Design Documentation Summary

This is a construction design document package for the Rosebud Agency Building #1004 Boiler & HVAC System(s) replacement project located in Mission, South Dakota. The project, identified as 140A1622F0214, was issued on September 20, 2024 as a 100% Construction Documents (CD) package for bid purposes. The work is being executed under the Bureau of Indian Affairs Great Plains Region Division of Facilities.

The project scope involves replacing the existing boiler heating system and window unit cooling system with an electric Variable Refrigerant Flow (VRF) system, Dedicated Outdoor Air System (DOAS), and baseboard heaters. The design package includes comprehensive drawings and specifications covering mechanical, electrical, and architectural systems across basement and first floor levels. Key applicable codes include the 2021 NFPA 5000 Building Construction and Safety Code, 2020 National Electrical Code (NEC/NFPA 70), 2021 Uniform Mechanical Code (UMC), 2023 ASME Boiler and Pressure Vessel Code, and ASHRAE 90.1-2016 standards. The documentation comprises mechanical demolition plans (MD101-MD401), HVAC plans (MH101-MH102), mechanical piping plans (MP101-MP102), electrical demolition and systems plans (ED101-ED102, EP101-EP102, EL101-EL102), schedules for equipment and systems (M-701 through M-702, E-701), and mechanical/electrical details and legends. All work must comply with local, state, and federal codes, with the General Contractor responsible for construction means and methods, site condition verification, and protection of existing construction elements to remain.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOSEPH DAVID ASSOCIATES

REVISIONS

DRAWN BY

CHECKED BY

JOSEPHDAVIDASSOCIATES.COM

FARRIS ENGINEERING

12700 West Dodge Road, Omaha, NE 68154

Proj ID

Project Status Issue Date

JAM

DKM

G100

COVER SHEET

R O

SE

BU

D A

G

EN

C Y

BO

IL

ER

H

VA

C S

YS

TE

M (S

) D

ES

IG

N

BU

IL

D

IN

G

C O

VE

R

S H

EE

T

140A1622F0214

ROSEBUD AGENCY BOILER & HVAC

SYSTEM(S) DESIGN

BUILDING #1004, 140A1622F0214

MISSION, SOUTH DAKOTA

GENERAL

G100 COVER SHEET

ARCHITECTURAL

A100 1ST FLOOR AND BASEMENT CORRIDOR REFLECTED CEILING PLAN

MECHANICAL

MG101 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES

MD101 BASEMENT MECHANICAL DEMOLITION PLAN

MD102 FIRST FLOOR MECHANICAL DEMOLITION PLAN

MD201 MECHANICAL ROOF DEMOLITION PLAN

MD401 LARGE-SCALE MECHANICAL DEMOLITION PLANS

MH101 BASEMENT HVAC PLAN

MH102 FIRST FLOOR HVAC PLAN

MP101 BASEMENT MECHANICAL PIPING PLAN

MP102 FIRST FLOOR MECHANICAL PIPING PLAN

M-401 LARGE-SCALE MECHANICAL PLANS

M-501 MECHANICAL DETAILS

M-701-702 MECHANICAL SCHEDULES

ELECTRICAL

EG101 ELECTRICAL SYMBOLS LEGEND AND GENERAL NOTES

ED101 BASEMENT ELECTRICAL DEMOLITION PLAN

ED102 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

EL101 BASEMENT LIGHTING PLAN

EL102 FIRST FLOOR LIGHTING PLAN

EP101 BASEMENT POWER AND SPECIAL SYSTEMS PLAN

EP102 FIRST FLOOR POWER AND SPECIAL SYSTEMS PLAN

E-701 ELECTRICAL SCHEDULES AND DIAGRAMS

SITE LOCATION

PROJECT TEAM SHEET INDEX

OWNER

BUREAU OF INDIAN AFFAIRS

115 FOURTH STREET SE, STE 400-MC 202

ABERDEEN, SD 57401

ARCHITECT

JOSEPH DAVID ASSOCIATES

19970 CHLOE LAYNE Rd.

SPIRO, OK 74959

MEP ENGINEER

FARRIS ENGINEERING

12700 WEST DODGE ROAD

OMAHA, NE 68154

VICINITY MAP

SITE LOCATION

LOCATION MAP

A. COMPLY WITH ALL LOCAL, STATE & FEDERAL CODES, LAWS & REGULATIONS.

EXECUTE WORK ONLY WHICH IS IN CONFORMANCE

B. GC IS RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES,

SEQUENCES, OR PROCEDURES

C. GC TO FIELD VERIFY ALL EXG SITE CONDITIONS & DETERMINE EXTENT OF WORK

PRIOR TO ANY & ALL CONSTRUCTION. NOTIFY ARCHITECT OF ANY DISCREPANCIES

BTWN CONSTRUCTION DOCUMENTS & ACTUAL CONDITIONS

D. ALL DIMS ON THE DRAWINGS SHALL BE CHECKED AGAINST SITE CONDITIONS.

NOTIFY ARCHITECT OF ANY DISCREPANCIES

E. DO NOT SCALE DRAWINGS. USE WRITTEN DIMENSIONS

F. U.N.O. ALL DIMS ARE TO FACE-OF-STUD OR FACE-OF-MASONRY ON NEW

CONSTRUCTION AND TO FACE-OF-WALL ON EXG CONSTRUCTION

G. ALL WORK IS TO BE PLUMB, LEVEL & SQUARE

H. PROTECT PORTIONS OF THE EXG CONSTRUCTION TO REMAIN DURING DEMOLITION

/ CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ANY / ALL DAMAGES CAUSED

BY HIMSELF OR HIS SUBCONTRACTOR. PROTECT ADJ AREAS FROM DUST & DEBRIS.

MAINTAIN A CLEAN, SAFE WORK ENVIRONMENTS AT ALL TIMES

I. EXG WALLS TO REMAIN SHALL BE PATCHED WHERE PARTIAL DEMO OF WALL OR

DEMOOF ADJ WALLS OCCURRED, U.N.O. PATCH TO MATCH ADJ REMAINING

SURFACE IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING &

REFINISHING. PAINT TO NEAREST BREAK

APPLICABLE CODES:

2021 NFPA 5000 BUILDING CONSTRUCTION AND SAFETY CODE

2020 NATIONAL ELECTRICAL CODE (NEC, NFPA 70)

2021 UNIFORM MECHANICAL CODE (UMC)

2020 NFPA 31

2019 NFPA 86

2021 NFPA 90A

2021 NFPA 90B

2021 UNIFORM PLUMBING CODE

2021 UNIFORM SOLAR, HYDRONICS, AND GEOTHERMAL CODE AND ASHRAE STANDARDS

2004 ADAABAAG & ADA STANDARDS IN EFFECT AT THE TIME OF THE PROJECT

2023 ASME BOILER AND PRESSURE VESSEL CODE

ASHRAE 90.1-2016

PROJECT SUMMARY:

THE PROJECT CONSISTS OF REPLACING THE EXISTING BOILER HEATING SYSTEM AND

WINDOW UNIT COOLING SYSTEM WITH AN ELECTRIC VRF, DOAS, AND BASEBOARD

HEATERS AT THE ROSEBUD AGENCY BUILDING #1004 LOCATED IN MISSION, SD.

GENERAL NOTES

100% CD Issue for Bid 09-20-24

N

CONCUR FOR PROGRAM BY

BUREAU OF INDIAN AFFAIRS

GREAT PLAINS REGION

DIVISION OF FACILITIES

DATE

102 Fleener Avenue Poteau, OK 74953

5'-4" (VIF)

5' -7

(V

IF

1 1 1

1 1

1 1 1

1 1

1 1 1 1 1

1 1

1 1

1 1

1 1

2 2

6' -0

(V

IF

1 1 1 1

1 1

1/2"

SPACE

6"

6"

MAX

M

AX

JOSEPH DAVID ASSOCIATES

REVISIONS

DRAWN BY

CHECKED BY

JOSEPHDAVIDASSOCIATES.COM

FARRIS ENGINEERING

12700 West Dodge Road, Omaha, NE 68154

Proj ID

Project Status Issue Date

JAM

DKM

A100

1ST FLOOR AND BASEMENT

R O

SE

BU

D A

G

EN

C Y

BO

IL

ER

H

VA

C S

YS

TE

M (S

) D

ES

IG

N

BU

IL

D

IN

G

1S T

FL

O

O R

A N

D B

AS

EM

EN

T

C O

R R

ID

O

R R

EF

LE

C

TE

D C

EI

LI

N G

P

LA

N

140A1622F0214

100% CD Issue for Bid 09-20-24

N

NOTES:

1. VERIFY ALL DIMENSIONS PRIOR TO START OF WORK.

2. SUSPENDED CEILING TO BE INSTALLED AT EXISTING CEILING

ELEVATION ABOVE FINISHED FLOOR.

3. EXISTING WALLS ARE NOT FIRE RATED.

4. IF REGULATED OR HAZARDOUS MATERIAL (OTHERWISE

NOT IDENTIFIED ON THE SURVEY) IS ENCOUNTERED, NOTIFY

OWNER IMMEDIATELY.

5. RE: MEP DRAWINGS FOR ADDITIONAL ITEMS SUCH AS

SIGNAGE, DIFFUSER, AND GRILLE LOCATIONS. FINISH/ COLOR

TO MATCH EXISTING, CONFIRMED BY THE OWNER,

KEY NOTES:

EXISTING CEILING TO REMAIN

DEMOLISH EXISTING CEILING INCLUDING GYPSUM BOARD

& SUSPENSION SYSTEM - RE. MEP FOR ADDITIONAL WORK.

CENTER GRID, LENGTH WISE, AT CORRIDORS.

EXISTING CEILING CONTAINS ASBESTOS MASTIC.

SEE ENVIRONMENT REPORT AND SPECIFICATIONS

FOR REMOVAL REQUIREMENTS.

1/16 = 1'-0"

1ST FLOOR CORRIDOR REFLECTED CEILING PLAN01

A100

DEMOLISH HOOD EQUIPMENT & CURB. RE : MEP

DRAWINGS & SPECIFICATIONS FOR ADDITIONAL

REQUIREMENTS.

DEMOLISH FLASHING

DEMOLISH WOOD BLOCKING

TO EXISTING METAL DECK

EXISTING METAL DECK/

STRUCTURE TO REMAIN

3/32 = 1'-0"

SECTION @ MECH. OPENING - DEMOLITION03

A100

3/32 = 1'-0"

SECTION @ MECH. OPENING - ROOF PATCH05

A100

NEW JOINT PER "MULEHIDE"

ROOFING MANUFACTURER

NEW "MULEHIDE" ROOFING-MATCH EXIST ROOF/MATERIAL/

APPLICATION/INSTALLATION

NEW COVER BOARD - MATCH EXISTING

POLYISO INSULATION

3/4 "CDX PLYWOOD IN SEALANT BED, LAMINATE

MOISTURE BARRIER TO BOTTOM SIDE PRIOR TO

INSTALLATION. ATTACH W/ #10 X 2 1/2 " SCREWS AT 8" C.C.MAXIMUM 32"

OPENING

1/16 = 1'-0"

BASEMENT CORRIDOR REFLECTED CEILING PLAN02

A100

CORRIDOR REFLECTED

CEILING PLAN

1-1/2" = 1'-0"

ACOUSTIC CEILING EDGE04

A100

MAIN RUNNER TEES

ACCUSTICAL TILE CEILING

METAL SEAT ANGLE

FINISH WALL

12 GAUGE WIRE HANGER @

60MM ON CENTER EACH WAY