This is Amendment 0003 to solicitation 36C24525B0003 for Building 23H Fire Damage Repairs at Perry Point VA Medical Center. The amendment extends the bid due date to March 5, 2025 at 1:00 PM ET and includes nine additional documents: construction RFIs, floor plans for all four floors, amended specifications, a drying report, lead survey report, and ACM data.
The underlying solicitation covers repairs following an October 2024 fire, with a 90-day performance period. Key work includes replacing 1,610 SF of gypsum board, 1,640 SF of acoustical ceiling tile, 578 LF of rubber wall base, 1,184 SF of carpet tile, and 250 SF of luxury vinyl plank flooring. Additional requirements include removal of 1,300 SF of asbestos-containing mastic by a licensed abatement contractor, installation of fire-rated penetration seals, and HVAC/electrical repairs. The work requires Level 3 ICRA controls and must comply with VA safety and security protocols. The Department of Veterans Affairs Maryland Health Care System is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23H Perry Point Lead Survey Summary Report_11-14-2013.pdf | ||
| Amended Specs.pdf | ||
| 512A5-25-003 Construction RFIs Rev.1.pdf | ||
| 512A5-25-003 23H ACM Data.xlsx | XLSX spreadsheet | |
| PP-23H-2-First Floor.pdf | ||
| PP-23H-4-Third Floor.pdf | ||
| PP-23H-5-Fourth Floor.pdf | ||
| PP-23H-3-Second Floor.pdf | ||
| DryingReport_Nov-15-2024.pdf | ||
| 36C24525B0003 0002.docx | DOCX document | |
| 512A5-25-003 23H Fire Damage Repairs SOW Rev2 - Amend 0002 -02112025.pdf | ||
| 512A5-25-003 Construction Visit Roster.pdf | ||
| RFI Form.xlsx | XLSX spreadsheet | |
| 36C24525B0003 0001.docx | DOCX document | |
| Wage Determination MD20250049.pdf | ||
| Attachment 3 - 512A5-25-003 Combined Specs Rev1.pdf | ||
| 36C24525B0003_1.docx | DOCX document | |
| Parking Location for 23H Site Visit.pdf | ||
| Attachment 1 - 23H Area Estimation Rev1.pdf | ||
| Attachment 2 - 23H Floor Plans.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 02-20-2025 512A5-25-003 Department of Veterans Affairs VA Maryland Health Care System Contracting Officer (90C) P.O. Box 1000, Bldg. 101, Room 26 Perry Point
MD
21902 Department of Veterans Affairs VA Maryland Health Care System Contracting Officer (90C) P.O. Box 1000, Bldg. 101C Room 3 Perry Point
MD
21902 To all Offerors/Bidders
36C24525B0003 01-29-2025
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 03-05-2025 13:00 EST Subject solicitation is hereby amended as follows:
1. Due date for bids has been extended to 3/5/2025 at 1:00PM ET.
2. Please see nine attached documents.
All other terms and conditions remain unchanged.
Brandon Parker Contract Officer See attached document: 512A5-25-003 Construction RFIs Rev.1.
See attached document: PP-23H-2-First Floor.
See attached document: PP-23H-4-Third Floor.
See attached document: PP-23H-3-Second Floor.
See attached document: PP-23H-5-Fourth Floor.
See attached document: Amended Specs.
See attached document: DryingReport_Nov-15-2024.
See attached document: 23H Perry Point Lead Survey Summary Report_11-14-2013.
See attached document: 512A5-25-003 23H ACM Data.
File details come from the government source that posted it. Updated .