Attachment 1 - Bill of Materials.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Communications Shelter Manufacture, Delivery, and Installation Federal contract opportunity
Solicitation number
12760425Q0016
Issued by
Department of Agriculture Forest Service

About this file

This is a Bill of Materials (BOM) document for a communications shelter project at Fiddler Mountain for the Rogue River-Siskiyou National Forest. The BOM details requirements for an 8x8 walk-in enclosure with DC power layout and Faraday Cage technology to be installed at coordinates 42N 14' 24.94", 123W 48' 2.75" at 4,916 ft elevation.

The specifications include two 19" telecom equipment racks, battery trays, DC power entries with surge suppression, passive ventilation, and a 50' integrated tower structure rated for five Command 150-5N antennas. The scope includes delivery to Cave Junction, OR, drive-in installation, and backhaul disposal of an existing 3,000 lb shelter. Notable requirements include solar mounting provisions, a 6-port telecom entrance panel, cable entry glands tied to the Faraday Cage, and OSHA-compliant fall restraint anchors. The BOM explicitly excludes subsurface work and site preparation, noting that adjacent tower and radio equipment removal will be completed separately. Any damage to perimeter fencing during installation must be repaired at contractor expense.

View the file

Other files for this federal contract opportunity

Other files attached to Communications Shelter Manufacture, Delivery, and Installation, newest first.
File Type Posted
12760425Q0016_AMD.pdf PDF
Attachment 1 - Bill of Materials.xlsx XLSX spreadsheet
Attachment 4 - GFI.zip ZIP file
Attachment 2 - Performance Work Statement (PWS).pdf PDF
Attachment 3 - Supplementary Statement of Work (SOW).pdf PDF
12760425Q0016.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R6 Fiddler Mtn.

Bill of Materials

Unit Name to Ship to:Rogue River-Siskiyou NF
Point of Contact (Local SAT):Dennis Brigante
Phone (Local SAT):541-618-2194
Street Address:26568 Redwood Highway
City, State:Cave Junction, OR
Zip:97523
Additional Information needed for request.
Project Point of Contact (name and phone):Aaron Wolff, 541-618-2195
Additional Technical Contact (name and phone), if applicable:Dennis Brigante, 541-618-2194
WR# or Incident Number:20253800
Override/Job Code:2505/ITJVAA25
Q-CodeTBD
IAS PMOJoe Bonaparte
UAITBD
BOC3290
AAP#RPSH
POW Line Item # and Project DescriptionFiddler Mtn. Shelter Replacement
COR, if applicable:Ernesto DeLeon, 970-837-6103
Comments:Drive-in install: Lat 42N 14' 24.94", Long 123W 48' 2.75", Elevation: 4916ft. Door location: West, Tower: East
LINE
ITEMDESCRIPTIONManufacturers Part NumberUnit of IssueQTYUNIT
PRICETOTAL

PRICE

1SHELTER DESCRIPTION
28x8 Walk-in Enclosure w/ DC power layout & Faraday Cage technologyEA1$ - 0
3INTERIOR LAYOUT
519" Telecom Equipment rackEA2$ - 0
6Battery Tray for 19" telecom rackEA2$ - 0
7Rack Mounted Busbar for 19" Telecom rackEA1$ - 0
9First Aid KitEA1$ - 0
10Wall mounted light switchEA1$ - 0
11DC led lights with fixtures mounted to ceilingEA2$ - 0
12POWER ENTRY
13DC Power EntryEA2$ - 0
1424-volt surge suppression deviceEA2$ - 0
15Note: Power entry provisions must be tied to Faraday Cage
16VENTILATION
17Passive ventilationEA1$ - 0
18TOWER
1950' integrated tower structureEA1$ - 0
20Notes: Antennas used for loading calculations shall be (5) Command 150-5N antennas; (1) each at 50',45',40,35 & 30' marks. Tower rating shall follow TIA-222 Standards for a Risk category II structure. Site 3-second wind speed is 94mph, and radial ice loading is less than 1 inch.
21SOLAR
22Provisions for Roof and Wall mounted solar bracketsEA1$ - 0
23Solar bracketEA1
24CABLE ENTRY
256-port telecom entrance panel for coaxial cablesEA1
264-inch cable entry glands (Cable Type: LDF4, 1-Hole per entry gland)EA3$ - 0
27Cable Entry CoversEA3$ - 0
28Note: Cable entry provisions must be tied to Faraday Cage
29ANTENNA MOUNTING
30Mounting Brackets, hardware, and 18-inch standoffs suitable for attaching (3) Command 150-5N antennas onto tower structureEA3$ - 0
31Fall restraint: anchor point on roof of shelter that meets OSHA standard 29 CFR § 1926.502(d)(15) capable of sustaining 5,000lbs. (22.2KN) of forceEA1$ - 0
32Site Specific DrawingEA1$ - 0
33Delivery & Offload at FS Staging Location: 26568 Redwood Highway Cave Junction, OR 97523EA1$ - 0
34Drive-In Install: Transport shelter form staging location, transport, and install shelter at: Lat 42N 14' 24.94", Long 123W 48' 2.75", Elevation: 4916ft. Door location: North, Tower: EastEA1$ - 0
35Backhaul: 8'x8'x8' shelter weighing approx. 3,000 lbs. and dispose at landfill.EA1$ - 0
36Mob & DemobEA1$ - 0
37Miscellaneous: Please describe or add line items as necessaryEATBDERROR:#VALUE!
38Project Management: Requirements for PM activities outlines in Performance Work StatementEATBDERROR:#VALUE!
39NOTES: Items excluded from the BOM include any subsurface work and/or site preparation. The adjacent tower, guy wires, and radio equipment will be removed prior to shelter installation. Any damage to adjacent facility including the perimeter fence will be the responsibility of the contractor to repair at their own expense.
40GRAND TOTALERROR:#VALUE!

File details come from the government source that posted it. Updated .