Attachment 1 - C-32 PWS 9 Jan 23.pdf

PDF 263 KB Posted

Attached to
AFICC/763 ESS - C-32A (B757-200) Pilot Training Federal contract opportunity
Solicitation number
FA445223R0001
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

C-32A (B757-200) FLIGHT SIMULATOR TRAINING

09 Jan 2023

1. DESCRIPTION OF SERVICES.

1.1. BACKGROUND. The C-32A is a military derivative of the Boeing 757-200 commercial airliner that supports Executive Branch and Department of Defense (DoD) requirements. Air Mobility Command (AMC) acquires pilot classroom and simulator training from suitably equipped and certified civilian flight training centers.

1.2. SCOPE. Required training includes academic and simulator training for the following courses: Initial Qualification Pilot Training, Refresher Pilot Training, Pilot Recurring Evaluation Training, Pilot Requalification Training and Pilot Senior Officer Training. Training shall be conducted at a Title 14, Code of Federal Regulations (14 CFR) Part 142 approved training center.

To be considered qualified, each contractor must possess an applicable training program approved under 14 CFR Part 121, or a training course approved under Part 142, applicable to the B757-200.

1.2.1. Contractor shall have the ability to provide training in both a legacy Boeing 757-200 simulator, as well as a simulator with dual cue flight directors, Pegasus FMC, Innovative Solution and Support Flat Panel Configuration (or similar flat panel displays), electronic flight instrument displays, Heads Up Display (HUD), Enhanced Flight Vision System (EFVS), WAAS/LPV capable GPS receiver, and USB power/ownship position ports for carry-on Electronic Flight Bag (EFB) devices. Both simulators shall have the ability to simulate Pratt & Whitney 2040 engines and winglets. United States Air Force (USAF) cockpit procedures and checklists shall be used in all courses.

1.3. SPECIFIC SUPPORT SERVICES.

1.3.1. C-32A (B757-200) Initial Qualification Pilot Training (Maximum course length 25-business days). The contractor shall conduct C- 32A (B757-200) Initial Qualification Pilot Training. Initial qualification training shall be to the standard that all pilots meeting the FAA prerequisites shall be offered the opportunity to receive an Airline Transport Pilot (ATP) Rating/Type Certification (as applicable). The individual student pilot is responsible for completing FAA prerequisites. On the ATP/Type check ride, each pilot will perform all required ATP/Type check maneuvers independently in the left seat. The contractor shall provide an FAA examiner (or designee) to administer the ATP Rating/Type Certification, and the Air Force will provide an examiner pilot to administer the Air Force requirements evaluation. Up to seven hours of simulator time may be flown per pilot during their check ride to satisfy Air Force specific Evaluation requirements. If the ATP option is not utilized, simulator time scheduled for FAA evaluation shall be devoted to proficiency maneuvers.

The contractor shall provide a syllabus in contractor format to each student at the beginning of class outlining the daily activities that will enable the pilots to obtain an ATP Rating and aircraft Type Certification. Course content shall include blocks of instruction in Required Navigation

Performance (RNP) approaches, Category (CAT) II/III Instrument Landing System (ILS), Required Navigation Performance Authorization Required (RNP AR) and Takeoff and Landing Data (TOLD) calculations based on the Performance Dispatch and Performance Inflight sections of the flight manuals.

A normal initial training class shall consist of 2 pilots (in a rare circumstance, one (1) pilot) per class, with an estimated 5 classes required each year, with a maximum course length of 25 business days. This training will consist of classroom, Computer Based Training (CBT), and a minimum of 3 fixed base simulator instruction periods to include one day of automation and FMA training and one day of RNP AR training, and a minimum of 9 full flight simulator periods to include one day of Upset Prevention and Recovery Training (UPRT) initial training (see requirements in para. 1.3.9.11), including the evaluation). Simulator training will include a 2-hour pre-brief, a 4-hour simulator training period, and 1- hour post-simulator debrief.

1.3.2. C-32A (B757-200) Refresher Pilot Training (2 business days). The contractor shall conduct C-32A (B757-200) Pilot Refresher classroom and simulator training. The training class shall consist of 2 pilots (in a rare circumstance, one (1) pilot) per class, with an estimated 60 classes per year. Content shall be structured to present a comprehensive review of aircraft systems, normal and emergency procedures on a quarterly rotation over a calendar year. The COR or designated unit SME may coordinate with contractor for inclusion of USAF specific special interest items. The contractor shall provide a syllabus in contractor format at the beginning of each class outlining daily activities. To satisfy Air Force training and currency requirements, the class shall include at least 8 hours of simulator time. Simulator training will include a 2-hour pre-brief, a 4-hour simulator training period, and 1 hour of post- simulator debrief. Pilot Refresher Simulator Training shall be completed within a total number of 2 consecutive days.

1.3.3. C-32A (B757-200) Pilot Recurring Evaluation Training (3 business days). The contractor shall conduct C-32 (B757-200) Pilot Recurring Evaluation Training. The training class shall normally consist of 2 pilots (in a rare circumstance, one (1) pilot) per class, with an estimated 12 evaluation classes needed per year. Pilot Recurring Evaluation Training shall be completed within a total number of 3 consecutive days. Air Force requirements will include refresher training (to include UPRT training), a Mission Oriented Simulator Training (MOST) training, and then an evaluation. The contractor shall provide a syllabus in contractor format at the beginning of each class outlining daily activities as well as Air Force supervised recurring evaluations. Per Air Force recurring evaluation criteria (which consists of the standard ATP/Type check ride maneuvers plus three additional instrument patterns) each pilot will independently perform all required maneuvers. These maneuvers have historically taken 2 hours of simulator time per pilot. The contractor shall provide an instructor to operate the simulator, and the Air Force will provide an examiner pilot to administer the flight evaluation.

1.3.4. C-32A (B757-200) Pilot Senior Officer Training (5 business days). The contractor shall conduct C-32A (B757-200) Senior Officer Pilot Training. The training class will normally consist of one (1) pilot) Senior Officer Pilot, and one (1) pilot) Air Force Instructor Pilot per class, with an estimated one (1) pilot) class required each year. Instructional duties will be coordinated and shared between the contractor provided instructor and AF instructor pilot. Total number of simulator sessions will be five (5) with the last simulator session an evaluation for the senior officer. During this session, the contractor shall provide an instructor to run the simulator, and the Air Force will provide an examiner pilot to administer the Air Force requirements evaluation. The contractor shall provide a syllabus in contractor format to each student at the beginning of each class identifying the curriculum and plan.

1.3.5. C-32A (B757-200) Requalification Training (5 business days). The contractor shall conduct C-32A (B757-200) Requalification Training. The training class will normally consist of one (1) pilot Unqualified Pilot, and one (1) pilot Air Force Instructor Pilot per class, with an estimated one (1) pilot class required each year. Instructional duties will be coordinated and shared between the contractor provided instructor and AF instructor pilot. Total number of simulator sessions will be five (5) with the last simulator session an evaluation for the unqualified pilot. During this session, the contractor shall provide an instructor to run the simulator, and the Air Force will provide an examiner pilot to administer the Air Force requirements evaluation. The contractor shall provide a syllabus in contractor format to each student at the beginning of each class identifying the curriculum and plan.

1.3.6. Simulator Time. The contractor shall provide a fully operational simulator and a fully qualified simulator operator. Type of training will be coordinated at least 7 days prior and administered by the unit or the contractor. Flight simulator time, although purchased on an hourly basis, will normally be purchased in no less than a 2-hour block of time. The training shall consist of hourly increments in a Level D, CAT IIIB, RNP AR and UPRT capable simulator. The simulator shall mirror the C-32A’s Flight Management Computer (FMC) software and options, Mode Control Panel (MCP) functions, and Flight Mode Annunciations (FMAs) (to include the use of speed intervention during RNP AR IAPs with on-approach logic satisfied). Using AC 91-101A as a guide, training scenarios should always be flown at HD visibility airports instead of generic database airports.

1.3.7. Simulator Position Fill-ins. When requested, the contractor shall provide a C-32A (757- 200) instructor or a type-rated Second-In-Command (SIC) pilot to act as the second pilot.

The contractor instructor will participate in all required simulator training.

1.3.8. Classroom/Briefing Time. Contractor shall provide supplementary classroom/briefing time when requested by the unit. Subject matter may include additional instruction on specific aircraft systems, procedures, or general aviation topics. The unit will coordinate subject matter of the supplementary classroom/briefing time with contractor at least 7 days in advance to give contractor time to prepare. Subject matter will not change within 7-days of classroom/briefing time unless mutually agreed upon by the COR and contractor. Classroom time, although purchased on an hourly basis, will normally be purchased in no less than a 2-hour block of time and include audio/visual display capability.

1.3.9. Crew Resource Management/Threat and Error Management (CRM/TEM). With relation to CRM/TEM training, the contractor shall provide services IAW AFI 11-290, Crew Resource Management Training Program. The contractor shall develop separate multi-media presentations and case studies for the Initial and Refresher/Recurrent (Continuation Training) CRM/TEM and Upset Prevention and Recovery Training (UPRT), see AC 120-111 courses.

Case studies will be presented in an interactive format to exercise students’ decision-making and reasoning skills and, where appropriate, stimulate discussion. The Government will provide the contractor yearly CRM/TEM Topic(s) of the Year (ToY) that contain “real world” CRM/TEM topics and source material references with which the contractor will develop applicable presentations. CRM/TEM ToYs will be integrated into the contractor’s existing CRM/TEM program where appropriate; a contractor syllabus revision is not required. ToYs will include timely topics particularly regarding MAF aviation operations and relevant source material references. Source material references include USAF Safety Center and AMC Safety Reports, aviation mishaps (civilian and military), Air Force Safety Automated System (AFSAS) information, Aviation Safety Aviation Safety Action Program (ASAP) reports, Military Flight Operations Quality Assurance (MFOQA) analysis, AMC standardization/evaluation reports, FAA Advisory Circulars (AC) and Safety Alerts (SA), Line Oriented Safety Audit (LOSA) recommendations, and findings from the aviation industry. The contractor shall ensure personnel working with “Safety Privileged” information--such as AFSAS mishap reports--are appropriately trained and employ proper safeguards for the handling of Safety Privileged information. At a minimum, mishaps reviewed and analyzed during Refresher Training shall be changed annually by the contractor. CRM/TEM Core Curriculum shall focus on:

1.3.9.1. Situational Awareness. Includes knowledge and skill objectives for preventing the loss of situational awareness, skills for recognizing the loss of situational awareness, and techniques for recovering from the loss of situational awareness.

1.3.9.2. Crew Coordination/Flight Integrity. Includes knowledge and skill objectives covering the impact on aircrew performance of command authority, leadership, responsibility, assertiveness, conflict resolution, hazardous attitudes, behavioral styles, legitimate avenues of dissent, and team building.

1.3.9.3. Communication. Includes knowledge of common errors, cultural influences, and barriers (rank, age, experience, and position). Skills will encompass listening, feedback, precision, and efficiency of communication with all members and agencies (i.e., Crewmembers, Weather, ATC, Dispatch etc.).

1.3.9.4. Risk Management/Decision Making. Includes risk assessment, the risk management process, tools, breakdowns in judgment and flight discipline, problem-solving, evaluation of hazards, and control measures.

1.3.9.5. Task Management. Includes establishing priorities, overload, underload, complacency, management of automation, available resources, checklist discipline, and standard operating procedures.

1.3.9.6. Mission Planning/Debrief. Includes pre-mission analysis and planning, briefing, ongoing mission evaluation, and post mission debrief. Also, specific tools and techniques to be used on operational missions. Debriefings will include an analysis of Undesired Aircraft State occurrences and TEM techniques that either fostered effective TEM or were deficient.

Enhancements to the Pilot Monitoring (PM) role will also be discussed.

1.3.9.7. Threat and Error Management (TEM). An aviation industry-recognized best practice, TEM is a structured, proactive systems approach by building multiple layers of defenses. TEM is intuitively, logically, and flexibly designed to identify, prevent, and mitigate threats and/or trap or mitigate inevitable human errors to avoid Undesired Aircraft States (UAS) and potential mishaps. Effective Flight Path Management (FPM), Information Automation (IA) management, and the importance of TEM tools such as the roles of the Pilot Flying (PF) & Pilot Monitoring (PM) and “Verbalize, Verify, and Monitor” (VVM) in mitigating threats and trapping errors cannot be over-emphasized.

1.3.9.7.1. Threats. Defined as events or errors that occur outside the influence of the flight crew, threats increase operational complexity and must be managed to maintain safety margins. All threats have the potential to negatively affect flight operations.

1.3.9.7.2. Errors. Errors are flight crew actions or inactions that lead to a deviation from crew or organization intentions or expectations, reduce safety margins, and increase the probability of adverse operational events on the ground or in flight. Unmanaged or mismanaged errors can lead to an Undesired Aircraft State.

1.3.9.7.3. Undesired Aircraft States (UAS). Operational conditions where an unintended situation results in a reduction in margins of safety. A UAS is a result of ineffective Threat and Error Management and may lead to a mishap.

1.3.9.8. Flight Path Management (FPM). FPM is the planning, execution, and monitoring of the aircraft’s guidance, trajectory, and energy state. FPM applies anytime the aircraft is in motion—in flight or on the ground. All cockpit crewmembers must ensure that effective FPM is a primary and shared responsibility during all phases of flight. Flight Path Management is comprised of three aspects:

1.3.9.8.1. Planning. The process to development a thorough understanding of the aircraft’s desired flight path. Planning is dynamic and includes changes driven by the mission, environmental considerations, and clearances from authorities, such as ATC. Note: For the purposes of this document, a clearance is the flight path of the aircraft, as normally defined by the assigned ATC clearance. Flight deck occupants, (typically two pilots or as necessary for the safe conduct of the flight), must hear/read, understand, anticipate its impact, and comply with the clearance. Other cockpit crewmembers, who have the training, ability, and authority to do so, should assist with clearance acceptance.

1.3.9.8.2. Executing. The process through which the aircrew controls the aircraft and achieves compliance with the desired flight path.

1.3.9.8.3. Monitoring. The process through which crewmembers monitor compliance with the desired (planned) flight path. Effectively monitoring the flight path is a critical TEM task that discovers and corrects FPM errors that might lead to flight path deviations or UAS. As a primary and shared responsibility, monitoring is equally as important as controlling the aircraft. Monitoring requirements vary depending on phase of flight and on situations encountered within each phase of flight. Aircrews should anticipate flight situations or phases where they will be most vulnerable to flight path deviations (Areas of Vulnerability – AoV), and strategically manage workload and distractions to maximize monitoring during AoVs.

1.3.9.9. Mission Oriented Simulator Training (MOST). Training presented as a part of a CRM/TEM program in a realistic, operationally based simulator environment in real time.

MOST is the AF equivalent of Line Oriented Flight Training (LOFT). LOFT/MOST will provide actual time, realistic mission scenarios that demand crew coordination to safely complete the mission. LOFT/MOST scenarios may be based upon case studies presented in the classroom instruction and changed annually. An AMC Form 4031 (A001 – AD01) shall be completed and submitted for each refresher course described in paragraph 1.3.2 that includes a LOFT/MOST scenario. MOST is not applicable to Pilot Initial or Senior Officer courses.

1.3.9.10. CRM/TEM Competency. Civilian/Contract CRM/TEM facilitators and simulator instructors will maintain competency as CRM/TEM instructors and will receive recurrent CRM/TEM training annually, or as directed by AFMAN 11-2EA, Volume 1 or AFI 11- 290_AMC Supplement

1.3.9.11. Core Principles of UPRT. All UPRT training shall be in accordance with FAA AC 120-111 and shall include:

• Enhanced instructor training on the limitations of simulation.

• Comprehensive pilot academic training on aerodynamics.

• Early recognition of divergence from intended flightpath.

• Upset prevention through improvements in manual handling skills.

• Training that integrates Crew Resource Management (CRM) including progressive intervention strategies for the pilot monitoring.

1.4. DATA DELIVERABLES.

Data Item

Deliverable Title PWS Para

Data Item Description Number Title

A001-

AD01

AMC Form 4031 1.3.9.9. DI-PSSS-81522C Course Conduct Information Package

A002-

AD02

AF Form 1522, AFORMS Additional Training Accomplishment Input

4.8.1. DI-PSSS-81522C

Course Conduct Information Package

A003-

AD03

If available, Web-based, asynchronous, distance learning courseware.

4.11.6. DI-SESS-81526C

Instructional Media Package

A004-

AD04

Student Failure Notification 1.5.2.,4.8.2.1 DI-SESS-81525C Student Failure Notification Letter

A005-

AD05

Certificate of Training 1.5.3.,4.8.3 DI-PSSS-81522D Course Conduct Information

A006-

AD06

Course Critique 1.5.4.,3., 4.8.4 DI-SESS-81517C Training Situation Document

A007-

AD07

Student Hospitalization Notification 1.5.5.,4.11.7 DI-SAFT-81563 Accident/Incident Report

A008-

AD08

Course Syllabi/Course Descriptions 4.11.7 DI-MISC-81459A Syllabus

1.5. ADDITIONAL DELIVERABLES.

1.5.1. Program Management Support. The Contractor shall designate a single point of contact (POC) responsible for the overall management and performance of the PWS the contract.

The Contractor shall provide the name and contact information of the designee to the COR within 10 business days after contract award. Any change to this POC shall be submitted to the COR within 5 business days prior to change.

1.5.2. Student Failure Notification Letter. The POC in Section 1.5.1 will immediately notify the COR electronically if a training student receives an unsatisfactory course grade. Also, if at any time throughout the course a student fails to comply with Air Force or contractor expectations in regard to conduct, course objective completion or performance electronic notification shall immediately be made to the COR to determine the course of action with the student.

1.5.3. Certificate of Training. A Certificate of Training in agreed format between the Contractor and the COR shall be provided to each student that completes the course.

1.5.4. OSA/EA Student Course Critique.

Upon completion of each training course, the contractor shall provide each student with a copy of AMC Operational Support Airlift/Executive Airlift (OSA/EA) Form, Student Course Critique.

Filling out this critique is mandatory for students. Students shall be afforded time to complete the critique in private and return it to their instructor in a sealed envelope for review by the contractor program manager. The contractor shall forward a completed copy of the course critique along with the invoice via e-mail to the COR.

1.5.5. Student Hospitalization Notification. If treatment or hospitalization is required, the contractor shall ensure student receives medical treatment. As the student is a member of the armed forces, he/she shall be taken to the nearest military treatment facility, if possible. The nearest civilian hospital/medical facility shall be a secondary consideration; however, immediate treatment will be given priority. The contractor shall notify the A3T COR immediately, or, at maximum, within 8 hours after becoming aware of a student’s treatment and/or hospitalization.

The contractor will not pay for any medical costs or medications on behalf of students. Payment for medical services, and prescribed medications, shall be managed through the military medical program.

2. SERVICES SUMMARY.

The Services Summary (SS) table below summarizes the most important performance objectives and thresholds (specific standards) as identified within the body of the PWS. The absence of any performance objective and threshold from this summary shall not detract from its enforceability or limit the Government’s rights or remedies afforded under this contract. Metrics shall be calculated monthly unless otherwise specified.

Performance Objective PWS Para Performance Threshold

Provide C-32A Initial Pilot Training (≤ 25 business days)

1.3.1. COR shall receive no more than one

validated student complaint concerning quality of instruction during a training quarter.

Provide C-32A Refresher Pilot Training (2 business days)

1.3.2. COR shall receive no more than one

validated student complaint concerning quality of instruction during a training quarter.

Provide C-32A Pilot Recurring Evaluation Training (3 business days)

1.3.3. COR shall receive no more than one

validated student complaint concerning quality of instruction during a training quarter.

Provide C-32A Pilot Senior Officer Training (5 business days)

1.3.4. COR shall receive no more than one

validated student complaint concerning quality of instruction during a training quarter.

Provide C-32A Requalification Training (5 business days)

1.3.5. COR shall receive no more than one

validated student complaint concerning quality of instruction during a training quarter.

Provide Supplementary Simulator Time

1.3.6. Level D, CAT IIIB RNP AR and

UPRT capable simulator. The simulator shall mirror the C-32A’s Flight Management Computer (FMC) software and options, Mode Control Panel (MCP) functions, and Flight Mode Annunciations (FMAs) (to include the use of speed intervention during RNP AR IAPs with on-approach logic satisfied).

Provide Simulator Position Fill In

1.3. 7. The contractor instructor will participate in all required simulator training 100% of the time (when requested.)

Provide Supplementary Classroom/Briefing Time

1.3.8. The contractor instructor will

participate in all required Classroom/Briefing Time 100% of the time.

3. GOVERNMENT PROVIDED PUBLICATIONS.

The government will provide the below publications to the contractor after award.

ITEM PUBLICATION TITLE NO. COPIES

1 C-32A Operations Vol 1, 2, QRH 1 Softcopy 2 AFMAN 11-2EA Vol 3 Operations Procedures 1 PDF 3 OSA/EA Form Student Course Critique 1 PDF

4 USAF C-32A FOM USAF C-32A Flight Operations Manual 1 Softcopy

5 USAF C-32A FOM

Supplement

USAF C-32A Flight Operations Manual

Supplement 1 Softcopy

6 AF Form 1522 ARMS Additional Training 1 PDF

4. GENERAL INFORMATION.

4.1. PERIOD OF PERFORMANCE. The period of performance will be a five-year ordering.

4.2. PLACE OF PERFORMANCE. C-32A (B757-200) training shall be conducted at the contractor’s facility.

4.3. TRAVEL AND OTHER DIRECT COSTS. No contractor travel required in support of this contract.

4.4. HOURS OF WORK. A training period is defined as the period when a student reports to the training facility to start a training session until the student leaves the facility at the end of the training session.

4.4.1. Training Times. The maximum length of a training day is 9 hours. Initial and recurring evaluation days may extend to 10 hours. All academic training shall be accomplished between the hours of 7:00 a.m. and 6:00 p.m. local time. This time will include time for breaks and lunch periods. The contractor shall conduct all Initial and Senior Officer simulator training from Monday through Friday. A minimum of two (2) days off will be scheduled for every five consecutive days worked.

4.4.2. Simulator Training Hours. The contractor shall make every effort possible to conduct refresher and recurring evaluation simulator training between the hours of 7:00 a.m. and 10:00 p.m. local time.

4.4.3. Crew Rest. A period between training periods must be set aside for the student so that he/she is adequately rested to begin the next training session. This time must not be broken up into segments, and, therefore must be given as a solid block of time. The minimum length for crew rest time between training periods will be 12 hours.

4.5. CLASS SCHEDULING. Scheduling shall be accomplished after issuance of a delivery order by the Contracting Officer (CO) in accordance with the Ordering clause (Federal Acquisition Regulation 52.216-18 – Ordering). Classes shall be scheduled by direct contact between the designated training officer(s) of the 1st Airlift Squadron (1AS) and the contractor.

NLT 45 days prior to the end of the current quarter, the next quarter’s simulator schedule will be passed to the 1AS Training office.

4.5.1. In the event agreement cannot be reached on scheduling of a class or classes, the matter shall be referred to the CO or COR for resolution. The flying unit reserves the right to substitute pilots at its discretion.

4.5.2. The Government shall notify the contractor in writing of any class scheduling change.

4.6. CANCELLATION NOTICE.

4.6.1. If a scheduled trainee is unable to attend or departs a course prior to completion of planned curriculum, not achieving rating/certification, due to personal emergency or emergent operational need (i.e., fatality, injury, illness, or mission critical task) the Government shall not be liable for payment.

4.6.2. If the contractor is unable to provide all planned curriculum required for certification (i.e.

simulator malfunction, illness of instructor, etc.) the Government may negotiate with the contractor for partial payment.

4.7. STUDENT QUALIFICATION. At the time of scheduling, the Government shall inform the contractor whether the student possesses the FAA prerequisites required to receive an Airline Transport Pilot (ATP) Rating/Type Certification (as applicable) rating upon completion of training.

4.8. STUDENT ADMINISTRATION. During this contract, the Government will be providing to the contractor personal data pertaining to the students sent for training under the contract, such as: names, home addresses and other contact information, and social security numbers. The contractor shall safeguard that information and not release it to any entity other than the Government without the permission of the Contracting Officer.

4.8.1. AF Form 1522 (ARMS Additional Training Accomplishment Report). With the invoice, the contractor shall forward AF Form 1522.

Complete the AF FORM 1522 in accordance with the following instructions.

4.8.1.1. Students or the contractor can fill out the form. The contractor shall ensure the information is accurate.

4.8.1.2. Last Name: Enter appropriate last name.

4.8.1.3. SSN: Leave Blank.

4.8.1.4. Unit: Enter appropriate unit number.

4.8.1.5. Acft Code: Enter "C-32A"

4.8.1.6. Crew Position: Enter "P" (Pilot), or "CP" (Co-Pilot)" as applicable.

4.8.1.7. Event Description: Enter "Initial", "Refresher", or "Flight Simulator Training" as applicable.

4.8.1.8. Event Identifier: Leave Blank.

4.8.1.9. Date: Enter the course completion date.

4.8.1.10. Input By: Contractor signs here to indicate that the training was completed.

4.8.1.11. Date: Enter the date the contractor signs the form.

4.8.1.12. Remote Identification: Leave Blank

4.8.2. Unsatisfactory Performance.

4.8.2.1. Students whose academic progress does not meet the standards established for the course will continue in training and will be reported as stated below. If the contractor determines that a student should be released from training for any of the reasons listed in paragraphs 4.8.2.1.1., 4.8.2.1.2., and 4.8.2.1.3. below, he shall forward within twenty-four (24) hours of the determination, a Student Failure Notification Letter to the COR and the student’s unit of assignment. The student will remain in class until disposition instructions are received from the Government. An information copy will be furnished to the Contracting Officer assigned to administer this contract.

Reasons for releasing a student are:

4.8.2.1.1. The student’s academic progress fails to meet established course standards, and in the opinion of the contractor’s course supervisor, cannot satisfactorily complete the course.

4.8.2.1.2. The student’s physical condition, by reason of injury or illness, has been changed to the extent that further training is deemed impractical.

4.8.2.1.3. An emergency develops which in the best interest of the AF, for compassionate reasons or for personal emergency, requires a student to be withdrawn from training either temporarily or permanently.

4.8.3. Training Certificate. A Certificate of Training in contractor format shall be provided to students upon course completion.

4.8.4. Course Critique. Upon completion of training, the contractor shall provide each student with access to an electronic version of the OSA/EA, Student Course Critique. Filling out this critique is mandatory for students. Students shall be afforded time to complete the critique in private. The critique will be reviewed by the contractor program manager and a completed copy will be included with the invoice via e-mail to the COR.

4.9. SECURITY REQUIREMENTS. Training is unclassified.

4.9.1. Physical Security. The contractor shall safeguard all Government owned equipment and materials (if any) in the contractor’s possession.

4.10. QUALITY ASSURANCE. In accordance with the Federal Acquisition Regulation clause

52.212-4 – Contract Terms and Conditions – Commercial Items, the Government will evaluate the contractor’s performance under the contract. Any action taken by the COR, because of surveillance, will be in accordance with the terms of the contract.

4.11. CONTRACTOR FURNISHED ITEMS AND SERVICES.

The contractor shall provide a Federal Aviation Administration (FAA) certified C- 32 (757-200) Level C or better Flight Simulator or Level 5 or better Flight Training Device for static systems training, and Level D, RNP AR, and UPRT certified (CAT IIIB capable) flight simulator that mirrors the C-32A’s Flight Management Computer (FMC) software and options, Mode Control Panel (MCP) functions, and Flight Mode Annunciations (FMAs) (to include the use of speed intervention during RNP AR IAPs with on-approach logic satisfied) for initial, refresher, recurring evaluation and senior officer pilot training. The contractor shall provide a B757 type rated, UPRT qualified pilot instructor.

4.11.1. The simulator configuration for all training will be Pratt & Whitney 2040 engines, winglets, dual cue flight directors and Pegasus FMC. The contractor will advise the unit when these configurations (Pratt & Whitney 2040 engines, winglets, dual cue flight directors and Pegasus FMC) will not be available during the requested training dates. This notification will allow unit scheduling personnel to consider alternate training dates when appropriately configured simulators will be available.

4.11.1.1. The Government will provide notice to the contractor when the USAF commences the C-32 avionics modernization program (AMP). The Contractor will then be provided with a timeline from the Government to provide a simulator device for training with dual cue flight directors, Pegasus FMC, Innovative Solution and Support Flat Panel Configuration (or similar flat panel displays), electronic flight instrument displays, Heads Up Display (HUD), Enhanced Flight Vision System (EFVS), WAAS/LPV capable GPS receiver, USB power/ownship position ports for carry-on Electronic Flight Bag (EFB), winglets and Pratt & Whitney engines.

4.11.2. Instructors. Instructors shall be certified IAW 14 CFR Part 61 or Part 142 and trained in UPRT. Initial pilot and senior officer classroom and simulator instruction shall be taught by instructors with a minimum combination of 3 years prior Pilot in Command (PIC) flight, classroom instructor or simulator experience in the C-32 or B757 type. Refresher, instructor, and proficiency classroom and simulator instruction shall be taught by instructors with a minimum combination of 1-year prior PIC flight, classroom instructor or simulator experience in the C-32 or B757 type.

4.11.3. The contractor shall also furnish all training materials, and any other equipment required to perform this contract except for the materials and equipment that are identified to be Government furnished.

4.11.4. Newly assigned USAF pilots shall receive a copy of the most current CBT courseware compatible with government PC systems (Windows 10) and hand-held devices (e.g., MAF EFB), access to pertinent online courseware associated with initial or refresher training course and retain access for the duration of their assignment in the C-32A.

4.11.5. Syllabus. The contractor shall submit an informational copy of all course syllabi to the government within 10 calendar days after award. In follow on years, following the base year, copies are only required if there is a change in the course or on request of AMC/A3TA.

4.11.6. Tailored Training to Meet USAF Requirements.

4.11.6.1 Air Force cockpit procedures and checklists shall be used during training. 1 AS will collaborate with instructor personnel to ensure they are up to date with these procedures and checklists. Unit personnel will travel to contractor facility to instruct/brief key personnel (instructors) on these procedures and checklists if necessary. In addition, the COR will be available for telephone inquiries.

4.11.6.2. The contractor will collaborate with 1 AS to identify and sequence training profiles.

The goal is to optimize the contractor training syllabus with USAF learning objectives/maneuver requirements.

4.11.7. Emergency and Minor Medical Services. The contractor shall provide, to all students receiving training at the contractor’s facility, emergency minor medical services as normally provided its own employees. If immediate hospitalization is required, the contractor will arrange for the student to be admitted to the nearest available hospital. The student, if a member of the Armed Forces should be admitted to a military hospital if possible. The contractor is not responsible for student hospitalization costs. The contractor shall notify the students unit of assignment within 24 hours after admitting any student to a hospital.

4.11.8. Performance of services during crisis declared by the President or Secretary of Defense up to and including war: None of the services in this PWS are determined to be essential for performance during a crisis.

4.12. CONTRACTOR REPORTING. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the AMC/A3TA via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.sam.gov/. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

Uses and safeguarding of information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor's name and contract number associated with the data.

http://www.sam.gov/

PERFORMANCE WORK STATEMENT (PWS)
1. DESCRIPTION OF SERVICES.
1.3. SPECIFIC SUPPORT SERVICES.
1.4. DATA DELIVERABLES.
2. SERVICES SUMMARY.
3. GOVERNMENT PROVIDED PUBLICATIONS.
4. GENERAL INFORMATION.
4.1. PERIOD OF PERFORMANCE. The period of performance will be a five-year ordering.
4.6. CANCELLATION NOTICE.
4.8. STUDENT ADMINISTRATION. During this contract, the Government will be providing to the contractor personal data pertaining to the students sent for training under the contract, such as: names, home addresses and other contact information, and soci...
4.8.2. Unsatisfactory Performance.
4.11. CONTRACTOR FURNISHED ITEMS AND SERVICES.
4.11.6. Tailored Training to Meet USAF Requirements.

File details come from the government source that posted it. Updated .