Attachment 07-Spec 01 31 00.01 Project Management and Coordination.docx

DOCX document 34 KB Posted

Attached to
Y1DA--460-22-700 | Construct EHRM Infras Upgrades | Wilmington, DE Federal contract opportunity
Solicitation number
36C77625B0044_1
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a Project Management and Coordination specification for a Department of Veterans Affairs construction project in Wilmington, Delaware. The specification mandates the use of a web-based project management software package (such as Procore or Oracle Primavera Submittal Exchange) with comprehensive digital collaboration features. Key requirements include providing user licenses for the Owner, Architect, and consultants, offering eight hours of software training, and ensuring the software supports real-time tracking of project communications, document workflow, access control, and mobile device compatibility. At project completion, the contractor must provide a digital archive in a locked, readable format. The project involves infrastructure upgrades for the EHRM (Enterprise Health Resource Management) system, with the solicitation issued by the Department of Veterans Affairs Technology Acquisition Center in Austin under solicitation number 36C77625B0044_1.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--460-22-700 | Construct EHRM Infras Upgrades | Wilmington, DE, newest first.
File Type Posted
Attachment 02- Attachment 01a-Specs EHRM Construction WILM Vol 1.pdf PDF
Attachment 01- Tech Questions - Wilmington.docx DOCX document
36C77625B0044 0005.pdf PDF
Attachment 01-Tech Questions-Wilmington.docx DOCX document
36C77625B0044 0004.pdf PDF
36C77625B0044 0003.pdf PDF
Attachment 01-Sign in Sheet WILM.pdf PDF
Attachment 02-Specs EHRM Construction WILM Vol 2.pdf PDF
Amendment 0002 36C77625B0044 0002.pdf PDF
Attachment 01(a)-Specs EHRM Construction WILM Vol 1.pdf PDF
Amendment 0001 36C77625B0044 0001.pdf PDF
Attachment 01(b)-Specs EHRM Construction WILM Vol 2.pdf PDF
Attachment 10-EHRM Wilmington_Security REV 250630.pdf PDF
Attachment 09-230923 Direct Digital Control System for HVAC.pdf PDF
Attachment 08-283100 - Fire Alarm and Detection Systems.pdf PDF
Attachment 02-Drawings EHRM Construction WILM.pdf PDF
Attachment 01-Specs EHRM Construction WILM.zip ZIP file
Attachment 03-Limitations on Subcontracting - Construction.pdf.pdf PDF
Attachment 06 - Seasonal Influenza with Vaccines.pdf PDF
Attachment 04-DBA Wage Rates 7.22.25.pdf PDF
Attachment 05-Brand Name Justification WILM Redacted.pdf PDF
36C77625B0044 Wilmington.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 31 00.01

PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative provision for coordinating construction operations on Project, including, but not limited to, the following:

1. Web-based Project management software package.

B. Each contractor shall participate in coordination requirements. Certain areas of responsibility are assigned to a specific contractor.

1.3 DEFINITIONS

A. BIM: Building Information Modeling.

B. RFI: Request for Information. Request from Owner, Architect, or Contractor seeking information required by or clarifications of the Contract Documents.

1.4 DIGITAL PROJECT MANAGEMENT PROCEDURES

A. Web-Based Project Management Software Package: Provide, administer, and use web-based Project management software package for purposes of hosting and managing Project communication and documentation until Final Completion.

1. Basis of Specification: Procore, Oracle Primavera Submittal Exchange or other equivalent web-based project management software.

2. Web-based Project management software includes, at a minimum, the following features:

a. Compilation of Project data, including Contractor, subcontractors, Architect, Architect's consultants, Owner, and other entities involved in Project. Include names of individuals and contact information.

b. Access control for each entity for each workflow process, to determine entity's digital rights to create, modify, view, and print documents.

c. Document workflow planning, allowing customization of workflow between project entities.

d. Creation, logging, tracking, and notification for Project communications required in other Specification Sections, including, but not limited to, RFIs, submittals, Minor Changes in the Work, Construction Change Directives, and Change Orders.

e. Track status of each Project communication in real time, and log time and date when responses are provided.

Project Number 460-22-700 Project Name Construct EHRM Infras Upgrades Project Location Wilmington, DE

PROJECT MANAGEMENT AND COORDINATION

05-01-24

01 31 00.01 - 1

f. Procedures for handling PDFs or similar file formats, allowing markups by each entity. Provide security features to lock markups against changes once submitted.

g. Processing and tracking of payment applications.

h. Processing and tracking of contract modifications.

i. Creating and distributing meeting minutes.

j. Document management for Drawings, Specifications, and coordination drawings, including revision control.

k. Management of construction progress photographs.

l. Mobile device compatibility, including smartphones and tablets.

3. Provide Project management software user licenses for use of Owner, Architect, and Architect's consultants. Provide eight hours of software training for web-based Project software users.

4. At completion of Project, provide digital archive in format that is readable by common desktop software applications in format acceptable to Architect. Provide data in locked format to prevent further changes.

PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)

- - - END - - -