALLED AT THE SAME SKEW AS REMOVED STRUCTURES.
AutoCAD SHX Text
SKEW NO.
AutoCAD SHX Text
DEGREE
AutoCAD SHX Text
SKEW
AutoCAD SHX Text 90%%d
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
ROAD
AutoCAD SHX Text 90%%d
AutoCAD SHX Text
DEGREE
AutoCAD SHX Text
SKEW
SKEW NO.
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW
FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT
SHEETS\GUTSHOT-SITE.DWG
G U
TS
H
O T
O U
TL
ET
W O
R
KS
D
EM
O
LI
TI
O
N
DEMOLITION NOTES
[1] OUTLET WORKS CULVERT DIAMETER ≈ 5'.
DIAMETER AND DEPTH SHALL BE VERIFIED BY
CONTRACTOR UPON MOBILIZATION
[2] EXCAVATION SHALL BE IN ACCORDANCE WITH
SPECIFICATION SECTION 204. THE CONTRACTOR IS
EXPECTED TO MINIMIZE DISTURBANCE TO
IMMEDIATE AREA DURING EXCAVATION AND
EMBANKMENT OPERATIONS
[3] CONCRETE AND FENCING MATERIALS SHALL BE
DISPOSED OF OFF-SITE IN ACCORDANCE WITH
SPECIFICATION SECTION 203.05.(a)
EXISTING OUTLET STRUCTURE
PROFILE VIEW
NO SCALE
REMOVE AND DISPOSE OF
EXISTING STEEL FENCING
EXCAVATE, CUT, AND
DISPOSE OF CONDUIT
DECOMMISSIONED OUTLET STRUCTURE
PROFILE VIEW
NO SCALE
BACKFILL WITH EXISTING
ON-SITE MATERIAL.
COMPACT AND CONTOUR
TO SURFACE
≈ 60"
C4
C4
C4
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
REMOVE AND DISPOSE OF
EXISTING CONCRETE PAD
BROKEN BACK CULVERT
APP. 10' BELOW EXISTING GROUND SURFACE
(ABANDON IN PLACE) BLM PROVIDED SEED. INSTALL PER
SPECIFICATION SECTION 625.07(a)
R
EM
O
VE
A N
D D
IS
PO
SE
O
F D
R O
P
PI
PE
DEMOLITION
ITEM QUANTITY UNIT
STEEL FENCE REMOVAL &
DISPOSAL
48 LF
CONCRETE REMOVAL &
DISPOSAL
10 CY
5' Ø OUTLET WORKS
REMOVAL & DISPOSAL
20 LF
EARTHWORK FOR
DECOMMISSIONED OUTLET
STRUCTURE
20 CY
HAND SEEDING 0.25 ACRES
GUTSHOT DAM OUTLET WORKS
REMOVAL ESTIMATED QUANTITIES
GENERAL NOTES:
1. FILL MATERIAL FOR CAPPED OUTLET WORKS SHALL BE SOURCED ON SITE FROM NEARBY
EXCAVATION WORK.
2. MATERIAL SHALL BE FREE OF LARGE BOULDERS (>6" IN) DIA. AND COMPACTED IN LIFTS TO
ENSURE STABILIZATION.
3. IMPACTED AREA SHALL BE HAND-SEEDED WITH BLM PROVIDED SEED MIX PER SPECIFICATION
SECTION 625.
EXISTING OUTLET WORKS INTAKE STRUCTURE
PROFILE VIEW
NO SCALE
C4
2260 2262
17+00
18+00
19+00
STA:17+00.00 TO STA:19+00.00
HORZ: 1"=20'
VERT: 1"=10'
2245.00
2250.00
2255.00
2260.00
2265.00
2270.00
FG
: 2
0.
EG
: 2
0.
ST
A:
7+
.0
EG
: 2
9.
FG
: 2
0.
ST
A:
7+
.0
EG
: 2
9.
FG
: 2
0.
ST
A:
7+
.0
EG
: 2
9.
FG
: 2
8.
ST
A:
7+
.0
FG
: 2
5.
EG
: 2
6.
ST
A:
8+
.0
EG
: 2
7.
FG
: 2
7.
ST
A:
8+
.0
EG
: 2
0.
FG
: 2
0.
ST
A:
8+
.0
EG
: 2
0.
FG
: 2
0.
ST
A:
8+
.0
FG
: 2
0.
EG
: 2
0.
ST
A:
9+
.0
0.65%
14.17%
0.58%
11.46%
16.54%
BV
C
ST
A:
7+
.2
EL
EV
: 2
0.
BV
C
ST
A:
8+
.8
EL
EV
: 2
8.
BV
C
ST
A:
7+
.4
EL
EV
: 2
8.
BV
C
ST
A:
7+
.1
EL
EV
: 2
6.
BV
C
ST
A:
8+
.1
EL
EV
: 2
0.
LEGEND
GRASS/SEEDING
AREA
WASTE
TOP SOIL
RIP RAP (GRADE 3)
CONCRETE
NATIVE MATERIAL
GEOCELL
ROADWAY -
NATURAL SURFACE
EROSION CONTROL
BLANKET
N
0 10 20
FULL SCALE (22" X 34") 1 IN . = 10 FT.
HALF SCALE (11" X 17") 1 IN . = 20 FT.
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW
FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT
SHEETS\GUTSHOT-SITE.DWG
G U
TS
H
O T
D
AM
L O
W W
AT
ER
C R
O
SS
IN
G
LOW WATER CROSSING
CONSTRUCTION NOTES
[1] LOW WATER CROSSING FINISHED DRIVING
SURFACE WIDTH = 12'
[2] LOW WATER CROSSING TO BE ANCHORED BY
IMPORTED RIPRAP INSTALLED IN 2' TRENCH
OVER NON-WOVEN GEOTEXTILE AS SHOWN IN
DETAILS ON SHEET C6 AND IN ACCORDANCE
WITH SPECIFICATION SECTION 251.04.
SUBGRADE TO BE BLADED AND COMPACTED
PRIOR TO INSTALLATION OF GEOCELL.
[3] GEOCELL (8" THICKNESS) TO BE INSTALLED PER
SPECIFICATION SECTION 629.06 AND
MANUFACTURER'S INSTRUCTIONS. FILL
MATERIAL (IMPORTED AGGREGATE) TO BE
INSTALLED FLUSH TO GEOCELL HEIGHT PRIOR
TO CONCRETE PLANK INSTALLATION
[4] CONCRETE PLANKS TO BE INSTALLED OVER
GEOCELL AND CONSTRUCTED PER DETAILS ON
SHEET D4
LOW WATER CROSSING
PLAN VIEW
SCALE 1:20
M A
T C
H L
IN
E
ST
A
7+
M A
TC
H
LIN
E
STA
19+00
EXISTING GROUND
FINISH GROUND
(TOP OF CONCRETE PLANKS)
MATERIALS
TYPE QUANTITY UNIT
GEOCELL (8" DEPTH) 155 SY
IMPORTED AGGREGATE
(CLASS B SUBGRADE
MATERIAL)
44 CY
PRECAST CONCRETE PLANKS
(SHEET D4)
70 EA
NON-WOVEN GEOTEXTILE 180 SY
CLASS 2 RIP RAP 45 CY
C5
LOW WATER CROSSING
PROFILE VIEW
SCALE 1:20
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
BEGIN LOW WATER CROSSING
CONSTRUCTION
STA 17+50.00
END LOW WATER CROSSING
CONSTRUCTION
STA 18+50.00
EARTHWORK
ITEM QUANTITY UNIT
EXCAVATION (CUT) 180 CY
FILL (NATIVE) 380 CY
GUTSHOT DAM LOW WATER
CROSSING ESTIMATED QUANTITIES
RIP RAP ARMORING
(NOT SHOWN FOR CLARITY)
KEY-IN 2' BELOW FINISH GRADE
REFER TO DETAIL (1/C6))
CONCRETE PLANKS INSTALLED
PER DETAILS ON SHEET D4
STA 17+60 TO 18+40
40'≈30'
4'
≈30' 12'
14"
6"
DR
AW
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW
FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT
SHEETS\GUTSHOT-SITE.DWG
G U
TS
H
O T
D
AM
L O
W W
AT
ER
C R
O
SS
IN
G
STA 17+50 TO 18+50
12'-0"
TRAVELED WAY
CONCRETE PLANK
SLOPE≈.002
SUBGRADE
UNCLASSIFIED BORROW,
NATIVE FILL, OR 3" BASE COURSE
LOW WATER CROSSING TYPICAL SECTION
NO SCALE
MATCH STREAM BED SLOPESLOPE≈.002
KEY-IN RIP RAP 2' DEPTH
6" GEOCELL
C6
C6
LOW WATER CROSSING
CONSTRUCTION NOTES
[1] LOW WATER CROSSING SHALL DRAIN OUTSIDE
EDGE OF ROAD WITHOUT IMPEDING NATURAL
STREAM DYNAMICS.
[2] RIPRAP SHALL BE PLACED ON EACH SIDE OF
STRUCTURE AT 2' DEPTH BELOW FINISH GRADE IN
ACCORDANCE WITH SPECIFICATION SECTION 251.04
[3] ALL STREAM WORK SHALL BE DONE IN
ACCORDANCE WITH 124 PERMITTING AND
PERMORMED IN THE DRY WHEN FEASIBLE. CARE
SHALL BE TAKEN TO AVOID DISTURBANCE OF
EXISTING VEGETATION OUTSIDE THE FOOTPRINT OF
THE LOW WATER CROSSING STRUCTURE AND ALL
WASTE MATERIAL SHALL BE HAULED OUTSIDE OF
THE FLOODPLAIN PER BLM DIRECTION.
LOW WATER CROSSING
PLAN & PROFILE CONCEPTUAL VIEW
NO SCALE
CONCRETE PLANKS
DETAILS ON SHEET D4
RECONDITIONED ROADWAY
GEOCELL
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
EXISTING
CUT SLOPE
DEPOSIT FILL
MATERIAL ON
ROADBED, TYP.
EXISTING
FILL SLOPE
LOW WATER CROSSING EXAMPLE
NO SCALE
GEOCELL EXAMPLE
NO SCALE
STA 17+60 TO 18+40
*NOTE: RIPRAP NOT SHOWN FOR CLARITY
*NOTE: ANCHOR GEOCELL PER
MANUFACTURER'S RECOMMENDATIONS
AutoCAD SHX Text C
L
0+00
1+00
2+00
3+00 4+005+00
6+00
7+00
8+00
9+00
10+00
11+00
12+00
2240.00
2244.00
2248.00
2252.00
2256.00
2260.00
2264.00
2268.00
2272.00
2276.00
2280.00
2284.00
2288.00
2292.00
2296.00
2300.00
2304.00
2308.00
0+00.002240.00
2244.00
2248.00
2252.00
2256.00
2260.00
2264.00
2268.00
2272.00
2276.00
2280.00
2284.00
2288.00
2292.00
2296.00
2300.00
2304.00
2308.00
0+00.001+00.002+00.003+00.004+00.005+00.006+00.007+00.008+00.009+00.0010+00.0011+00.0011+50.002240.00
2244.00
2248.00
2252.00
2256.00
2260.00
2264.00
2268.00
2272.00
2276.00
2280.00
2284.00
2288.00
2292.00
2296.00
2300.00
2304.00
2308.00
11+50.00
VERT: 1"=8'
FG
: 2
5.
EG
: 2
5.
ST
A:
+0
0.
EG
: 2
0.
FG
: 2
0.
ST
A:
+5
0.
FG
: 2
6.
EG
: 2
6.
ST
A:
+0
0.
EG
: 2
3.
FG
: 2
3.
ST
A:
+5
0.
FG
: 2
1.
EG
: 2
1.
ST
A:
+0
0.
EG
: 2
0.
FG
: 2
0.
ST
A:
+5
0.
FG
: 2
9.
EG
: 2
9.
ST
A:
+0
0.
EG
: 2
8.
FG
: 2
8.
ST
A:
+5
0.
FG
: 2
8.
EG
: 2
8.
ST
A:
+0
0.
EG
: 2
8.
FG
: 2
8.
ST
A:
+5
0.
FG
: 2
7.
EG
: 2
7.
ST
A:
+0
0.
EG
: 2
6.
FG
: 2
7.
ST
A:
+5
0.
FG
: 2
7.
EG
: 2
6.
ST
A:
+0
0.
EG
: 2
7.
FG
: 2
7.
ST
A:
+5
0.
FG
: 2
7.
EG
: 2
7.
ST
A:
+0
0.
EG
: 2
7.
FG
: 2
7.
ST
A:
+5
0.
FG
: 2
7.
EG
: 2
7.
ST
A:
+0
0.
EG
: 2
7.
FG
: 2
8.
ST
A:
+5
0.
FG
: 2
8.
EG
: 2
8.
ST
A:
+0
0.
EG
: 2
8.
FG
: 2
9.
ST
A:
+5
0.
FG
: 2
9.
EG
: 2
9.
ST
A:
0+
.0
EG
: 2
8.
FG
: 2
8.
ST
A:
0+
.0
FG
: 2
7.
EG
: 2
6.
ST
A:
1+
.0
EG
: 2
5.
FG
: 2
5.
ST
A:
1+
.0
10.36%
6.32% 2.38%
0.68%0.19% 1.09%
3.05%
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW
FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT
SHEETS\GUTSHOT-SITE.DWG
G U
TS
H
O T
D
AM
A C
C
ES
S R
O
AD
N
0 40 80
FULL SCALE (22" X 34") 1 IN . = 40 FT.
HALF SCALE (11" X 17") 1 IN . = 80 FT.
GUTSHOT DAM ACCESS ROAD PLAN VIEW
SCALE 1:40
BEGINNING OF ROAD RECONDITIONING
STA 0+00.00
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
GUSTHOT DAM ACCES ROAD PROFILE VIEW
SCALE 1:40
ROAD CONSTRUCTION NOTES
[1] PREPARE AND GRADE ROADWAY PER
SPECIFICATION SECTIONS 204 AND 212
[2] GRUB AND SCARIFY ROADWAY 6" IN DEPTH.
GRADE TO MATCH EXISTING PRISM ELEVATION.
COMPACT PER SPECIFICATION SECTION 204.11
STA 0+00 TO 17+50
STA 18+50 TO 23+00
12'-0" MIN AND VARIES,
TRAVELED WAY
6" RECONDITIONED SURFACE
CUT S
LO
PE
≈3 :1
SLO
PE
≈2:1
SUBGRADE
UNCLASSIFIED BORROW,
NATIVE FILL, OR 3" BASE COURSE
SITE ROAD CONSTRUCTION TYPICAL SECTION
NO SCALE
2% SLOPE
C7
EXISTING GROUND
FINISH GROUND
SCARIFY AND REDEFINE ROADWAY. GRADE ROADWAY SURFACE TO DRAIN
12+00.0013+00.0014+00.0015+00.0016+00.0017+00.0018+00.0019+00.0020+00.0021+00.0022+00.0023+00.0023+50.00
ST
A:
2+
.0
EG
: 2
2.
FG
: 2
2.
ST
A:
2+
.0
FG
: 2
7.
EG
: 2
7.
ST
A:
3+
.0
EG
: 2
3.
FG
: 2
4.
ST
A:
3+
.0
FG
: 2
1.
EG
: 2
1.
ST
A:
4+
.0
EG
: 2
0.
FG
: 2
0.
ST
A:
4+
.0
FG
: 2
0.
EG
: 2
9.
ST
A:
5+
.0
EG
: 2
9.
FG
: 2
0.
ST
A:
5+
.0
FG
: 2
0.
EG
: 2
9.
ST
A:
6+
.0
EG
: 2
0.
FG
: 2
0.
ST
A:
6+
.0
FG
: 2
0.
EG
: 2
0.
ST
A:
7+
.0
EG
: 2
9.
FG
: 2
0.
ST
A:
7+
.0
FG
: 2
5.
EG
: 2
6.
ST
A:
8+
.0
EG
: 2
0.
FG
: 2
0.
ST
A:
8+
.0
FG
: 2
0.
EG
: 2
0.
ST
A:
9+
.0
EG
: 2
1.
FG
: 2
2.
ST
A:
9+
.0
FG
: 2
5.
EG
: 2
4.
ST
A:
0+
.0
EG
: 2
0.
FG
: 2
1.
ST
A:
0+
.0
FG
: 2
9.
EG
: 2
9.
ST
A:
1+
.0
EG
: 2
9.
FG
: 2
8.
ST
A:
1+
.0
FG
: 2
5.
EG
: 2
5.
ST
A:
2+
.0
EG
: 2
8.
FG
: 2
8.
ST
A:
2+
.0
FG
: 2
0.
EG
: 2
0.
ST
A:
3+
.0
FG
EG
ST
A:
3+
.0
12.15% 7.35%
3.27% 0.24%0.65%
14.17%0.58%2.10%
6.64%
14.87%
18.20%
10.23%2.87%
4.14%
11.46%
16.54% ctrl 100
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00 23+22
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW
FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT
SHEETS\GUTSHOT-SITE.DWG
G U
TS
H
O T
D
AM
A C
C
ES
S R
O
AD
LOW WATER CROSSING
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
GUSTHOT DAM ACCES ROAD PROFILE VIEW
NO SCALE
N
0 40 80
FULL SCALE (22" X 34") 1 IN . = 40 FT.
HALF SCALE (11" X 17") 1 IN . = 80 FT.
ROAD CONSTRUCTION NOTES
[1] PREPARE AND GRADE ROADWAY PER
SPECIFICATION SECTIONS 204 AND 212
[2] SCARIFY ROADWAY 6" IN DEPTH AND GRADE
TO MATCH EXISTING PRISM ELEVATION.
COMPACT PER SPECIFICATION SECTION 204.11
END OF ROAD RECONDITIONING
STA 23+22.00
C8
STA 0+00 TO 17+50
STA 18+50 TO 23+00
12'-0" MIN AND VARIES,
TRAVELED WAY
6" RECONDITIONED SURFACE
CUT S
LO
PE
≈3 :1
SLO
PE
≈2:1
SUBGRADE
UNCLASSIFIED BORROW,
NATIVE FILL, OR 3" BASE COURSE
SITE ROAD CONSTRUCTION TYPICAL SECTION
NO SCALE
2% SLOPE
SCARIFY AND REDEFINE ROADWAY. GRADE ROADWAY SURFACE TO DRAINSCARIFY AND REDEFINE ROADWAY. GRADE ROADWAY SURFACE TO DRAIN LOW WATER CROSSING ctrl 100 ctrl 200
226022
70 22
16+00
17+0018+00
19+00 20+00 ctrl 100 ctrl 200
226022
70 22
16+00
17+0018+00
19+00 20+00
LEGEND
GRASS/SEEDING
AREA
WASTE
TOP SOIL
EROSION CONTROL
BLANKET
STA:15+00.00 TO STA:19+50.00
HORZ: 1"=40'
VERT: 1"=20'
2245.00
2250.00
2255.00
2260.00
2265.00
2270.00
2275.00
2280.00
2285.00
2290.00
2295.00
2300.00
2305.00
2310.00
FG
EG
: 2
5.
ST
A:
5+
.0
EG
: 2
5.
04 FG
ST
A:
5+
.0
FG
: 2
3.
EG
: 2
3.
ST
A:
6+
.0
EG
: 2
0.
FG
: 2
8.
ST
A:
6+
.0
FG
: 2
1.
EG
: 2
8.
ST
A:
7+
.0
EG
: 2
7.
FG
: 2
1.
ST
A:
7+
.0
FG
: 2
8.
EG
: 2
0.
ST
A:
8+
.0
EG
: 2
0.
98 FG
ST
A:
8+
.0
FG
EG
: 2
5.
ST
A:
9+
.0
FG
EG
: 2
5.
ST
A:
9+
.0
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW
FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT
SHEETS\GUTSHOT-SITE.DWG
G U
TS
H
O T
D
AM
S
TA
BI
LI
ZA
TI
O N
GRADING NOTES
[1] ALL EXCAVATED MATERIAL TO BE WASTED ON
SITE, OUTSIDE OF EXISTING FLOOD PLAIN, IN
LOCATIONS DESIGNATED BY BLM
[2] IF ENCOUNTERED DURING EXCAVATION, REMOVE
AND DISPOSE OF OUTLET WORKS CONDUIT
DURING EXCAVATION EFFORTS. DISPOSE OF OFF
SITE PER SPECIFICATION SECTION 203.05(a).
[3] ALL GRADED MATERIAL ASSUMED TO BE AN
ASSORTMENT OF COMPACTED SILT AND CLAY.
BLEND ALL FINAL GRADE BREAKS TO MATCH
EXISTING CONTOURS.
[4] SURVEY GRADE STAKES TO BE PROVIDED BY
CONTRACTOR AND VERIFIED BY BLM ENGINEER
[5] PROTECT ALL CONTROL, BENCHMARKS, OR
MONUMENTS DURING EXCAVATION. CONFINE
HEAVY EQUIPMENT OPERATION TO PREVIOUSLY
DISTURBED AREAS WHEN POSSIBLE
[6] MINIMIZE WORK AND EQUIPMENT OPERATION IN
THE STREAM CHANNEL AND AVOID CROSSING
DURING WET CONDITIONS. ALL WORK SHOULD BE
COMPLETED IN THE DRY, AND CONTRACTOR
SHALL MAINTAIN AN EFFORT TO MINIMIZE
SEDIMENTATION OR DEBRIS FROM ENTERING THE
STREAM CHANNEL. INSTALL SILT FENCE ALONG
TOE OF ALL NON-STABILIZED SLOPES.
[7] INSTALL EROSION CONTROL MAT CONFORMING TO
SPECIFICATION SECTION 629, AND HAND SEED ALL
DISTURBED AREAS PER SPECIFICATION SECTION
625.07.(a).
N
0 40 80
FULL SCALE (22" X 34") 1 IN . = 40 FT.
HALF SCALE (11" X 17") 1 IN . = 80 FT.
BREACH STABILIZATION
PLAN VIEW
EXISTING BREACH
PLAN VIEW
SCALE 1:40 SCALE 1:40
GRADE AT 3:1 SLOPE
TIE-IN TO EXISTING GROUND
CUT BOUNDARY
ASSUMED BROKEN-BACK
CULVERT LOCATION
C9
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
3:1 SLOPE
3:1 SLOPE
EARTHWORK
ITEM QUANTITY UNIT
CUT 8600 CY
FILL 400 CY
WASTE 8200 CY
EROSION CONTROL MATERIALS
ITEM QUANTITY UNIT
EROSION CONTROL
BLANKET
2780 SY
SILT FENCE 400 LF
SEEDING AREA 0.5 ACRE
GUTSHOT DAM STABILIZATION
ESTIMATED QUANTITIES
BREACH PROFILE VIEW
SCALE 1:20
DAM CREST
TOP OF CUT
ASSUMED OUTLET WORKS
LOCATION (NOT TO SCALE)
FINISH GROUND
(INSTALL EROSION CONTROL
MATTING AND SEED)
EXISTING GROUND
EXISTING STREAM BED
2-YR FLOW ELEV. = 2558.3'
10-YR FLOW ELEV. = 2562.2'
100-YR FLOW ELEV. = 2567.5'
MAT AND SEED ALL
DISTURBED AREAS PER
DETAILS ON SHEET D1
10 2210
2205.00
2208.00
2212.00
2216.00
2220.00
2224.00
2228.00
2232.00
1+00.00 2+00.00 3+00.00 4+00.00 4+50.00
FG
: 2
6.
EG
: 2
5.
ST
A:
+0
0.
EG
: 2
6.
FG
: 2
6.
ST
A:
+2
5.
EG
: 2
6.
FG
: 2
6.
ST
A:
+5
0.
EG
: 2
7.
FG
: 2
6.
ST
A:
+7
5.
FG
: 2
6.
EG
: 2
7.
ST
A:
+0
0.
EG
: 2
8.
FG
: 2
6.
ST
A:
+2
5.
EG
: 2
8.
FG
: 2
6.
ST
A:
+5
0.
EG
: 2
2.
FG
: 2
6.
ST
A:
+7
5.
FG
: 2
6.
EG
: 2
8.
ST
A:
+0
0.
EG
: 2
8.
FG
: 2
6.
ST
A:
+2
5.
EG
: 2
7.
FG
: 2
6.
ST
A:
+5
0.
EG
: 2
7.
FG
: 2
6.
ST
A:
+7
5.
FG
: 2
6.
EG
: 2
6.
ST
A:
+0
0.
EG
: 2
6.
FG
: 2
6.
ST
A:
+2
5.
FG
: 2
6.
EG
: 2
5.
ST
A:
+5
0.
0.11%
2204.00
2208.00
2212.00
2216.00
2220.00
2224.00
2228.00
3+75.00 4+00.00 5+00.00
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\CACTUS FLATS
ROUND - SITE.DWG
C
AC
TU
S
FL
AT
S R
O U
N D
CONSTRUCTION NOTES
[1] CULVERT SIZED TO 10-YEAR STORM EVENT.
[2] CULVERT TO BE SET ON PREPARED SUBGRADE IN ACCORDANCE WITH
SPECIFICATION SECTION 208. REFER TO DETAILS ON SHEET D2.
[3] INSTALL POLYMER COATED 12 GAUGE CMP CULVERT CENTERED AT ROAD
STATIONING 2+82.89 PER MANUFACTURER'S SPECIFICATIONS AND MONTANA
DEPARTMENT OF TRANSPORTATION HYDRAULICS MANUAL
(https://www.mdt.mt.gov/other/webdata/external/hydraulics/manuals/Chapter-11-Culverts .pdf).
[4] FURNISH CLASS 2 RIPRAP IN ACCORDANCE WITH SPECIFICATION TABLE 705-01
AND INSTALL OVER GEOTEXTILE UNDERLAYMENT TO ELEVATION (2216.0'). ALL
EXCESS RIPRAP MATERIAL SHALL BE USED IN THE STREAM CHANNEL AS A
CULVERT APRON.
[5] ROCK WEIRS TO BE CONSTRUCTED AT 50' INTERVALS FROM EXISTING CLASS II
RIP RAP ON SITE. CONSTRUCT PER DETAILS ON SHEET D4
[6] TEMPORARY ROAD CLOSURES WILL BE IDENTIFIED BY THE BLM IN THE FIELD
DURING CULVERT CONSTRUCTION. ALL TEMPORARY ROADS SHALL BE
RESTORED TO ORIGINAL CONDITION AS BEST POSSIBLE AFTER CULVERT
CONSTRUCTION HAS BEEN COMPLETED.
N
0 20 40
FULL SCALE (22" X 34") 1 IN . = 20 FT.
HALF SCALE (11" X 17") 1 IN . = 40 FT.
CACTUS FLATS CULVERT
PLAN VIEW
1:20
CACTUS FLATS CULVERT ROAD PROFILE
1:20
M A
T C
H L
IN
E
ST
A
+5
M A
T C
H L
IN
E
ST
A
1+00
EXISTING GROUND
FINISH GROUND
C10
CULVERT STREAM PROFILE
1:20
'-0
ROCK WEIR
RIPRAP ARMORING
EARTHWORK
ITEM QUANTITY UNIT
CUT 850 CY
FILL 800 CY
WASTE 50 CY
MATERIALS
ITEM QUANTITY UNIT
ROCK WEIR (ON SITE RIPRAP) 5 CY
POLYMER-COATED
CORRUGATED METAL
CULVERT (72" Ø)
80 LF
GEOTEXTILE FABRIC 50 SY
IMPORTED RIPRAP 25 CY
CACTUS FLATS
ESTIMATED QUANTITIES
INV STREAM STA: 3+96.63
INV. ELEV: 2208.35
INV STREAM
STA: 4+76.87
INV. ELEV: 2207.75
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
RIPRAP HEADWALL
RIPRAP ARMORING
ROADWAY SURFACE
EXISTING BYPASS
REHABILITATE ROADWAY PER
SPECIFICATION SECTION 211
'-0
72" Ø POLYMER-COATED CMP
90°Skew #90
2418.00
2420.00
2424.00
2428.00
2432.00
1+25.00 2+00.00 2+50.00
FG
: 2
7.
EG
: 2
7.
ST
A:
+2
5.
EG
: 2
6.
FG
: 2
6.
ST
A:
+5
0.
EG
: 2
6.
FG
: 2
6.
ST
A:
+7
5.
FG
: 2
6.
EG
: 2
6.
ST
A:
+0
0.
EG
: 2
6.
FG
: 2
6.
ST
A:
+2
5.
FG
: 2
6.
EG
: 2
6.
ST
A:
+5
0.
2408.00
2412.00
2416.00
2420.00
2424.00
2428.00
2432.00
2436.00
0+00.00 1+00.00 2+00.00 3+00.00
FG
EG
: 2
1.
ST
A:
+0 0.
EG
: 2
0.
65 FG
ST
A:
+2
5.
EG
: 2
1.
23 FG
ST
A:
+5
0.
EG
: 2
0.
49 FG
ST
A:
+7
5.
00 FG
EG
: 2
1.
ST
A:
+0
0.
EG
: 2
1.
26 FG
ST
A:
+2
5.
EG
: 2
6.
FG
: 2
9.
ST
A:
+5
0.
EG
: 2
2.
FG
: 2
9.
ST
A:
+7
5.
00 FG
EG
: 2
7.
ST
A:
+0
0.
EG
: 2
8.
07 FG
ST
A:
+2
5.
EG
: 2
8.
93 FG
ST
A:
+5
0.
EG
: 2
8.
37 FG
ST
A:
+7
5.
00 FG
EG
: 2
7.
ST
A:
+0
0.
0.40%
1.21%
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\TC CULVERTS -
SITE.DWG
W
ES
T
TR
IP
LE
C R
O
SS
IN
G
C U
LV
ER
T
CONSTRUCTION NOTES
[1] CULVERT TO BE INSTALLED AT INVERT
ELEVATIONS SHOWN IN PLANS AND COMPACTED
AS SHOWN ON SHEET D2
[2] EXISTING CULVERTS TO BE REMOVED AND
DISPOSED OF OFF-SITE
[3] INSTALL POLYMER COATED 12 GAUGE CMP
CULVERT PER MANUFACTURER'S SPECIFICATIONS
AND MONTANA DEPARTMENT OF
TRANSPORTATION HYDRAULICS MANUAL
(https://www.mdt.mt.gov/other/webdata/external/hydraulic s/manuals/Chapter-11-Culverts.pdf).
[4] INSTALL ROCK HEADWALL AROUND CULVERT
ENDS. HAND PLACE WITH CLASS 3 RIPRAP
MATERIAL IN ACCORDANCE WITH DETAILS ON
SHEET D2.
[5] TEMPORARY ROAD CLOSURES WILL BE IDENTIFIED
BY THE BLM IN THE FIELD DURING CULVERT
CONSTRUCTION. ALL TEMPORARY ROADS SHALL
BE RESTORED TO ORIGINAL CONDITION AS BEST
POSSIBLE AFTER CULVERT CONSTRUCTION HAS
BEEN COMPLETED.
N
0 20 40
FULL SCALE (22" X 34") 1 IN . = 20 FT.
HALF SCALE (11" X 17") 1 IN . = 40 FT.
WEST TRIPLE CROSSING CULVERT PLAN VIEW
NO SCALE
WEST TC CROSSING CULVERT STREAM PROFILE
NO SCALE
M A
T C
H L
IN
E
ST
A
50M A
T C
H L
IN
E
ST
A
0+
TRIPLE CROSSING ROAD
FINISH GROUND
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
WEST TC CROSSING CULVERT ROAD PROFILE
NO SCALE
FLOW
FLOW
FL
O
W
FL
O
W
STREAM (THALWEG)
ALIGNMENT
TRIPLE CROSSING ROAD
EXISTING GROUND
EXISTING CMP
CULVERT
PROPOSED RCP
CULVERT
LEGEND
INSTALL NEW CMP AT SAME SKEW
AS SHOWN ON SHEET C3
EXISTING CMP
CULVERT (72")
PROPOSED CULVERT
(72")
STREAM STATIONING: 1+86.54
INV ELEV: 2418.40
STREAM STATIONING: 1+36.80
INV ELEV: 2419.00
ITEM QUANTITY UNIT
EARTHWORK CUT/FILL 130 CY
REMOVE AND DISPOSE
EXISTING CMP (72")
40 LF
INSTALL POLYMER COATED
CMP (72" Ø, 12 GAUGE
THICKNESS)
50 LF
WEST TRIPLE CROSSING CULVERT
ESTIMATED QUANTITIES
C11
'-0
C O
VE
R
1.
RIPRAP HEADWALL
2424.00
2428.00
2432.00
2436.00
2440.00
2+75.00 3+00.00 4+00.00
FG
: 2
2.
EG
: 2
2.
ST
A:
+7
5.
FG
: 2
1.
EG
: 2
1.
ST
A:
+0
0.
EG
: 2
0.
FG
: 2
0.
ST
A:
+2
5.
EG
: 2
9.
FG
: 2
9.
ST
A:
+5
0.
EG
: 2
9.
FG
: 2
9.
ST
A:
+7
5.
FG
: 2
8.
EG
: 2
8.
ST
A:
+0
0.
C
TR
L
2416.00
2420.00
2424.00
2428.00
2432.00
2436.00
2440.00
2444.00
0+00.00 1+00.00 2+00.00 3+00.00 3+75.00
FG
: 2
0.
EG
: 2
0.
ST
A:
+0
0.
EG
: 2
9.
FG
: 2
9.
ST
A:
+2
5.
EG
: 2
1.
FG
: 2
1.
ST
A:
+5
0.
EG
: 2
9.
FG
: 2
9.
ST
A:
+7
5.
FG
: 2
9.
EG
: 2
9.
ST
A:
+0
0.
EG
: 2
7.
FG
: 2
7.
ST
A:
+2
5.
EG
: 2
9.
FG
: 2
9.
ST
A:
+5
0.
EG
: 2
7.
FG
: 2
7.
ST
A:
+7
5.
FG
: 2
7.
EG
: 2
7.
ST
A:
+0
0.
EG
: 2
7.
FG
: 2
7.
ST
A:
+2
5.
EG
: 2
7.
FG
: 2
7.
ST
A:
+5
0.
EG
: 2
7.
FG
: 2
7.
ST
A:
+7
5.
FG
: 2
7.
EG
: 2
7.
ST
A:
+0
0.
EG
: 2
9.
FG
: 2
9.
ST
A:
+2
5.
EG
: 2
8.
FG
: 2
8.
ST
A:
+5
0.
FG
: 2
8.
EG
: 2
8.
ST
A:
+7
5.
1.10%
1.07%
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\TC CULVERTS -
SITE.DWG
W H
IT
ET
AI
L
C U
LV
ER
T
N
0 20 40
FULL SCALE (22" X 34") 1 IN . = 20 FT.
HALF SCALE (11" X 17") 1 IN . = 40 FT.
WHITETAIL CROSSING CULVERT
PLAN VIEW
1:20
WHITETAIL CROSSING CULVERT STREAM PROFILE
NO SCALE
M A
T C
H L
IN
E
ST
A
M A
T C
H L
IN
E
ST
A
2+
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
WHITETAIL CROSSING CULVERT ROAD PROFILE
NO SCALE
FLOW
FLOW
EXISTING CMP
CULVERT
PROPOSED RCP
CULVERT
LEGEND
EXISTING CMP
CULVERT (48")
PROPOSED RCP
CULVERT
(72")
ITEM QUANTITY UNIT
EARTHWORK CUT/FILL 320 CY
REMOVE AND DISPOSE
EXISTING CMP (48")
60 LF
INSTALL POLYMER COATED
CMP (72" Ø, 12 GAUGE
THICKNESS)
60 LF
WHITETAIL CULVERT ESTIMATED
QUANTITIES
TRIPLE CROSSING ROAD
FINISH GROUND
FLOW
FL
O
W
STREAM (THALWEG)
ALIGNMENT
TRIPLE CROSSING ROAD
EXISTING GROUND
INSTALL NEW CMP AT SAME SKEW
AS SHOWN ON SHEET C3
STREAM STATIONING: 1+95.50
INV ELEV: 2427.81
STREAM STATIONING: 1+35.81
INV ELEV: 2428.45
C12
60'-0" C
O
VE
R 6.
RIPRAP HEADWALL
CONSTRUCTION NOTES
[1] CULVERT TO BE INSTALLED AT INVERT
ELEVATIONS SHOWN IN PLANS AND COMPACTED
AS SHOWN ON SHEET D2
[2] EXISTING CULVERTS TO BE REMOVED AND
DISPOSED OF OFF-SITE
[3] INSTALL POLYMER COATED 12 GAUGE CMP
CULVERT PER MANUFACTURER'S SPECIFICATIONS
AND MONTANA DEPARTMENT OF
TRANSPORTATION HYDRAULICS MANUAL
(https://www.mdt.mt.gov/other/webdata/external/hydraulic s/manuals/Chapter-11-Culverts.pdf).
[4] INSTALL ROCK HEADWALL AROUND CULVERT
ENDS. HAND PLACE WITH CLASS 3 RIPRAP
MATERIAL IN ACCORDANCE WITH DETAILS ON
SHEET D2.
[5] TEMPORARY ROAD CLOSURES WILL BE IDENTIFIED
BY THE BLM IN THE FIELD DURING CULVERT
CONSTRUCTION. ALL TEMPORARY ROADS SHALL
BE RESTORED TO ORIGINAL CONDITION AS BEST
POSSIBLE AFTER CULVERT CONSTRUCTION HAS
BEEN COMPLETED.
2496.00
2500.00
2504.00
2508.00
2512.00
3+75.00 4+00.00 5+00.00 5+25.00
FG
: 2
7.
EG
: 2
7.
ST
A:
+7
5.
FG
: 2
7.
EG
: 2
7.
ST
A:
+0
0.
EG
: 2
7.
FG
: 2
7.
ST
A:
+2
5.
EG
: 2
7.
FG
: 2
7.
ST
A:
+5
0.
EG
: 2
7.
FG
: 2
7.
ST
A:
+7
5.
FG
: 2
7.
EG
: 2
7.
ST
A:
+0
0.
FG
: 2
7.
EG
: 2
7.
ST
A:
+2
5.
CTRL 100
2490.00
2492.00
2496.00
2500.00
2504.00
2508.00
2512.00
2516.00
0+00.00 1+00.00 2+00.00 3+00.00
FG
EG
: 2
4.
ST
A:
+0 0.
EG
: 2
4.
26 FG
ST
A:
+2
5.
EG
: 2
4.
05 FG
ST
A:
+5
0.
EG
: 2
3.
80 FG
ST
A:
+7
5.
00 FG
EG
: 2
3.
ST
A:
+0
0.
EG
: 2
1.
08 FG
ST
A:
+2
5.
EG
: 2
7.
FG
: 2
0.
ST
A:
+5
0.
EG
: 2
5.
FG
: 2
9.
ST
A:
+7
5.
FG
: 2
8.
EG
: 2
0.
ST
A:
+0
0.
EG
: 2
8.
02 FG
ST
A:
+2
5.
EG
: 2
8.
14 FG
ST
A:
+5
0.
EG
: 2
8.
52 FG
ST
A:
+7
5.
00 FG
EG
: 2
8.
ST
A:
+0
0.
3.42%
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\TC CULVERTS -
SITE.DWG
U
PP
ER
T
R
IP
LE
C
R O
SS
IN
G C
U
LV
ER
T
N
0 20 40
FULL SCALE (22" X 34") 1 IN . = 20 FT.
HALF SCALE (11" X 17") 1 IN . = 40 FT.
UPPER TRIPLE CROSSING CULVERT
PLAN VIEW
NO SCALE
UPPER TRIPLE CROSSING CULVERT PROFILE VIEW
NO SCALE
M A
T C
H L
IN
E
ST
A
M A
T C
H L
IN
E
ST
A
2+
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
UPPER TRIPLE CROSSING CULVERT PROFILE VIEW
NO SCALE
FLOW
FLOW
EXISTING CMP
CULVERT
PROPOSED RCP
CULVERT
LEGEND
EXISTING CMP
CULVERT (42")
PROPOSED RCP
CULVERT
(60")
ITEM QUANTITY UNIT
EARTHWORK CUT/FILL 210 CY
REMOVE AND DISPOSE
EXISTING CMP (42")
80 LF
INSTALL POLYMER COATED
CMP (60" Ø, MIN. 12 GAUGE
THICKNESS)
80 LF
UPPER TRIPLE CROSSING CULVERT
ESTIMATED QUANTITIES
TRIPLE CROSSING ROAD
FINISH GROUND
FLOW
FL
O
W
STREAM (THALWEG)
ALIGNMENT
TRIPLE CROSSING ROAD
EXISTING GROUND
INSTALL NEW CMP AT SAME SKEW
AS SHOWN ON SHEET C3
STREAM STATIONING: 2+05.58
INV ELEV: 2498.20
STREAM STATIONING: 1+26.86
INV ELEV: 2500.85
C13
'-0
C O
VE
R
1.
RIPRAP HEADWALL
RIPRAP ARMORING
CONSTRUCTION NOTES
[1] CULVERT TO BE INSTALLED AT INVERT
ELEVATIONS SHOWN IN PLANS AND COMPACTED
AS SHOWN ON SHEET D2
[2] EXISTING CULVERTS TO BE REMOVED AND
DISPOSED OF OFF-SITE
[3] INSTALL POLYMER COATED 12 GAUGE CMP
CULVERT PER MANUFACTURER'S SPECIFICATIONS
AND MONTANA DEPARTMENT OF
TRANSPORTATION HYDRAULICS MANUAL
(https://www.mdt.mt.gov/other/webdata/external/hydraulic s/manuals/Chapter-11-Culverts.pdf).
[4] INSTALL ROCK HEADWALL AROUND CULVERT
ENDS. HAND PLACE WITH CLASS 3 RIPRAP
MATERIAL IN ACCORDANCE WITH DETAILS ON
SHEET D2.
[5] TEMPORARY ROAD CLOSURES WILL BE IDENTIFIED
BY THE BLM IN THE FIELD DURING CULVERT
CONSTRUCTION. ALL TEMPORARY ROADS SHALL
BE RESTORED TO ORIGINAL CONDITION AS BEST
POSSIBLE AFTER CULVERT CONSTRUCTION HAS
BEEN COMPLETED.
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\GSC-DETAILS.DWG
ER
O
SI
O
N C
O N
TR
O
L D
ET
AI
LS
D1
D R
AW
N
B Y:
L
IS
A C
YF
O
R D
FLOW
ASHINGLE SPLICE ~ SECTION
FASTENER
(TYP.)
6" MIN. EDGE
OVERLAP
6" MIN. END
OVERLAP
ISOMETRIC VIEW
6"
6" 4"
6" 4"
6"
(TYP.)
6"
6"
4"
B
EROSION CONTROL
BLANKET
NATIVE SOIL ~ FOLLOW
INSTALLATION STEPS
6" × 6" TRENCH
EXTEND BLANKET FAR ENOUGH OVER
CREST OF SLOPE TO EFFECTIVELY
PREVENT UNDERCUTTING AND TO
PROVIDE SECURE ANCHORING
BIODEGRADABLE EROSION
CONTROL BLANKET
PLACEMENT FOR SLOPES
EROSION CONTROL
BLANKET
4"
2 ROWS OF STAPLES
4" APART, STAGGERED,
6" O. C. PLACED WITHIN
6" OF BLANKET EDGE.
EXTEND BLANKET 24" BEYOND
TOE OF SLOPE OR TO EDGE
OF VEGETATION ~ WHICHEVER
IS CLOSER
18" MAX.
(TYP.)
36" MAX.
(TYP.)
36" MAX.
(TYP.)
18" MAX.
(TYP.)
INITIAL ANCHOR ~ DETAIL
(TYP.)
STAPLES ~ 4" APART,
STAGGERED, 6" O. C.
4"
6"
2 ROWS OF STAPLE (TYP.) ~
4" APART, STAGGERED, 6" O. C.
CONSTRUCTION NOTES
[1] More than the minimum of one fastener per square yard may be required due to conditions such as blanket composition, soil type, surface uniformity, and slope steepness.
[2] See Standard Specification 629.
Use manufacturer's requirements. When manufacturer's requirements are not provided, use installation requirements shown on Standard Plans.
[3] Additional staples may be required on slopes greater than 3H : 1V.
INSTALLATION STEPS
[1] Prepare smooth slope.
[2] Dig anchor trench. Set aside native soil removed from trench.
[3] Secure blanket in anchor trench, staking or stapling blanket as shown.
[4] Replace native soil previously removed from trench.
[5] Roll blanket down the slope in a controlled manner, taking care to remove excess slack, and taking care not to stretch blanket.
[6] Stake or staple blanket as shown so there are no gaps between the blanket and the soil.
Staple while unrolling blanket to minimize walking on blanket.
FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\GSC-DETAILS.DWG
C U
LV
ER
T D
ET
AI
LS
BEDDING [3]
NATIVE OR IMPORT
BACKFILL [4]
T
ROUND CULVERT INSTALLATION NOTES
[1] CONTRACTOR TO PERFORM EXCAVATION IN ACCORDANCE
WITH FHA FP-14 SPEC SEC 208.03. EXCAVATION SHALL
PROVIDE A SAFE WORKING ENVIRONMENT AND ALLOW FOR
ALL INSTALLATION AND COMPACTION REQUIREMENTS.
CONTRACTOR TO SLOPE, BENCH OR PROVIDE SHORING IN
ACCORDANCE WITH THE U.S. DEPARTMENT OF LABOR,
OCCUAPTION SAFETY AND HELTH ADMINISTRATION (OSHA)
TECHINAL MANUAL, SECTION 5 CHAPER 2.
[2] CONTRACTOR TO FURNISH AND INSTALL COUPLING BAND
WHEN MULTIPLE PIPE SEGEMENTS ARE REQUIRED TO
ACHIEVE CULVERT LENGTH. REFERENCE " ROUND
CORRUGATED METAL PIPE COUPLING BAND DETAIL" ON THIS
SHEET. COUPLING BAND TO BE CONTECH HUGGER BAND,
WITH GASKETS, OR APPROVED EQUAL. INSTALL PER
MANUFACTURER'S INSTRUCTIONS.
[3] CONTRACTOR TO FURNISH AND INSTALL BEDDING MATERIAL
PER FHA FP-14 SPEC SEC 209.08(B). BEDDING MATERIAL
SHALL CONFORM TO FHA FP-14 SPEC SEC 704.02.
[4] CONTRACTOR TO FURNISH & INSTALL BACKFILL MATERIAL
PER FHA FP-14 SPEC SEC 209.09(B)(1). BACKFILL MATERIAL
SHALL CONFORM TO FHA FP-14 SPEC SEC 704.03. 3. NO
BACKFILL SHALL BE PLACED UNTIL CULVERT SECTIONS HAVE
BEEN CONNECTED, PLACED, AND APPROVED BY THE
GOVERNMENT.
[5] CONTRACTOR TO PLACE AND COMPACT NATIVE BACKFILL
AND COVER MATERIAL PER FHA FP-14 SPEC SEC 209.09(B)(1).
MATERIAL TO BE NATIVE SOIL, FREE OF STONES LARGER
THAN 1' DIAMETER. 3. NO BACKFILL SHALL BE PLACED UNTIL
CULVERT SECTIONS HAVE BEEN CONNECTED, PLACED, AND
APPROVED BY THE GOVERNMENT.
[6] CONTRACT TO FURNISH AND INSTALL CMP CULVERT PER FHA
FP-14 SPEC SEC 602.03 & 602.05. DIAMETER, LENGTH, & SLOPE
PER PLAN. MATERIAL SHALL CONFORM TO FHA FP-14 SPEC
SEC 707 UNLESS OTHERWISE SPECIFIED. CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY DAMAGE TO CULVERT
SECTIONS, BANDS, BENDS, AND ANY OTHER ACCESSORIES
REQUIRED FOR INSTALLATION DURING CONSTRUCTION.
1.5 :1
(M
AX)
[6]
D + 2T + 6'
DEPTH VARIES
MIN. COVER PER
MANUFACTURER'S INSTRUCTIONS
2'
MIN
2D MIN
D
UNDISTURBED NATIVE MATERIAL
CONSTRUCT ROADWAY PER
PLAN WHEN REQUIRED
MATCH CENTERLINE OF CULVERT INLET TO CENTERLINE OF
WASH/STREAM. INLET PLACEMENT TO BE APPROVED BY THE
GOVERNMENT PRIOR TO BACKFILLING. WASH/STREAM WIDENING
AT INLET MAY BE REQUIRED. INLET LOCATION PER PLAN.
PROPOSED CULVERT [6]
ROUND CULVERT INSTALLATION DETAIL
N.T.S.
COUPLER AS REQUIRED [2]
EXCAVATE AS REQUIRED [1]
MATCH CENTERLINE OF CULVERT INLET TO CENTERLINE OF
WASH/STREAM. INLET PLACEMENT TO BE APPROVED BY THE
GOVERNMENT PRIOR TO BACKFILLING. WASH/STREAM WIDENING
AT INLET MAY BE REQUIRED. INLET LOCATION PER PLAN.
NATIVE BACKFILL[5]
TYPICAL INSTALLATION IN STREAM CHANNELCULVERT HEADWALL OF HAND PLACED RIPRAP ARMOR
NO SCALENO SCALE
NOTE: LAY CULVERT ON NATURAL FLOWLINE
CL RD.
RIPRAP ARMOR WHEN
IDENTIFIED IN
WORKLIST
STREAM
CHANNEL
TOP OF SUBGRADE
RIPRAP WHEN IDENTIFIED
IN WORKLIST
A MIN. OF 1 FT. OR
1/2 DIA. ABOVE TOP
OF PIPE-WHICHEVER
IS GREATER
GEOTEXTILE WHEN
SPECIFIED
DIA.
FILL SLOPE
AS STAKED
6 FT OR AS
STAKED TO UTILIZE
SPECIFIED RIPRAP
1.5 FT OR
AS STAKED
3 FT OR
AS STAKED
CULVERT INLET
CULVERT OUTLET
ROAD SURFACE
FILL SLOPE
AS STAKED
CULVERT OUTLET
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
ROUND CULVERT BEDDING DETAIL
N.T.S.
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
C:\USERS\GANDERSON\DOI\WESTERN DISTRICT OFFICE - ENGINEERING\_PROJECT\_GLASGOW FIELD OFFICE\GLASGOW FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\GSC-DETAILS.DWG
SI
LT
F
EN
C
IN
G
D3
D R
AW
N
B Y:
L
IS
A C
YF
O
R D
FABRIC (GEOTEXTILE)
(TYPICAL)
SPLICE DETAIL
ISOMETRIC
TYPICAL SILT FENCE
WITHOUT BACKUP SUPPORT
SILT FENCE
(WOOD POSTS SHOWN)
SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH
TOGETHER TO PREVENT SILT LADEN WATER FROM
ESCAPING THROUGH THE FENCE AT THE OVERLAP.
SEE NOTE 1
SEE NOTE 1
SHEET FLOW
(TYPICAL)
6' - 0 " M
AX. SPACING
PROTECTED AREA
PROTECTED AREA
PROTECTED AREA
GEOTEXTILE FOR SILT FENCE ~ SEE STANDARD
SPECIFICATION SECTION
713.16(c)
(STEEL POSTS SHOWN)
NOTE
(STEEL POSTS SHOWN)
POST ~ SEE STD.
SPEC. 713.16(b)
GEOTEXTILE
FLOW
BURY GEOTEXTILE
IN TRENCH
4"
2'
0" M
IN
2'
0" M
IN
FASTEN GEOTEXTILE TO
POST EVERY 6" (IN.) O.C.
4"
BACKFILLED &
COMPACTED
NATIVE SOIL
FASTEN TO POST
EVERY 6" O.C
SELF-LOCKING TIE~NYLON 6/6 (MIN. GRADE),
120# MIN. TENSILE STRENGTH, UV STABILIZED
TYPICAL INSTALLATION DETAIL
POST
~ WOOD OR STEEL
(TYPICAL)
DURING EXCAVATION, MINIMIZE DISTURBING THE GROUND
AROUND TRENCH AS MUCH AS IS FEASIBLE, AND SMOOTH
SURFACE FOLLOWING EXCAVATION TO AVOID CONCENT-
RATING FLOWS. COMPACTION MUST BE ADEQUATE TO
PREVENT UNDERCUTTING FLOWS.
CONSTRUCTION NOTES
[1] Install the ends of the silt fence to point slightly upslope to prevent sediment from flowing around the ends of the fence.
[2] Perform maintenance in accordance with BLM direction
[3] Splices shall never be placed in low spots or sump locations. If splices are located in low or sump areas, the fence may need to be reinstalled unless the Project Engineer approves the installation.
[4] Install silt fencing parallel to mapped contour lines.
FIELD OFFICE STREAM CROSSING IMPROVEMENTS\GUTSHOT DAM DWGS\06_IMPROVEMENT SHEETS\GSC-DETAILS.DWG
IN
S
TR
EA
M D
ET
AI
LS
CONCRETE PLANK DETAIL
D4
G
LA
SG
O
W S
TR
EA
M C
R O
SS
IN
G
IM
PR
O
VE
M
EN
TS
BU
R
EA
U
O F
LA
N
D M
AN
AG
EM
N
ET
IS
SU
E D
AT
E:
M
AR
K R
EV
IS
IO
N
D
AT
E
AP
PR
O
VE
D
___ OF ___
SHEET
4/
/2
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
(DESIGNED BY: SPC & GJA DRAWN BY: GJA CHECKED BY: SPC APPROVED BY: MJB)
D
IS
TR
IC
T:
D
ES
IG
N
O
FF
IC
E:
IS
SU
ED
F
O R
:C O
N
ST
R U
C
TI
O N
EA
ST
ER
N
M O
N
TA
N A
D
IS
TR
IC
T
W
ES
TE
R
N M
O N
TA
N
A D
IS
TR
IC
T
12'-0"
14"
6"
#5 REBAR INSTALLED PER
SPECIFICATION SECTION 554
1 - 2 "
3 16
3" OVERHANG
0.75" Ø
NO SCALE
CONNECTION TAB DETAIL
NO SCALE
HEADER
BOULDER
FOOTING
BOULDER
CHINKING ROCKS
CHANNEL
CROSS
SECTION BANKFULL
ELEV
HEADER
BOULDER
FOOTER
BOULDER
CHINK ROCK INTO VOID
SPACE (SEE CHINKING
DETAIL)
EXTEND GRADE
CONTROL TO 1' ABOVE
BANKFULL ELEV
CHANNEL
MATERIAL MIX, 2'
THICK IN CHANNEL
SUBBASE
RECONSTRUCTED
CHANNEL
SLOPE = 6.5%
HEADER
BOULDER
FOOTER
BOULDER
BANKFULL ELEV
HEADER
BOULDER
FOOTER
BOULDER
THALWEG
TOP BANK
(BANKFULL
ELEV)
FL
O
W
FL
O W
CHINKING DETAIL
NO SCALE
ROCK WEIR CROSS SECTION VIEW
NO SCALE
ROCK WEIR PROFILE VIEW
NO SCALE
ROCK WEIR PLAN VIEW
NO SCALE
D R
AW
N
B Y:
G . A
N D
ER
SO
N
N . P
LA
TT
BROOM FINISH PER
SPECIFICATION SECTION 501.09
INSTALL STEEL CONNECTION TAB
AS CONTINUOUS PIECE WITH 3"
OVERHANG ON EACH EDGE.
TOTAL CONNECTION TAB LENGTH = 19"
NOTE:
CONNECTION TABS ARE A RECOMMENDATION BY THE BLM, BUT
T…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .