This file is a quantity estimation spreadsheet (Attachment 1) detailing repair areas for Building 23H at Perry Point VA Medical Center. It provides room-by-room measurements for flooring, drywall, ceiling tiles, paint, and wall base repairs across multiple floors. Specific quantities include carpet tile installations ranging from 28 to 252 square feet per room, luxury vinyl plank flooring requirements, drywall repairs including shaftliner systems at pipe shafts, ceiling tile replacements, and wall base installations measured in linear feet. The document includes special notes for matching existing materials and types, particularly for partial repairs. The spreadsheet covers work areas on the 1st, 2nd, 3rd, and 4th floors, with the most extensive repairs needed on the 4th floor in multiple office spaces (rooms 406-413).

The quantities provided are estimated amounts with a general note indicating that additional demolition and replacement may be necessary beyond the listed measurements. Key specifications include triple-layer drywall requirements for the 3rd floor corridor and complete wall base replacement in several rooms versus partial repairs that must match existing materials in other areas. The document serves as a supporting attachment to a larger solicitation for fire damage repairs at the VA facility.

View the file

Other files

File Type Posted
23H Perry Point Lead Survey Summary Report_11-14-2013.pdf PDF
Amended Specs.pdf PDF
512A5-25-003 Construction RFIs Rev.1.pdf PDF
512A5-25-003 23H ACM Data.xlsx XLSX spreadsheet
PP-23H-2-First Floor.pdf PDF
PP-23H-4-Third Floor.pdf PDF
36C24525B0003 0003.docx DOCX document
PP-23H-5-Fourth Floor.pdf PDF
PP-23H-3-Second Floor.pdf PDF
DryingReport_Nov-15-2024.pdf PDF
36C24525B0003 0002.docx DOCX document
512A5-25-003 23H Fire Damage Repairs SOW Rev2 - Amend 0002 -02112025.pdf PDF
512A5-25-003 Construction Visit Roster.pdf PDF
RFI Form.xlsx XLSX spreadsheet
36C24525B0003 0001.docx DOCX document
Wage Determination MD20250049.pdf PDF
Attachment 3 - 512A5-25-003 Combined Specs Rev1.pdf PDF
36C24525B0003_1.docx DOCX document
Parking Location for 23H Site Visit.pdf PDF
Attachment 2 - 23H Floor Plans.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 ‐ Building 23H Repairs Estimated Quantities

Rooms Flooring (ft2) CT: Carpet Tile

LVT: Vinyl Plank

Drywall (ft ) Ceiling Tile (ft

) Paint (ft

) Wall Base (ft)

1st Floor:

1G‐106 124 (CT) 45 8 255

c 47 b

1G‐108 ‐‐ 170 d

40 265 c 51 c

2nd Floor:

Corridor ‐‐ 20 a

‐‐ 320 c c

224 ‐‐ 30 16 175 c c

225 ‐‐ 80 8 265 c c

226 ‐‐ 15 16 325 c c

227 ‐‐ 130 d

8 340 c c

3rd Floor:

Corridor ‐‐ a

(TRIPLE LAYER) ‐‐ 250 c 15 c

323 ‐‐ 105 d

88 560 c 5 c

4th Floor:

Elevator Lobby ‐‐ ‐‐ 184 ‐‐ ‐‐

Corridor @ Suite 252 (LVP) 200 a 252 550 50 b

Closet 410 28 (CT) 30 28 140 15 b

406 112 (CT) 110 112 440 45

b

407 128 (CT) 140 128 440 45

b

408 128 (CT) 160 128 430 45

b

409 116 (CT) 200

d

116 430 45 b

411 128 (CT) 45 128 430 45

b

412 128 (CT) 45 128 430 45

b

413 252 (CT) 65 252 640 65 b a Drywall thickness shall match adjacent wall surfaces b Replace entire wall base in room c Partial Repair ‐ Match existing type and color adjacent to repaired location d At pipe shaft provide new shaft‐liner system (CH studs, Gypsum Liner Panels, and Finish Drywall)

GENERAL NOTE: The above areas are an estimation of required materials. Additional demolition and replacement of existing materials may be necessary to fully repair areas.