Attachment 1 - A04 40521947 Statement of Work 3-30-21.docx
DOCX document 200 KB Posted
- Attached to
- Interior & Exterior Preparation and Painting Federal contract opportunity
- Solicitation number
- 140P1421R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1421R0004_Amd_0001.pdf | ||
| Attachment 6 - Price Schedule IDIQ Task Orders.pdf | ||
| Attachment 5 - Binding Rates Price Schedule.pdf | ||
| Attachment 7 - Past Performance Questionnaire.doc | DOC document | |
| Attachment 3 - B03 40521947 Wage Determinatation Building.pdf | ||
| Attachment 2 - A06 40521947 Seed Project Drawings Fort Area Painting.pdf | ||
| Attachment 4 - Price Schedule - Seed Project.docx | DOCX document | |
| Sol_140P1421R0004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
SEED PROJECT
Preparation and Painting of Exteriors of Five Buildings Mammoth Hot Springs Yellowstone National Park
Table of Contents
1. Project Description / Summary
2. Objectives
3. Background
4. Specific Work / Tasks
5. Special Conditions / Requirements
6. Place of Performance
7. Performance Period / Schedule Requirements
1. Project Description / Summary
| (1) |
| North District Maintenance Shop: |
| 6,000 square feet |
| (2) |
| Fire Cache/Structural Fire Building: |
| 12,000 square feet |
| (3) |
| Carpenter Shop: |
| 13,000 square feet |
| (4) |
| Sign Shop: |
| 5,000 square feet |
| (5) |
| Old Paint Shop: |
| 5,000 square feet |
Contractor shall provide all labor, supervision, supplies, materials, equipment, and travel necessary for surface preparation / renovation work and painting of exteriors of buildings in Mammoth Hot Springs, Wyoming, Yellowstone National Park. The following buildings are including on this Seed Project Task Order:
Objectives:
The work includes but is not necessarily limited to the following principle features:
a. Preparation and renovation of surfaces to be painted
b. Applying paints and protective coatings
c. Minor cosmetic repairs to surfaces (e.g. deteriorated siding) (no sandblasting of brick or masonry)
d. Offers shall submit any proposal to alter historic buildings a minimum of 14 days in advance of work in order to gain prior approval.
e. Lead based paint renovation (Scrape only peeling paint and encapsulate with primer)
f. The Government will be responsible for the disposal off all paint and construction debris
g. Painting historic buildings which are not already painted No altering of historic buildings in any way except under explicit direction of the Contracting Officer
h. Coordinate work to cause minimal disruption for occupants of adjacent buildings and facilities.
i. Always maintain safe access and egress for occupants and users.
j. Do not obstruct or close exit ways without authorization.
k. Field verify all existing conditions, existing construction, dimensions, quantities, other pertinent requirements and suitability for the intended use prior to starting work activities, ordering materials or fabricating components.
l. Determine special requirements or precautions required for items or structures to be renovated, removed, shored, braced or supported.
Assume that lead-based paint (LBP) exists in all work areas (unless tests indicate otherwise). Take appropriate precautions for worker and environmental protection.
2. Work Hours:
Normal working hours for the Contractor will be 7:30 a.m. to 4:30 p.m. excluding Saturdays, Sundays, Federal holidays, and any other time frames indicated by the Contracting Officer. Notify the Contracting Officer three days in advance if work is desired during other time periods. If Inspectors will be available, a modified work period may be authorized. If Inspectors are required to work other than their normal duty/days solely for the benefit of the Contractor, the actual cost of inspections at overtime rates will the charged to the Contractor and an adjustment made to the contract price.
3. Specific Work / Tasks
All materials shall be new unless otherwise indicated. All materials (both new and recycled) shall be the most suitable and highest grade and type for the intended use unless otherwise indicated. They shall be produced by a manufacturer regularly engaged in manufacturing or fabricating similar products with a history of successful production acceptable to the Contracting Officer.
The specific product(s) called out by Manufacturer and Model is the basis for the design but is not intended to limit competition. Products by other manufacturers may be used subject to the following:
a. The product meets or exceeds the quality level of the specified product.
b. The warranty is the same as for the specified products.
c. The Government determines that the product(s) is equivalent to the specified product is otherwise suitable for the intended use and approves its use in writing.
d. The Contractor coordinates the installation and makes any necessary changes at no additional cost to the Government.
e. The Contractor waives claims for any time extension associated with the use of the product.
4. Unacceptable Material:
Any finish material that has been discontinued or will be discontinued within two (2) years is unacceptable.
If any proposed usage or installation method does not comply with the recommendations or specifications of the Manufacturer, notify the Contracting Officer.
Protect materials during delivery, storage, handling and installation per manufacturer's printed instructions. Place on blocking and cover when necessary to protect from water, dust, direct exposure to sunlight and other elements. Deliver in original containers or packaging with labels intact. Storage locations shall not interfere with work of other trades. Maintain acceptable temperature and humidity conditions.
5. Hazardous Materials:
Prohibited materials include those that contain Class 1 ozone-depleting chemicals (including CFCs, halons, carbon tetrachloride, methyl chloroform, and methyl bromide), asbestos, PCBs or other hazardous substances.
6. Background: Industrial standards:
Work must be in compliance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties https://www.nps.gov/tps/standards/treatment-guidelines-2017.pdf .
General Applicability of Standards: Applicable standards of the construction industry have the same force and effect (and are made a part of the contract documents when referenced) as if copied directly into contract documents, or as if published copies were bound herewith.
Standards apply only to the technical aspects of manufacture, design and construction. No provision of any referenced standard, manual, or code shall change or increase the duties and responsibilities of the Government or the Contractor.
Reference standards (referenced directly in contract documents or by governing regulations) have precedence over non-referenced standards which are recognized in industry for applicability to work. Non-referenced standards recognized in the construction industry are hereby defined, except as otherwise limited in contract documents, to have direct applicability to the work and will be so enforced for performance of the work.
Publication Dates: Comply with standard in effect as of date of contract documents.
Copies of Standards: Provide where needed for proper performance of the work; obtain directly from publication sources.
Comply with the latest editions of the LIFE SAFETY CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL, MECHANICAL CODE, INTERNATIONAL PLUMBING CODE and the NATIONAL ELECTRICAL CODE.
a. Comply with the UNIFIED FACILITIES CRITERIA (UFCs) as applicable.
b. Comply with the UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS).
c. Comply with the AMERICANS WITH DISABILITIES ACT OF 1990 (ADA).
d. Comply with all other FEDERAL, STATE, and LOCAL LAWS and REGULATIONS that apply to this project.
7. Safety Standards:
Comply with requirement of the Park Service Safety Office for the protection of Personnel and Property. A representative from this office will attend the pre-construction meeting.
Comply with the rules, regulations, standards and requirements of the DOI, WYOMING DEPT. OF ENVIRONMENTAL QUALITY (DEQ), EPA AND OSHA regarding disturbing, removing and disposing of materials including, but not limited to lead-based paints, and other materials. Comply with OSHA STANDARDS, and other applicable rules, regulations, standards and requirements regarding worker safety.
Comply with WYOMING OCCUPATIONAL HEALTH AND SAFETY RULES AND REGULATIONS FOR CONSTRUCTION.
Workers of all trades doing any type of work on a roof must wear a safety harness and be tied off properly in accordance with OSHA regulations.
When space is available at the project site, it may be used for the Contractor's storage, staging and parking areas. Otherwise, space at another location will be designated by the Contracting Officer.
No sodden or landscaped areas or exit ways shall be used for storage, staging, or parking.
8. Utilities:
The Government will furnish reasonable quantities of utilities (water, electricity) to the Contractor at no cost from existing points of connections.
All costs of making connections and extensions shall be paid by the Contractor.
Provide temporary power and lighting. Use the permanent systems when they are operational Provide and maintain temporary fire extinguishers as deemed necessary by the Park Service Fire Department.
9. Project Supervision:
Provide a competent superintendent for the project. This person, or a designated representative, must be readily available when not at the project site. Each Subcontractor shall maintain a competent foreman or representative on the job when work is in progress for their portion of the contract. Together, they shall cooperate and be responsible for the proper and timely layout, coordination, erection and completion of the work.
Each trade shall lay out and install its work at such time and manner to avoid delay or interference with other work. Anticipate and resolve conflicts before work begins. Submit questions through the prime General Contractor to the Contracting Officer or authorized representative for resolution before proceeding with the work in question.
10. Project Meetings:
Conduct coordination/ progress meetings at the project site at weekly intervals. Attendees shall include the Government’s Representatives, Subcontractors and others concerned with project progress, coordination or performance. These representatives shall be familiar with the Project and authorized to conclude matters relating to coordination & progress.
11. Contractor Methods and Means:
The Contractor is solely responsible for ensuring construction means, methods, techniques, procedures, fabrication processes, sequences, scheduling, coordination, safety precautions, safety programs and other necessary precautions during construction. The Government will NOT assume responsibility for any of these. Secretary of the Interior’s Standards for the Treatment of Historic Properties https://www.nps.gov/tps/standards/treatment-guidelines-2017.pdf .
12. Barricades, Fencing, Warning Signs and related devices:
Erect barricades, safety barriers, barrels, fencing, signs, warning lights, flagging, flag persons and devices as appropriate to control traffic and to warn and protect the workmen, users, occupants and the public. All signs shall be professional quality.
Barricade and lock doors and place warning signs when doors open onto/into hazardous work areas or when overhead work is occurring.
13. Patching and Repairing:
No sandblasting of masonry and brick. For brick and masonry, remove damaged or deteriorated paint only to the next sound layer using the gentlest method possible (e.g., hand scraping) prior to repainting. No removal of paint that is firmly adhered to masonry surfaces.
Patch, repair, replace or restore all finished or unfinished surfaces damaged by weather. Fill, seal or close all holes, voids and openings remaining after activities. Finish to match adjacent surfaces in color, texture and appearance. Contractor to ensure patching, filling, restoration, and replacement meet the Secretary of the Interior’s Standards for the Treatment of Historic Properties https://www.nps.gov/tps/standards/treatment-guidelines-2017.pdf Perform cosmetic patching to surfaces that are to be painted. “Cosmetic patching” is defined as repairing scratches, gouges, cracks, and separations, as well as holes less than five inches in diameter.
14. Protection and Restoration of Property:
Protect the existing facility, all materials and equipment to be incorporated therein, completed work, site improvements, trees, landscaping, utilities, public ways and other facilities.
Promptly remedy all damage or loss resulting from activities or operations under this contract. Restore equivalent to original conditions.
Restore disturbed areas to a condition equivalent to or better than that which existed previously.
Protect trees to remain with a 6-ft. high fence not less than 5 feet from the trunks. Trees are considered significant to the historic setting and must be protected. Do not stockpile/store any materials, equipment, etc. under the dripline of trees (10-feet from trunk).
15. Special Alterations and Renovation requirements:
a. When existing finish materials or surfaces will be visible, protect from damage. Cover if necessary. Refinish each material or surface as specified for comparable new work.
b. Make smooth, even and neat transitions between new and existing work.
c. Reinstall materials, equipment or items that are disturbed or removed temporarily.
d. Comply with workmanship and other applicable provisions of technical specification sections for comparable new work. in accordance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties https://www.nps.gov/tps/standards/treatment-guidelines-2017.pdf .
16. Disposal and Cleanup:
The Government shall provide construction dumpsters for the removal of all construction debris Remove all debris, waste and surplus materials from the immediate work areas each day and from the premises at suitable intervals and at final completion of the project. Burning or burial at the project site or within the Park is not acceptable disposal methods.
On completion of the project, leave interior and exterior surfaces including site and streets in a clean, sanitary, odor-free, acceptable condition, ready for operation and occupancy.
Remove temporary labels, foreign matter, dirt, dust, sawdust, fingerprints, marks, stains, streaks, splatters, water spots, films, cleaning residue, paint drippings or overspray, cobwebs, mold and mildew from exposed surfaces and accessible spaces. Rake clean other exterior ground surfaces. Use cleaning materials and procedures as recommended by the manufacturer of the surface being cleaned.
17. Warranty:
Upon completion, submit to the Contracting Officer copies of all guarantees and warranties pertinent to each housing units. This includes but is not limited to paint materials and application processes.
18. Air Quality:
Equipment operation, activities, or processes performed by the contractor shall be in accordance with all Federal and State air emission and performance laws and standards.
Contractors may not burn or incinerate materials.
Particulates – The contractor shall not operate a construction site or demolition project unless Best Management Practices (BMPs) are implemented to control emissions of particulate matter. Such emissions of airborne particulate matter shall not exceed 20% opacity as defined in 40 CFR Sound Intrusions – The contractor shall keep construction activities under surveillance and control to minimize environment damage by noise. The contractor shall comply with the provisions of the state where work is being performed.
The contractor shall implement BMPs and monitor construction activities to prevent erosion, sediment runoff, and pollution of surface and ground waters. Toxic or hazardous chemicals shall not be applied to soil or vegetation. The contractor shall monitor all water areas affected by construction activities.
Storm Sewer – The contractor shall not discharge any contaminated materials into the storm sewer system on locations. EPA authorizes the following non-storm water discharges: firefighting activities; fire hydrant flushing; potable water sources; irrigation drainage; lawn watering; routine building wash-down without detergents; pavement wash-waters where spills/leaks of toxic or hazardous materials have not occurred and where detergents are not used; air conditioning condensate; springs; uncontaminated groundwater; and foundation/footing drains where flows are not contaminated with process materials such as hydrocarbons/solvents.
For construction projects that disturb at least one (1) acre but less than five (5) acres in the State of Wyoming, the contractor shall obtain and comply with all requirements of the General Permit The contractor shall comply with all permit requirements until the site has reached final stabilization, which is determined by the Contracting Officer and includes, but is not exclusive to the following:
19. Toxins:
The contractor is responsible for ensuring that no employee is exposed to toxic materials such as lead-based paint (LBP), lead contamination in soils or other surfaces.
No new asbestos-containing materials shall be used or installed at any facilities under the jurisdiction of The National Park Service.
Notice – For all demolition/renovation in Wyoming, the contractor shall notify the Wyoming Department of Environmental Quality, Air Quality Division, 122 West 25th St, Herschler Building, Cheyenne WY 82002, at least ten (10) days in advance of renovation work where any amount of Regulated Asbestos Containing Materials (RACM) are to be removed as specified in Chapter 3, Section 8 for large and small projects.
20. Disposal Requirements:
Lead - The contractor is responsible for ensuring that no employee is exposed to lead-based paint (LBP) and other lead hazards including but not limited to lead dust and lead in soils. Existing Paint: Existing painted surfaces may contain LBP. For facilities constructed prior to 1981, it must be presumed that paint coatings contain lead unless survey data indicates otherwise.
It will be the responsibility of the contractor to either perform a partial or full inspection of the facility at their own cost included in the contract documents or presume that all painted surfaces are LBP. Copies of surveys performed by the contractor shall be given to the Contracting Officer prior to the commencement of any work activities. Renovations of these materials shall be at the cost of the contractor and included in the contract documents. The contractor shall conform to all the requirements of 29 CFR 1926.62, Lead Exposure in Construction; 40 CFR 745, Lead-Based Paint Poisoning Prevention in Certain Residential Structures; 24 CFR 35, Lead-Based Paint Poisoning Prevention in Certain Residential Structures; and any and all other applicable regulations pertaining to lead.
The contractor is responsible for ensuring that no employee is exposed to concentrations of lead in excess of the permissible exposure limit (PEL) equal to an eight-hour time weighted average of 50 micrograms per cubic meter (µg/m3). The contractor shall conform to all the requirements of 29 CFR 1926.62, Lead Exposure in Construction. Workers are to wear respirators unless air testing establishes that lower protection factors are sufficient. Lead Safe Engineering Controls and Work Practices may be sufficient to reduce exposure to or below the PEL. If the lead PEL is exceeded, all workers shall wear appropriate personal protective equipment.
New-Paint Restriction-The contractor shall not furnish or use any paints or coatings containing mercury or lead for exterior applications.
The contractor shall use workers that have been properly trained to conduct the work under the discipline and type of work that they will be performing under the contract and shall be current on any and all refresher courses for that discipline. The contractor, and their workers, renovating homes, childcare facilities, and schools built before 1978 shall be trained and certified and follow specific work practices.
21. Hazardous Materials:
All materials used by the contractor on Park Service property shall be stored properly in special areas in accordance with all regulatory and FEW Fire Department requirements. Storage shall include, but is not limited to:
a. Keeping container closed when not in use. Labeling containers with warning labels.
b. Posting hazardous signs as required.
c. Providing storage with secondary containment and routinely checking for leaks and spills and appropriately documenting.
d. Storing materials at a central location.
e. Storing flammable items in an approved flammable storage locker.
f. Contractors storing hazardous waste on-site for more than 24 hours must follow the 90 MW Plan Hazardous Waste Management Plan. As a minimum, the contractor must establish satellite accumulation points, and appoint and train satellite accumulation point managers. If more than 55 gallons of hazardous waste or more than one (1) quart of acutely hazardous waste is generated, the contractor must obtain approval for and establish a 90-day accumulation site, or further specific instructions must be obtained from 90 CES/CEIE.
The contractor is responsible for all fines and penalties that may stem from a hazardous waste inspection of their operation.
Solid wastes (excluding clearing debris) shall be placed in containers that are emptied on a regular schedule. Handling, storage, and disposal shall be conducted to prevent contamination.
Segregation measures shall be employed so that no hazardous or toxic waste will become co-mingled with solid waste.
22. Spills and Spill Response:
It is the contractor's responsibility to properly handle and dispose of clean up materials. Spills of any type of material (excluding clean water) shall be reported immediately to the Contracting Officer to determine which State and Federal agencies are to be notified.
All spill clean-ups will be completed by trained personnel only and in accordance with the DEQ Spill Response:
For spills beyond the capabilities of contractor personnel or if it has impacted a storm drain or waterway, call the Park Service Fire Dept at 911.
Determine if the spill can be contained by the contractor. If it can be contained without injury to personnel, without assistance from Park Service response personnel, and has not impacted a storm drain or waterway, perform the following:
Evacuate immediate area of the spill if warranted by the type of release.
Ensure all workers shut down their operations and secure equipment, time permitting.
Stop the source of the spill without undue risk of personal injury. Use on-site containment, safety equipment, and materials.
Contain and/or control the release. Clean up the release using proper absorbent media for the chemical spilled.
Recover as much of the spill as possible using absorbent media or approved vacuum device to minimize hazardous waste volume. Do not hose down the spilled material into storm drains.
Report the spill to the Contracting Officer for the proper reporting and guidance and proper disposal of recovered material.
23. Natural Resources:
Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work. Confine construction activities to within the limits of the work indicated or specified.
Except in areas to be cleared, do not remove, cut, deface, injure, or destroy trees or shrubs without the Contracting Officer's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages unless authorized by the Contracting Officer. Where such use of attached ropes, cables, or guys is authorized, the contractor shall be responsible for any resultant damage.
Protect existing trees that are to remain and that may be injured, bruised, defaced, or otherwise damaged by construction operations. Remove displaced rocks from uncleared areas.
24. Lead Control:
A system of control methods to prevent the spread of lead dust, paint chips or debris to adjacent areas that may include temporary containment, floor or ground cover protection (tarps), physical boundaries, and warning signs to prevent unauthorized entry of personnel. HEPA filtered local exhaust equipment may be used as engineering controls to further reduce personnel exposures or building/outdoor environmental contamination.
25. Lead permissible exposure:
Fifty micrograms per cubic meter of air as an 8-hour time weighted average as determined by 29 CFR 1926.62. If an employee is exposed for more than eight hours in a workday, the PEL shall be determined by the following formula.
26. Personal Sampling:
sampling of airborne lead concentrations within the breathing zone of an employee to determine the 8-hour time weighted average concentration in accordance with 29 CFR 1926.62. Samples shall be representative of the employees' work tasks. Breathing zone shall be considered an area within a hemisphere, forward of the shoulders, with a radius of 6 to 9 inches and centered at the nose or mouth of an employee.
27. Physical Boundary:
Area physically roped or partitioned off around an enclosed lead control area to limit unauthorized entry of personnel. As used in this section, "inside boundary" shall mean the same as "outside lead control area but inside the physical boundary."
The contractor shall coordinate with work being performed in adjacent areas. Coordination procedures shall be explained in the Removal/Control Plan and shall describe how the Contractor will prevent lead exposure to other contractors and/or Government personnel performing work unrelated to lead activities. Notification of the Commencement of LBP Hazard Abatement;
Respiratory Protection Program;
Hazard Communication Program;
EPA or State (whichever is applicable) approved hazardous waste treatment, storage, or disposal facility for lead disposal;
Lead Waste Management Plan;
Train each employee performing paint removal, disposal, and air sampling operations prior to the time of initial job assignment and annually thereafter, in accordance with 29 CFR 1926.21, 29 CFR 1926.62, and State and local regulations where appropriate.
Provide each employee required to wear a respirator a respirator fit test at the time of initial fitting and at least annually thereafter as required by 29 CFR 1926.62.
Establish and implement a respiratory protection program as required by AIHA Z88.6,
28. Lead Waste Management Plan:
a. The Lead Waste Management Plan shall comply with applicable requirements of federal, State, and local hazardous waste regulations and address:
b. Identification and classification of hazardous wastes associated with the work.
c. List of waste handling equipment to be used in performing the work, to include cleaning, volume reduction, and transport equipment.
d. Spill prevention, containment, and cleanup contingency measures including a health and safety plan to be implemented in accordance with 29 CFR 1926.65. Work plan and schedule for waste containment, removal and disposal. Wastes shall be cleaned up and containerized daily. Proper containment of the waste includes using acceptable waste containers (e.g., 55-gallon drums) as well as proper marking/labeling of the containers.
e. Perform paint removal work without damage or contamination of adjacent areas. Where existing work is damaged or contaminated, restore work to its original condition or better.
29. Cleaning and Disposal:
Maintain surfaces of the lead control area free of accumulations of paint chips and dust. Restrict the spread of dust and debris; keep waste from being distributed over the work area. Do not dry sweep or use compressed air to clean up the area. At the end of each shift and when the paint removal operation has been completed, clean the area of visible lead paint contamination. After visible dust, chips and debris is removed.
Place waste materials in U.S. Department of Transportation approved 55-gallon drums. Properly label each drum to identify the type of waste and the date the drum was filled. For hazardous waste, the collection drum requires marking/labeling in accordance with 40 CFR 262 during the accumulation/collection timeframe. The Contracting Officer or an authorized representative will assign an area for interim storage of waste-containing drums. Do not store hazardous waste drums in interim storage longer than 90 calendar days from the date affixed to each drum.
All material, whether hazardous or non-hazardous shall be disposed in accordance with laws and provisions and Federal, State, or local regulations. Ensure waste is properly characterized. The result of each waste characterization (TCLP for RCRA materials) will dictate disposal requirements.
30. Paint, Color, Brand Name and Application Requirements:
a. After all surfaces are properly prepped Prime RX Peel Bonding Primer or equal shall be applied to entire surface and will be back brushed.
b. Siding shall be painted with two coats of A-100 Exterior Acrylic Latex, Satin, 506GS-218 Bronco or equal.
c. Trim shall be painted with two coats of A-100 Exterior Acrylic Latex, gloss, 616YP Mooreland or equal.
d. Exterior side of storm window shall be painted with two coats A-100 Exterior Acrylic Latex, gloss, 716YP-101 Graphite or equal.
It is the responsibility of the Contractor to demonstrate a proposed product is equal to the products indicated above.
31. Place of Performance:
All buildings are located in the original Fort Yellowstone, Mammoth Hot Springs, Wyoming 82190, at the following addresses
| 1. |
| North District Maintenance Shop |
102 Stable Street
| 3. |
| Sign Shop |
133 Bakery Lane
| 5. |
| Carpenter Shop |
113 Stable Street
| 2. |
| Fire Cache/Structural Fire Building |
106 Stable Street
| 4. |
| Old Paint Shop |
112 Soap Suds Row
32. Period of Performance:
180 days after Notice to Proceed.