Attachment 1 - Final Design Drawings (DBEH191517).pdf
PDF 10 MB Posted
- Attached to
- Repair Cable and Splices in Feeder from North Substation, Cape Canaveral Space Force Station, FL
- Solicitation number
- FA252122B0003
About this file
This solicitation is for a firm-fixed-price construction contract to replace approximately 20,000 linear feet of 15kV Feeder 7N cable and install ten new sectionalizing terminal cabinets along the feeder route between the North Substation and Switch Station 37 at Cape Canaveral Space Force Station in Florida. The project involves work in approximately 44 manholes. The NAICS code for this opportunity is 237130 with a size standard of $39.5 million. The magnitude of the project is estimated between $1,000,000 to $5,000,000. This acquisition is set aside for women-owned small businesses. The solicitation was issued by the Department of the Air Force Space Command. Funds are not presently available and the government's obligation is contingent upon availability of appropriated funds. The government reserves the right to cancel the solicitation before or after the closing date without obligation to reimburse offerors for any costs.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
OTHER
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
ASBESTOS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS
MATERIAL NOT IDENTIFIED ON THESE DRAWINGS IS
REQUIRED TO BE DISTURBED IN ORDER TO PERFORM
THE CONTRACT WORK, LEAVE MATERIAL UNDISTURBED
AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
HEAVY METALS
YES NO
LEAD
PCB
NOT
VERIFIEDHAZARDOUS MATERIALSERP/WETLANDS/ DREDGE
& FILL
BASE OPERATIONS:
COMMUNICATIONS:
PROJECT MANAGER:
CHIEF, ENGINEERING FLIGHT:
USER:
SAFETY:
SECURITY FORCES:
ATO:
OTHER:
ENVIRONMENTAL:
FIRE:
A P P R O V E D
SCALE:
LOCATION MAP
NONETRUE
NORTH
SKID STRIP
ATLAN
TIC
O C
EAN
BA
NA
NA
R
IV
ER
CX-40
INDUSTRIAL
AREA
CAPE CANAVERAL AIR FORCE STATION
CAPE CANAVERAL, FLORIDA
PH
IL
LI
PS
P
AR
KW
AY
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SA
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
AF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
Ne ls on En gi ne er in gCo rh od es b rit o
A
R
C
H
I T
E
S
AA
G-001
C O
VE
R
S H
EE
T
/1
2/
M .J
O H
N
SO
N
J.
PA
D
IL
LA
M .G
O N
ZA
LE
Z
D
BE
H
9-
XX
-X
X-
XX
D
BE
H
9-
R
EP
AI
R
C
AB
LE
A
N D
S
PL
IC
ES
IN
F
EE
D
ER
N F
R O
M N
O R
TH
S
U
BS
TA
TI
O N
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
N
EL
SO
N
EN
G
IN
EE
R
IN
G
DBEH 19-1517
REPAIR CABLE AND SPLICES IN
FEEDER 7N FROM NORTH SUBSTATION
PROJECT LOCATION
X X X X
DOC
RWWTP
NORTH
SUBSTATION
SHEET INDEX
DRAWING NO. SHEET TITLE REV
G-001 COVER SHEET
CIVL
C-001 CIVIL GENERAL NOTES
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, LEGEND AND ABBREVIATIONS
ED-002 DEMOLITION SINGLE LINE DIAGRAM
E-003 INSTALLATION SINGLE LINE DIAGRAM
E-101 ELECTRICAL SITE PLAN
E-401 ELECTRICAL ENLARGED PLANS I
E-402 ELECTRICAL ENLARGED PLANS II
E-403 ELECTRICAL ENLARGED PLANS III
E-404 ELECTRICAL ENLARGED PLANS IV
E-405 ELECTRICAL ENLARGED PLANS V
E-406 ELECTRICAL ENLARGED PLANS VI
E-407 ELECTRICAL ENLARGED PLANS VII
E-408 ELECTRICAL ENLARGED PLANS VIII
E-501 ELECTRICAL DETAILS
E-502 CIVIL DETAILS
E-701 ELECTRICAL MANHOLES I
E-702 ELECTRICAL MANHOLES II
E-703 ELECTRICAL MANHOLES III
E-704 ELECTRICAL MANHOLES IV
E-705 ELECTRICAL MANHOLES V
E-706 ELECTRICAL MANHOLES VI
E-707 ELECTRICAL MANHOLES VII
E-708 ELECTRICAL MANHOLES VIII
E-709 ELECTRICAL MANHOLES IX
E-710 ELECTRICAL MANHOLES X
E-711 ELECTRICAL MANHOLES XI
HORIZONTAL INTEGRATION FACILITYFPL
SUBSTATION
NASA PARKWAY
CIVIL GENERAL NOTES:
EROSION AND TURBIDITY CONTROL GENERAL NOTES:
REINFORCING STEEL:
CONCRETE:
STRUCTURAL STEEL:
UNLESS OTHERWISE SPECIFIED, ALL WORK TO BE PERFORMED CONSISTENT WITH THE RULES AND REQUIREMENTS OF THE FOLLOWING:
· CAPE CANAVERAL AIR FORCE STATION
· ST. JOHNS RIVER WATER MANAGEMENT DISTRICT
· FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
1. APPLY CIVIL NOTES TO ALL APPLICABLE PROJECT IMPROVEMENTS INCLUDING BUT NOT LIMITED TO DEMOLITION, EXCAVATION, TRENCHING, GRADING, DUCT BANKS AND EQUIPMENT PADS.
2. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES SHOWN ARE THE BEST INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. THERE MAY BE OTHER UNKNOWN IMPROVEMENTS, SUCH AS UTILITIES, WHICH ARE WITHIN THE PROJECT AREA. VERIFY, PRIOR TO CONSTRUCTION, THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (WHETHER OR NOT SHOWN ON
THE PLANS) AFFECTING THE WORK.
3. NIGHT WORK FROM 1 MAY TO 31 OCTOBER BETWEEN 2100 AND 0600 HOURS, REQUIRES REVIEW AND APPROVAL OF A CONSTRUCTION LIGHT MANAGEMENT PLAN THROUGH CONTRACTING OFFICER AND 45 CES ENVIRONMENTAL (45 CES/CEIE) AT LEAST 45 DAYS PRIOR TO NIGHT WORK
COMMENCEMENT.
4. A WILDLIFE SURVEY WILL BE CONDUCTED THROUGH 45 CES/CEIE AT A MINIMUM OF TWO (2) WEEKS PRIOR TO ANY DEMOLITION OR GROUND
EXCAVATION.
5. REQUEST UTILITY LOCATES AND OBTAIN A CCAFS DIG PERMIT AF FORM 103 PRIOR TO CONSTRUCTION.
6. FIELD LOCATE ALL EXISTING UTILITIES AS TO SIZE, LOCATION, AND ELEVATION. CONTRACTOR TO NOTIFY THE CONTRACTING OFFICER OF ALL CONFLICTS PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR TO CONFIRM THE ACCURACY OF ALL SURVEY AND OTHER GRADING DATA.
7. FIELD CONDITIONS MAY NECESSITATE SLIGHT ALIGNMENT AND GRADE DEVIATION OF THE PROPOSED CONSTRUCTION TO AVOID OBSTACLES, AS AGREED TO BY THE CONTRACTING OFFICER.
8. WORK THE SCOPE CONTAINED ON THE CIVIL DRAWINGS IN COORDINATION WITH ALL OTHER DISCIPLINES TO LOCATE DEPRESSED SLABS, SLOPES, DRAINS, BOLT SETTINGS, AND GRADES. CALL ANY DISCREPANCIES TO THE ATTENTION OF THE CONTRACTING OFFICER BEFORE
PROCEEDING WITH THE WORK.
9. REVIEW THESE DRAWINGS AND VISIT THE SITE BEFORE CONSTRUCTION BEGINS TO COMPARE ALL EXISTING CONDITIONS TO WHAT IS SHOWN
ON THE DRAWINGS. IF THERE ARE VARIANCES, NOTIFY THE CONTRACTING OFFICER.
10. THE STRUCTURAL INTEGRITY OF THE COMPLETED STRUCTURE DEPENDS ON THE INTERACTION OF VARIOUS CONNECTED COMPONENTS.
PROVIDE ADEQUATE BRACING, SHORING, AND OTHER TEMPORARY SUPPORTS AS REQUIRED BY SITE CONDITIONS AND FOR SAFE WORK
CONDITIONS.
11. VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS PRIOR TO ORDERING ANY MATERIALS AND NOTIFY THE CONTRACTING OFFICER IF
DIFFERENT FROM WHAT IS SHOWN ON THE DRAWINGS.
12. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND CONSTRUED TO APPLY TO ANY SIMILAR SITUATION
ELSEWHERE ON THE PROJECT, EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN.
13. SCHEDULE A CONSTRUCTION COORDINATION MEETING WITH THE CONTRACTING OFFICER AND PROJECT STAKEHOLDERS TO REVIEW THE CONSTRUCTION SCHEDULE, CRITICAL MILESTONES AND OUTAGES AND REVIEW/CLARIFY REQUESTS FOR INFORMATION.
14. SUBMIT SHOP DRAWINGS WITH COORDINATED TRADES TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL PRIOR TO THE START OF
CONSTRUCTION.
15. GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS AND PERMIT CONDITIONS BEARING ON THE CONDUCT OF THE WORK AS DRAWN AND SPECIFIED. IF THE CONTRACTOR OBSERVES THAT THE DRAWINGS AND SPECIFICATIONS ARE AT VARIANCE, NOTIFY THE CONTRACTING OFFICER, IN WRITING, AND ANY NECESSARY CHANGES TO BE ADJUSTED, AS PROVIDED IN THE AGREEMENT FOR
CHANGES IN THE WORK.
16. THE ACTS AND OMISSIONS OF CONTRACTOR EMPLOYEES AND ALL THEIR SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES AND OTHER PERSONS PERFORMING ANY OF THE WORK UNDER A CONTRACT WITH THE CONTRACTOR IS THE RESPONSIBILITY OF THE
CONTRACTOR.
17. IF THE CONTRACTOR DISCOVERS ANY ERRORS OR OMISSIONS IN THE PLANS, IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
18. PRESERVE AND PROTECT ALL PERMANENT REFERENCE MONUMENTS, PERMANENT CONTROL POINTS, PERMANENT BENCH MARKS AND PROPERTY CORNERS. IF THE MONUMENTS, POINTS OR MARKERS ARE DISTURBED, EMPLOY A FLORIDA REGISTERED LAND SURVEYOR TO
RESET OR REPLACE THEM.
19. MAKE ALL NECESSARY ARRANGEMENTS WITH THE U.S. AIR FORCE, PUBLIC UTILITIES, PUBLIC CARRIERS, SERVICE COMPANIES, AND OTHER AGENCIES HAVING JURISDICTION OWNING OR CONTROLLING ROADWAYS, WATER, SEWER, GAS, ELECTRICAL, AND TELEPHONE SUCH AS PAVEMENTS, PIPING, WIRES, CABLES, CONDUITS, POLES, GUYS OR OTHER SIMILAR FACILITIES, INCLUDING INCIDENTAL STRUCTURES THAT ARE ENCOUNTERED IN THE WORK SUCH THAT ITEMS MAY BE PROPERLY SUPPORTED, PROTECTED OR LOCATED.
20. MAINTAIN ACCESS TO WORK AREA FOR OWNER, OWNER'S AGENT AND INSPECTOR OF APPLICABLE GOVERNMENT JURISDICTIONS AT ALL
TIMES AND PROVIDE PROPER FACILITIES FOR SUCH ACCESS AND INSPECTION.
21. TAKE ALL REASONABLE AND PRUDENT PRECAUTIONS TO ENSURE THAT ALL COMPLETED WORK, MATERIALS AND EQUIPMENT STORED ON SITE ARE SAFE AND SECURED FROM UNAUTHORIZED ACCESS, USE, THEFT, OR VANDALISM. SUCH PRECAUTIONS MAY INCLUDE INSTALLATION OF
SIGNS, FENCES, OR POSTING OF SECURITY GUARDS.
22. PRIOR TO INITIATING ANY EXCAVATION (INCLUDING BUT NOT LIMITED TO DITCHES, STORMWATER PONDS, CANALS), INSTALL FENCES AND TAKE ALL OTHER REASONABLE AND PRUDENT STEPS TO ENSURE THAT ACCESS TO EXCAVATION BY UNAUTHORIZED PERSONNEL IS
PREVENTED.
23. AT ALL TIMES, USE ALL NORMALLY ACCEPTED AND REASONABLY EXPECTED SAFETY PRACTICES AND COMPLY WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS, ORDINANCES AND GUIDELINES PERTAINING TO SAFE USE OF EQUIPMENT OR MATERIALS AS PUBLISHED BY
MANUFACTURER.
24. COMPLY WITH ALL FEDERAL OCCUPATIONAL HEALTH AND SAFETY ACT RULES AND REGULATIONS. COMPLY WITH ANY AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS PERTAINING TO JOB SAFETY AND HEALTH.
25. ENSURE ALL WORK PERFORMED UNDER THE CONTRACT, AND ALL EQUIPMENT, APPLIANCES, TOOLS AND LIKE ITEMS USED IN THE WORK CONFORM TO APPLICABLE SAFETY CODES AND REGULATIONS OF ANY PUBLIC OR OTHER AUTHORITY HAVING JURISDICTION. IN THE EVENT OF CONFLICTING REQUIREMENTS, THE MORE STRINGENT INTERPRETATION OR REGULATION GOVERNS. TAKE ALL REASONABLE PRECAUTIONS FOR THE SAFETY OF, AND PROVIDE ALL REASONABLE PROTECTION TO PREVENT DAMAGE, INJURY OR LOSS TO:
A. ALL EMPLOYEES ON THE WORK AND ALL OTHER PERSONS WHO MAY BE AFFECTED;
B. ALL THE WORK AND ALL MATERIALS AND EQUIPMENT USED, WHETHER IN STORAGE ON OR OFF THE SITE, UNDER THE CARE, CUSTODY OR
CONTROL OF THE CONTRACTOR OR ANY OF ITS SUBCONTRACTORS;
C. OTHER PROPERTY AT THE SITE OR ADJACENT TO IT, INCLUDING TREES, SHRUBS, LAWNS, WALKS, PAVEMENTS, ROADWAY, STRUCTURES
AND UTILITIES NOT DESIGNATED FOR DEMOLITION DURING CONSTRUCTION.
25. ERECT AND MAINTAIN, AS REQUIRED BY EXISTING CONDITIONS AND PROGRESS OF THE WORK, ALL REASONABLE SAFEGUARDS FOR SAFETY AND ENVIRONMENTAL PROTECTION, INCLUDING POSTING DANGER SIGNS AND OTHER WARNINGS AGAINST HAZARDS, PROMULGATING SAFETY REGULATIONS AND NOTIFYING OWNERS AND USERS OF ADJACENT UTILITIES OF THE EXISTENCE OF HAZARDS AND OF THE SAFETY OR
ENVIRONMENTAL REGULATIONS.
26. PROVIDE ADEQUATE PROTECTION FOR PARTS IN WORKPLACE AND ADJACENT AREAS THAT ARE SUBJECT TO DAMAGE DUE TO
CONSTRUCTION. PROTECTION OF PARTS IS AT THE COST OF THE CONTRACTOR.
27. FURNISH AND MAINTAIN ADEQUATE TRAFFIC CONTROL, BARRICADES AND FLAGMAN SERVICES AT ALL POINTS WHERE CONVEYING EQUIPMENT
ENGAGED ON THE WORK REGULARLY ENTERS ONTO OR CROSSES TRAFFIC-CARRYING ROADS.
28. USE, HANDLE, TRANSPORT, AND DISPOSE OF ALL HAZARDOUS MATERIALS IN COMPLIANCE WITH ALL FEDERAL, STATE AND LOCAL
ENVIRONMENTAL, HEALTH OR SAFETY LAWS, AND REQUIREMENTS.
29. TAKE ALL THE PRECAUTIONS TO PREVENT THE DISCHARGE, RELEASE OR DISPOSAL OF ANY HAZARDOUS MATERIAL CREATED BY THEIR WORK ON OR ABOUT THE JOB SITE. IN THE EVENT OF ANY SPILL, RELEASE OR ANY OTHER REPORTABLE OCCURRENCE, CONTRACTOR MUST NOTIFY THE APPROPRIATE GOVERNMENTAL AGENCY IN ACCORDANCE WITH THE CONTRACTING OFFICER, AND TAKE SUCH ACTION AS MAY BE NECESSARY TO MINIMIZE THE DELETERIOUS EFFECT OF SUCH SPILL ON PERSONS OR PROPERTY. THE CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ANY HAZARDOUS WASTE MATERIALS IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS.
30. UPON COMPLETION OF PERFORMANCE OF ALL DUTIES UNDER THIS CONTRACT, REMOVE ALL SUPPLIES, MATERIALS, AND WASTE CONTAINING ANY HAZARDOUS MATERIAL FROM THE JOB SITE. BEAR FULL FINANCIAL RESPONSIBILITY, AS BETWEEN THE PARTIES OF THIS CONTRACT, FOR
THE COMPLIANCE OF CONTRACTOR AND ITS SUBCONTRACTORS.
31. IN THE EVENT CONTRACTOR OR SUBCONTRACTORS ENCOUNTER ON THE PREMISES ANY PIPELINE, UNDERGROUND STORAGE TANK OR OTHER CONTAINER, OF ANY KIND, THAT MAY CONTAIN A HAZARDOUS MATERIAL, OR ENCOUNTER MATERIAL REASONABLY BELIEVED TO BE A HAZARDOUS MATERIAL, IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND REPORT THE CONDITION TO CONTRACTING OFFICER IN
WRITING.
32. "HAZARDOUS MATERIAL" MEANS ANY SUBSTANCE: (A) THE PRESENCE OF WHICH REQUIRES INVESTIGATION OR REMEDIATION UNDER ANY PRESENT FEDERAL, STATE OR LOCAL STATUTE, REGULATION, ORDINANCE, RULE, CODE, ORDER, ACTION, POLICY OR COMMON LAW, OR (B) WHICH IS OR BECOMES DEFINED AS A "HAZARDOUS WASTE," "HAZARDOUS SUBSTANCE," POLLUTANT OR CONTAMINANT UNDER ANY PRESENT FEDERAL, STATE OR LOCAL STATUTE, REGULATION, RULE OR ORDINANCE OR AMENDMENTS THERETO INCLUDING, WITHOUT LIMITATION, THE COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION AND LIABILITY ACT (42 U.S.C. SECTIONS 9601 ET SEQ.) AND/OR THE RESOURCE CONSERVATION AND RECOVERY ACT (42 U.S.C. SECTIONS 6901 ET SEQ.), OR (C) WHICH IS TOXIC, EXPLOSIVE, CORROSIVE, FLAMMABLE, INFECTIOUS, RADIOACTIVE, CARCINOGENIC, MUTAGENIC, OR OTHERWISE HAZARDOUS AND IS REGULATED BY ANY GOVERNMENTAL AUTHORITY, AGENCY, DEPARTMENT, COMMISSION, BOARD, AGENCY OR INSTRUMENTALITY OF THE UNITED STATES, THE STATE IN WHICH THE PREMISES ARE LOCATED OR ANY POLITICAL SUBDIVISION THEREOF, OR (D) THE PRESENCE OF WHICH ON THE PREMISES CAUSES OR THREATENS TO CAUSE A NUISANCE UPON THE PREMISES OR TO ADJACENT PROPERTIES OR POSES OR THREATENS TO POSE A HAZARD TO THE HEALTH OR SAFETY OF PERSONS ON OR ABOUT THE PREMISES, OR (E) WHICH CONTAINS GASOLINE, DIESEL FUEL OR OTHER PETROLEUM HYDROCARBONS, OR (F) WHICH CONTAINS POLYCHLORINATED BIPHENYLS, ASBESTOS, LEAD OR UREA FORMALDEHYDE FOAM INSULATION.
33. BLASTING OPERATIONS CANNOT BE PERFORMED WITHOUT PRIOR APPROVAL OF THE INSTALLATION AIR PROGRAM MANAGER. THE USE OF SILICA SAND IS PROHIBITED IN SANDBLASTING. PROVIDE TARPAULIN DROP CLOTHS AND WINDSCREENS TO ENCLOSE ABRASIVE BLASTING OPERATIONS TO CONFINE AND COLLECT DUST, ABRASIVE AGENT, PAINT CHIPS, AND OTHER DEBRIS. PERFORM WORK INVOLVING REMOVAL OF HAZARDOUS MATERIAL IN ACCORDANCE WITH 29 CFR 1910. CONDUCT TCLP FOR ANY RCRA METALS PRIOR TO DEMOLITION.
1. REMOVE ALL EXCAVATED MATERIAL AND CONSTRUCTION AND DEMOLITION DEBRIS FROM THE PROJECT SITE AND
PROPERLY DISPOSE OF IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL REQUIREMENTS.
2. THE EROSION CONTROL MEASURES TO BE TAKEN IN CONFORMANCE WITH PATRICK AIR FORCE BASE, FDEP, ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, AND ANY OTHER LOCAL, STATE, OR FEDERAL AGENCIES HAVING JURISDICTION.
3. INSTALL EROSION CONTROL MEASURES PRIOR TO CONSTRUCTION COMMENCEMENT.
4. THE APPROPRIATE TURBIDITY AND EROSION CONTROL METHODOLOGIES SELECTED BY THE CONTRACTOR FOR THIS PROJECT TO BE MADE FOLLOWING ASSESSMENT OF THE PLANS AND PROJECT SITE SPECIFIC FACTORS AND AFTER CONSULTATIONS AS NEEDED WITH THE CONTRACTING OFFICER AND APPROPRIATE AGENCIES. THE CONSTRUCTION SEQUENCING SHOULD BE THOUGHT OUT IN ADVANCE OF INITIATION TO PROVIDE ADEQUATE PROTECTION OF WATER
QUALITY.
5. THE TYPE OF EROSION CONTROL BARRIERS USED ARE GOVERNED BY THE NATURE OF THE CONSTRUCTION OPERATION AND SOIL TYPE THAT WILL BE EXPOSED. SILTY AND CLAYEY MATERIAL MAY REQUIRE SOLID SEDIMENT BARRIERS TO PREVENT TURBID WATER DISCHARGE WHILE SANDY MATERIAL MAY NEED ONLY SILT SCREENS OR HAY BALES TO PREVENT EROSION. DIVERSION DITCHES OR SWALES MAY BE REQUIRED TO PREVENT TURBID STORMWATER RUNOFF FROM BEING DISCHARGED TO WETLANDS OR OTHER WATER BODIES. IT MAY BE NECESSARY TO EMPLOY A COMBINATION OF BARRIERS, DITCHES, AND OTHER EROSION/TURBIDITY CONTROL MEASURES IF CONDITIONS WARRANT.
6. MAINTAIN THE EROSION CONTROL DEVICES THROUGHOUT THE DURATION OF CONSTRUCTION. SUCH DEVICES TO REMAIN
UNTIL SUFFICIENT GROUND COVER IS ESTABLISHED.
7. INSPECT THE SITE ROUTINELY AFTER RAINFALL EVENTS. CONTRACTOR TO ENSURE APPROPRIATE EQUIPMENT IS
AVAILABLE AT THE SITE AT ALL TIMES TO MAKE REPAIRS AS NECESSARY.
8. INSTALL TEMPORARY EROSION CONTROL BARRIERS IN COORDINATION WITH THE CONSTRUCTION OF THE PERMANENT EROSION CONTROL FEATURES TO THE EXTENT NECESSARY TO ASSURE ECONOMICAL, EFFECTIVE, AND CONTINUOUS CONTROL OF EROSION AND WATER POLLUTION THROUGHOUT THE LIFE OF THE CONSTRUCTION PHASE.
9. SCHEDULE OPERATIONS SUCH THAT THE AREA OF UNPROTECTED, ERODIBLE EARTH EXPOSED AT ANY ONE TIME IS NOT LARGER THAN THE MINIMUM AREA NECESSARY FOR EFFICIENT CONSTRUCTION OPERATION AND ENSURE THE DURATION OF EXPOSED, UNCOMPLETED CONSTRUCTION TO THE ELEMENTS IS AS SHORT AS PRACTICABLE. GRADING OPERATIONS ARE TO IMMEDIATELY FOLLOW SCHEDULED AND COMPLETED CLEARING AND GRUBBING, PERMANENT EROSION CONTROL FEATURES ARE TO BE SCHEDULED AND PERFORMED IMMEDIATELY FOLLOWING GRADING OPERATIONS IF THE
CONDITIONS ON THE PROJECT AREA ALLOW.
10. STABILIZE EXPOSED SOILS AS SOON AS POSSIBLE. THE CONTRACTOR IS RESPONSIBLE FOR SELECTING AND PROVIDING
TEMPORARY AND PERMANENT STABILIZATION METHODS.
11. INSTALL ENERGY DISSIPATERS, INCLUDING BUT NOT LIMITED TO RIP-RAP, GRAVEL, HAY BALES, VEGETATION OR
GEOTEXTILES, AT THE DISCHARGE POINT OF PIPES OR SWALES IF SCOURING IS OBSERVED.
12. IF VEHICLE OR EQUIPMENT WASHDOWN DEBRIS/AREAS IS REQUIRED, OBTAIN APPROVAL FROM THE CONTRACTING
OFFICER.
13. STOCKPILE EXCAVATED MATERIAL IN SUCH A MANNER THAT PREVENTS DIRECT OFFSITE DISCHARGE FROM THE PROJECT SITE OR INTO ANY ADJACENT WATER BODY, WETLAND, OR STORMWATER MANAGEMENT FACILITY.
14. CONSTRUCT ALL PROJECT FEATURES TO PREVENT EROSION AND SEDIMENTATION AND MAINTAIN THROUGHOUT THE LIFE
OF CONSTRUCTION.
15. THROUGHOUT CONSTRUCTION CONTRACTOR TO PERFORM ONGOING INSPECTIONS AND PERIODIC MAINTENANCE AND OFTEN AS NECESSARY TO ENSURE THAT THE ABOVE METHODS ARE WORKING SUITABLY, NEEDED AS OFTEN AS DAILY IF CONDITIONS SO WARRANT. MAINTAIN A WRITTEN RECORDED OF ALL EROSION CONTROL INSPECTIONS, INCIDENTS, AND MODIFICATIONS AND MAKE ALL RECORDS AVAILABLE UPON REQUEST OF THE CONTRACTING OFFICER.
1. CONCRETE REINFORCEMENT STEEL INSTITUTE (CRSI) AND AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS APPLY.
2. INSTALL DEFORMED BARS CONFORMING TO ASTM A615 AND IAW ACI 315-99.
3. COLD BEND ALL REINFORCEMENT. DO NOT FIELD BEND REINFORCEMENT PARTIALLY EMBEDDED IN GROUT.
4. MECHANICAL SPLICES, CONFORMING TO ACI 318-14, SECTION 25.5.7 CAN BE SUBSTITUTED FOR LAP SPLICES AT NO ADDITIONAL COST. MECHANICAL SPLICES MUST DEVELOP 125% (MINIMUM) OF THE YIELD STRENGTH OF THE CONNECTING
REBAR.
5. ENSURE ALL REINFORCEMENT IS FREE OF DIRT, DEBRIS, CORROSION, OIL, NONMETALLIC COATINGS OR OTHER DELETERIOUS MATERIAL THAT REDUCE BOND STRENGTH WITH CONCRETE AT THE TIME OF CONCRETE PLACEMENT.
6. INSTALL WELDED WIRE FABRIC CONFORMING TO ASTM A185. LAP ONE FULL MESH PLUS 2 INCHES AT SIDES AND ENDS AND
WIRE TOGETHER.
7. SUPPORT REINFORCING STEEL IN STANDARD ACCESSORIES, HELD RIGIDLY AND ACCURATELY IN PLACE, AND PROTECTED AGAINST DISPLACEMENT BEFORE AND DURING PLACEMENT OF CONCRETE. PROVIDE SUPPORT FOR REINFORCING STEEL AND WIRE MESH AT THE FOUNDATIONS AND SLAB-ON-GRADE BY PRECAST CONCRETE BRICKS AT TWO FEET O.C. EACH
WAY (MAX SPACING).
8. INSTALL FIBERGLASS REINFORCED PLASTIC OR PLASTIC COATED STEEL REINFORCEMENT CHAIR LEGS WHERE CHAIR
LEGS REST ON CONCRETE SURFACES THAT WILL BE EXPOSED IN THE FINISHED STRUCTURE.
9. ALL EPOXY DOWELS ADHESIVE SYSTEM TO BE HILTI HIT-RE 500-SD OR AN APPROVED EQUIVALENT.
1. THE LATEST EDITION OF THE FOLLOWING ACI STANDARDS APPLY:
ACI 318 (CODE)
ACI 304 (PLACING)
ACI 306 (WINTER CONCRETE)
ACI 315/SP66 (DETAILING)
ACI 305 (HOT WEATHER CONCRETE)
ACI 347 (FORM WORK)
ACI 211.1 (MIX PROPORTIONING)
2. USE 4,000 PSI, TYPE I OR II, NORMAL WEIGHT, PORTLAND CEMENT CONCRETE.
3. DO NOT USE CALCIUM CHLORIDE IN ANY FORM.
4. SITE ADDED WATER IS PERMITTED PROVIDED MAX WATER TO CEMENT RATIO ARE NOT EXCEEDED; HOWEVER, NOT MORE THAN ONE GALLON OF WATER PER CUBIC YARD MAY BE USED TO ADJUST THE MIX AT THE JOB SITE.
5. CONSOLIDATE ALL CONCRETE, OTHER THAN SLABS ON GRADE USING MECHANICAL VIBRATING EQUIPMENT. DO NOT
OVER-CONSOLIDATE.
7. DO NOT PLACE CONCRETE DURING RAIN OR IF RAIN IS LIKELY TO OCCUR PRIOR TO CONCRETE HARDENING.
8. WITHIN THE AREA OF WORK, REMOVE SPALLING OR DAMAGED CONCRETE AND REPAIR WITH NON-SHRINK EPOXY GROUT
IAW WITH GROUT MANUFACTURER'S INSTRUCTIONS.
1. ALL BOLTS TO BE A325 HIGH STRENGTH; ALL NUTS MUST BE A563; AND ALL WASHERS TO BE F436. HOT DIP GALVANIZED
ALL HARDWARE COMPONENTS IN ACCORDANCE WITH ASTM A 153 TO G90 THICKNESS.
2. MINIMIZE THE USE OF DISSIMILAR METALS TO THE GREATEST EXTENT POSSIBLE. IF THE SITE CONDITIONS, DRAWINGS OR SPECIFICATIONS DICTATE THE USE OF DISSIMILAR METALS, PROVIDE APPROPRIATE, EXTERIOR RATED, INSULATING
BARRIERS BETWEEN THE INTERACTIVE SURFACES OF THE DISSIMILAR METALS.
3. WITHIN THE AREA OF WORK, REPAIR EXISTING STEEL TO REMAIN BY PERFORMING CORROSION CONTROL AND APPLY
COLD GALVANIZING COMPOUND.
CONCRETE PROTECTION FOR REINFORCEMENT:
STRUCTURAL SYSTEM
FOOTINGS (CAST AGAINST AND EXPOSED TO EARTH)
COVER
3 INCHES
2 INCHES
2 INCHES
1 1/2 INCHES
1 INCH
FOOTINGS AND WALLS (FORM CAST AND EARTH EXPOSED)
SLABS (EARTH EXPOSED)
SLABS (EXTERIOR EXPOSED)
SLABS (ABOVE GRADE)
LAP SPLICE LENGTH - NORMAL WEIGHT CONCRETE, NO EPOXY
TO
P
BA
R
S O
TH
ER
BAR SIZES (#)
3 4 5 6 7 8 9 10 11
15" 20" 24" 29" 42" 48" 55" 65" 80"3" 15" 20" 24" 29" 46" 61" 77" 97" 120"2" 15" 20" 25" 36" 62" 81" 102" 130" 160"1 1/2" 18" 32" 50" 73" 106" 121" 136" 153" 170"3/4"
12" 15" 19" 23" 33" 37" 42" 50" 62"3" 12" 15" 19" 23" 36" 47" 59" 75" 92"2" 12" 15" 20" 28" 48" 62" 79" 100" 123"1 1/2" 14" 25" 39" 56" 81" 93" 105" 118" 131"3/4"
#3 #4 #5 #6 #7 #8 #9 #10 #11
DEFORMED REBAR
TYPE
STIRRUPS & TIES
OTHER BARS 2.25" 3" 3.75" 4.5" 5.25" 6" 9" 10.25" 11.25"
MIN INSIDE DIAMETER OF BEND
1.5" 2" 2.5" N/A N/A N/A N/A N/A N/A
REQUIRED EMBEDMENT DEPTH OF STANDARD ACI HOOKS INTO CONCRETE
NORMAL WEIGHT
CONCRETE TYPE BAR SIZES
4 5 6 7 8 9 10 113
8" 10" 12" 15" 17" 19" 22" 25" 27"
LEAST
CONCRETE
COVER AT BAR
DESCRIPTION
ACI MINIMUM STANDARD HOOK EXTENSION LENGTHS
#3 #4 #5 #6 #7 #8 #9 #10 #11
STIRRUPS & TIES
90° BEND PLUS 2.25" 3" 3.75" 4.5" 5.25" 6" 6.77" 7.62" 8.46"
STIRRUPS & TIES
135° BEND PLUS 3" 3" 3.75" 4.5" 5.25" 6" 6.77" 7.62" 8.46"
OTHER BARS 90°
BEND PLUS 4.5" 6" 7.5" 9" 10.5" 12" 13.75" 15.5" 7"
OTHER BARS 180°
BEND PLUS 2.5" 2.5" 2.5" 3" 3.5" 4" 4.75" 5.25" 5.75"
FOUNDATIONS:
1. ALL FOUNDATIONS MUST BEAR ON FIRM, UNDISTURBED SOIL OR COMPACTED STRUCTURAL FILL. COORDINATE
ELEVATIONS OF FOOTINGS AND ABOVE GRADE COMPONENTS TO PROVIDE PROPER FINISHED ELEVATIONS.
2. IF IN PLACE MATERIALS ARE FOUND TO BE UNSUITABLE, OVER-EXCAVATE AND BACKFILL WITH WITH CRUSHED STONE STRUCTURAL FILL, COMPACTED TO 95% OF THE MAXIMUM MODIFIED PROCTOR DRY DENSITY IAW ASTM D-1557.
3. DEWATER, AS REQUIRED, SUCH THAT THE EXCAVATIONS ARE FREE OF STANDING WATER AT THE TIME OF CONCRETE
PLACEMENT.
4. PLACE #57 STONE BASE, WHERE SPECIFIED AND PROVIDE THREE PASSES WITH VIBRATORY PLATE COMPACTION.
REFERENCE INDIVIDUAL DETAILS FOR DEPTH OF BASE. LIFTS NOT TO EXCEED 6-INCHES.
5. COMPACT SUBGRADE SOIL TO A MINIMUM OF 95% OF THE MAXIMUM MODIFIED PROCTOR DRY DENSITY IAW ASTM D-1557.
6. FOR UTILITY BEDDING, HAUNCHING AND COVER PLACE CLEAN GRANULAR FILL IN SIX INCH LIFTS AND COMPACT TO A
MINIMUM OF 98% OF THE MAXIMUM MODIFIED PROCTOR DRY DENSITY IAW ASTM D-1557.
7. INSTALL 10 MIL VAPOR BARRIER BETWEEN NEW CONCRETE AND BASE MATERIAL.
8. COORDINATE ALL NEW FOUNDATIONS WITH EXISTING CONDITIONS. REPORT ANY CONFLICTS TO THE CONTRACTING
OFFICER FOR PROPOSED SOLUTION.
9. COORDINATE ALL NEW EXCAVATION WITH EXISTING CONDITIONS AND VERIFY PROPOSED ELEVATIONS. REPORT
CONFLICTS TO CONTRACTING OFFICER.
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SA
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
AF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
Ne ls on En gi ne er in gCo rh od es b rit
C-001
C
IV
IL
G
EN
ER
AL
N
O
TE
S
/1
2/
M .J
O H
N
SO
N
J.
LO
N G
SH
O
R E
M .G
O N
ZA
LE
Z
D
BE
H
9-
XX
-X
X-
XX
D
BE
H
9-
R
EP
AI
R
C
AB
LE
A
N D
S
PL
IC
ES
IN
F
EE
D
ER
N F
R O
M N
O R
TH
S
U
BS
TA
TI
O N
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
N
EL
SO
N
EN
G
IN
EE
R
IN
G
ELECTRICAL SYMBOL LEGEND:
SINGLE LINE DIAGRAM LEGEND:
1. ALL ELECTRICAL CONSTRUCTION/ INSTALLATION MUST BE IN ACCORDANCE WITH NFPA 70, NFPA 70E, UFC 3-501-01 AND IEEE C2.
2. ALL CONSTRUCTION WILL BE GOVERNED BY THE PLANS, SPECIFICATIONS AND ALL APPLICABLE
BUILDING AND SAFETY CODES, LAWS AND ORDINANCES.
3. CONTRACTOR MUST BE FAMILIAR WITH THE SITE, THE WORK REQUIRED, THE CUSTOMER'S WORK PROCEDURES, AND ALL OTHER CONDITIONS THAT MAY AFFECT THE SUCCESSFUL COMPLETION OF
THE JOB PRIOR TO COMMENCEMENT OF WORK.
4. FIELD LOCATE ALL EXISTING UTILITIES AS TO LOCATION AND ELEVATION. NOTIFY THE CONTRACTING
OFFICER OF ANY AND ALL CONFLICTS PRIOR TO THE BEGINNING OF CONSTRUCTION.
5. ALL SPECIFIC MATERIALS AND PRODUCTS IDENTIFIED IN THE PLANS ARE INCLUDED AS THE BASIS OF
DESIGN. CONTRACTOR MAY SUBMIT EQUIVALENT PRODUCTS IN COMPLIANCE WITH THE PROJECT
SPECIFICATIONS FOR APPROVAL INSTEAD OF THOSE SPECIFIED.
6. BASIS OF DESIGN SPLICE KITS ARE 3M 15KV CLASS, TYPE QS4 INTEGRATED, INLINE COLD SHRINK
SPLICE KITS.
7. ALL NEW SECTIONALIZERS MUST BE 15KV, 600AMP, 3-WAY WITH DEADBREAK JUNCTIONS AND
CONNECTORS.
8. ALL EXISTING AND NEW EQUIPMENT IS 15KV CLASS, 600 AMP, 3-PHASE, 3-WIRE, GROUNDED. EXISTING
AND NEW MEDIUM VOLTAGE CABLE CONCENTRIC NEUTRAL SHIELD CONDUCTORS SERVE AS AN
EQUIPMENT GROUNDING CONDUCTOR BACK TO THE SUPPLYING SUBSTATION TRANSFORMER
NEUTRAL.
9. THE CONTRACTOR MUST HAVE A QUALIFIED REPRESENTATIVE FOLLOW THE GOVERNMENT'S
SWITCHING CREWS DURING ALL SWITCHING RELATED TO CONSTRUCTION IN ORDER TO INSTALL AND
REMOVE LOCKOUT/TAG-OUTS AND GROUNDING CABLES.
10. DE-ENERGIZED CABLES ARE TO BE TRACED (BY BOTH PHYSICAL AND ELECTRONIC MEANS) AND FIELD IDENTIFIED OVER THE ENTIRE LENGTH TO BE HANDLED BY THE CONTRACTOR. DO NOT HANDLE OR DISTURB ENERGIZED MEDIUM VOLTAGES CABLES WITHIN MANHOLES. ADVISE THE GOVERNMENT IF
ENERGIZED CABLES IMPACT THE WORK.
11. CABLES MUST BE TRACED (BY BOTH PHYSICAL AND ELECTRONIC MEANS) AND IDENTIFIED TO THE
SATISFACTION OF THE GOVERNMENT PRIOR TO CUTTING. CUTTING MUST BE MADE BY REMOTE
MEANS AND PERSONNEL MUST NOT BE WITHIN THE MANHOLE OR NEAR THE MANHOLE COVER
DURING CABLE CUTTING.
12. MAINTAIN VEHICLE AND PEDESTRIAN TRAFFIC DURING CONSTRUCTION WORK IN ACCORDANCE WITH FHWA PART II. PROVIDE DETOUR ROUTES, BARRICADES, WARNING SIGNS AND WARNING LIGHTS AS
REQUIRED. SUBMIT TRAFFIC PLANS FOR APPROVAL PRIOR TO IMPLEMENTING.
13. STC DIMENSIONS, CONCRETE PAD DIMENSIONS, AND CONDUIT STUB-UP LOCATIONS ARE
APPROXIMATE AND ARE TO BE VERIFIED AGAINST APPROVED SHOP SUBMITTALS WITH THE REQUIRED
DIMENSIONAL DATA. NO FIELD WORK WILL COMMENCE UNTIL THE APPROVED SHOP SUBMITTAL
DIMENSIONAL DATA IS AVAILABLE, AND NO CONCRETE WILL BE POURED UNTIL THE EXISTING FIELD
INSTALLATION IS CONFIRMED AGAINST THE APPROVED SHOP SUBMITTAL DIMENSIONAL DATA.
14. ALL EXCAVATIONS WILL REQUIRE AN ISSUED DIG PERMIT WHICH INCLUDES A UTILITY LOCATE SERVICE. ALL LOCATED AND SUSPECTED UTILITIES IN THE EXCAVATION AREA, INCLUDING EXISTING DUCT BANKS OR UNDERGROUND CONDUITS, MUST BE LOCATED BY HAND DIGGING METHODS PRIOR
TO PRIMARY EXCAVATIONS.
15. CONDUIT AND CABLE ROUTINGS ARE APPROXIMATE. ACTUAL ROUTING WILL ACCOUNT FOR FIELD
CONDITIONS AND BE DETERMINED BY THE CONTRACTOR.
16. CORE DRILL MANHOLE WALLS FOR INSTALLATION OF NEW DUCTS WHERE REQUIRED. INSPECT INTERIOR OF MANHOLE PRIOR TO CORE DRILLING AND IMMEDIATELY NOTIFY THE GOVERNMENT IF
CORE DRILLING IS REQUIRED DIRECTLY ABOVE ENERGIZED CABLES.
17. NEW CONDUCTORS ARE TO TAKE A “LOOPED” PATH AROUND THE MANHOLE FROM THE ENTRY DUCT
TO THE EXIT DUCT TO PROVIDE MAXIMUM CABLE LENGTH WITHIN THE MANHOLE. NOTIFY THE
GOVERNMENT WHERE EXISTING CONDITIONS PROHIBIT THIS AND INCLUDE MANHOLE INTERIOR
PICTURES AND SKETCHES DETAILING THE EXISTING CONDITIONS.
18. LEAVE ADEQUATE CONDUCTOR LENGTH AT NEW STC TERMINATIONS IN ORDER TO CHANGE
TERMINATION LOCATIONS IN THE EVENT PHASE ROTATION DOES NOT MATCH PREVIOUSLY
RECORDED EXISTING AND CABLES MUST BE RE-TERMINATED.
19. RACK, SECURE, AND FIRE-PROOF TAPE NEW MV CABLE WITHIN EXISTING MANHOLES. PROVIDE AND INSTALL UP TO TWO (2) RACKS AND FOUR (4) RACK ARMS PER MANHOLE AFFECTED BY THE PROJECT.
INSTALL NEW RACKS AND RACK ARMS ONLY IF REQUIRED.
20. LABEL ALL NEW AND EXISTING EQUIPMENT MODIFIED IN THIS PROJECT TO REFLECT FINAL CONFIGURATION AND IDENTIFICATION AS SHOWN ON SHEET E-003 USING TECH PRODUCTS MODEL
NO. HR25 OR APPROVED EQUAL, 2-1/2 INCH HIGH, HIGH REFLECTIVITY LETTER DECALS.
21. ALL STEEL MATERIALS MUST BE HOT DIPPED GALVANIZED. DO NOT ALLOW GALVANICALLY
INCOMPATIBLE STAINLESS STEEL, AND MILD STEEL TO CONTACT ONE ANOTHER.
22. THE GOVERNMENT RESERVES THE RIGHT TO WITNESS FIELD TESTING. PROVIDE THREE WORK-DAY
NOTICE FOR CABLE VLF TESTS AND STC TESTING.
23. UPON COMPLETION OF WORK IN MANHOLES PROVIDE MANHOLE SURVEY TO GOVERNMENT. SURVEY
MUST INCLUDE PHOTOGRAPHS OF ALL MANHOLE WALLS, CABLES, AND RACKS AND MANHOLE
SKETCHES WITH NUMBER OF DUCTS AND CABLE IDENTIFICATION. REFER TO SPECIFICATION 26 05
13.00 40.
ELECTRICAL GENERAL NOTES: CODE COMPLIANCE CRITERIA:
NFPA 70 NATIONAL ELECTRICAL CODE
IEE C2 NATIONAL ELECTRICAL SAFETY CODE
NFPA 70E STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE
UFC 3-501-01 UNIFIED FACILITIES CRITERIA, ELECTRICAL ENGINEERING
AFI 32-1062 AIR FORCE INSTRUCTION, ELECTRICAL SYSTEMS, POWER PLANTS AND
GENERATORS
29 CFR 1926 OSHA STANDARDS FOR CONSTRUCTION
FW FWEXISTING FIRE WATER LINE
EXISTING POTABLE WATER LINE
EXISTING ELECTRIC DUCTBANK
NEW ELECTRIC DUCTBANK
EXISTING FENCE LINE
OVERHEAD ELECTRIC LINE
EXISTING FORCE MAIN WATER LINE
EXISTING WATER LINE
EXISTING COMMUNICATIONS LINE
EXISTING NATURAL GAS LINE
EXISTING EFFLUENT LINE
EXISTING STORM DRAIN LINE
EXISTING FUEL MAIN GN2 LINE
EXISTING SANITARY SEWER LINE
ABANDONED IN PLACE LINE
ROADWAY CENTERLINE
POND
PROJECT BOUNDARY LINE
EXISTING CONTOURS
MATCHLINE
EXISTING FIRE HYDRANT
EXISTING COMMUNICATIONS MANHOLE
EXISTING ELECTRIC MANHOLE
EXISTING SANITY SEWER MANHOLE
EXISTING CLEAN OUT
EXISTING LIGHT POLE
EXISTING CONCRETE BOLLARD
EXISTING CONCRETE POLE
EXISTING TREE
EXISTING ASPHALT
NEW ASPHALT
EXISTING CONCRETE
NEW CONCRETE
EXISTING GRAVEL
NEW CONDUIT TURN UP
EXISTING VALVE
VALVE CHECK
TEE ELBOW CONNECTION
NEW SECTIONALIZERS
EXISTING MONITORING WELL
W W
X X
E E
E EE E
OHE
FM
W
C
NG
AIP
EFF
SD
G/N2
SS
C
S
CO
E
3-1/C THREE SINGLE CONDUCTOR CABLES
A AMPERE
AF AIR FORCE
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
APPOX APPROXIMATE
AWG AMERICAN WIRE GAUGE
BLDG BUILDING
CBL CABLE
CCAFS CAPE CANAVERAL AIR FORCE STATION
CJ CONTROL JOINT
CKT CIRCUIT
COMM COMMUNICATION
CSJ CONSTRUCTION JOINT
CT CURRENT TRANSFORMER
CU COPPER
CX COMPLEX
DEF DIESEL EXHAUST FLUID
DI DUCTILE IRON
DOC DELTA IV OPERATIONS CENTER
D/S DISCONNECT SWITCH
EDB ELECTRICAL DUCT BANK
EJ EXPANSION JOINT
EMT ELECTRO METALLIC TUBING
EOP EDGE OF PAVEMENT
EPO EMERGENCY POWER OFF
EPR ETHYLENE-PROPYLENE RUBBER
ERP ENVIRONMENTAL RESOURCE PERMIT
ESP ELECTRIC SERVICE PANEL
ET ELECTRIC TRANSFORMER
ETR EXISTING TO REMAIN
EW EACH WAY
FDEP FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
FHWA FEDERAL HIGHWAY ADMINISTRATION
FM FORCEMAIN
GEN / GENSET GENERATOR
GCP GENERATOR CONTROL PANEL
GCU GENERATOR CONTROL UNIT (SYNCHRONIZER)
GND GROUND
HH HANDHOLE
HZ HERTZ
IND INDUSTRIAL
KAIC THOUSAND AMPS INTERRUPTING CURRENT
KCMIL THOUSAND CIRCULAR MILLS
KV KILOVOLT
KVA KILOVOLT AMPERE
KW KILOWATT
LBS LOAD BREAK SWITCH
LF LINEAR FEET
LS LIFT STATION
LV LOW VOLTAGE
MCB MAIN CIRCUIT BREAKER
MDP MAIN DISTRIBUTION PANEL
MEG MATCH EXISTING GRADE
MH MANHOLE
MIN MINIMUM
MOC CIRCUIT BREAKER MECHANISM OPERATED CONTACT
MTL METAL
MV MEDIUM VOLTAGE
NAD 83 NORTH AMERICAN DATUM OF 1983
NAVD 88 NORTH AMERICAN VERTICAL DATUM OF 1988
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NSSB NORTH SUBSTATION B
NTS NOT TO SCALE
OC ON CENTER
OSHA OCCUPATIONAL SAFETY AND HEALTH ORGANIZATION
P POLE
PH PHASE
PNL PANEL
PSI PER SQUARE INCH
PVC POLYVINYL CHLORIDE
QTY QUANTITY
RGS RIGID GALVANIZED STEEL
RSC (GALVANIZED) RIGID STEEL CONDUIT
RWWTP REPAIR WASTER WATER TREATMENT PLANT
SCH SCHEDULE
SS SWITCH STATION
STC SECTIONALIZING TERMINAL CABINET
SWBD SWITCHBOARD
TYP TYPICAL
UG UNDERGROUND
UL UNDERWRITER'S LABORATORIES
USS UNIT SUBSTATION
V VOLT
VAC VOLTS ALTERNATING CURRENT
VCB VACUUM CIRCUIT BREAKER
VDC VOLTS DIRECT CURRENT
VFD VARIABLE FREQUENCY DRIVE
VT VOLTAGE TRANSFORMER (SAME AS PT-POTENTIAL TRANSFORMER)
W WATT
XFMR TRANSFORMER
ABBREVIATIONS:
SYMBOLS:
DRAWING WHERE DETAIL IS SHOWN/REFERENCED
DETAIL BUBBLE
DETAIL REFERENCE NUMBER
SECTION DETAIL BUBBLE
DETAIL REFERENCE LETTER
C-501 B
A C-501
DETAIL PLAN REFERENCE NUMBER
DRAWING WHERE SECTION IS REFERENCED
SPECIFIC NOTE
TYPICAL NOTE,
APPLICABLE TO ALL
OCCURRENCES
B
A DETAIL SYMBOL:
A=IDENTIFYING NUMBER
B=SHEET WHERE SECTION IS SHOWN
A
A
TYP
LBS-XXX
S S V V
EXISTING LOAD BREAK SWITCH (NUMBER OF SWITCHED WAYS VARIES)
S = SWITCHED WAY IDENTIFIER
V = PROTECTED WAY IDENTIFIER
NO = NORMALLY OPEN
15KV DEAD-FRONT ELBOW CONNECTOR AND BUSHING
15KV SPLICE
15KV LIVE-FRONT CONNECTION
GROUND
CIRCUIT BREAKER
EQUIPMENT TO BE REMOVED
EXISTING MANHOLE OR EQUIPMENT
DUCT BANK SECTION IN DIRECTION OF ARROWS
"#" CORRESPONDS TO INSTALLATION CABLE SCHEDULE ON SHEET E-003
"●" OTHER MV CABLE
"X" EMPTY DUCT
3-WAY SECTIONALIZING TERMINAL CABINET
NO
STC-XXX
1 2 3
1. INSTALL NEW SECTIONALIZING TERMINAL CABINETS IN IDENTIFIED LOCATIONS. INSTALL NEW CONCRETE DUCTBANK FROM NEW SECTIONALIZING TERMINAL CABINETS TO EXISTING MANHOLES AS
INDICATED.
2. INSTALL NEW FEEDER 7N CONDUCTORS FROM NSSB TO SS-37 LBS-7N3 USING SPARE DUCT IN EXISTING
DUCT BANK TO GREATEST EXTENT PRACTICABLE.
3. COORDINATE WITH THE GOVERNMENT TO PERFORM MV SWITCHING TO DE-ENERGIZE FEEDER 7N AND
SUPPLY FEEDER 7N LOADS FROM SECONDARY FEEDERS:
A. CLOSE LBS-CPF3/1 TO SUPPLY DOWNSTREAM LOADS FROM SECONDARY FEEDER 3N.
B. CLOSE LBS-7N3/2 TO SUPPLY DOWNSTREAM LOADS FROM SECONDARY FEEDER 10N.
C. OPEN NSSB/7N, LBS-7N/1,2,4,6, LBS-CPF3/3 AND LBS-7N3/1 TO DE-ENERGIZE EXISTING FEEDER 7N.
4. DEMOLISH EXISTING FEEDER 7N CONDUCTOR SECTIONS AS REQUIRED TO INSTALL NEW FEEDER 7N
USING EXISTING DUCTS. REFER TO SHEETS E-701 AND E-705 FOR DETAILS.
5. TERMINATE NEW FEEDER 7N TO NSSB, LBS-7N1, LBS-3N4, LBS-CPF3, LBS-7N2, LBS-7N3 AND LBS-3N6.
6. NETA TEST NEW SECTIONALIZING TERMINAL CABINETS AND FEEDER 7N CONDUCTORS IN ACCORDANCE WITH SPECIFICATION SECTION 26 08 00. SUBMIT TEST RESULTS TO GOVERNMENT FOR APPROVAL.
7. COORDINATE WITH THE GOVERNMENT TO PERFORM SWITCHING TO ENERGIZE NEW FEEDER 7N AND
DE-ENERGIZE FEEDER 10N IN MH NE-15:
A. CLOSE NSSB/7N, LBS-7N/1,2,4,6, LBS-CPF3/3 AND LBS-7N3/1 TO ENERGIZE NEW FEEDER 7N.
B. OPEN LBS-CPF3/1 TO RESTORE LOADS TO NORMAL CONFIGURATION.
C. OPEN LBS-10N1/1 AND LBS-10N2/1 TO DE-ENERGIZE FEEDER 10N.
D. FEEDER 10N LOADS ARE SUPPLIED BY SECONDARY FEEDER 7N FROM LBS-7N3/2.
8. PERFORM NEW FEEDER 10N INSTALLATION:
A. CUT EXISTING FEEDER 10N IN MH NE-15 AND TERMINATE TO NEW STC-10N-1Z.
B. DEMOLISH EXISTING FEEDER 10N FROM MH NE-15 TO EXISTING SPLICE IN MH NE-14.
C. INSTALL NEW FEEDER 10N FROM NEW STC-10N-1Z TO EXISTING SPLICE IN MH NE-14.
9. COORDINATE WITH THE GOVERNMENT TO PERFORM SWITCHING TO ENERGIZE NEW FEEDER 10N AND
RESTORE ALL LOAD BREAK SWITCHES TO THEIR NORMAL CONFIGURATION.
10. DEMOLISH EXISTING FEEDER 7N CONDUCTORS. PERFORM MANHOLE SURVEYS TO DOCUMENT
AS-BUILT CONDITIONS.
SEQUENCE OF CONSTRUCTION:
P
$MWP
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SA
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
AF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
Ne ls on En gi ne er in gCo rh od es b rit
E-001
EL
EC
TR
IC
AL
G
EN
ER
AL
N
O
TE
S
/1
2/
M .J
O H
N
SO
N
J.
PA
D
IL
LA
M .G
O N
ZA
LE
Z
D
BE
H
9-
XX
-X
X-
XX
D
BE
H
9-
R
EP
AI
R
C
AB
LE
A
N D
S
PL
IC
ES
IN
F
EE
D
ER
N F
R O
M N
O R
TH
S
U
BS
TA
TI
O N
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
N
EL
SO
N
EN
G
IN
EE
R
IN
NORTH SUBSTATION
NSSB
MH NE-2
MH NE-3
LBS-7N1LBS-3N4
MH NE-14
LBS-3N6
MH NE-18
MH NE-4
MH NE-1
MH NE-5
MH NE-6
MH NE-7
MH NE-15
FROM LBS-10N1/2
MH NE-16
MH NE-8 MH NE-8A
MH NE-8B
MH NE-9
MH NE-10
MH NE-11
MH NE-12
MH NE-13
TO XFMR CSI1
FROM LBS-3N3/2
TO XFMR SPC6
TO LBS-CPF1/1
TO LBS-3N5/1
TO LBS-10N2/1
MH NE-17
TO LBS-3N8/1
FROM LBS-3N5/2
MH NE-19
MH NE-20
MH-2347
LBS-CPF3
FROM LBS-CPF2MH-2186
MH-2066
TO XFMR C-CPB-E
TO USS CTC
MH-2068
MH-2060 MH-2102 MH-2029
MH-2310
MH-2193
MH-2100
MH NE-21MH NE-22MH NE-23MH NE-24MH NE-25MH NE-26MH NE-27MH-2253MH-2273MH-2327MH-2329
LBS-7N2SWITCH STATION 37
LBS-7N3
TO LBS-10N2/2
TO LBS-W65IG/1 TO XMFR SS37
TO LBS-7N4/1
MH-2328
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SA
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
AF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
Ne ls on En gi ne er in gCo rh od es b rit
ED-002
D
EM
O
LI
TI
O
N S
IN
G
LE
L
IN
E
D
IA
G R
AM
/1
2/
M .J
O H
N
SO
N
J.
PA
D
IL
LA
M .G
O N
ZA
LE
Z
D
BE
H
9-
XX
-X
X-
XX
D
BE
H
9-
R
EP
AI
R
C
AB
LE
A
N D
S
PL
IC
ES
IN
F
EE
D
ER
N F
R O
M N
O R
TH
S
U
BS
TA
TI
O N
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
N
EL
SO
N
EN
G
IN
EE
R
IN
G
1. COORDINATE CONSTRUCTION ACTIVITIES TO MINIMIZE OUTAGES TO
DOWNSTREAM FACILITIES. REFER TO SHEET E-001 FOR GENERAL
SEQUENCE OF CONSTRUCTION.
2. REFER TO ENLARGED UTILITY PLANS IN SHEETS E-401 THROUGH E-409 FOR
EQUIPMENT LOCATIONS AND CABLE LENGTHS.
3. REFER TO ELECTRICAL MANHOLE LAYOUTS ON SHEETS E-701 THROUGH
E-711 FOR MANHOLE CONFIGURATION, CABLES AND CONDUIT ROUTING
INFORMATION.
4. DEMOLISH EXISTING FEEDER 7N TO EXTENTS INDICATED. ALL EXISTING
DUCTS, MANHOLE ACCESSORIES, AND DUCTBANKS TO REMAIN.
5. CUT EXISTING FEEDER 10N SPLICE IN MH-14, PULL BACK ENOUGH LENGTH
OF EXISTING CONDUCTORS TO MH-15 TO TERMINATE TO NEW STC-10N-1Z
USING NEW CONCRETE DUCT BANK, REFER TO INSTALLATION SINGLE-LINE
DIAGRAM ON SHEET E-003. DEMOLISH EXCESS CONDUCTORS BETWEEN
MH-14 AND MH-15.
SPECIFIC NOTES:
DEMOLITION CABLE SCHEDULE
ID FROM TO
1 NORTH SUBSTATION LBS-7N1/1
2 LBS-7N1/2 LBS-7N2/1
3 LBS-7N1/3 LBS-3N4/3
4 LBS-7N1/4 LBS-CPF/3
5 LBS-7N1/6 LBS-3N6/5
6 LBS-7N2/2 LBS-7N3/1
7 MH NE-14 MH NE-15
SCALE:
DEMOLITION SINGLE LINE DIAGRAM
NTS
NORTH SUBSTATION
NSSB
MH NE-2
MH NE-3
LBS-7N1LBS-3N4
MH NE-14
LBS-3N6
MH NE-18
STC-7N-6Z
MH NE-4
STC-7N-1Z
MH NE-1
MH NE-5
MH NE-6
MH NE-7
STC-7N-2Z
STC-7N-5Z
MH NE-15
STC-7N-7Z
STC-10N-1Z
FROM LBS-10N1/2
MH NE-16
MH NE-8 MH NE-8A
MH NE-8B
STC-7N-3Z
MH NE-9
MH NE-10
MH NE-11
STC-7N-4Z
MH NE-12
MH NE-13
TO XFMR CSI1
FROM LBS-3N3/2
TO XFMR SPC6
TO LBS-CPF1/1
TO LBS-3N5/1
TO LBS-10N2/1
MH NE-17
TO LBS-3N8/1
FROM LBS-3N5/2
MH NE-19
MH NE-20
MH-2347
LBS-CPF3
FROM LBS-CPF2MH-2186
MH-2066
TO XFMR C-CPB-E
TO USS CTC
MH-2068
MH-2060 MH-2102 MH-2029
MH-2310
MH-2193
MH-2100
MH NE-21MH NE-22MH NE-23MH NE-24MH NE-25MH NE-26MH NE-27MH-2329
STC-7N-8ZSTC-7N-9Z
LBS-7N2SWITCH STATION 37
LBS-7N3
TO LBS-10N2/2
TO LBS-W65IG/1 TO XMFR SS37
TO LBS-7N4/1
MH-2253MH-2273MH-2327MH-2328
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SA
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
AF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
Ne ls on En gi ne er in gCo rh od es b rit
E-003
IN
ST
AL
LA
TI
O
N S
IN
G
LE
-L
IN
E
D
IA
G R
AM
/1
2/
M .J
O H
N
SO
N
J.
PA
D
IL
LA
M .G
O N
ZA
LE
Z
D
BE
H
9-
XX
-X
X-
XX
D
BE
H
9-
R
EP
AI
R
C
AB
LE
A
N D
S
PL
IC
ES
IN
F
EE
D
ER
N F
R O
M N
O R
TH
S
U
BS
TA
TI
O N
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
N
EL
SO
N
EN
G
IN
EE
R
IN
G
1. INSTALLATION SINGLE LINE DIAGRAM SCHEMATICALLY REPRESENTS FINAL
SYSTEM CONFIGURATION. REFER TO ENLARGED UTILITY PLAN SHEETS E-401
THROUGH E-409 FOR FEEDER ROUTING AND EQUIPMENT LOCATION
INFORMATION.
2. COORDINATE CONSTRUCTION ACTIVITIES TO MINIMIZE OUTAGES TO
DOWNSTREAM FACILITIES. REFER TO SHEET E-001 FOR GENERAL
SEQUENCE OF CONSTRUCTION.
3. REFER TO GENERAL NOTES SHEET E-001 FOR NEW EQUIPMENT AND SPLICE
INFORMATION.
4. REFER TO ELECTRICAL MANHOLE LAYOUTS ON SHEETS E-701 THROUGH
E-711 FOR MANHOLE CONFIGURATION, CABLES AND CONDUIT ROUTING
INFORMATION.
5. PARTIAL SINGLE LINE DIAGRAM OF FEEDER 10N SHOWN FOR CLARITY.
6. INSTALL NEW FEEDER SECTIONS AS INDICATED. ALL NEW MEDIUM VOLTAGE
FEEDERS ARE 3-1/C, 350KCMIL, 15KV, COPPER CONDUCTORS WITH 1/3
CONCENTRIC NEUTRAL AND 133%, TYPE EPR INSULATION.
7. ALL NEW UNDERGROUND DUCTS ARE 6-INCH TRADE SIZE CONCRETE
ENCASED TYPE EB PVC UNLESS OTHERWISE INDICATED. REFER TO SHEETS
E-401 THROUGH E-409 FOR LOCATIONS OF NEW DUCT BANKS, AND TO
SHEET E-502 FOR DUCT BANK DETAILS.
8. ALL FEEDER LENGTHS PROVIDED ARE ESTIMATED. CONTRACTOR IS
RESPONSIBLE FOR FIELD VERIFYING DISTANCES BETWEEN MANHOLES AND
ALL NEW AND EXISTING EQUIPMENT LOCATIONS PRIOR TO PROCURING MV
CABLES TO ENSURE ALL NEW MV CABLES ARE INSTALLED WITH
CONTINUOUS RUNS WITHOUT SPLICES UNLESS OTHERWISE INDICATED OR
NECESSARY BASED ON FIELD CONDITIONS.
SPECIFIC NOTES:
SCALE:
INSTALLATION SINGLE LINE DIAGRAM
NTS
INSTALLATION CABLE SCHEDULE
ID FROM TO
ESTIMATED
LENGTH (LFT)
1 NORTH SUBSTATION STC-7N-1Z/1 1,330
2 STC-7N-1Z/2 STC-7N-2Z/1 1,401
3 STC-7N-2Z/2 STC-7N-3Z/1 1,280
4 STC-7N-3Z/2 STC-7N-4Z/1 1,515
5 STC-7N-4Z/2 LBS-7N1/1 1,035
6 LBS-7N1/3 LBS-3N4/3 50
7 LBS-7N1/4 LBS-CPF3/3 1,110
8 LBS-7N1/6 STC-7N-5Z/1 1,040
9 STC-7N-5Z/2 LBS-3N6/5 1,330
10 LBS-7N1/2 STC-7N-6Z/1 1,543
11 STC-7N-6Z/2 STC-7N-7Z/1 1,347
12 STC-7N-7Z/2 STC-7N-8Z/1 1,543
13 STC-7N-8Z/2 STC-7N-9Z/1 1,511
14 STC-7N-9Z/2 LBS-7N2/1 885
15 LBS-7N2/2 LBS-7N3/1 1,602
16 FEEDER 10N SPLICE IN
MH NE-14 STC-10N-1Z/1 520
17 STC-10N-1Z/2 FEEDER 10N SPLICE
IN MH NE-16
X
X
X
X
X X
X
X X
X X
X X X
X X
X
XX
X X
XX
G /N
G/N2 G/N2 G/N2 G/N2
G /N
G /N
G /N
G /N
G /N
G /N
G /N
N G
N G
N G
G/N2
ST
ST
ST
ST
ST
2x2x6x6
M H-137
2x2x6x6
M H-277
3x2x6x6
M H-455
4x7.5x7
M H-3001
2x2x6x6
M H-280
2x2x6x6
M H-279
2x2x5x6
M H-463
2x2x6x6
M H-99
3x2x6x6
M H-569
4x7.5x7
M H-1005
4x7.5x7
M H-1003
4x7.5x7
M H-418
5x8.5x7
M H-94
3x2x6x6
M
H-570-AIP
4x7.5x7
M
H-573-AIP
3x2x6x6
M H-567
3x2x6x6
M H-459
2x2x6x6
M H-132
4x4x4
HH-1006A
4x4x4
HH-1006B
3x2x6x6
M H-452
4x7.5x7
M H-98A
3x2x6x6
M H-568
4x7.5x7
M H-1007
4x7.5x7
M H-3003
4x7.5x7
M H-609
4x7.5x7
M H-464
3x2x6x6
M H-453
3x2x6x6
M H-93
4x7.5x7
M H-3002
6x2x6x16
M H-456F
4x7.5x7
M H-129
4x4x6x6
M H-456D
4x7.5x7
HH-456J
3x2x6x6
M H-450
4x9x8
M H-611
2x2x6x6
M H-456
2x2x6x6
M H-98B
2x2x6x6
M H-461
4x7.5x7
M H-607
4x7.5x7
M H-635
6x26x6
M H-138
4x7.5x7
M H-3004
3x2x6x6
M H-465
5x10.5x7
M H-99A
4x7.5x7.5
M H-139
4x7.5x7
M H-608
4x7.5x7
M H-1009
4x7.5x7
M H-610
2x2x6x6
M H-133
6x12x7
M
H-606HB
3x8x5x3x5x6
M H-450A
4x7.5x7
M H-1004
4x4x4
HH-93A
2x2x6x6
M H-276
4x4x4
HH-285A
3x2x6x6
M H-454
4x9x6
M H-612
3x2x6x6
M H-451
2x6x4x16
M H-456G
2x2x6x6
M H-283
4x7.5x7
M H-634
2x2x6x6
M H-98
4x7.5x7
M
H-572-AIP
2x2x6x6
M H-285
4x9x8
M H-633
2x2x6x6
M H-134
4x9x7
M H-613A
4x7.5x7
M
H-575-AIP
4x7x7
M H-130
2x2x6x6
M H-278
2x2x6x6
M H-281
2x2x6x6
M H-460
4x7.5x7
M H-636
2x2x6x6
M H-136
4x7.5x7
M H-637
3x2x6x6
M H-458
4x4x4
HH-285B
4x7.5x7
M H-1006
2x2x6x6
M H-131
4x7x7
M H-462
2x2x6x6
M H-135
2x2x6x6
M H-282
4x7.5x7
M H-606
4x4x6x6
M H-456C
4x7.5x7
M H-1008
4x4x6x6
M H-456A
4x7.5x7
M
H-606HA
2x2x6x6
M H-457
4x7.5x7
M H-275
5x2x6x16
M H-456H
4x4x6x6
M H-456B
4x7.5x7
M H-274
4x7.5x7
M
H-576-AIP
4x7.5x7
M H-3000
6x2x6x16
M H-456E
4x7.5x7.5
M H-3005
9x9x8
M H-613
2x2x6x6
M H-284
3x2x6x6
M H-449
C
C
C
C
C
C
C
C
C
C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C
C
C C
C
C
C
C
C C
C C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C
C
C C
CC C C
C C
C C
C C
C
E E
3756A
W
OOD
T21W
OOD
F55A2IF
W
OOD
T25CONCRETE
F57W
OOD
F55A1F
W
OOD
F54I
CONCRETE
T22W
OOD
F55W
OOD
T19W
OOD
T20A W
OOD
T23W
OOD
F56W
OOD
W
OOD
F551A
W
OOD
F551 W
OOD
W
OOD
T19A
CONCRETE
F53W
OOD
T24W
OOD
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
E
EE
E
E
E E
E
E
E
E
E
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
D
D
C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C E
E E
N G
FM
W
E
E
E
E
E
E
E
E
E
EE
E
E
E
E
E
E
E
E
E
ABANDONED
10 AC
ABANDONED
TBD AC
ABANDONED
TBD AC
FIRETBD TBD
MAIN6 AC
FIRE12 AC
MAIN6 DI
SERVICE
TBD TBD
ABANDONED
2 TBD
SERVICE
4 PVC
MAIN6 DI
MAIN6 AC
MAIN6 PVC
MAIN4 PVC
SERVICE
4 PVC
SERVICE
2 TBD
FIRE6 AC
MAIN4 TBD
SERVICE
6 S
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
8 AC
SERVICE
TBD TBD
SERVICE
6 PVC
ABANDONED
TBD TBD
FIRE6 TBD
FIRETBD TBD
FIRETBD TBD
FIRETBD TBD
FIRE6 TBD
MAINTBD TBD
ABANDONED
TBD TBD
SERVICE
4 TBD
MAINTBD TBD
SERVICE
TBD TBD
SERVICE
2 S
FIRETBD TBD
MAIN6 CASTIRON
ABANDONED
2 CASTIRON
SERVICE4 AC
ABANDONED
TBD TBD
MAIN6 TBD
SERVICE
2 CASTIRON
SERVICETBD TBD
SERVICE
TBD CASTIRON
ABANDONED
4 CASTIRON
MAIN6 AC
SERVICE
1 PVC
MAIN12 PVC
ABANDONED
10 AC
SERVICE
TBD TBD
MAIN6 DI
SERVICE
4 TBD
FIRE6 TBD
MAIN6 TBD
MAIN10 AC
ABANDONED
8 AC
MAIN6 DI
MAIN6 DI
MAIN1 PVC
MAIN6 TBD
MAIN6 DI
FIRE6 TBD
MAIN6 DI
FIRE6 CASTIRON
SERVICE
TBD TBD
MAINTBD TBD
MAINTBD TBD
ABANDONED
10 AC
MAIN12 AC
MAIN8 AC
MAIN8 PVC
MAINTBD TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
8 TBD
ABANDONED
TBD TBD
ABANDONED
TBD TBD
ABANDONED
6 DI
FIRE6 TBD
FIRE6 TBD
FIRE12 AC
FIRE12 AC
FIRE12 AC
FIRE10 DI
FIRE6 DI
FIRE6 DI
FIRE6 DI
FIRE6 DI
FIRE6 DI
FIRETBD TBD
FIRE6 DI
FIRE12 AC
MAIN4 PVC
MAIN6 PVC
SERVICE2 S
MAIN6 TBD
FIRE6 TBD
FIRE12 AC
FIRE12 AC
FIRE12 AC
MAIN12 AC
MAIN12 AC
MAINTBD TBD
MAIN6 DI
MAIN6 TBD
MAIN6 DI
SERVICE3 TBD
MAIN12 TBD
MAIN6 TBD
MAIN6 TBD
MAIN6 DI
MAIN6 TBD
MAIN6 DI
MAIN10 AC
MAIN6 TBD
MAIN10 AC
MAIN6 PVC
MAIN2 PVC
SERVICE2 PVC
SERVICE
2 PVC
SERVICE
2 PVC
SERVICE
2 PVC
SERVICE2 PVC
SERVICE
2 PVC
SERVICE2 PVC
SERVICE
2 PVC
SERVICE2 PVC
MAINTBD PVC
MAIN10 AC
MAIN6 DI
SERVICE1 PVC
MAIN6 CASTIRON
MAIN6 CASTIRON
SERVICE
6 CASTIRON
SERVICE4 CASTIRON
MAIN4 CASTIRON
MAIN8 AC
MAIN6 AC
MAIN4 AC
SERVICE4 AC
SERVICE4 AC
SERVICE4 AC
SERVICE4 CASTIRON
SERVICE
4 CASTIRON
MAIN4 CASTIRON
FIRETBD TBD
FIRETBD TBD
MAINTBD TBD
MAIN8 AC
SERVICE
TBD TBD
MAINTBD TBD
MAINTBD TBD
MAIN4 CASTIRON
SERVICE4 CASTIRON
MAINTBD TBD
MAINTBD TBD
SERVICE
TBD PVC
SERVICETBD PVC
MAINTBD PVC
MAIN6 AC
MAIN8 PVC
MAIN6 AC
MAIN6 PVC
SERVICE2.5 PVC
MAIN8 PVC
MAIN4 TBD
MAIN6 AC
MAINTBD TBD
SERVICE
TBD TBD
MAIN6 AC
MAIN6 AC
MAIN6 TBD
MAIN6 AC
MAIN6 AC
SERVICE2 AC
SERVICE
TBD TBD
SERVICETBD TBD
SERVICETBD TBD
SERVICE
TBD TBD
MAIN16 AC
FIRE12 AC
MAINTBD TBD
MAINTBD TBD
MAINTBD TBD
MAINTBD TBD
MAINTBD TBD
MAINTBD TBD
MAINTBD TBD
MAINTBD TBD
MAINTBD TBD
MAIN6 TBD
MAIN16 AC
MAIN6 AC
MAIN14 AC
MAIN6 AC
ABANDONED
8 AC
MAIN6 TBD
MAIN6 TBD
MAINTBD TBD
SERVICETBD TBD
SERVICE
4 DI
MAIN8 DI
W
W
W
W
W
AIP
AIP
W
W
W
W
W
W
W
W
W
W
W
W W
W W
AIP
AIP
AIP
FW FW
FW
FW
W
W
W W W W W
W
W
W
W
W
W
W
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
CAP
CAP
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
CAP
TEE
TEE
TEE
TEE
TEE
TEE
CAP
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
CAP
TEE
TEE
TEE
TEE
TEE
TEE
TEE
HYDRANT
HN-41-01
HYDRANT
HI-25-06
HYDRANT
HI-25-09
HYDRANTHI-21-04
HYDRANTHN-03-01
HYDRANTHN-03-08
HYDRANT
HN-29-01
HYDRANT
HN-29-03
HYDRANT
HN-03-05
HYDRANT
HN-30-02
HYDRANTHI-21-03
HYDRANT
HN-04-01
HYDRANTHI-25-03
HYDRANT
HN-30-04
HYDRANTHN-03-02
HYDRANT
HI-24-02
HYDRANTHI-25-01
HYDRANTHI-25-08
HYDRANT
HI-25-02
HYDRANT
HN-13-01
HYDRANT
HN-03-03
HYDRANT
HN-03-06
HYDRANTHN-23-01
HYDRANT
HI-25-07
HYDRANT
HN-30-03
HYDRANTHN-20-01
HYDRANTHN-04-02
HYDRANTHI-21-07
HYDRANTHN-30-01
HYDRANT
HI-24-01
HYDRANTHI-24-04
HYDRANTHI-21-08
HYDRANT
HN-19-01
HYDRANT
KSC
HYDRANT
HI-21-05
HYDRANTHI-25-04
HYDRANT
HI-21-01
HYDRANTHN-23-03
HYDRANT
HI-29-01
HYDRANT
HI-29-02
HYDRANT
HN-23-02
HYDRANT
HN-41-02
HYDRANT
HN-32-01
HYDRANT
HN-03-09
HYDRANT
HN-03-04
HYDRANTHI-25-05
METER
METER
PUMP38830 FIRE PUMP
PUMP54939 BOOSTER PUMP STATION
REDUCER
REDUCER
REDUCER
REDUCER
REDUCER
REDUCER
W
W
TEE
HYDRANT
HI-23-01
REDUCER
REDUCER
TEE
HYDRANT
HI-24-05
HYDRANTHI-24-06
HYDRANT
HI-30-01
HYDRANT
HN-30-05
HYDRANTHN-32-02
HYDRANT
HI-21-02
SERVICE1 TBD
MAIN10 TBD
TEECAP
MAIN3 TBD
TEEMAIN3/4 TBD
SERVICE3/4 TBD
MAIN10 TBD
CAP TEE
MAIN6 TBD
TEETEE
MAIN2 TBD
SERVICE2 TBD
MAIN10 TBD
CROSS
FIRE_CONNECT
TEE TEE
MAIN8 TBD
TEE
MAIN6 TBD
MAIN10 TBD
MAIN4 TBD
TEE
MAIN2 TBD
SERVICE
2 TBD
TEE
MAIN4 TBD
TEE
SERVICE
2 TBD
SERVICE
3/4 TBD
SERVICE
1 TBD
TEE
MAIN10 TBD
TEE
SERVICE2 TBD
MAIN2 TBD
MAIN6 DI
TEE
HYDRANTHN-03-07
TEE CAP
TEE
MAIN6 TBD
MAIN10 TBD
MAIN3/4 TBD
SERVICE3/4 TBD
TEEMAIN3 TBD
MAIN12 TBD
TEE
TEE
FM
FM
FM
FM
ABANDONED
ABANDONED
ABANDONED
ABANDONED
FM
FM
FM
FM
FM
AIP
EFF
FM
FM
FM
FM
FM
FM
FM
FM
AIP
AIP
AIP
AIP
AIP
AIP AIP
AIP
AIP
FM
FMEFF
FM
FM FM
EFF EFF EFFFM FM FM FM
S S
S
S
S
SS
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
CO
CO
CO
CO
COCO
CO
CO
S
FM
FM
FM
FM
FM
FM
FM
FM
FMFMFMFM
E
E
E
E E
E
E
E
E E
E E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E E
E
E
E
E E
E
E
E
E
E
E
E
1. REFER TO GENERAL NOTES SHEET E-001 FOR NEW STC EQUIPMENT
INFORMATION AND SHEET E-003 FOR CABLE AND CONDUIT INFORMATION.
2. REFER TO CABLE SCHEDULE ON SHEET E-003 FOR FEEDER AND CONDUIT
INFORMATION, ROUTING, AND ESTIMATED LENGTHS FOR ALL NEW FEEDER
SECTIONS.
3. REFER TO DEMOLITION AND INSTALLATION SINGLE-LINE DIAGRAMS ON
SHEETS E-002 AND E-003 FOR CONFIGURATION INFORMATION.
4. REFER TO ELECTRICAL MANHOLE LAYOUTS ON SHEETS E-701 THROUGH E-711
FOR MANHOLE CONFIGURATION AND FEEDER ROUTING INFORMATION.
5. REFER TO SHEETS E-501 AND E-502 FOR ELECTRICAL AND CIVIL INSTALLATION
DETAILS.
SPECIFIC NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SA
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
AF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
Ne ls on En gi ne er in gCo rh od es b rit
E-101
EL
EC
TR
IC
AL
S
IT
E
PL
AN
/1
2/
M .J
O H
N
SO
N
J.
PA
D
IL
LA
M .G
O N
ZA
LE
Z
D
BE
H
9-
XX
-X
X-
XX
D
BE
H
9-
R
EP
AI
R
C
AB
LE
A
N D
S
PL
IC
ES
IN
F
EE
D
ER
N F
R O
M N
O R
TH
S
U
BS
TA
TI
O N
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
N
EL
SO
N
EN
G
IN
EE
R
IN
G
0 150 300 600
1"=300'
SCALE IN FEET
GRAPHIC SCALE
SCALE:
ELECTRICAL SITE PLAN
1" = 300'
NN
MH NE-1
MH NE-2
MH NE-3
MH NE-4 MH NE-5 MH NE-6 MH NE-7
MH NE-8
MH NE-8A
MH NE-8B MH NE-9
MH NE-10
MH NE-11
MH NE-12 MH NE-13 MH NE-14 MH NE-15 MH NE-16 MH NE-17
MH NE-18 MH NE-19
MH NE-20
MH NE-21
MH NE-22
MH NE-23
MH NE-24
MH NE-25
MH NE-26
MH NE-27
MH-2253
MH-2273
MH-2329
MH-2327
NEW SECTIONALIZER
STC-7N-2Z
NEW SECTIONALIZER
STC-7N-1Z
NEW SECTIONALIZER
STC-7N-3Z
NEW
SECTIONALIZER
STC-7N-4Z
NEW SECTIONALIZER
STC-7N-5Z
NEW SECTIONALIZER
STC-7N-8Z
NEW SECTIONALIZER
STC-7N-9Z
E-401 A
E-401 B
E-402 C
E-402 D
E-402 E
E-403 G
E-403 H
E-404 J
E-404 K
E-404 L
E-405 M
E-405 N
E-406 R
E-407 W
E-408 Z
E-405 P
E-406 T
E-406 U
E-407 V
E-407 Y
CAPE ROAD
TI
TA
N
II
I R O
AD
TE
ST
R O
AD
FREEDOM ROADHANGAR ROAD
SCRUB J ROAD
BEACH ROAD
SA
M
UE
L
C
PH
IL
LI
PS
P
KW
Y
E-403 F
IN
D
U
ST
R Y
R O
AD
NORTH SUBSTATION
SWITCH STATION 37
LBS-7N3
NEW SECTIONALIZER
STC-7N-6Z NEW SECTIONALIZER
STC-7N-7ZNEW SECTIONALIZER
STC-10N-1Z
LBS-7N1
LBS-3N4
LBS-3N6
LBS-7N2
MH-2328
MH-2347
X X X X X
X X
X X
X X
X
XXXXXX
X X
X
NG
NG
NG
N G
ST
ST
ST
ST ST ST ST ST ST ST ST ST ST ST ST ST
C
C
C C
C
C C C CC C C C CC C C
C C
C C
C C
C C
C C
O H
E
O H
E O H
E
E
E
E
E
E E E E E E E
MAIN6 PVC
SERVICE
TBD TBD
SERVICE
TBD TBD
M
AINTBD TBDW
W W
W W
W W
W W
W W
W
TEE
TEE
HYDRANT
HI-24-04
W
W
FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM FM FM FM FM FM FM FM FM FM FM
SSSSSSSS
SS SS SS SS SS SS
SS
SS
SS SS
FM
AIP
AIP
AIP
AIP
AIP
AIP
AIP
AIP
AIP
AIP
AIP
AIP
AIPAIP
AIP
AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP
FM
FM
FM
E
E E
E
E E
E
ST ST ST ST ST ST ST
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C C C C C C C C C C C C C
C
C
C
C
E
E
E E E E E E E E E E E E E E E E
SERVICE
1 PVC
MAIN
8 PVC
MAIN6 AC
M
AIN
8 PVC
W
W W
W
W W
W W
W
TEE
TEE
HYDRANT
HI-25-01
HYDRANT
HI-24-01
FM
FM
FMFM FM FM FM FM
SS
SS
SSSSSS
SS SS SS SS SS SS SS SS
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM FM FM FM FM FM FM FM FM FM FM FM
FM
SS
SS
SS
SS SS
SS SS SS
AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP AIP
AIP
AIP
7.00
7.00
7.00 8.00
6.00
7.00
E
E
E
E
C
C
C
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
D
D
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
A
B
2 3
C
D
1 2 3
4 5 6
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SA
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N , P
AF
B, F L
C O
N
TR
AC
T
N O
FA
-1 8-
D -0
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
Ne ls on En gi ne er in gCo rh od es b rit
E-401
EL
EC
TR
IC
AL
E
N
LA
R G
ED
P
LA
N
S I
/1
2/
M .J
O H
N
SO
N
J.
LO
N G
SH
O
R E
M .G
O N
ZA
LE
Z
D
BE
H
9-
XX
-X
X-
XX
D
BE
H
9-
R
EP
AI
R
C
AB
LE
A
N D
S
PL
IC
ES
IN
F
EE
D
ER
N F
R O
M N
O R
TH
S
U
BS
TA
TI
O N
D
AT
E:
AS
B
U
IL
T D
AT
E:
D
EL
IV
ER
Y N
O
N
EL
SO
N
EN
G
IN
EE
R
IN
G
KEY PLAN
0 15 30 60
1"=30'
SCALE IN FEET
GRAPHIC SCALE
SCALE:
ELECTRICAL ENLARGED UTILITY PLAN
1" = 30' A
E-101
SCALE:
ELECTRICAL ENLARGED UTILITY PLAN
1" = 30' B
E-101
M
AT
C H
LI
N
E:
B
/E -4
M
AT
C H
LI
N
E:
A
/E -4
M
AT
C H
LI
N
E:
C
/E -4
NN
NN
SCRUB J ROAD
NORTH SUBSTATION
MH NE-1
MH NE-2
MH NE-3
SCRUB J ROAD
U N
N
AM
ED
A
C C
ES
S
R O
AD
MH NE-4
IN
D
U
ST
R Y
R O
AD
NORTH T2
60306
60302
60305
NORTH T1
1. REFER TO GENERAL NOTES SHEET E-001 FOR NEW STC EQUIPMENT
INFORMATION.
2. REFER TO CABLE SCHEDULE ON SHEET E-003 FOR FEEDER AND CONDUIT
INFORMATION, ROUTING, AND ESTIMATED LENGTHS FOR ALL NEW FEEDER
SECTIONS.
3. REFER TO DEMOLITION AND INSTALLATION SINGLE-LINE DIAGRAMS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .