This document is a set of Special Contract Requirements (SCRs) for stream crossing improvements across the Bureau of Land Management's Glasgow Field Office in Eastern Montana. The project involves decommissioning activities at Gutshot Dam, including breach stabilization, outlet works removal, and an improved low water crossing. Additionally, the project will address replacement of failing culverts along Cactus Flats Road and Triple Crossing Road.

The document modifies and supplements the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), providing specific technical requirements for the project. It includes detailed specifications for various construction elements such as aggregate base courses, soil and foundation materials, cellular confinement systems, and environmental protection measures. The SCRs specify technical requirements for material composition, compaction, testing, quality control, and installation methods, with particular attention to erosion control, noxious weed prevention, and environmental protection in the project area.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Special Contract Requirements Eastern Montana District, Montana Glasgow Stream Crossing Improvement Bureau of Land Management

Special Contract Requirements for Stream Crossing Improvements across the Bureau of

Land Management’s Glasgow Field Office

Description of Work

The project consists of decommissioning activities at Gutshot Dam, including breach stabilization, outlet works removal, and an improved low water crossing. The project will also address replacement of failing culverts along Cactus Flats Road and Triple Crossing Road.

Applicable Standard Specifications

The following Special Contract Requirements (SCRs) are only a portion of the specifications for this project. These SCRs amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. The FP-14 is a separately published book. In order to understand the solicitation properly you need to have the FP-14 as well as this packet. Pay particular attention to the provisions of Subsection 104.04 in the FP-14 that explain how each of the many contract documents fit together.

One printed copy of the FP-14 will be distributed to the successful bidder.

To view the FP-14 electronically, go to: https://highways.dot.gov/federal-lands/specs A single paper copy can also be obtained from the Research & Technology Product Distribution Center (RTPDC) by e-mail report.center@dot.gov, phone 814-239-1160, or fax 814-239-2156.

Note: These Special Contract Requirements change, supplement, or modify the FP-14 specifications to make them more applicable to The Bureau of Land Management (BLM) low or very low volume roads and rural construction environments. Specifications are often changed to reduce their complexity, limit testing, and loosen tolerances. Specifications are called out in this way to call attention to where requirements are changed from the standard FP-14 specifications.

How to use the FP-14 specifications with the Special Contract Requirements and the contract’s bid schedule.

• Pay item no. 20401 means this work is defined in section 204 of the FP-14 specifications. For all pay items the first three digits correlate to the FP-14 section that describes that work.

• Next check Special Contract Requirements. If there is a matching section 204 then it modifies the

FP-14. If there is no section listed there are no changes, the FP-14 specification is utilized in its entirety. The change direction will be underlined and italicized; the specification text will be plain.

o Example: Section 204 is listed in the Special Contract Requirements with a direction to “Delete Section 204 in its entirety and replace with the following.”

Apply those changes. None of the original FP-14 specification will be used. Only use the content that is in the Special Contract Requirements.

https://highways.dot.gov/federal-lands/specs mailto:report.center@dot.gov

Glasgow Stream Crossing Improvement Bureau of Land Management

STANDARD SPECIFICATIONS FOR THE CONSTRUCTION OF ROADS AND BRIDGES ON

FEDERAL HIGHWAY PROJECTS FP-14

SPECIFICATION SECTIONS

PREFACE

DIVISION 100 GENERAL REQUIREMENTS

Section 101 - Terms¸ Format¸ and Definitions

Section 102 - Bid¸ Award¸ and Execution of Contract

Section 103 - Scope of Work

Section 104 - Control of Work

Section 106 - Acceptance of Work

Section 107. – Legal Relations and Responsibility to the Public

Section 108 - Prosecution and Progress

Section 109 - Measurement and Payment

DIVISION 150

Section 151 - Mobilization

Section 152 - Construction Survey and Staking

Section 153 - Contractor Quality Control

DIVISION 300

Section 301 – Untreated Aggregate Base Courses

DIVISION 600

Section 629. —Rolled Erosion Control Products and Cellular Confinement Systems

DIVISION 700

Section 703 - Aggregate

Section 704 – Soil

Glasgow Stream Crossing Improvement Bureau of Land Management

PREFACE

Delete the Preface and substitute the following:

These Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects are issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Bureau of Land Management. These specifications are cited as "FP-14" indicating "Federal Project" Standard Specifications issued in 2014 and contain both United States Customary and Metric units of measure.

When designated in a contract, the FP-14 becomes part of the contract and binding upon all parties to the contract. Construction contracts of the Bureau of Land Management are also governed by the following regulations:

● Federal Acquisition Regulation (FAR), Title 48, Code of Federal Regulations, Chapter 1 The FAR regulations are not included in the FP-14. A complete copy of the FAR is available from the Superintendent of Documents, Congressional Sales Office, U.S. Government Printing Office, Washington, DC 20402.

U.S. Customary units of measure are used in the FP-14 as provided in the November 25, 2008 Memorandum from Jeffrey F. Paniati entitled Update on Metric Use Requirements for FHWA Documents. Metric units are noted in parentheses following the U.S. Customary Units. The references to Metric or Metric units apply only when the project or portion of the project expressly calls for Metric units of measure.

Glasgow Stream Crossing Improvement Bureau of Land Management

DIVISION 100

GENERAL REQUIREMENTS

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 101 - Terms¸ Format¸ and Definitions

101.01 Meaning of Terms. Add the following:

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03 Abbreviations. Add the following to (a) Acronyms

AA

AAN

AAR

ABA

ACPA

ADA

AFPA

AI

AIA

ARA

AREA

ASCE

ASCII

ASLA

BLM

FTMS

GSA

IEEE

MIL

MSHA

NESC

NFPA

PCA

SAE

USFS

USGS

USPS

WCLIB

WWPI

Aluminum Association American Association of Nurserymen Association of American Railroad Architectural Barriers Act American Concrete Pavement Association Americans with Disabilities Act American Forest and Paper Association Asphalt Institute American Institute of Architects American Railway Association American Railway Engineering Association American Society of Civil Engineers American Standard Code for Information Interchange American Society of Landscape Architects Bureau of Land Management Federal Test Method Standard General Services Administration Institute of Electrical and Electronic Engineers Military Specifications Mine Safety and Health Administration National Electrical Safety Code National Forest Products Association Portland Cement Association Society of Automotive Engineers United States Forest Service United States Geological Survey United States Postal Service West Coast Lumber Inspection Bureau Western Wood Preservers Institute

Add the following to (b) U.S. Customary unit abbreviations and symbols:

hr mp ppm

Hour Milepost Part Per Million

Glasgow Stream Crossing Improvement Bureau of Land Management

101.04 Definitions. Delete the definitions for the following terms:

Bid Bidder

Modify the following definitions as follows:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contract Time – Delete this definition and substitute the following:

Period of Performance (POP) – The specified time allowed for completion of contract work.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Maximum Particle Size – The smallest sieve opening through which all particles in the material will pass

Neat Line – A line defining the proposed or specified limits of an excavation or structure.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Glasgow Stream Crossing Improvement Bureau of Land Management

Utilization Standards – The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

BLM — The United States of America, acting through the Bureau of Land Management, U.S.

Department of the Interior.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Bureau of Land Management jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.

Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.

Glasgow Stream Crossing Improvement Bureau of Land Management

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 102 - Bid¸ Award¸ and Execution of Contract

102 Bid, Award, and Execution of Contract. Delete in its entirety.

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 103 - Scope of Work

103.02 Disputes. Delete in its entirety.

103.03 Value Engineering. Delete in its entirety.

103.04 Contractor Records. Delete in its entirety.

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 104 - Control of Work

104.01 Authority of the Contracting Officer (CO). Delete in its entirety.

104.02 Authority of Inspectors. Delete in its entirety.

104.03 Specifications and Drawings.

(c) As-built drawings. Modify the first sentence to read as follows:

Use one set of Contractor-provided plans exclusively for as-built drawings.

(d) Submittals. Add this section:

1. Material Gradation and Test Results (105.02, 154.05, 208, 209, 214, 251, 301

2. Site specific Quality Control Plan (153.03)

3. Traffic Control Plan (156.04)

4. Erosion Control Plan (157.05)

5. Manufacturer’s literature on geotextile and geotextile seam assembly (207)

6. Dewatering Plan (208.07)

7. Concrete Mix Design (552.03)

8. Reinforcing steel order list and bending diagrams (554.03)

9. Manufacturer’s assembly instructions (603.4)

10. Manufacturer’s literature on fertilizer and mulch (625)

11. Salvage and Planting Plan (626.03)

104.04 Coordination of Contract Documents. Delete in its entirety.

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 106 - Acceptance of Work

106.02 Visual Inspection. Delete and replace with the following:

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.

106.05 Statistical Evaluation of Work and Determination of Pay Factor. Delete in its entirety, including all references to Statistical Evaluation. All references to Section 106.05 shall be replaced with references to Section 106.04 Measured or Tested Conformance.

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 107. – Legal Relations and Responsibility to the Public

107.03 Bulletin Board. Delete in its entirety.

107.05 Responsibility for Damage Claims. Delete in its entirety.

107.06 Contractor’s Responsibility for Work. Delete in its entirety.

107.09 Legal Relationship of the Parties. Delete in its entirety.

107.10 Environmental Protection.

(b) Oil and hazardous substances. Delete in its entirety and add the following:

Submit a Hazardous Spill Plan, prior to construction, stating what actions will be taken in case of a spill, notification procedures, and specific cleanup and disposal instructions for different products. This plan will also incorporate preventive measures to be implemented, such as the placement of refueling facilities, storage and handling of hazardous materials, etc. Immediately notify the Contracting Officer of all hazardous spills. Spill plan will be available on site at all times, in addition; at least one worker on site will be trained in spill containment.

Power equipment shall be refueled at least 200 feet from any stream, or as far away as possible.

Immobile equipment shall have absorbent pads placed under them to capture any petroleum products that may leak and be stored a minimum of 200 feet from any stream. All vehicles operating within 150 feet of a live stream shall be inspected daily for fluid leaks before leaving the staging area. Any leaks will be repaired before the vehicle resumes operation. Inspections shall be documented, and a copy provided to the COR

Contractor shall have a SPILL RESPONSE KIT on the project whenever equipment is operating. The spill kit shall be sufficient to absorb 34 gallons of oil and designed to float on the surface while absorbing oil and repelling water. The kit shall meet or exceed the physical properties of “new pig products spill kit #408”. Oil-absorbing, floating booms shall be installed at both sites just downstream of construction activities.

Any and all spills of chemicals, including petroleum products, shall be immediately contained, cleaned up and shall be disposed of, in accordance with State and Federal regulations.

(c) Dirt, plant, and foreign material. Delete in its entirety and add the following:

All equipment shall be power washed and inspected by COR or a COR-designated Representative for compliance prior to mobilizing onto BLM lands to prevent transference of noxious weeds. All mechanized equipment shall be steam-cleaned before being used below ordinary high water until all visible external oil, grease, mud, and other visible contaminants are removed. The Contractor shall take reasonable precautions to prevent the spread of known noxious weeds from the project area by cleaning

Glasgow Stream Crossing Improvement Bureau of Land Management all off-highway vehicles and equipment, before leaving infested areas and entering uninfested areas, when operating in areas infested with noxious weeds.

Numerous noxious weeds have been mapped in the area. Due to ground disturbance and continued road use, the following statements and stipulations apply:

1. Take care where vehicles are parked and where staff is working/walking;

2. Take care to check personnel, tools, and vehicles for plant parts before leaving the site, and wash vehicles if necessary;

3. Minimize soil disturbance outside of road prism as much as possible.

(e) Project specific Environmental Protection. Add this section:

The Government may direct the Contractor to discontinue all operations in the event that:

1. Threatened, or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, may be affected by the operation, and a determination is made that consultation or reinitiating of consultation is required concerning the species prior to continuing operation, or;

2. Federal candidate (Categories 1 and 2), sensitive or State listed species protected under BLM

Manual 6840 - Special Status Species Management, have been discovered, and a determination is made that continued operations would affect the species or its habitat, or;

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 108 - Prosecution and Progress

Section 108. Delete Section 108 in its entirety.

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 109 - Measurement and Payment

109.03 Weighing Procedures and Devices.

(c) Project weighing system. Add the following:

Manual scales may be used if approved in writing by the CO and if the method of weighing meets all other contract requirements. For aggregates weighed for payment, adjust scale weights of material to deduct the daily average moisture content in excess of 2 percentage points over optimum moisture as determined by AASHTO T 99 or the designated compaction method. If moisture determination is necessary, determine the daily average moisture content in accordance with AASHTO T 255, from not less than three representative samples of aggregate taken at random intervals each day that aggregate is being weighed.

109.06 Pricing of Adjustments. Delete in its entirety.

109.07 Eliminated Work. Delete in its entirety.

109.08 Progress Payments. Delete in its entirety.

109.09 Final Payment. Delete in its entirety.

Glasgow Stream Crossing Improvement Bureau of Land Management

DIVISION 150

PROJECT REQUIREMENTS

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 151 - Mobilization

151.03 Payment

(b) Replace with the following:

Up to 25 percent of the original contract amount may be paid upon mobilization to the jobsite prior to any other work being completed. Any portion of the mobilization pay item in excess of 25 percent of the original contract amount will be paid after final acceptance.

(c) Delete in its entirety

(d) Delete in its entirety

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 152 - Construction Survey and Staking

Table 152-1 Construction Survey and Staking Tolerances Replace Table 152-1 with the following:

Table 152-1 Construction Survey and Staking Tolerances (1)

Staking Phase Horizontal Vertical

Control points set from existing Government control points- Tolerance Class A

±0.03 feet (±10 millimeters)

±0.01 feet × N

(±3 millimeters × N )(2)

Mapping, topography, and cross-section Points- Tolerance Class A

±0.16 feet (±50 millimeters)

±0.16 feet (±50 millimeters)

Centerline points (3) including (PC), (PT), (POT),(POC), and references- Tolerance Class A

±0.06 feet (±20 millimeters)

±0.06 feet (±20 millimeters)

Slope-stake and slope-stake references- Tolerance Class A (4)

±0.16 feet (±50 millimeters)

±0.16 feet ±50 millimeters)

Culverts, ditches, and minor drainage structures stakes- Tolerance Class A

±0.16 feet (±50 millimeters)

±0.06 feet (±20 millimeters)

Retaining walls stakes ±0.06 feet (±20 millimeters)

±0.03 feet (±10 millimeters)

Curb and gutter stakes ±0.06 feet (±20 millimeters)

±0.03 feet (±10 millimeters)

Bridge substructures stakes ±0.03 feet (±10 millimeters)(5)

±0.03 feet (±10 millimeters)

Bridge superstructures stakes ±0.03 feet (±10 millimeters)(5)

±0.03 feet (±10 millimeters)

Clearing and grubbing limit stakes- Tolerance Class A

±1.00 feet (±300 millimeters)

Roadway subgrade finish stakes- Tolerance Class A (6)

±0.16 feet (±50 millimeters)

±0.03 feet (±10 millimeters)

Roadway finish grade stakes (6) ±0.16 feet (±50 millimeters)

±0.03 feet (±10 millimeters)

Glasgow Stream Crossing Improvement Bureau of Land Management

Table 152-1 Construction Survey and Staking Tolerances (continued) (1)

Control points set from existing Government control points –Tolerance Class B (7)

±0.16 feet (±20 millimeters)

±0.16 feet × (±20 millimeters × )(2)

Mapping, topography, and cross-section points–Tolerance Class B (7)

±1.00 feet (±300 millimeters)

±0.50 feet (±150 millimeters)

Centerline points including (PC), (PT), (POT),(POC), and references–Tolerance Class B (7)

±0.16 feet (±20 millimeters)

±0.16 feet (±20 millimeters)

Slope-stake and slope-stake references– Tolerance Class B (7)

±0.50 feet (±50 millimeters)

±0.16 feet ±50 millimeters)

Culverts, ditches, and minor drainage structures stakes–Tolerance Class B (7)

±0.50 feet (±150 millimeters)

±0.16 feet (±20 millimeters)

Clearing and grubbing limit stakes– Tolerance Class B (7)

±2.00 feet (±600 millimeters)

Roadway subgrade finish stakes– Tolerance Class B (7)

±0.50 feet (±50 millimeters)

±0.16 feet (±10 millimeters)

Roadway finish grade stakes–Tolerance Class B (7)

±0.50 feet (±50 millimeters)

±0.16 feet (±10 millimeters)

(1) At statistical 95 percent confidence level. Tolerances are relative to existing Government control points.

(2) N is the number of instrument setups.

(3) Centerline points: PC - point of curve, PT - point of tangent, POT - point on tangent, POC - point on curve.

(4) Take the cross-sections normal to the centerline ±1 degree.

(5) Bridge control is established as a local network and the tolerances are relative to that network.

(6) Includes paved ditches.

(7) Tolerance Class B for Very Low Volume Roads with an aggregate or native finished surface.

N

N

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 153 - Contractor Quality Control

153.02 Qualifications. Delete and replace with the following:

Submit the following for approval with the quality control plan:

(a) Quality control manager (QCM). Furnish a QCM who has at least 2 years’ experience in construction, inspector, quality control and material testing on construction projects of similar type and scope.

(b) Testers. Provide testers with at least one year experience in the type of sampling and testing required, and with one of the following for the type of sampling and testing performed:

(1) NICET Level II certification in highway material or equivalent state or industry certification;

(2) Certification by a regional certification program (such as Western Alliance for Quality Transportation Construction (WAQTC), Northeast Transportation Technician Certification Program (NETTCP), Southeast Task Force for Technician Training and Qualification (STFTTQ), or Multi Regional Training and Certification (M-TRAC)); or

(3) At least one year employment by an AASHTO accredited laboratory performing equivalent sampling and testing.

153.03 Quality Control Plan. Add the following paragraph to the end of Subsection 153.03(b):

(b) Quality Control Procedures.

Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.

153.07 Records and control charts. Delete Subsection 153.07 and replace with the following:

Maintain complete testing and inspection records by pay item number and make them accessible to the

CO.

153.04 (2) (a) Submittal Log Add the following Subsection:

At a minimum the contractor shall provide project submittals as shown on the Submittal Log below.

Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.

Glasgow Stream Crossing Improvement Bureau of Land Management

Submittal Log

Log No.

Indirect paymen t to Pay

Item(s) Description of Submittal Type of

Submittal

Requirement found in

Specification No.

/Drawings

Additional Specificatio n References

1 <fill in> <fill in> <fill in> <fill in> <fill in>

Glasgow Stream Crossing Improvement Bureau of Land Management

DIVISION 300

EARTHWORK

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 301 – Untreated Aggregate Base Courses

301.05 Compacting. Delete Subsection 301.05 and replace with the following:

Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road.

Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

(a) Compaction A. Operating spreading and hauling equipment over the full width of the travel way.

(b) Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

(c) Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).

(d) Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

(e) Compaction E. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures.

Glasgow Stream Crossing Improvement Bureau of Land Management

DIVISION 600

INCIDENTAL CONSTRUCTION

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 629. —Rolled Erosion Control Products and Cellular Confinement Systems

629.06. Cellular Confinement Systems Add the following Subsection 629.06:

(a) Design Basis – Rutguard load support and erosion control (or approved equal)

(b) Height: 8”

(c) Tensile Strength: 1800 lbs min

(d) Material:

a. UV stabilized

b. 100% recyclable materials

c. Manufactured in USA

d. Anchoring:

i. Embed per manufacturer’s specifications below 6” lift of aggregate and concrete planks as shown in plans.

e. Underlayment: Install 6 oz non-woven geotextile fabric as specified by the manufacturer as underlayment through geocell footprint. Rutguard installation overview found here… https://cdn.shopify.com/s/files/1/0558/9414/7246/files/RutGuard_Installation_Guide.pdf?

v=1623100079 https://cdn.shopify.com/s/files/1/0558/9414/7246/files/RutGuard_Installation_Guide.pdf?v=1623100079 https://cdn.shopify.com/s/files/1/0558/9414/7246/files/RutGuard_Installation_Guide.pdf?v=1623100079

Glasgow Stream Crossing Improvement Bureau of Land Management

DIVISION 700

MATERIAL

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 703 - Aggregate

703.05 (c) Surface Course Aggregate. Delete Subsection 703.05(c)(3) and Replace with the following:

(3) Plasticity Index, AASHTO T 90 If the percent passing the No. 200 sieve is less than 12% 2 to 9 If the percent passing the No. 200 sieve is greater than 12% Less than 2

Glasgow Stream Crossing Improvement Bureau of Land Management

Section 704 – Soil

704.01. Foundation Fill. Delete the subsection and replace with the following:

Furnish a suitable material conforming to the following:

(a) Material passing 6 inch sieve 100%

(b) Material passing 3 inch sieve 75%-100%

(c) Material passing No. 200 sieve 0-15%

(d) Maximum Plasticity Index 6

704.02 Bedding Material. Delete Subsection 704.02(a) and replace with the following:

(a) Maximum particle size

3 in (75 millimeters) or half the corrugation depth, whichever is smaller

704.03 Backfill Material. Delete the subsection and replace with the following:

Furnish granular material or fine compactible soil free of excess moisture, muck, frozen lumps, roots, sod, and other deleterious material.

704.04 Structural Backfill. Delete the subsection and replace with the following:

Furnish a suitable, free draining material. Remove all rock particles and hard earth clods larger than 9 inches in the longest dimension. Ensure material conforms with the following:

(a) Material passing No 200 sieve, AASHTO T 27 and T 11 5% max.

(b) Liquid limit, AASHTO T 89 30% max.

PREFACE
DIVISION 100 GENERAL REQUIREMENTS
Section 101 - Terms¸ Format¸ and Definitions
101.01 Meaning of Terms. Add the following:
101.03 Abbreviations. Add the following to (a) Acronyms
101.04 Definitions. Delete the definitions for the following terms:
Modify the following definitions as follows:
Add the following definitions:
Section 102 - Bid¸ Award¸ and Execution of Contract
102 Bid, Award, and Execution of Contract. Delete in its entirety.
Section 103 - Scope of Work
103.02 Disputes. Delete in its entirety.
103.03 Value Engineering. Delete in its entirety.
103.04 Contractor Records. Delete in its entirety.
Section 104 - Control of Work
104.01 Authority of the Contracting Officer (CO). Delete in its entirety.
104.02 Authority of Inspectors. Delete in its entirety.
104.03 Specifications and Drawings.
(c) As-built drawings. Modify the first sentence to read as follows:
(d) Submittals. Add this section:
104.04 Coordination of Contract Documents. Delete in its entirety.
Section 106 - Acceptance of Work
106.02 Visual Inspection. Delete and replace with the following:
Section 107. – Legal Relations and Responsibility to the Public
107.03 Bulletin Board. Delete in its entirety.
107.05 Responsibility for Damage Claims. Delete in its entirety.
107.06 Contractor’s Responsibility for Work. Delete in its entirety.
107.09 Legal Relationship of the Parties. Delete in its entirety.
107.10 Environmental Protection.
Section 108 - Prosecution and Progress
Section 108. Delete Section 108 in its entirety.
Section 109 - Measurement and Payment
109.03 Weighing Procedures and Devices.
109.06 Pricing of Adjustments. Delete in its entirety.
109.07 Eliminated Work. Delete in its entirety.
109.08 Progress Payments. Delete in its entirety.
109.09 Final Payment. Delete in its entirety.
DIVISION 150
Section 151 - Mobilization
151.03 Payment
Section 152 - Construction Survey and Staking
Table 152-1 Construction Survey and Staking Tolerances Replace Table 152-1 with the following:
Section 153 - Contractor Quality Control
153.02 Qualifications. Delete and replace with the following:
153.03 Quality Control Plan. Add the following paragraph to the end of Subsection 153.03(b):
153.07 Records and control charts. Delete Subsection 153.07 and replace with the following:
153.04 (2) (a) Submittal Log Add the following Subsection:
DIVISION 300
Section 301 – Untreated Aggregate Base Courses
301.05 Compacting. Delete Subsection 301.05 and replace with the following:
DIVISION 600
Section 629. —Rolled Erosion Control Products and Cellular Confinement Systems
629.06. Cellular Confinement Systems Add the following Subsection 629.06:
DIVISION 700
Section 703 - Aggregate
703.05 (c) Surface Course Aggregate. Delete Subsection 703.05(c)(3) and Replace with the following:
Section 704 – Soil
704.01. Foundation Fill. Delete the subsection and replace with the following:
704.02 Bedding Material. Delete Subsection 704.02(a) and replace with the following:
704.03 Backfill Material. Delete the subsection and replace with the following:
704.04 Structural Backfill. Delete the subsection and replace with the following: