This is a Questions and Answers document containing 36 contractor questions and VA responses related to solicitation 36C24525B0003 for fire damage repairs at Building 23H of the Perry Point VA Medical Center.
The Q&A addresses key logistics and requirements including: elevator access restrictions for material transport with workers required to use stairs; lead and asbestos testing/remediation requirements; mold detection survey status; HVAC isolation and ICRA Level 3 controls needed; wall finishing requirements (Level 5 finish confirmed); noise considerations due to patient care areas on floors 1-3; and clarifications on electrical work, floor preparation, and ceiling grid replacement. Notable specifications include the requirement for CIH certification for air monitoring during mastic removal, continuous negative pressure monitoring at ICRA entrances, and smoke sealing (but not fire rating) requirements for corridor walls. The document provides detailed technical responses while emphasizing coordination with the COR and infection control protocols throughout the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23H Perry Point Lead Survey Summary Report_11-14-2013.pdf | ||
| Amended Specs.pdf | ||
| 512A5-25-003 23H ACM Data.xlsx | XLSX spreadsheet | |
| PP-23H-2-First Floor.pdf | ||
| PP-23H-4-Third Floor.pdf | ||
| 36C24525B0003 0003.docx | DOCX document | |
| PP-23H-5-Fourth Floor.pdf | ||
| PP-23H-3-Second Floor.pdf | ||
| DryingReport_Nov-15-2024.pdf | ||
| 36C24525B0003 0002.docx | DOCX document | |
| 512A5-25-003 23H Fire Damage Repairs SOW Rev2 - Amend 0002 -02112025.pdf | ||
| 512A5-25-003 Construction Visit Roster.pdf | ||
| RFI Form.xlsx | XLSX spreadsheet | |
| 36C24525B0003 0001.docx | DOCX document | |
| Wage Determination MD20250049.pdf | ||
| Attachment 3 - 512A5-25-003 Combined Specs Rev1.pdf | ||
| 36C24525B0003_1.docx | DOCX document | |
| Parking Location for 23H Site Visit.pdf | ||
| Attachment 1 - 23H Area Estimation Rev1.pdf | ||
| Attachment 2 - 23H Floor Plans.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI # Question VA Response
How is the contractor permitted to access the project site and transport materials? Will the contractor be permitted to use the elevators?
The elevators need to be available for patient care.
Arrangements can be made with the COR for scheduled material transport for bulk/heavy items and materials/debris via the elevators. Workers will need to use stairway to access 4th floor. Elevator doorways to the 4th floor will be part of the sealed ICRA boundary during work operations.
It was noticed during the site visit several rooms appear to have lead paint that is chipping. Has a Lead paint survey been completed and are the results available to be published?
23H Lead testing information to be provided. Follow OSHA Lead in Construction Guidelines during renovation activities.
Will the contractor be responsible for conducting a lead paint survey?
23H Lead Testing information to be provided.
If lead paint is confirmed, will the remediation be done by change order?
This will be addressed if there is an issue requireing abatement to occur. Follow OSHA Lead in Construction Guidelines during renovation activities.
During the site survey there appeared to be asbestos insulation exposed on some of the existing piping. Has an asbestos survey been completed in the working areas and are the results available to be published?
23H Asbestos information will be provided.
Will the contractor be responsible for conducting and asbestos survey?
Refer to Work Item 2 of Scope of Work.
If asbestos is confirmed, will the remediation be done by change order?
Refer to Work Item 2 of Scope of Work.
Have the affected areas had a mold detection survey completed and are the results available to be published?
There was no mold detection survey completed.
Dehumidifcation Report will be provided.
Will the contractor be responsible for a mold detection survey?
A mold detection survey is not in the Scope of Work.
If mold is confirmed, will the remediation be done by change order?
This will be addressed if there is an issue.
If mold is to be remediated, what are the approved methods for the Perry Point VAMC?
This will be addressed if there is an issue.
Who is responsible for removing and reinstalling any alarms, cameras, detectors, etc. in the working areas?
Refer to Work Item 2 of Scope of Work to what will need to be removed/reinstalled. No alarms present or scheduled for removal.
If the contractor is responsible for removing/reinstalling alarms, detectors, etc. in the working areas, can the government provide any proprietary points of contact.
No proprietary information required. Local OIT to manage removal of network devices as required by work scope. Fire alarms/detectors must remain active. Coordinate with project
COR.
Will the contractor be responsible for testing the any alarms, detectors, strobes, etc. after reinstallation.
As long as the systems stay connected, there are no alarms, detectors, or strobes that need retesting. Coordinate all work with project COR.
Will the elevator be available for material transport and trash removal?
The elevators need to be available for patient care.
Arrangements can be made with the COR for scheduled material transport for bulk/heavy items and materials/debris via the elevators. Workers will need to use stairway to access 4th floor. Elevator doorways to the 4th floor will be part of the sealed ICRA boundary during work operations.
Will a terminal cleaning be required at the completion of construction?
See specification 017700-3.1 "Final Cleaning"
Can the superintendent dual hat SSHO?
Due to the limited project scope, Superintendent may dual hat as SSHO.
18 What level wall finish is required? See specification 092900-3.5 "Finishing of Gypsum Board"
36C24525B0003 - Repair 23H Fire Damage - 512A5-25-003
Are there any areas adjacent to the working area that have noise or vibration considerations?
Yes - 2nd and 3rd Floor below are 24/7 patient care rooms, and 1st floor is a daytime Dental clinic. Heavy noise generating work to be coordinated with COR to occur at optimal times and methods.
Can the negative air be exhausted through the windows?
This is the preferred method. Windows on 4th floor are operable. Coordinate with project COR and facility Infection Control.
SOW requires on site CIH for air monitoring during mastic removal. Will an IH be sufficient for this work?
All monitoring must be certified by a Certified Industrial Hygienist.
Will a staging area be provided for the contractor for material storage, or an area for a container?
Coordinate with COR. Space is available on campus, however limited nearby.
Page 14-15 of SOW items 1-2 indicates COVID-19 record keeping procedures. Is this section still valid?
VOID - clause to be removed
Are the working areas able to be isolated for HVAC supply/return? If not, will a physical barrier be sufficient for ICRA level 3 isolation?
Contractor shall be resonsible for blocking off all HVAC supply and return registers/ducts to prevent debris transfer.
Coordinate with project COR and Infection Control.
Will an airflow test be required upon completion in accordance with ICRA level III in the working areas?
Montinoring of negative pressure shall be continuous (provide manometer at site ICRA entrance(s))
Specifications page 01 00 00-14 para. 1.16 Availability and Use of Utility Services. Will metering and reporting utility usage be required for this contract?
Metering not required. 120V power available for contractor use.
Have all electrical, HVAC, life safety, and emergency systems in the working area been tested for operation in accordance with Specification 1.18? Are there any known inoperable systems in the working area?
There are no known inoperable systems. All systems active.
Will any FF&E be required to be moved and/or stored by the contractor?
FF&E to be removed and stored by VA as needed.
Will work on multiple floors be able to be conducted simultaneously?
Acceptable and preferred
During site visit it was noticed some walls were intact with no demolition performed. Will the government clarify if all walls in the affected areas are to be painted, or only the walls to be repaired are to be painted.
Refer to attachment 1. Rooms with a "c" keynote in the "paint" column indicates the intent is to repaint only the walls that require repairs. Where no paint keynote is provided (typical at 4th floor rooms), all walls shall be repainted.
For the shaft wall replacement, how many lnft of wall and studs are being replaced? Also, how high is the deck to deck height? I see note “d” on the quantity page but cant decern what area or extent.
Contractor shall verify exact dimensions in field. Shaft wall encloses the exhaust duct at the corner of the building (1' to 3' wide x 10-12' tall)
For receptacle replacement and cover replacement: How many receptacles need replaced?
Verify quantity in field. Receptacles do not require replacement, only damaged covers.
For the floors, will we need to skim the floor with Ardex prior to installation of carpet and LVT? Has the glue been completely removed
Refer to specifications 090516 and 028213.19. Contractor shall provide underlayment leveling/corrections as needed to prep floor for new finishes. Extensive floor leveling/flood coat is not anticipated to be required. Glue has NOT been removed, and on the 4th floor the mastic contains asbestos and requires abatement prior to application of new finishes.
Per the specs, please confirm the wall finished are to be Level 5 (level 3 above ceiling). Also, for the areas that are being patched and painted, do these areas require a level 5 finish as well?
Confirmed. Level 5 finish required at all walls that are partially repaired with new drywall spliced partial height with existing substrate (drywall/plaster). Walls requiring only minor patching/repaint may be Level 4.
Are any of the walls to be replaced fire rated? Do they require a fire stencil for above the ceiling?
Walls ajoining corridors must be smoke sealed (smoke rated), but not fire rated.
Do you have an estimated quantity for ceiling grid replacement?
Contractor to verify exact extents with in field conditions. Most of the grid is intact and may be re-used if in good condition.