Attachment 1 Bid Schedule General Construction (MS Excel Interactive Document).xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- General Construction IDIQ Federal contract opportunity
- Solicitation number
- 12805B22R0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 Scope of Work (SOW).pdf | ||
| Attachment 4 Work Site Address List.pdf | ||
| Attachment 5 ARS Facilities Design Standards ARS-242.1.pdf | ||
| Attachment 6 Wage Determinations (Brazos and Burleson).pdf | ||
| Attachment 8 Pre-Award Survey Form.doc | DOC document | |
| Attachment 3 Request for Task Order Proposal (RTOP) Example.pdf | ||
| Attachment 9 SAM Reps and Certs Form.docx | DOCX document | |
| Attachment 10 Price Evaluation Understanding Form.docx | DOCX document | |
| Attachment 11 Upfront Questions and Answers from USDA.pdf | ||
| Solicitation 12805B22R0007.pdf | ||
| Attachment 7 Contractor Certification Regarding EMR.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Eval Summary
| Attachment 1 - Interactive Bid Schedule | ||||
| The Spreadsheet will automatically calcluate the Total Evaluated Annual Amount Estimate for each option CLIN once you enter values in "FFP Labor Rates" tab and "Materials and Equipment" tab | ||||
| Contractor shall enter amounts from cells E12, E14, E16, E18, and E20 to Solicitation Page 4, B.3 to the corresponding "Schedule of Items" for each CLIN. | ||||
| CLIN | Description | Quantity | Unit of Issue | Evaluated Contract Price |
0001 Base Year Ordering Period General Construction Pricing 1 Dollars $300,000.00
0001 2nd Year Ordering Period General Construction Pricing 1 Dollars $300,000.00
0001 3rd Year Ordering Period General Construction Pricing 1 Dollars $300,000.00
0001 4th Year Ordering Period General Construction Pricing 1 Dollars $300,000.00
0001 5th Year Ordering Period General Construction Pricing 1 Dollars $300,000.00
Evaluated Contract Total for all Ordering Periods $1,500,000.00
FFP Labor Rates Offers shall enter a Firm-Fixed-Price (FFP) Fully Burdened Labor Rate into EVERY labor category for ALL contract years, as indicated in C.1.2.1. Every "Yellow" block in this sheet shall be populated.
| Base Year | 2nd Year | ||||||
| Direct Labor Category | Estimated Hours | Proposed FFP Fully Burdened Labor Hourly Rate | Total | Direct Labor Category | Estimated Hours | Proposed FFP Fully Burdened Labor Hourly Rate | Total |
| On-Site Superintendent | 1200 | $0.00 | On-Site Superintendent | 1200 | $0.00 | ||
| Boilermaker | 20 | $0.00 | Boilermaker | 20 | $0.00 | ||
| Elevator Mechanic | 20 | $0.00 | Elevator Mechanic | 20 | $0.00 | ||
| Ironworker, Ornamental | 60 | $0.00 | Ironworker, Ornamental | 60 | $0.00 | ||
| Plumber | 550 | $0.00 | Plumber | 550 | $0.00 | ||
| Pipefitter (HVAC Pipe Install Only) | 120 | $0.00 | Pipefitter (HVAC Pipe Install Only) | 120 | $0.00 | ||
| Pipefitter (Excludes HVAC Pipe Install) | 120 | $0.00 | Pipefitter (Excludes HVAC Pipe Install) | 120 | $0.00 | ||
| Sheet Metal Worker (HVAC Duct Install Only) | 120 | $0.00 | Sheet Metal Worker (HVAC Duct Install Only) | 120 | $0.00 | ||
| Bricklayer | 60 | $0.00 | Bricklayer | 60 | $0.00 | ||
| Carpenter (Excludes Form Work) | 500 | $0.00 | Carpenter (Excludes Form Work) | 500 | $0.00 | ||
| Cement Mason/Concrete Finisher | 120 | $0.00 | Cement Mason/Concrete Finisher | 120 | $0.00 | ||
| Electrician | 500 | $0.00 | Electrician | 500 | $0.00 | ||
| Form Worker | 60 | $0.00 | Form Worker | 60 | $0.00 | ||
| Insulator - Mechanical (Duct, Pipe & Mech) | 120 | $0.00 | Insulator - Mechanical (Duct, Pipe & Mech) | 120 | $0.00 | ||
| Ironworker, Reinforcing | 60 | $0.00 | Ironworker, Reinforcing | 60 | $0.00 | ||
| Ironworker, Structural | 60 | $0.00 | Ironworker, Structural | 60 | $0.00 | ||
| Laborer: Common or General | 1000 | $0.00 | Laborer: Common or General | 1000 | $0.00 | ||
| Laborer: Mason Tender - Brick | 120 | $0.00 | Laborer: Mason Tender - Brick | 120 | $0.00 | ||
| Laborer: Mason Tender - Cement/Concrete | 120 | $0.00 | Laborer: Mason Tender - Cement/Concrete | 120 | $0.00 | ||
| Laborer: Pipelayer | 120 | $0.00 | Laborer: Pipelayer | 120 | $0.00 | ||
| Laborer: Roof Tearoff | 60 | $0.00 | Laborer: Roof Tearoff | 60 | $0.00 | ||
| Operator: Backhoe/Excavator/Tractor | 60 | $0.00 | Operator: Backhoe/Excavator/Tractor | 60 | $0.00 | ||
| Operator: Bobcat/Skid Steer/Skid Loader | 60 | $0.00 | Operator: Bobcat/Skid Steer/Skid Loader | 60 | $0.00 | ||
| Operator: Bulldozer | 60 | $0.00 | Operator: Bulldozer | 60 | $0.00 | ||
| Operator: Drill | 60 | $0.00 | Operator: Drill | 60 | $0.00 | ||
| Operator: Forklift | 60 | $0.00 | Operator: Forklift | 60 | $0.00 | ||
| Operator: Grader/Blade | 60 | $0.00 | Operator: Grader/Blade | 60 | $0.00 | ||
| Operator: Loader | 60 | $0.00 | Operator: Loader | 60 | $0.00 | ||
| Operator: Mechanic | 60 | $0.00 | Operator: Mechanic | 60 | $0.00 | ||
| Operator: Paver (Asphalt, Aggregate, Concrete) | 60 | $0.00 | Operator: Paver (Asphalt, Aggregate, Concrete) | 60 | $0.00 | ||
| Operator: Roller | 60 | $0.00 | Operator: Roller | 60 | $0.00 | ||
| Painter (Brush, Roller, and Spray) | 500 | $0.00 | Painter (Brush, Roller, and Spray) | 500 | $0.00 | ||
| Roofer | 60 | $0.00 | Roofer | 60 | $0.00 | ||
| Sheet Metal Worker (Exludes HVAC Duct Install) | 120 | $0.00 | Sheet Metal Worker (Exludes HVAC Duct Install) | 120 | $0.00 | ||
| Asbestos/ACM/Lead Worker | 100 | $0.00 | Asbestos/ACM/Lead Worker | 100 | $0.00 | ||
| Tile Finisher | 120 | $0.00 | Tile Finisher | 120 | $0.00 | ||
| Tile Setter | 120 | $0.00 | Tile Setter | 120 | $0.00 | ||
| Truck Driver: Dump Truck | 120 | $0.00 | Truck Driver: Dump Truck | 120 | $0.00 | ||
| Truck Driver: Flatbed Truck | 120 | $0.00 | Truck Driver: Flatbed Truck | 120 | $0.00 | ||
| Truck Driver: Semi-Trailer Truck | 60 | $0.00 | Truck Driver: Semi-Trailer Truck | 60 | $0.00 | ||
| Truck Driver: Water Truck | 60 | $0.00 | Truck Driver: Water Truck | 60 | $0.00 | ||
| Welder | 500 | $0.00 | Welder | 500 | $0.00 | ||
| Form Builder/Form Setter | 60 | $0.00 | Form Builder/Form Setter | 60 | $0.00 | ||
| Civil Engineer | 10 | $0.00 | Civil Engineer | 10 | $0.00 | ||
| Structural Engineer | 10 | $0.00 | Structural Engineer | 10 | $0.00 | ||
| Power Equipment Operator: Tower Crane | 60 | $0.00 | Power Equipment Operator: Tower Crane | 60 | $0.00 | ||
| Power Equipment Operator: Cranes with Pile Driving or Hydraulic 60 Tons and above | 60 | $0.00 | Power Equipment Operator: Cranes with Pile Driving or Hydraulic 60 Tons and above | 60 | $0.00 | ||
| Power Equipment Operator: Hydraulic 59 Tons and Under | 60 | $0.00 | Power Equipment Operator: Hydraulic 59 Tons and Under | 60 | $0.00 | ||
| Power Equipment Operator: Concrete Paving Finishing Machine | 60 | $0.00 | Power Equipment Operator: Concrete Paving Finishing Machine | 60 | $0.00 |
Total $0.00 Total $0.00
| 3rd Year | 4th Year | ||||||
| Direct Labor Category | Estimated Hours | Proposed FFP Fully Burdened Labor Hourly Rate | Total | Direct Labor Category | Estimated Hours | Proposed FFP Fully Burdened Labor Hourly Rate | Total |
| On-Site Superintendent | 1200 | $ - 0 | On-Site Superintendent | 1200 | $ - 0 | ||
| Boilermaker | 20 | $ - 0 | Boilermaker | 20 | $ - 0 | ||
| Elevator Mechanic | 20 | $ - 0 | Elevator Mechanic | 20 | $ - 0 | ||
| Ironworker, Ornamental | 60 | $ - 0 | Ironworker, Ornamental | 60 | $ - 0 | ||
| Plumber | 550 | $ - 0 | Plumber | 550 | $ - 0 | ||
| Pipefitter (HVAC Pipe Install Only) | 120 | $ - 0 | Pipefitter (HVAC Pipe Install Only) | 120 | $ - 0 | ||
| Pipefitter (Excludes HVAC Pipe Install) | 120 | $ - 0 | Pipefitter (Excludes HVAC Pipe Install) | 120 | $ - 0 | ||
| Sheet Metal Worker (HVAC Duct Install Only) | 120 | $ - 0 | Sheet Metal Worker (HVAC Duct Install Only) | 120 | $ - 0 | ||
| Bricklayer | 60 | $ - 0 | Bricklayer | 60 | $ - 0 | ||
| Carpenter (Excludes Form Work) | 500 | $ - 0 | Carpenter (Excludes Form Work) | 500 | $ - 0 | ||
| Cement Mason/Concrete Finisher | 120 | $ - 0 | Cement Mason/Concrete Finisher | 120 | $ - 0 | ||
| Electrician | 500 | $ - 0 | Electrician | 500 | $ - 0 | ||
| Form Worker | 60 | $ - 0 | Form Worker | 60 | $ - 0 | ||
| Insulator - Mechanical (Duct, Pipe & Mech) | 120 | $ - 0 | Insulator - Mechanical (Duct, Pipe & Mech) | 120 | $ - 0 | ||
| Ironworker, Reinforcing | 60 | $ - 0 | Ironworker, Reinforcing | 60 | $ - 0 | ||
| Ironworker, Structural | 60 | $ - 0 | Ironworker, Structural | 60 | $ - 0 | ||
| Laborer: Common or General | 1000 | $ - 0 | Laborer: Common or General | 1000 | $ - 0 | ||
| Laborer: Mason Tender - Brick | 120 | $ - 0 | Laborer: Mason Tender - Brick | 120 | $ - 0 | ||
| Laborer: Mason Tender - Cement/Concrete | 120 | $ - 0 | Laborer: Mason Tender - Cement/Concrete | 120 | $ - 0 | ||
| Laborer: Pipelayer | 120 | $ - 0 | Laborer: Pipelayer | 120 | $ - 0 | ||
| Laborer: Roof Tearoff | 60 | $ - 0 | Laborer: Roof Tearoff | 60 | $ - 0 | ||
| Operator: Backhoe/Excavator/Tractor | 60 | $ - 0 | Operator: Backhoe/Excavator/Tractor | 60 | $ - 0 | ||
| Operator: Bobcat/Skid Steer/Skid Loader | 60 | $ - 0 | Operator: Bobcat/Skid Steer/Skid Loader | 60 | $ - 0 | ||
| Operator: Bulldozer | 60 | $ - 0 | Operator: Bulldozer | 60 | $ - 0 | ||
| Operator: Drill | 60 | $ - 0 | Operator: Drill | 60 | $ - 0 | ||
| Operator: Forklift | 60 | $ - 0 | Operator: Forklift | 60 | $ - 0 | ||
| Operator: Grader/Blade | 60 | $ - 0 | Operator: Grader/Blade | 60 | $ - 0 | ||
| Operator: Loader | 60 | $ - 0 | Operator: Loader | 60 | $ - 0 | ||
| Operator: Mechanic | 60 | $ - 0 | Operator: Mechanic | 60 | $ - 0 | ||
| Operator: Paver (Asphalt, Aggregate, Concrete) | 60 | $ - 0 | Operator: Paver (Asphalt, Aggregate, Concrete) | 60 | $ - 0 | ||
| Operator: Roller | 60 | $ - 0 | Operator: Roller | 60 | $ - 0 | ||
| Painter (Brush, Roller, and Spray) | 500 | $ - 0 | Painter (Brush, Roller, and Spray) | 500 | $ - 0 | ||
| Roofer | 60 | $ - 0 | Roofer | 60 | $ - 0 | ||
| Sheet Metal Worker (Exludes HVAC Duct Install) | 120 | $ - 0 | Sheet Metal Worker (Exludes HVAC Duct Install) | 120 | $ - 0 | ||
| Asbestos/ACM/Lead Worker | 100 | $ - 0 | Asbestos/ACM/Lead Worker | 100 | $ - 0 | ||
| Tile Finisher | 120 | $ - 0 | Tile Finisher | 120 | $ - 0 | ||
| Tile Setter | 120 | $ - 0 | Tile Setter | 120 | $ - 0 | ||
| Truck Driver: Dump Truck | 120 | $ - 0 | Truck Driver: Dump Truck | 120 | $ - 0 | ||
| Truck Driver: Flatbed Truck | 120 | $ - 0 | Truck Driver: Flatbed Truck | 120 | $ - 0 | ||
| Truck Driver: Semi-Trailer Truck | 60 | $ - 0 | Truck Driver: Semi-Trailer Truck | 60 | $ - 0 | ||
| Truck Driver: Water Truck | 60 | $ - 0 | Truck Driver: Water Truck | 60 | $ - 0 | ||
| Welder | 500 | $ - 0 | Welder | 500 | $ - 0 | ||
| Form Builder/Form Setter | 60 | $ - 0 | Form Builder/Form Setter | 60 | $ - 0 | ||
| Civil Engineer | 10 | $ - 0 | Civil Engineer | 10 | $ - 0 | ||
| Structural Engineer | 10 | $ - 0 | Structural Engineer | 10 | $ - 0 | ||
| Power Equipment Operator: Tower Crane | 60 | $ - 0 | Power Equipment Operator: Tower Crane | 60 | $ - 0 | ||
| Power Equipment Operator: Cranes with Pile Driving or Hydraulic 60 Tons and above | 60 | $ - 0 | Power Equipment Operator: Cranes with Pile Driving or Hydraulic 60 Tons and above | 60 | $ - 0 | ||
| Power Equipment Operator: Hydraulic 59 Tons and Under | 60 | $ - 0 | Power Equipment Operator: Hydraulic 59 Tons and Under | 60 | $ - 0 | ||
| Power Equipment Operator: Concrete Paving Finishing Machine | 60 | $ - 0 | Power Equipment Operator: Concrete Paving Finishing Machine | 60 | $ - 0 |
Total $0.00 Total $0.00
| 5th Year | |||
| Direct Labor Category | Estimated Hours | Proposed FFP Fully Burdened Labor Hourly Rate | Total |
| On-Site Superintendent | 1200 | $0.00 | |
| Boilermaker | 20 | $0.00 | |
| Elevator Mechanic | 20 | $0.00 | |
| Ironworker, Ornamental | 60 | $0.00 | |
| Plumber | 550 | $0.00 | |
| Pipefitter (HVAC Pipe Install Only) | 120 | $0.00 | |
| Pipefitter (Excludes HVAC Pipe Install) | 120 | $0.00 | |
| Sheet Metal Worker (HVAC Duct Install Only) | 120 | $0.00 | |
| Bricklayer | 60 | $0.00 | |
| Carpenter (Excludes Form Work) | 500 | $0.00 | |
| Cement Mason/Concrete Finisher | 120 | $0.00 | |
| Electrician | 500 | $0.00 | |
| Form Worker | 60 | $0.00 | |
| Insulator - Mechanical (Duct, Pipe & Mech) | 120 | $0.00 | |
| Ironworker, Reinforcing | 60 | $0.00 | |
| Ironworker, Structural | 60 | $0.00 | |
| Laborer: Common or General | 1000 | $0.00 | |
| Laborer: Mason Tender - Brick | 120 | $0.00 | |
| Laborer: Mason Tender - Cement/Concrete | 120 | $0.00 | |
| Laborer: Pipelayer | 120 | $0.00 | |
| Laborer: Roof Tearoff | 60 | $0.00 | |
| Operator: Backhoe/Excavator/Tractor | 60 | $0.00 | |
| Operator: Bobcat/Skid Steer/Skid Loader | 60 | $0.00 | |
| Operator: Bulldozer | 60 | $0.00 | |
| Operator: Drill | 60 | $0.00 | |
| Operator: Forklift | 60 | $0.00 | |
| Operator: Grader/Blade | 60 | $0.00 | |
| Operator: Loader | 60 | $0.00 | |
| Operator: Mechanic | 60 | $0.00 | |
| Operator: Paver (Asphalt, Aggregate, Concrete) | 60 | $0.00 | |
| Operator: Roller | 60 | $0.00 | |
| Painter (Brush, Roller, and Spray) | 500 | $0.00 | |
| Roofer | 60 | $0.00 | |
| Sheet Metal Worker (Exludes HVAC Duct Install) | 120 | $0.00 | |
| Asbestos/ACM/Lead Worker | 100 | $0.00 | |
| Tile Finisher | 120 | $0.00 | |
| Tile Setter | 120 | $0.00 | |
| Truck Driver: Dump Truck | 120 | $0.00 | |
| Truck Driver: Flatbed Truck | 120 | $0.00 | |
| Truck Driver: Semi-Trailer Truck | 60 | $0.00 | |
| Truck Driver: Water Truck | 60 | $0.00 | |
| Welder | 500 | $0.00 | |
| Form Builder/Form Setter | 60 | $0.00 | |
| Civil Engineer | 10 | $0.00 | |
| Structural Engineer | 10 | $0.00 | |
| Power Equipment Operator: Tower Crane | 60 | $0.00 | |
| Power Equipment Operator: Cranes with Pile Driving or Hydraulic 60 Tons and above | 60 | $0.00 | |
| Power Equipment Operator: Hydraulic 59 Tons and Under | 60 | $0.00 | |
| Power Equipment Operator: Concrete Paving Finishing Machine | 60 | $0.00 |
Total $0.00
Material and Equipment Material and Equipment Overhead and Profit Rate
| Offers shall enter a Firm-Fixed-Price (FFP) Material and Equipment Overhead and Profit Rate for ALL contract years, as indicated in C.1.2.2. Every "Yellow" block in this sheet shall be populated. |
| Offers shall not adjust the Estimated Dollar Values listed in Column C, or adjust the forumlas. |
CLIN Description Estimated Dollar Value Material and Equipment Overhead and Profit Rate Overhead and Profit Rate Applied Evaluated Contract Price
0001 Base Year Ordering Period Material/Equipment Pricing $300,000.00 $0.00 $300,000.00
1001 2nd Year Ordering Period Material/Equipment Pricing $300,000.00 $0.00 $300,000.00
2001 3rd Year Ordering Period Material/Equipment Pricing $300,000.00 $0.00 $300,000.00
3001 4th Year Ordering Period Material/Equipment Pricing $300,000.00 $0.00 $300,000.00
4001 5th Year Ordering Period Material/Equipment Pricing $300,000.00 $0.00 $300,000.00
Total $1,500,000.00
File details come from the government source that posted it. Updated .