This is a lead paint screening report dated November 13, 2013 documenting the results of testing conducted at the Perry Point VA Medical Center campus in Maryland between September 30 and October 31, 2013. The screening was performed by Aerosol Monitoring & Analysis, Inc. under Contract No. GS-10F0386K to identify lead-containing materials within 50 buildings totaling 1,103,000 square feet, including facilities constructed between 1750-present with various renovation dates from 1968 onward.

The testing was conducted using an RMD LPA-1 x-ray fluorescence analyzer by six Maryland-certified lead inspectors/risk assessors. Components were considered to contain lead if readings exceeded 0.7 mg/cm2 per Maryland regulations. The report includes detailed XRF testing results showing numerous building components that tested positive for lead-containing materials, including metal railings, doors, windows, walls, pipes, and other architectural elements across multiple buildings. For Building 23H specifically, which relates to the current fire damage repair contract, the report documents lead-containing materials in components like vent covers, handrails, stair treads, and newel posts primarily in stairwell and dining room areas.

View the file

Other files

File Type Posted
Amended Specs.pdf PDF
512A5-25-003 Construction RFIs Rev.1.pdf PDF
512A5-25-003 23H ACM Data.xlsx XLSX spreadsheet
PP-23H-2-First Floor.pdf PDF
PP-23H-4-Third Floor.pdf PDF
36C24525B0003 0003.docx DOCX document
PP-23H-5-Fourth Floor.pdf PDF
PP-23H-3-Second Floor.pdf PDF
DryingReport_Nov-15-2024.pdf PDF
36C24525B0003 0002.docx DOCX document
512A5-25-003 23H Fire Damage Repairs SOW Rev2 - Amend 0002 -02112025.pdf PDF
512A5-25-003 Construction Visit Roster.pdf PDF
RFI Form.xlsx XLSX spreadsheet
36C24525B0003 0001.docx DOCX document
Wage Determination MD20250049.pdf PDF
Attachment 3 - 512A5-25-003 Combined Specs Rev1.pdf PDF
36C24525B0003_1.docx DOCX document
Parking Location for 23H Site Visit.pdf PDF
Attachment 1 - 23H Area Estimation Rev1.pdf PDF
Attachment 2 - 23H Floor Plans.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Veterans Affairs Perry Point Campus Lead Paint Screening

Environmental Consultants

1331 Ashton Road P.O. Box 646 Hanover, MD 21076 410-684-3327 FAX: 410-684-3384 www.amaconsulting.com

November 13, 2013

Mr. Robert Deinert Safety/Occupational Health Program Manager VA Maryland Healthcare System Perry Point VA Medical Center Bldg. 101, Room 31 Perryville, MD 21902

RE: United States Department of Veteran Affairs VISN 5 Contract No. GS-10F- 0386K Lead Paint Screening for the Veterans Affairs Perry Point Campus

Bldg: Perry Point Campus

AMA Project #: 13404

Mr. Deinert:

Between September 30 and October 31st, 2013 Aerosol Monitoring & Analysis, Inc. (AMA) representatives, Mr. Andrew Washington, Mr. Patrick Dincher, Mr.

Adam Truax, Mr. Rob Schoennagel, Mr. Kinte Thompson, and Mr. Ron Stallard conducted an onsite lead paint screening of the Perry Point VAMC campus facilities for the purpose of identifying lead containing materials within the buildings.

Background Information

Perry Point Campus Perry Point, MD 21902

1,103,000 square feet for inspection

Total Buildings: 50 (including connecting corridors)

Original Construction Dates: Various dates ranging from 1918 – Present (Mansion constructed in 1750)

Renovations Dates: Various dates on select buildings ranging from 1968 - Present

Existing Lead Documentation – None to be relied upon

Buildings inspected by AMA:

(24H) Mental Health (1H) Domiciliary (25H) Mental Health (2H) Domiciliary (26) Fire House (3H) Administration (27H) Biomedical Shop

(4) Research (41) Greenhouse

(4H) IRMS (59)

(5H) Director’s Office (80H) Mental Health Clinic

(5) Stock Storage (82) Education/Research (6H) Voluntary Service (97) Gatehouse

(8) Engineering Storage (101) Administration (9H) Nursing Home (102) Filter Plant

(11) Warehouse (314A) Theater (11H) Human Resources (314B) Recreation (13H) Psychiatric Units (314C) Chapel

(13) Public Health Service (315) Boiler Plant (14H) Psychiatric Units (321) Chiller Plant

(14) (360)

(15) Administration (361) (15H) Rehab (364) (17H) Dietetics Connecting Corridors (18H) Maintenance Shops Credit Union (19H) Medical Wards Mansion House (20H) Medical Media/IRMS Grist Mill

(20) Water Pumping Station REMRO

(22) Filter Plant (22H) Substance Abuse/Detox (23H) Geropsych Nursing

General Summary

AMA randomly tested surfaces for lead containing materials (LCM) throughout each above listed building at the Perry Point VAMC Campus.

Lead Inspector(s) – Andrew Washington (Maryland Risk Assessor 10057)

Adam Truax (Maryland Lead Inspector 14117) Robert Schoennagel (Maryland Lead Inspector 4179) Kinte Thompson (Maryland Lead Inspector 13795) Patrick Dincher (Maryland Lead Inspector 7164) Ronald Stallard (Maryland Lead Inspector 4357)

The LCM testing was performed with a Radiation Monitoring Device (RMD) LPA-1 model x-ray fluorescence analyzer (XRF), Serial #1954. The XRF contains a small radioactive source (Cobalt 57), which emits radiation when pressed against a surface. If the paint contains lead, the radiation will stimulate the lead atoms to re-emit x-rays, which are sensed by a detector in the unit. The XRF then converts these signals to a final reading in milligrams of lead per square centimeter of surface area tested (mg/cm2). The LPA-1 XRF is capable of achieving a ninety-five percent confidence interval in readings to a depth of 3/8 inch.

The XRF was calibrated in accordance with the manufacturer's instructions. Prior to obtaining readings from suspect surfaces, three calibration readings were taken on a National Institute for Science and Technology (NIST) Calibration Test Block and recorded. The NIST Calibration Block contains a known concentration of lead (1.02 mg/cm2) and the XRF must indicate 1.02 mg/cm2 with a tolerance of + or - 0.3 mg/cm2 for the average of the three readings. If the average of three readings is within the established tolerance, the unit is working properly. Calibration checks were performed prior to and at the end of the investigation.

The LPA-1 XRF features two modes of operation when in use: Quick mode and Standard mode. When the Quick mode is engaged on the LPA-1, the unit seeks the shortest period of time to assure a positive, or a negative measurement with 95% confidence. As stated in the XRF Performance Characteristics Sheet (PCS) developed jointly by the U.S. EPA and the U.S. Department of Housing and Urban Development (HUD); no substrate correction is needed. The Quick mode was used during the course of the investigation.

Many types of components tested were found to contain greater than (>) 0.7 mg/cm2 of surface area tested, which is the amount defined as a lead-containing material according to the COMAR, Title 26, Department of the Environment, Subtitle 16, Lead, Chapter 01. Table I at the end of the report lists components that were found to have lead concentrations of >0.7 mg/cm2 within each building.

Table II lists all XRF readings that were found to be LCM.

(17H) Dietetics

Isolated damaged lead paint in building includes: Metal Step, Metal Riser, Metal Hand rail, Concrete Ceiling, Metal Newel Post, & Metal Safety Rail

(18H) Maintenance Shops

Isolated damaged lead paint in building includes: Plaster Walls, Metal Fire Extinguisher Case, Metal Fan Casing, Metal Fire Protection Pipe, & Porcelain Sink

(19H) Medical Wards

No damaged paint identified

(20H) Medical Media/IRMS

No damaged paint identified

(20) Water Pumping Station

Isolated damaged lead paint in building includes: Wood Door Casings, & Concrete Base

(22) Filter Plant

Isolated damaged lead paint in building includes: Wood Column, Wood Stairs, & Wood Walls.

(22H) Substance Abuse/Detox

Isolated damaged lead paint in building includes: Porcelain Toilet, Porcelain Sink, Concrete Floor, & Metal Pipe

(23H) Geropsych Nursing

No damaged paint identified

(24H) Mental Health

Isolated damaged lead paint in building includes: Metal Hand rail

(25H) Mental Health

No damaged paint identified

(26) Fire House

No damaged paint identified

TABLE I

LBP COMPONENT TABLE

VA PERRY POINT

NOVEMBER 2013

Metal Fire Extinguisher Case Metal Fan Casing Metal Fire

Protection Pipe Metal Door

Casing Ceramic tile

Walls Concrete

Walls Plaster Walls &

Ceilings

Wood Column Metal Window Porcelain Sinks Metal Rail Metal Down Spout Fan Case

Building 19H

Plaster Walls & Ceilings Metal Radiator Cover Concrete Walls

Metal Electical Box

Door Metal Radiator Metal Cage Metal Stair

Riser

Metal Spindle Metal Newel Post Metal Kick Plate Concrete Ceiling

Metal Door Casings

Wood Crawlspace

Case Metal Pipe

G tilo Wall Concrete Columns Building 20

Metal Lintel Wood Door Casing Metal Door Frame

Concrete Base

Building 20H

Cinderblock Walls Cinderblock Window Sill

Metal Window Mullion Metal Pipe

Building 22 Wood Column Metal I-beam Wood Stairs Wood Walls Building 22H

Metal Radiator Cover Plaster Walls Porcelain Sinks Porcelain Toilet

Ceramic tile Baseboard

Metal Door Casing

Metal Trap Door

Wood Window Casing

Plaster Radiator Cover Metal Hand rail Metal Riser Metal Newel Post Ceramic tile

Wall Plaster

Window Case

Metal I-beam Concrete Floor Metal Pipe Wood Mullion Metal Stringer Metal Step Wood Door Casing

Plaster Door Trim Concrete Door Stoop Metal Rail Metal Fire Box

Building 23H

Metal Vent Cover Metal Hand Rail Metal Stair Stringer

Metal Stair Riser Metal Stairtread Metal Newel

Post Plaster Walls

Building 24H

Metal Hand rail Wood Door Frame Wood Window Sill

Metal Door Casing Ceramic Wall

Wood Window Casing

Building 25H

Metal Baseboard Metal Window Case Metal Stringer Metal Kick Plate

Wood Window Casing

Metal Radiator Cover

Wood Window Sill

Metal Window Jamb Metal Window Sill Wood Door Casings

Metal Fire Box Metal Pipe

Building 26

Metal Conduit Wood Window Wood Door Casings

Metal Window Sill

Building 27H Ceiling

Building 41

Plaster Walls & Ceilings Wood Window Sill Wood Window

Casing Wood

Window Sash Wood Door Wood Door Casing Metal Pipe

TBL I-3

TABLE II

POSITIVE XRF TABLE

VA PERRY POINT

NOVEMBER 2013

Sample # Location Color Component Substrate Condition Result (mg/cm2)

064 122 Men's restroom White Toilet Porcelain Not intact 8.3 066 122 Men's restroom White Sink Porcelain Not intact 0.8 088 117 Storage Green Radiator cover Plaster Intact 3.4 106 121 Stairwell Black Hand rail Metal Intact 1.5 107 121 Stairwell Black Stair riser Metal Intact 1.7 109 121 Stairwell Black Newel post Metal Intact 2.9 112 121 Stairwell Off-white Door casing Metal Intact 0.8 119 2nd floor corridor Off-white Radiator cover Metal Intact 3.3 125 Room 209 Off-white Radiator cover Metal Intact 3.5 127 Room 209 Off-white Door casing Metal Intact 0.8 138 205 Shower Off-white Radiator cover Metal Intact 5.1 148 228 Men's restroom Tan Wall Ceramic tile Intact >9.9 150 228 Men's restroom Off-white Window casing Plaster Intact 0.8 165 Attic Tan I-beam Metal Intact 0.8 166 Attic Tan I-beam Metal Intact 1.8 170 Attic Gray Floor Concrete Not intact 8.8 171 Attic Gray Pipe Metal Not intact 0.8 173 Attic White Mullion Wood Intact 5.1 174 Attic White Window casing Wood Intact >9.9 180 Attic stairwell Black Pipe Metal Intact 0.8 181 Attic stairwell Black Stair riser Metal Intact 0.8 182 Attic stairwell Black Stringer Metal Intact 1.9 183 Attic stairwell Black Hand rail Metal Intact 2.5 184 Attic stairwell Black Step Metal Intact 2.2 185 Attic stairwell Tan Door casing Metal Intact 1.6 192 SP 200 Sitting area Tan Radiator cover Metal Intact 3.6 193 SP 200 Sitting area Off-white Window casing Plaster Intact 4.8 197 Exterior Brown Door casing Wood Intact 2.0 198 Exterior Brown Door trim Plaster Intact 0.8 199 Exterior Tan Door stoop Concrete Intact 0.8 200 Exterior Black Rail Metal Intact 0.8 201 Exterior Red Fire box Metal Intact 0.8

Building 23H

1st floor, northwest stairwell Off white Vent cover Metal Intact 5.0

1st floor, northwest stairwell Black Handrail Metal Intact 0.8

1st floor, northwest stairwell Black Stair stringer Metal Intact 0.8

1st floor, northwest stairwell Black Stair riser Metal Intact 0.8 054 4th floor, elevator lobby Black Handrail Metal Intact 0.8

4th floor, northwest stairwell Black Stair tread Metal Intact 3.4

4th floor, northwest stairwell Black Newel post Metal Intact 2.1

4th floor, northwest stairwell Black Stair riser Metal Intact 1.4

4th floor, northwest stairwell Black Handrail Metal Intact 0.8 075 2nd floor, dining room White Vent cover Metal Intact 3.9

TBL II-16

TABLE II

POSITIVE XRF TABLE

VA PERRY POINT

NOVEMBER 2013

Sample # Location Color Component Substrate Condition Result (mg/cm2)

143 3rd floor, dining room Red Wall Plaster Intact 0.8 144 3rd floor, dining room Red Wall Plaster Intact 0.8

Building 24H

005 Exterior, west wall Black Handrail Metal Intact 0.8 007 Exterior, west wall White Door frame Wood Intact 5.2

1st floor, Visitor room #2 restroom Off-white Window sill Wood Intact 0.8 073 1st floor, linen room Off-white Door casing Metal Intact 0.8 081 1st floor, day room White Wall Ceramic Intact >9.9 100 1st floor, stair #2 Off-white Window sill Wood Intact 0.8 101 1st floor, stair #2 Off-white Window casing Wood Intact 0.8 103 1st floor, stair #2 Black Handrail Metal Not intact 0.8 119 2nd floor, main corridor Wood Wall Ceramic Intact >9.9 198 1st floor, room 163 Off-white Window sill Wood Intact 1.1 206 1st floor, room 161 Off-white Window sill Wood Intact 0.8

Building 25H

090 Snack room Black Baseboard Metal Intact 0.8 099 Dining room Red Window casing Metal Intact 0.8 107 Southwest stairwell Black Baseboard Metal Intact 2.8 108 Southwest stairwell Black Stringer Metal Intact 0.8 109 Southwest stairwell Black Kick plate Metal Intact 2.9 133 Computer room Green Window casing Wood Intact 5.8 151 Room 247 Blue Radiator cover Metal Intact 0.8 174 Room 224 Green Window sill Wood Intact 3.0 177 Room 224 Green Window jamb Metal Intact 0.8 184 Room 223 - bathroom Yellow Window sill Metal Intact 4.7 194 2nd floor dining room Blue Window sill Metal Intact 4.0 202 Exterior White Door casing Wood Intact 7.3 204 Exterior Red Fire box Metal Intact 0.8 208 Exterior Red Pipe Metal Intact 0.8

Building 26

032 Truck Storage Blue Conduit Metal Intact 0.8 045 Exterior Brown Window Wood Intact 8.8 053 Gym White Door Casing Wood Intact >9.9 059 Exterior Brown Window Wood Intact >9.9 060 Exterior Brown Window Wood Intact 3.3 061 Exterior Brown Window Wood Intact >9.9 074 Exterior Brown Window sill Metal Intact 3.0

Building 27H

022 Storage room Off-white Pipe Metal Intact 0.8 Building 41

006 Main common area Tan Wall Plaster Intact >9.9 007 Main common area Tan Wall Plaster Intact 9.1 008 Main common area White Window sill Wood Intact 4.3 009 Main common area White Window casing Wood Intact >9.9 010 Main common area White Window sash Wood Intact >9.9

TBL II-17

Building 23H Lead Documentation

File details come from the government source that posted it. Updated .