Attachment 1 DLA Appliances Contract-final.pdf
PDF 147 KB Posted
- Attached to
- Appliances Federal contract opportunity
- Solicitation number
- SP470524Q0223
- Issued by
- Defense Logistics Agency
About this file
This document is a Statement of Work (SOW) for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract to replace aging or failing appliances, such as Keurig coffee makers, microwaves, and small refrigerators, throughout the Defense Logistics Agency (DLA) Headquarters Complex (HQC) and leased buildings at Fort Belvoir, Virginia. The contract period is one base year from November 1, 2024 to October 31, 2025, with four one-year option periods.
The contractor will be responsible for providing commercial and Energy Star-rated appliances, with a focus on environmentally sensitive products. Appliances will be delivered to the Fort Belvoir HQC loading dock based on orders placed by the Government Point of Contact (GPOC). This is a 100% small business set-aside procurement with a NAICS code of 333241, Food Product Machinery Manufacturing, and a size standard of 500 employees. The agency issuing this solicitation is the Defense Logistics Agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SP470524Q0223_Amendment 0001_8Oct2024.pdf | ||
| SOW_Updated_8Oct2024_Appliances.pdf | ||
| Combined_Synopsis-SP4705-24-Q-0223 final.pdf | ||
| Attachment 2 Section B final.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEFENSE LOGISTICS AGENCY
DLA Installation Management Operations at Fort Belvoir
STATEMENT OF WORK (SOW)
Appliances Replacements IDIQ CONTRACT DM-FF Site Operations Division
1.0 INTRODUCTION:
1.1 The Defense Logistics Agency (DLA) is an agency of the Office of the Secretary of Defense within the United States Department of Defense (DOD). The DLA Director reports to the Under-Secretary of Defense for Acquisition, Technology and Logistics through the Deputy Under-Secretary of Defense (Logistics and Materiel Readiness). DLA provides worldwide logistics support for the missions of the Military Departments and the Unified Combatant Commands under conditions of peace and war. It also provides support to other DoD Components and certain federal agencies, foreign governments, international organizations, and others authorized.
1.2 DLA Installation Management Operations Ft. Belvoir has approximately 6,000 employees that work in the McNamara Headquarters Complex (HQC) facility that is managed by DLA Installation Operations.
Of the Ft. Belvoir employees, there are approximately 130 government civilians and about 200 contractors that work for the DLA HQC Site Operations Director. This is a joint military assignment with military members from the United States Army, Marine Corps, Navy, and Air Force working alongside DoD civilians and contractors. The McNamara HQC is comprised of over 1.1 million square feet that includes in addition to traditional office space, a cafeteria, barbershop, fitness center, and two (2) snack bars. It also has a functioning police force and is a tenant on the U.S. Army’s Ft. Belvoir reservation.
2.0 INTENT:
2.1 GENERAL INTENTION. The Defense Logistics Agency (DLA) Installation Operations at Fort Belvoir (DM-FF), Site Operations Division has requirements to replace aging or failing appliances (Keurig’s, Microwaves, and Small Refrigerators) throughout HQC complex and all lease space buildings.
3.0 REQUIREMENT:
3.1. GENERAL. Starting 1st November 2024 Through 31st October 2029, DLA will have requirements to replace aging or failing appliances (Keurig’s, Microwaves, and Small Refrigerators) throughout HQC complex and lease space building. The Contractor is required to provide the appliances as needed. This requirement is depending on the need to replace aging or failing appliances.
4.0 STANDARD:
4.1 The Contractor shall be responsible for providing commercial and energy star appliances.
4.2 The Contractor shall be responsible for purchasing environmentally sensitive appliances.
5.0 DELIVERY:
5.1 The Contractor shall deliver appliances to Headquarters DLA Fort Belvoir Virginia complex, once the government has submitted an order to the loading dock and inform the (COR) that the appliance is onsite at the loading dock.
6.0 GOVERNMENT POINT OF CONTACT (GPOC):
6.1. A Government Point of Contact (GPOC) will be assigned to ensure that the contract requirements are met. The GPOC will act on behalf of the Government for this contract. Contractor personnel providing and delivering service will report directly to the GPOC.
6.2. To be determined. HQC DLA Site Operations Division. DLA Installation Support at Fort Belvoir, 8725 John J. Kingman Road, Fort Belvoir, Virginia 22060-6220.
6.3. To be determined. HQC DLA Site Operations Division. DLA Installation Support at Fort Belvoir, 8725 John J. Kingman Road, Fort Belvoir, Virginia 22060-6220
7.0 PERIOD OF PERFORMANCE:
7.1. The period of performance is one base year, and 4 option years as followed:
Base Year: 1st November 2024 to 31st October 2025.
First Option Year: 1st November 2025 to 31st October 2026.
Second Option Year: 1st November 2026 to 31st October 2027.
Third Option Year: 1st November 2027 to 31st October 2028.
Fourth Option Year: 1st November 2028 to 31st October 2029.
File details come from the government source that posted it. Updated .