Attachment 01(a)-Specs EHRM Construction WILM Vol 1.pdf

PDF 5 MB Posted

Attached to
Y1DA--460-22-700 | Construct EHRM Infras Upgrades | Wilmington, DE Federal contract opportunity
Solicitation number
36C77625B0044_1
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a comprehensive Traditional Asbestos Abatement specification for the Wilmington VA Medical Center EHRM Infrastructure Upgrades project (Project No. 460-22-700). The specification details extensive requirements for safely removing asbestos-containing materials (ACM) from specific building areas, with a focus on Class I negative pressure enclosure asbestos abatement procedures. Key requirements include establishing regulated work areas, using specialized decontamination facilities, implementing negative air pressure systems, wet removal techniques, proper personal protective equipment, air monitoring, visual inspections, and final clearance testing.

The specification covers multiple technical aspects of asbestos abatement, including detailed procedures for worker protection, site preparation, ACM removal methods, waste disposal, and project closeout. Contractors must provide comprehensive documentation, including an Asbestos Hazard Abatement Plan, personnel qualifications, medical surveillance records, and training certifications. The project involves potential asbestos removal from wall cavities, mechanical rooms, and potentially contaminated areas, with strict adherence to OSHA, EPA, and state regulatory requirements. The abatement work is part of infrastructure upgrades at the Wilmington VA Medical Center, with a focus on ensuring worker safety and environmental protection during the asbestos removal process.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--460-22-700 | Construct EHRM Infras Upgrades | Wilmington, DE, newest first.
File Type Posted
Attachment 01- Tech Questions - Wilmington.docx DOCX document
36C77625B0044 0005.pdf PDF
Attachment 02- Attachment 01a-Specs EHRM Construction WILM Vol 1.pdf PDF
Attachment 01-Tech Questions-Wilmington.docx DOCX document
36C77625B0044 0004.pdf PDF
36C77625B0044 0003.pdf PDF
Attachment 01-Sign in Sheet WILM.pdf PDF
Attachment 02-Specs EHRM Construction WILM Vol 2.pdf PDF
Amendment 0002 36C77625B0044 0002.pdf PDF
Attachment 01(b)-Specs EHRM Construction WILM Vol 2.pdf PDF
Attachment 10-EHRM Wilmington_Security REV 250630.pdf PDF
Attachment 09-230923 Direct Digital Control System for HVAC.pdf PDF
Amendment 0001 36C77625B0044 0001.pdf PDF
Attachment 08-283100 - Fire Alarm and Detection Systems.pdf PDF
Attachment 02-Drawings EHRM Construction WILM.pdf PDF
Attachment 01-Specs EHRM Construction WILM.zip ZIP file
Attachment 06 - Seasonal Influenza with Vaccines.pdf PDF
Attachment 04-DBA Wage Rates 7.22.25.pdf PDF
Attachment 07-Spec 01 31 00.01 Project Management and Coordination.docx DOCX document
Attachment 03-Limitations on Subcontracting - Construction.pdf.pdf PDF
Attachment 05-Brand Name Justification WILM Redacted.pdf PDF
36C77625B0044 Wilmington.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EHRM INFRASTRUCTURE

UPGRADES

Construction Documents � 100%

Specifications

WILMINGTON VA MEDICAL CENTER

1601 KIRKWOOD HIGHWAY, WILMINGTON, DELAWARE

OCTOBER 1, 2024

PROJECT NO. 460-22-700

VOLUME I

Wilmington VA Medical Center EHRM Infrastructure Upgrades

Project No. 460-22-700 October 1, 2024

Consultants Directory 00 01 03 - 1

SECTION 00 01 03

CONSULTANTS DIRECTORY

PART 1 - GENERAL

1.1 PROJECT LISTING

A. Architect / Physical Security

Awen Solutions Group

4196 Merchant Plaza Woodbridge, Virginia 22192

B. Mechanical /Electrical / Plumbing / Fire Protection Engineer

IMEG Corp

672 E Royalton Road Broadview Heights, OH 44147

C. Structural Engineer

IMEG Corp

672 E Royalton Road Broadview Heights, OH 44147

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

Project No. 460-22-700 October 1, 2024

Consultants Directory 00 01 03 - 2

THIS PAGE INTENTIONALLY LEFT BLANK

Project No. 460-22-700 October 1, 2024

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 � SPECIAL SECTIONS

00 01 03 Consultants Directory

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 � GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21

01 32 16.15 Project Schedules (Small Projects � Design/Bid/Build 11-21

01 33 23 Shop Drawings, Product Data, and Samples 02-23

01 35 26 Safety Requirements 10-22

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 06-21

01 57 19 Temporary Environmental Controls 01-21

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 04-22

01 91 00 General Commissioning Requirements 04-22

DIVISION 02 � EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 01-21

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 � CONCRETE

03 30 00 Cast-in-Place Concrete 01-21

DIVISION 04 � MASONRY

Not Used

DIVISION 05 � METALS

05 12 00 Structural Steel Framing 11-18

Project No. 460-22-700 October 1, 2024

00 01 10-2

SECTION NO DIVISION AND SECTION TITLES DATE

05 31 00 Steel Decking 01-21

05 40 00 Cold-Formed Metal Framing 01-21

DIVISION 06 � WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

DIVISION 07 � THERMAL AND MOISTURE PROTECTION

07 08 00 Facility Exterior Closure Commissioning 01-21

07 13 00 Sheet Waterproofing 01-21

07 13 52 Modified Bituminous Sheet Waterproofing 01-21

07 21 13 Thermal Insulation 01-21

07 22 00 Roof and Deck Insulation 01-21

07 24 00 Exterior Insulation and Finish Systems 01-21

07 51 00 Built-Up Bituminous Roofing 12-21

07 60 00 Flashing and Sheet Metal 01-21

07 71 00 Roof Specialties 01-21

07 72 00 Roof Accessories 01-21

07 81 00 Applied Fireproofing 10-17

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 04-22

DIVISION 08 � OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 31 13 Access Doors and Frames 04-22

08 71 00 Door Hardware 05-22

DIVISION 09 � FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 06 00 Schedule for Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 01-21

09 65 19 Resilient Tile Flooring 05-18

09 69 00 Access Flooring 01-21

09 91 00 Painting 01-21

Project No. 460-22-700 October 1, 2024

00 01 10-3

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 10 � SPECIALTIES

10 14 00 Signage 01-21

10 26 00 Wall and Door Protection 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 � EQUIPMENT

Not Used

DIVISION 12 � FURNISHINGS

Not Used

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components 01-21

DIVISION 14� CONVEYING EQUIPEMENT

Not Used

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Protection Systems 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

21 22 00 Clean Agent Fire Suppression Systems 05-15

DIVISION 22 � PLUMBING

Not Used

DIVISION 23 � HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23

23 05 12 General Motor Requirements 03-23

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 03-23

23 09 23 Direct-Digital Control System for HVAC 03-23

23 23 00 Refrigerant Piping 03-23

23 31 00 HVAC Ducts and Casings 03-23

Project No. 460-22-700 October 1, 2024

00 01 10-4

SECTION NO DIVISION AND SECTION TITLES DATE

23 37 00 Air Outlets and Inlets 03-23

23 40 00 HVAC Air Cleaning Devices 03-23

23 81 00 Decentralized Unitary HVAC Equipment 03-23

23 81 23 Computer-Room Air-Conditioners 03-23

DIVISION 25 � INTEGRATED AUTOMATION

Not Used

DIVISION 26 � ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22

26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22

26 05 26 Grounding and Bonding for Electrical Systems 11-22

26 05 33 Raceway and Boxes for Electrical Systems 11-22

26 05 41 Underground Electrical Construction 11-22

26 05 73 Overcurrent Protective Device Coordination Study 11-22

26 08 00 Commissioning of Electrical Systems 11-22

26 09 23 Lighting Controls 11-22

26 22 00 Low-Voltage Transformers 11-22

26 24 16 Panelboards 11-22

26 26 00 Power Distribution Units for Static Uninterruptible Power Systems 11-22

26 27 26 Wiring Devices 11-22

26 29 21 Enclosed Switches and Circuit Breakers 11-22

26 51 00 Interior Lighting 11-22

DIVISION 27 � COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 12-22

27 05 33 Raceways and Boxes for Communications Systems 12-22

27 05 36 Cable Trays for Communications Systems 12-22

27 05 53 Identification for Communications Systems 12-22

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Structured Cabling 12-22

27 11 16 Communications Cabinets, Racks, Frames, and Enclosures 12-22

27 11 19 Communications Termination Blocks and Patch Panels 12-22

27 11 26 Communications Rack Mounted Power Protection and Power Strips 12-22

27 13 13 Communications Copper Backbone Cabling 12-22

27 13 13.13 Communications Copper Cable Splicing and Terminations 12-22

27 13 23 Communications Optical Fiber Backbone Cabling 12-22

27 13 23.13 Communications Optical Fiber Cable Splicing and Terminations 12-22

27 15 13 Communications Copper Horizontal Cabling 12-22

27 16 19 Communications Patch Cords, Station Cords and Cross Connect 12-22

Project No. 460-22-700 October 1, 2024

00 01 10-5

SECTION NO DIVISION AND SECTION TITLES DATE

Wire

27 78 00 Closeout Submittals for Communications

DIVISION 28 � ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and Security 10-18

28 05 26 Grounding and Bonding for Electronic Safety and Security 09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 23 00 Video Surveillance 09-11

DIVISION 31 � EARTHWORK

Not Used

DIVISION 32 � EXTERIOR IMPROVEMENTS

Not Used

DIVISION 33 � UTILITIES

Not Used

DIVISION 34 � TRANSPORTATION

Not Used

DIVISION 48 � ELECTRICAL POWER GENERATION

Not Used

- - - END - - -

Project No. 460-22-700 October 1, 2024

00 01 10-6

THIS PAGE INTENTIONALLY LEFT BLANK

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

BLDG 00

01 - GENERAL

00-GI000 COVER SHEET

00-GI001 SHEET INDEX - BUILDING 01

00-GI002 SHEET INDEX - BUILDINGS 05 - 15

00-GI003 SYMBOLS, LEGENDS & PROJECT INFORMATION

00-GI004 TIL ABBREVIATION LIST (PG-18-4)

00-GI011 TYPICAL ADA REQUIREMENTS - INTERIOR CLEARANCES

00-GS101 CAMPUS SITE PLAN

01.1 - GENERAL

00-AE501 INTERIOR FRAMING DETAILS

00-AE502 INTERIOR FRAMING DETAILS

00-AE511 DOOR DETAILS

00-AE521 PARTITION AND MISCELLANEOUS DETAILS

00-AE531 CEILING DETAILS

00-AE601 DOOR SCHEDULE

00-AE602 ROOM MATERIAL AND FINISH SCHEDULE

00-AE603 PARTITION TYPES

11 - FIRE PROTECTION

00-FX000 FIRE PROTECTION COVERSHEET

14 - MECHANICAL

00-MG000 MECHANICAL COVERSHEET

00-MH500 MECHANICAL DETAILS

00-MH600 CONTROL DETAILS

15 - ELECTRICAL

00-EP000 ELECTRICAL COVERSHEET

16 - TELECOMMUNICATION

00-TN000 TELECOMMUNICATIONS SYMBOLS AND ABBREVIATIONS

00-TN001 TELECOMMUNICATIONS SHEET INDEX

00-TN100 CAMPUS TECHNOLOGY SITE PLAN

00-TN101 CAMPUS TECHNOLOGY SITE PLAN (SERVICES)

00-TN400 TELECOMMUNICATIONS DETAILS

00-TN401 TELECOMMUNICATIONS DETAILS

00-TN402 TELECOMMUNICATIONS DETAILS

00-TN403 TELECOMMUNICATIONS DETAILS

00-TN500 TELECOMMUNICATIONS RISERS

00-TN501 TELECOMMUNICATIONS RISERS

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 2

00-TN600 TELECOMMUNICATIONS SCHEDULES

16.4 - PHYSICAL SECURITY

00-TY001 SECURITY NOTES, SYMBOLS, AND ABBREVIATIONS

BLDG 01

01 - GENERAL

01-GI000 COVER SHEET

07 - STRUCTURAL

01-ST000 GENERAL NOTES

01-ST001 SCHEDULES

01-ST002 SYMBOL AND ABBREVATIONS

01-ST201 PARTIAL 1ST FLOOR FRAMING PLAN

01-ST202 PARTIAL 2ND FLOOR FRAMING PLAN

01-ST301 DETAILS

01-ST302 DETAILS

08 - ARCHITECTURE

01-AD401 ENLARGED DEMOLITION TR FLOOR AND REFLECTED CEILING PLANS

01-AD402 ENLARGED DEMOLITION TR FLOOR AND REFLECTED CEILING PLANS

01-AD403 ENLARGED DEMOLITION TR FLOOR AND REFLECTED CEILING PLANS

01-AE101 BUILDING 01 - GROUND FLOOR PLAN

01-AE102 BUILDING 01 - FIRST FLOOR PLAN

01-AE103 BUILDING 01 - SECOND FLOOR PLAN

01-AE104 BUILDING 01 - THIRD FLOOR PLAN

01-AE105 BUILDING 01 - FOURTH FLOOR PLAN

01-AE106 BUILDING 01 - FIFTH FLOOR PLAN

01-AE107 BUILDING 01 - SIXTH FLOOR PLAN

01-AE108 BUILDING 01 - SEVENTH FLOOR PLAN

01-AE109 BUILDING 01 - EIGHTH FLOOR PLAN

01-AE110 BUILDING 01 - NINTH FLOOR PLAN

01-AE121 BUILDING 01 - ENLARGED GROUND FLOOR PLAN - AREA A + BUILDING 17

01-AE122 BUILDING 01 - ENLARGED GROUND FLOOR PLAN - AREA B

01-AE123 BUILDING 01 - ENLARGED GROUND FLOOR PLAN - AREA C

01-AE124 BUILDING 01 - ENLARGED GROUND FLOOR PLAN - AREA D

01-AE125 BUILDING 01 - ENLARGED GROUND FLOOR PLAN - AREA E + BUILDING 17

01-AE126 BUILDING 01 - ENLARGED GROUND FLOOR PLAN - AREA F + BUILDING 17

01-AE127 BUILDING 01 - ENLARGED FIRST FLOOR PLAN - AREA A

01-AE128 BUILDING 01 - ENLARGED FIRST FLOOR PLAN - AREA B

01-AE129 BUILDING 01 - ENLARGED FIRST FLOOR PLAN - AREA C

01-AE130 BUILDING 01 - ENLARGED FIRST FLOOR PLAN - AREA D

01-AE131 BUILDING 01 - ENLARGED SECOND FLOOR PLAN - AREA A

01-AE132 BUILDING 01 - ENLARGED SECOND FLOOR PLAN - AREA B

01-AE133 BUILDING 01 - ENLARGED SECOND FLOOR PLAN - AREA C

01-AE134 BUILDING 01 - ENLARGED THIRD FLOOR PLAN - AREA A

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 3

01-AE135 BUILDING 01 - ENLARGED THIRD FLOOR PLAN - AREA B

01-AE136 BUILDING 01 - ENLARGED THIRD FLOOR PLAN - AREA C

01-AE137 BUILDING 01 - ENLARGED FOURTH FLOOR PLAN - AREA A

01-AE138 BUILDING 01 - ENLARGED FOURTH FLOOR PLAN - AREA B

01-AE139 BUILDING 01 - ENLARGED FIFTH FLOOR PLAN - AREA A

01-AE140 BUILDING 01 - ENLARGED FIFTH FLOOR PLAN - AREA B

01-AE141 BUILDING 01 - ENLARGED SIXTH FLOOR PLAN - AREA A

01-AE142 BUILDING 01 - ENLARGED SIXTH FLOOR PLAN - AREA B

01-AE143 BUILDING 01 - ENLARGED SEVENTH FLOOR PLAN - AREA A

01-AE144 BUILDING 01 - ENLARGED SEVENTH FLOOR PLAN - AREA B

01-AE145 BUILDING 01 - ENLARGED EIGHTH FLOOR PLAN - AREA A

01-AE146 BUILDING 01 - ENLARGED EIGHTH FLOOR PLAN - AREA B

01-AE147 BUILDING 01 - ENLARGED NINTH FLOOR PLAN

01-AE301 BUILDING 01 - BUILDING SECTION

01-AE401 ENLARGED TR FLOOR AND REFLECTED CEILING PLANS

01-AE402 ENLARGED TR FLOOR AND REFLECTED CEILING PLANS

01-AE410 ENLARGED TR 1024 PLANS, SECTIONS AND DETAILS

01-AE450 INTERIOR ELEVATIONS

01-AE451 INTERIOR ELEVATIONS

11 - FIRE PROTECTION

01-FD101 OVERALL GROUND LEVEL DEMOLITION PLAN - FIRE PROTECTION

01-FD102 OVERALL FIRST FLOOR DEMOLITION PLAN - FIRE PROTECTION

01-FD103 OVERALL SECOND FLOOR DEMOLITION PLAN - FIRE PROTECTION

01-FD104 OVERALL THIRD FLOOR DEMOLITION PLAN - FIRE PROTECTION

01-FD105 OVERALL FOURTH FLOOR DEMOLITION PLAN - FIRE PROTECTION

01-FD106 OVERALL FIFTH FLOOR DEMOLITION PLAN - FIRE PROTECTION

01-FD107 OVERALL SIXTH FLOOR DEMOLITION PLAN - FIRE PROTECTION

01-FD108 OVERALL SEVENTH FLOOR DEMOLITION PLAN - FIRE PROTECTION

01-FD109 OVERALL EIGHTH FLOOR DEMOLITION PLAN - FIRE PROTECTION

01-FX101 OVERALL GROUND LEVEL PLAN - FIRE PROTECTION

01-FX102 OVERALL FIRST FLOOR PLAN - FIRE PROTECTION

01-FX103 OVERALL SECOND FLOOR PLAN - FIRE PROTECTION

01-FX104 OVERALL THIRD FLOOR PLAN - FIRE PROTECTION

01-FX105 OVERALL FOURTH FLOOR PLAN - FIRE PROTECTION

01-FX106 OVERALL FIFTH FLOOR PLAN - FIRE PROTECTION

01-FX107 OVERALL SIXTH FLOOR PLAN - FIRE PROTECTION

01-FX108 OVERALL SEVENTH FLOOR PLAN - FIRE PROTECTION

01-FX109 OVERALL EIGHTH FLOOR PLAN - FIRE PROTECTION

01-FX401 GROUND LEVEL ENLARGED PLANS - FIRE PROTECTION

01-FX402 FIRST FLOOR ENLARGED PLANS - FIRE PROTECTION

01-FX403 SECOND FLOOR ENLARGED PLANS - FIRE PROTECTION

01-FX404 THIRD - FIFTH FLOOR ENLARGED PLANS - FIRE PROTECTION

01-FX405 SIXTH - EIGHTH FLOOR ENLARGED PLANS - FIRE PROTECTION

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 4

14 - MECHANICAL

01-MD101 OVERALL GROUND LEVEL DEMOLITION PLAN - MECHANICAL

01-MD102 OVERALL FIRST FLOOR DEMOLITION PLAN - MECHANICAL

01-MD103 OVERALL SECOND FLOOR DEMOLITION PLAN - MECHANICAL

01-MD104 OVERALL THIRD FLOOR DEMOLITION PLAN - MECHANICAL

01-MD105 OVERALL FOURTH FLOOR DEMOLITION PLAN - MECHANICAL

01-MD106 OVERALL FIFTH FLOOR DEMOLITION PLAN - MECHANICAL

01-MD107 OVERALL SIXTH FLOOR DEMOLITION PLAN - MECHANICAL

01-MD108 OVERALL SEVENTH FLOOR DEMOLITION PLAN - MECHANICAL

01-MD109 OVERALL EIGHTH FLOOR DEMOLITION PLAN - MECHANICAL

01-MD110 OVERALL NINTH FLOOR DEMOLITION PLAN - MECHANICAL

01-MH101 OVERALL GROUND LEVEL PLAN - MECHANICAL

01-MH102 OVERALL FIRST FLOOR PLAN - MECHANICAL

01-MH103 OVERALL SECOND FLOOR PLAN - MECHANICAL

01-MH104 OVERALL THIRD FLOOR PLAN - MECHANICAL

01-MH105 OVERALL FOURTH FLOOR PLAN - MECHANICAL

01-MH106 OVERALL FIFTH FLOOR PLAN - MECHANICAL

01-MH107 OVERALL SIXTH FLOOR PLAN - MECHANICAL

01-MH108 OVERALL SEVENTH FLOOR PLAN - MECHANICAL

01-MH109 OVERALL EIGHTH FLOOR PLAN - MECHANICAL

01-MH110 OVERALL NINTH FLOOR PLAN - MECHANICAL

01-MH401 GROUND LEVEL ENLARGED PLANS - MECHANICAL

01-MH402 FIRST FLOOR ENLARGED PLANS - MECHANICAL

01-MH403 SECOND FLOOR ENLARGED PLANS - MECHANICAL

01-MH404 THIRD - FIFTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH405 SIXTH - EIGHTH FLOOR ENLARGED PLANS - MECHANICAL

01-MH700 MECHANICAL SCHEDULES

15 - ELECTRICAL

01-ED101A GROUND FLOOR DEMOLITION PLAN - AREA A - ELECTRICAL

01-ED101B GROUND FLOOR DEMOLITION PLAN - AREA B - ELECTRICAL

01-ED101C GROUND FLOOR DEMOLITION PLAN - AREA C - ELECTRICAL

01-ED101D GROUND FLOOR DEMOLITION PLAN - AREA D - ELECTRICAL

01-ED101E GROUND FLOOR DEMOLITION PLAN - AREA E - ELECTRICAL

01-ED101F GROUND FLOOR DEMOLITION PLAN - AREA F - ELECTRICAL

01-ED102A FIRST FLOOR DEMOLITION PLAN - AREA A - ELECTRICAL

01-ED102B FIRST FLOOR DEMOLITION PLAN - AREA B - ELECTRICAL

01-ED102C FIRST FLOOR DEMOLITION PLAN - AREA C - ELECTRICAL

01-ED102D FIRST FLOOR DEMOLITION PLAN - AREA D - ELECTRICAL

01-ED103A SECOND FLOOR DEMOLITION PLAN - AREA A - ELECTRICAL

01-ED103B SECOND FLOOR DEMOLITION PLAN - AREA B - ELECTRICAL

01-ED103C SECOND FLOOR DEMOLITION PLAN - AREA C - ELECTRICAL

01-ED104A THIRD FLOOR DEMOLITION PLAN - AREA A - ELECTRICAL

01-ED104B THIRD FLOOR DEMOLITION PLAN - AREA B - ELECTRICAL

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 5

01-ED104C THIRD FLOOR DEMOLITION PLAN - AREA C - ELECTRICAL

01-ED105A FOURTH FLOOR DEMOLITION PLAN - AREA A - ELECTRICAL

01-ED105B FOURTH FLOOR DEMOLITION PLAN - AREA B - ELECTRICAL

01-ED106A FIFTH FLOOR DEMOLITION PLAN - AREA A - ELECTRICAL

01-ED106B FIFTH FLOOR DEMOLITION PLAN - AREA B - ELECTRICAL

01-ED107A SIXTH FLOOR DEMOLITION PLAN - AREA A - ELECTRICAL

01-ED107B SIXTH FLOOR DEMOLITION PLAN - AREA B - ELECTRICAL

01-ED108A SEVENTH FLOOR DEMOLITION PLAN - AREA A - ELECTRICAL

01-ED108B SEVENTH FLOOR DEMOLITION PLAN - AREA B - ELECTRICAL

01-ED109A EIGHTH FLOOR DEMOLITION PLAN - AREA A - ELECTRICAL

01-ED109B EIGHTH FLOOR DEMOLITION PLAN - AREA B - ELECTRICAL

01-ED110 NINTH FLOOR ENLARGED DEMOLITION PLAN - ELECTRICAL

01-EP101 GROUND FLOOR OVERALL PLAN- ELECTRICAL

01-EP101A GROUND FLOOR PLAN - AREA A - ELECTRICAL

01-EP101B GROUND FLOOR PLAN - AREA B - ELECTRICAL

01-EP101C GROUND FLOOR PLAN - AREA C - ELECTRICAL

01-EP101D GROUND FLOOR PLAN - AREA D - ELECTRICAL

01-EP101E GROUND FLOOR PLAN - AREA E - ELECTRICAL

01-EP101F GROUND FLOOR PLAN - AREA F - ELECTRICAL

01-EP102 FIRST FLOOR OVERALL PLAN - ELECTRICAL

01-EP102A FIRST FLOOR PLAN - AREA A - ELECTRICAL

01-EP102B FIRST FLOOR PLAN - AREA B - ELECTRICAL

01-EP102C FIRST FLOOR PLAN - AREA C - ELECTRICAL

01-EP102D FIRST FLOOR PLAN - AREA D - ELECTRICAL

01-EP103 SECOND FLOOR OVERALL PLAN - ELECTRICAL

01-EP103A SECOND FLOOR PLAN - AREA A - ELECTRICAL

01-EP103B SECOND FLOOR PLAN - AREA B - ELECTRICAL

01-EP103C SECOND FLOOR PLAN - AREA C - ELECTRICAL

01-EP104 THIRD FLOOR OVERALL PLAN - ELECTRICAL

01-EP104A THIRD FLOOR PLAN - AREA A - ELECTRICAL

01-EP104B THIRD FLOOR PLAN - AREA B - ELECTRICAL

01-EP104C THIRD FLOOR PLAN - AREA C - ELECTRICAL

01-EP105 FOURTH FLOOR OVERALL PLAN - ELECTRICAL

01-EP105A FOURTH FLOOR PLAN - AREA A - ELECTRICAL

01-EP105B FOURTH FLOOR PLAN - AREA B - ELECTRICAL

01-EP106 FIFTH FLOOR OVERALL PLAN - ELECTRICAL

01-EP106A FIFTH FLOOR PLAN - AREA A - ELECTRICAL

01-EP106B FIFTH FLOOR PLAN - AREA B - ELECTRICAL

01-EP107 SIXTH FLOOR OVERALL PLAN - ELECTRICAL

01-EP107A SIXTH FLOOR PLAN - AREA A - ELECTRICAL

01-EP107B SIXTH FLOOR PLAN - AREA B - ELECTRICAL

01-EP108 SEVENTH FLOOR OVERALL PLAN - ELECTRICAL

01-EP108A SEVENTH FLOOR PLAN - AREA A - ELECTRICAL

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 6

01-EP108B SEVENTH FLOOR PLAN - AREA B - ELECTRICAL

01-EP109 EIGHTH FLOOR OVERALL PLAN - ELECTRICAL

01-EP109A EIGHTH FLOOR PLAN - AREA A - ELECTRICAL

01-EP109B EIGHTH FLOOR PLAN - AREA B - ELECTRICAL

01-EP110 NINTH FLOOR ENLARGED PLAN - ELECTRICAL

01-EP411 ENLARGED PLANS - ELECTRICAL

01-EP412 ENLARGED PLANS - ELECTRICAL

01-EP420 ENLARGED PLANS - GROUND FLOOR

01-EP421 ENLARGED PLANS -FIRST FLOOR

01-EP422 ENLARGED PLANS - SECOND FLOOR

01-EP423 ENLARGED PLANS - THIRD FLOOR

01-EP424 ENLARGED PLANS -FOURTH FLOOR

01-EP425 ENLARGED PLANS - FIFTH FLOOR

01-EP426 ENLARGED PLANS - SIXTH FLOOR

01-EP427 ENLARGED PLANS - SEVENTH FLOOR

01-EP428 ENLARGED PLANS - EIGHTH FLOOR

01-EP500 ELECTRICAL DETAILS

01-EP501 ELECTRICAL DETAILS

01-EP502 ELECTRICAL DETAILS

01-EP503 ELECTRICAL DETAILS

01-EP504 ELECTRICAL DETAILS

01-EP505 ELECTRICAL DETAILS

01-EP506 ELECTRICAL DETAILS

01-EP507 ELECTRICAL DETAILS

01-EP604 BUILDINGS 01 & 18 ONE LINE DIAGRAM

01-EP608 BUILDING 01-ONE LINE DIAGRAM

01-EP609 BUILDING 01-RISER DIAGRAM-CLINICAL ADDITION

01-EP613 BUILDING 01- NURSING HOME RISER DIAGRAM

01-EP700 ELECTRICAL SCHEDULES

01-EP701 ELECTRICAL PANEL SCHEDULES

01-EP702 ELECTRICAL PANEL SCHEDULES

01-EP703 ELECTRICAL PANEL SCHEDULES

01-EP704 ELECTRICAL PANEL SCHEDULES

01-EP705 ELECTRICAL PANEL SCHEDULES

01-EP706 ELECTRICAL PANEL SCHEDULES

01-EP707 ELECTRICAL PANEL SCHEDULES

01-EP708 ELECTRICAL PANEL SCHEDULES

16 - TELECOMMUNICATION

01-TD101A GROUND LEVEL DEMOLITION PLAN - AREA A - TECHNOLOGY

01-TD101B GROUND LEVEL DEMOLITION PLAN - AREA B - TECHNOLOGY

01-TD101C GROUND LEVEL DEMOLITION PLAN - AREA C - TECHNOLOGY

01-TD101D GROUND LEVEL DEMOLITION PLAN - AREA D - TECHNOLOGY

01-TD101E GROUND LEVEL DEMOLITION PLAN - AREA E - TECHNOLOGY

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 7

01-TD101F GROUND LEVEL DEMOLITION PLAN - AREA F - TECHNOLOGY

01-TD102A LEVEL 01 DEMOLITION PLAN - AREA A - TECHNOLOGY

01-TD102B LEVEL 01 DEMOLITION PLAN - AREA B - TECHNOLOGY

01-TD102C LEVEL 01 DEMOLITION PLAN - AREA C - TECHNOLOGY

01-TD102D LEVEL 01 DEMOLITION PLAN - AREA D - TECHNOLOGY

01-TD103A LEVEL 02 DEMOLITION PLAN - AREA A - TECHNOLOGY

01-TD103B LEVEL 02 DEMOLITION PLAN - AREA B - TECHNOLOGY

01-TD103C LEVEL 02 DEMOLITION PLAN - AREA C - TECHNOLOGY

01-TD104A LEVEL 03 DEMOLITION PLAN - AREA A - TECHNOLOGY

01-TD104B LEVEL 03 DEMOLITION PLAN - AREA B - TECHNOLOGY

01-TD104C LEVEL 03 DEMOLITION PLAN - AREA C - TECHNOLOGY

01-TD105A LEVEL 04 DEMOLITION PLAN - AREA A - TECHNOLOGY

01-TD105B LEVEL 04 DEMOLITION PLAN - AREA B - TECHNOLOGY

01-TD106A LEVEL 05 DEMOLITION PLAN - AREA A - TECHNOLOGY

01-TD106B LEVEL 05 DEMOLITION PLAN - AREA B - TECHNOLOGY

01-TD107A LEVEL 06 DEMOLITION PLAN - AREA A - TECHNOLOGY

01-TD107B LEVEL 06 DEMOLITION PLAN - AREA B - TECHNOLOGY

01-TD108A LEVEL 07 DEMOLITION PLAN - AREA A - TECHNOLOGY

01-TD108B LEVEL 07 DEMOLITION PLAN - AREA B - TECHNOLOGY

01-TD109A LEVEL 08 DEMOLITION PLAN - AREA A - TECHNOLOGY

01-TD109B LEVEL 08 DEMOLITION PLAN - AREA B - TECHNOLOGY

01-TD110 LEVEL 09 DEMOLITION PLAN - TECHNOLOGY

01-TN201 GROUND LEVEL PLAN - OVERALL - TECHNOLOGY

01-TN201A GROUND LEVEL PLAN - AREA A - TECHNOLOGY

01-TN201B GROUND LEVEL PLAN - AREA B - TECHNOLOGY

01-TN201C GROUND LEVEL PLAN - AREA C - TECHNOLOGY

01-TN201D GROUND LEVEL PLAN - AREA D - TECHNOLOGY

01-TN201E GROUND LEVEL PLAN - AREA E - TECHNOLOGY

01-TN201F GROUND LEVEL PLAN - AREA F - TECHNOLOGY

01-TN202 LEVEL 01 PLAN - OVERALL - TECHNOLOGY

01-TN202A LEVEL 01 PLAN - AREA A - TECHNOLOGY

01-TN202B LEVEL 01 PLAN - AREA B - TECHNOLOGY

01-TN202C LEVEL 01 PLAN - AREA C - TECHNOLOGY

01-TN202D LEVEL 01 PLAN - AREA D - TECHNOLOGY

01-TN203 LEVEL 02 PLAN - OVERALL - TECHNOLOGY

01-TN203A LEVEL 02 PLAN - AREA A - TECHNOLOGY

01-TN203B LEVEL 02 PLAN - AREA B - TECHNOLOGY

01-TN203C LEVEL 02 PLAN - AREA C - TECHNOLOGY

01-TN204 LEVEL 03 PLAN - OVERALL - TECHNOLOGY

01-TN204A LEVEL 03 PLAN - AREA A - TECHNOLOGY

01-TN204B LEVEL 03 PLAN - AREA B - TECHNOLOGY

01-TN204C LEVEL 03 PLAN - AREA C - TECHNOLOGY

01-TN205 LEVEL 04 PLAN - OVERALL - TECHNOLOGY

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 8

01-TN205A LEVEL 04 PLAN - AREA A - TECHNOLOGY

01-TN205B LEVEL 04 PLAN - AREA B - TECHNOLOGY

01-TN206 LEVEL 05 PLAN - OVERALL - TECHNOLOGY

01-TN206A LEVEL 05 PLAN - AREA A - TECHNOLOGY

01-TN206B LEVEL 05 PLAN - AREA B - TECHNOLOGY

01-TN207 LEVEL 06 PLAN - OVERALL - TECHNOLOGY

01-TN207A LEVEL 06 PLAN - AREA A - TECHNOLOGY

01-TN207B LEVEL 06 PLAN - AREA B - TECHNOLOGY

01-TN208 LEVEL 07 PLAN - OVERALL - TECHNOLOGY

01-TN208A LEVEL 07 PLAN - AREA A - TECHNOLOGY

01-TN208B LEVEL 07 PLAN - AREA B - TECHNOLOGY

01-TN209 LEVEL 08 PLAN - OVERALL - TECHNOLOGY

01-TN209A LEVEL 08 PLAN - AREA A - TECHNOLOGY

01-TN209B LEVEL 08 PLAN - AREA B - TECHNOLOGY

01-TN210 LEVEL 09 PLAN - TECHNOLOGY

01-TN300 ENLARGED PLANS - TECHNOLOGY

01-TN301 ENLARGED PLANS - TECHNOLOGY

01-TN302 ENLARGED PLANS - TECHNOLOGY

01-TN303 ENLARGED PLANS - TECHNOLOGY

01-TN304 ENLARGED PLANS - TECHNOLOGY

01-TN305 ENLARGED PLANS - TECHNOLOGY

01-TN306 ENLARGED PLANS - TECHNOLOGY

01-TN307 ENLARGED PLANS - TECHNOLOGY

01-TN308 ENLARGED PLANS - TECHNOLOGY

01-TN309 ENLARGED PLANS - TECHNOLOGY

01-TN310 ENLARGED PLANS - TECHNOLOGY

01-TN311 ENLARGED PLANS - TECHNOLOGY

01-TN312 ENLARGED PLANS - TECHNOLOGY

01-TN400 TECHNOLOGY DETAILS

01-TN500 TECHNOLOGY RISER DIAGRAMS

16.4 - PHYSICAL SECURITY

01-TY101 BLDG 01 - GROUND FLOOR SECURITY PLAN - AREA A + BUILDING 17

01-TY102 BUILDING 01 - GROUND FLOOR SECURITY PLAN - AREA B

01-TY103 BUILDING 01 - GROUND FLOOR SECURITY PLAN - AREA C

01-TY104 BUILDING 01 - GROUND FLOOR SECURITY PLAN - AREA D

01-TY105 BLDG 01 - GROUND FLOOR SECURITY PLAN - AREA E + BUILDING 17

01-TY106 BLDG 01 - GROUND FLOOR SECURITY PLAN - AREA F + BUILDING 17

01-TY107 BUILDING 01 - FIRST FLOOR SECURITY PLAN - AREA A

01-TY108 BUILDING 01 - FIRST FLOOR SECURITY PLAN - AREA B

01-TY109 BUILDING 01 - FIRST FLOOR SECURITY PLAN - AREA C

01-TY110 BUILDING 01 - FIRST FLOOR SECURITY PLAN - AREA D

01-TY111 BUILDING 01 - SECOND FLOOR SECURITY PLAN - AREA A

01-TY112 BUILDING 01 - SECOND FLOOR SECURITY PLAN - AREA B

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 9

01-TY113 BUILDING 01 - SECOND FLOOR SECURITY PLAN - AREA C

01-TY114 BUILDING 01 - THIRD FLOOR SECURITY PLAN - AREA A

01-TY115 BUILDING 01 - THIRD FLOOR SECURITY PLAN - AREA B

01-TY116 BUILDING 01 - THIRD FLOOR SECURITY PLAN - AREA C

01-TY117 BUILDING 01 - FOURTH FLOOR SECURITY PLAN - AREA A

01-TY118 BUILDING 01 - FOURTH FLOOR SECURITY PLAN - AREA B

01-TY119 BUILDING 01 - FIFTH FLOOR SECURITY PLAN - AREA A

01-TY120 BUILDING 01 - FIFTH FLOOR SECURITY PLAN - AREA B

01-TY121 BUILDING 01 - SIXTH FLOOR SECURITY PLAN - AREA A

01-TY122 BUILDING 01 - SIXTH FLOOR SECURITY PLAN - AREA B

01-TY123 BUILDING 01 - SEVEN FLOOR SECURITY PLAN - AREA A

01-TY124 BUILDING 01 - SEVEN FLOOR SECURITY PLAN - AREA B

01-TY125 BUILDING 01 - EIGHT FLOOR SECURITY PLAN - AREA A

01-TY126 BUILDING 01 - EIGHT FLOOR SECURITY PLAN - AREA B

01-TY127 BUILDING 01 - NINTH FLOOR SECURITY PLAN - AREA A

BLDG 05

05 - GENERAL

05-GI000 COVER SHEET

08 � ARCHITECTURE

05-AE101 BLDG 05 - FLOOR PLAN & ENLARGED VIEWS AND INT. ELEVATIONS

11 - FIRE PROTECTION

05-FD102 FIRST FLOOR DEMOLITION PLAN - FIRE PROTECTION

05-FN202 FIRST FLOOR PLAN - FIRE PROTECTION

05-FN300 ENLARGED PLANS - FIRE PROTECTION

14 - MECHANICAL

05-MD102 FIRST FLOOR DEMOLITION PLAN - MECHANICAL

05-MH102 FIRST FLOOR PLAN - MECHANICAL

05-MH400 ENLARGED PLANS - MECHANICAL

05-MH700 MECHANICAL SCHEDULES

15 - ELECTRICAL

05-ED102 FIRST FLOOR PLAN DEMO - ELECTRICAL

05-EP202 FIRST FLOOR PLAN - ELECTRICAL

05-EP600 BUILDING 05-ONE LINE DIAGRAM ELECTRICAL SHEET 2

05-EP700 ELECTRICAL SCHEDULES

16 - TELECOMMUNICATION

05-TD101 LEVEL B DEMOLITION PLAN - TECHNOLOGY

05-TD102 LEVEL 01 DEMOLITION PLAN - TECHNOLOGY

05-TN201 LEVEL B PLAN - TECHNOLOGY

05-TN202 LEVEL 01 PLAN - TECHNOLOGY

05-TN300 ENLARGED PLANS - TECHNOLOGY

05-TN400 TECHNOLOGY DETAILS

16.4 - PHYSICAL SECURITY

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 10

05-TY128 BUILDING 05 - BASEMENT FLOOR PLAN

05-TY129 BUILDING 05 - FIRST FLOOR PLAN

BLDG 06

01 - GENERAL

06-GI000 COVER SHEET

08 - ARCHITECTURE

06-AE101 BLDG 06 - BASEMENT, FIRST FLOOR, ENLARGED PLAN AND INT. ELEVATION

11 - FIRE PROTECTION

06-FD102 FIRST FLOOR DEMOLITION PLAN - FIRE PROTECTION

06-FX102 FIRST FLOOR PLAN - FIRE PROTECTION

06-FX400 ENLARGED PLANS - FIRE PROTECTION

14 - MECHANICAL

06-MH102 FIRST FLOOR PLAN - MECHANICAL

06-MH400 FIRST FLOOR ENLARGED PLANS - MECHANICAL

06-MH700 MECHANICAL SCHEDULES

15 - ELECTRICAL

06-ED101 BASEMENT PLAN DEMOLITION - ELECTRICAL

06-ED102 FIRST FLOOR PLAN DEMOLITION- ELECTRICAL

06-EP101 BASEMENT PLAN - ELECTRICAL

06-EP102 FIRST FLOOR PLAN - ELECTRICAL

06-EP401 FIRST FLOOR NEW ENLARGED PLANS - ELECTRICAL

06-EP600 BUILDING 06-ONE LINE DIAGRAM ELECTRICAL SHEET 2

06-EP700 ELECTRICAL SCHEDULES

16 - TELECOMMUNICATION

06-TD101 BASEMENT DEMOLITION PLAN - TECHNOLOGY

06-TD102 LEVEL 01 DEMOLITION PLAN - TECHNOLOGY

06-TD103 LEVEL 02 DEMOLITION PLAN - TECHNOLOGY

06-TN201 BASEMENT PLAN - TECHNOLOGY

06-TN202 LEVEL 01 PLAN - TECHNOLOGY

06-TN203 LEVEL 02 PLAN - TECHNOLOGY

06-TN300 ENLARGED PLANS - TECHNOLOGY

06-TN400 TECHNOLOGY DETAILS

16.4 - PHYSICAL SECURITY

06-TY131 BUILDING 06 - FIRST FLOOR PLAN

BLDG 07

01 - GENERAL

07-GI000 COVER SHEET

08 - ARCHITECTURE

07-AE101 BLDG 07 - FLOOR PLAN, ENLARGED FLOOR PLAN AND INT. ELEVATION

11 - FIRE PROTECTION

07-FD102 FIRST FLOOR DEMOLITION PLAN - FIRE PROTECTION

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 11

07-FX102 FIRST FLOOR PLAN - FIRE PROTECTION

07-FX400 ENLARGED PLANS - FIRE PROTECTION

14 - MECHANICAL

07-MD102 FIRST FLOOR DEMOLITION PLAN- MECHANICAL

07-MD103 MEZZANINE DEMOLITION PLAN - MECHANICAL

07-MD104 ROOF DEMOLITION PLAN - MECHANICAL

07-MH102 FIRST FLOOR PLAN - MECHANICAL

07-MH103 MEZZANINE PLAN - MECHANICAL

07-MH104 ROOF PLAN - MECHANICAL

07-MH400 FIRST FLOOR ENLARGED PLAN - MECHANICAL

07-MH700 MECHANICAL SCHEDULES

15 - ELECTRICAL

07-ED101 GROUND PLAN DEMOLITION - ELECTRICAL

07-ED102 FIRST FLOOR PLAN DEMOLITION- ELECTRICAL

07-ED103 SECOND FLOOR MEZZ PLAN DEMOLITION - ELECTRICAL

07-ED104 ROOF PLAN DEMOLITION - ELECTRICAL

07-EP101 GROUND PLAN - ELECTRICAL

07-EP102 FIRST FLOOR PLAN - ELECTRICAL

07-EP104 ROOF PLAN - ELECTRICAL

07-EP401 ENLARGED PLANS - ELECTRICAL

07-EP600 BUILDING 07-ONE LINE DIAGRAM ELECTRICAL SHEET 2

07-EP700 ELECTRICAL SCHEDULES

16 - TELECOMMUNICATION

07-TD101 GROUND DEMOLITION PLAN - TECHNOLOGY

07-TD102 LEVEL 01 DEMOLITION PLAN - TECHNOLOGY

07-TD103 LEVEL 02 MEZZ DEMOLITION PLAN - TECHNOLOGY

07-TN201 GROUND PLAN - TECHNOLOGY

07-TN202 LEVEL 01 PLAN - TECHNOLOGY

07-TN203 LEVEL 02 MEZZ PLAN - TECHNOLOGY

07-TN300 ENLARGED PLANS - TECHNOLOGY

07-TN400 TECHNOLOGY DETAILS

16.4 - PHYSICAL SECURITY

07-TY133 BUILDING 07 - FIRST FLOOR PLAN

BLDG 10

01 - GENERAL

10-GI000 COVER SHEET

08 - ARCHITECTURE

10-AE101 BLDG 10 - FIRST FLOOR, ENLARGED FLOOR PLAN AND INT. ELEVATION

11 - FIRE PROTECTION

10-FD102 OVERALL FIRST FLOOR DEMOLITION PLAN - FIRE PROTECTION

10-FN102 OVERALL FIRST FLOOR PLAN - FIRE PROTECTION

10-FX401 ENLARGED PLANS - FIRE PROTECTION

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 12

14 - MECHANICAL

10-MD102 FIRST FLOOR DEMOLITION PLAN- MECHANICAL

10-MD103 ROOF DEMOLITION PLAN - MECHANICAL

10-MH102 FIRST FLOOR PLAN - MECHANICAL

10-MH103 ROOF PLAN - MECHANICAL

10-MH400 ENLARGED PLANS - MECHANICAL

10-MH700 MECHANICAL SCHEDULES

15 - ELECTRICAL

10-ED101 BASEMENT DEMO - ELECTRICAL

10-ED102 FIRST FLOOR PLAN DEMO- ELECTRICAL

10-ED104 ROOF PLAN DEMO - ELECTRICAL

10-EP102 FIRST FLOOR PLAN - ELECTRICAL

10-EP104 ROOF PLAN - ELECTRICAL

10-EP600 BUILDING 10-ONE LINE DIAGRAM ELECTRICAL SHEET 2

10-EP700 ELECTRICAL SCHEDULES

16 - TELECOMMUNICATION

10-TD101 BASEMENT DEMOLITION PLAN - TECHNOLOGY

10-TD102 LEVEL 01 DEMOLITION PLAN - TECHNOLOGY

10-TN201 BASEMENT LEVEL - TECHNOLOGY

10-TN202 LEVEL 01 PLAN - TECHNOLOGY

10-TN300 ENLARGED PLANS - TECHNOLOGY

10-TN400 TECHNOLOGY DETAILS

16.4 - PHYSICAL SECURITY

10-TY135 BUILDING 10 - FIRST FLOOR PLAN

BLDG 13

01 - GENERAL

13-GI000 COVER SHEET

08 - ARCHITECTURE

13-AE101 BLDG 13 - FLOOR PLAN, ENLARGED FLOOR PLAN AND INT.ELEVATIONS

11 - FIRE PROTECTION

13-FD101 FIRST FLOOR DEMOLITION PLAN - FIRE PROTECTION

13-FX101 FIRST FLOOR PLAN - FIRE PROTECTION

13-FX400 ENLARGED PLANS - FIRE PROTECTION

14 - MECHANICAL

13-MD101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL

13-MD104 ROOF DEMOLITION PLAN - MECHANICAL

13-MH101 FIRST FLOOR PLAN - MECHANICAL

13-MH104 ROOF PLAN - MECHANICAL

13-MH400 ENLARGED PLANS - MECHANICAL

13-MH700 MECHANICAL SCHEDULES

15 - ELECTRICAL

13-EP101 FIRST FLOOR - ELECTRICAL

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 13

13-EP104 ROOF PLAN - ELECTRICAL

13-EP400 ENLARGED PLANS - ELECTRICAL

13-EP401 ENLARGED PLANS - ELECTRICAL

13-EP600 BUILDING 13-ONE LINE DIAGRAM ELECTRICAL SHEET 2

13-EP700 ELECTRICAL SCHEDULES

16 - TELECOMMUNICATION

13-TN201 LEVEL 01 - TECHNOLOGY

13-TN300 ENLARGED PLANS - TECHNOLOGY

13-TN400 TECHNOLOGY DETAILS

16.4 - PHYSICAL SECURITY

13-TY136 BUILDING 13 - FIRST FLOOR PLAN

BLDG 15

01 - GENERAL

15-GI000 COVER SHEET

08 - ARCHITECTURE

15-AE101 BLDG 15 - FIRST & SECOND FLOOR PLAN, RCP AND INT. ELEVATIONS

11 - FIRE PROTECTION

15-FD101 DEMOLITION PLANS - FIRE PROTECTION

15-FX101 PLANS - FIRE PROTECTION

15-FX400 ENLARGED PLANS - FIRE PROTECTION

14 - MECHANICAL

15-MD103.1 SECOND FLOOR DEMOLITION PLAN - MECHANICAL - PHASE 1

15-MD103.2 SECOND FLOOR DEMOLITION PLAN - MECHANICAL - PHASE 2

15-MD104.1 ROOF DEMOLITION PLAN - MECHANICAL - PHASE 1

15-MH103.1 SECOND FLOOR PLAN - MECHANICAL - PHASE 1

15-MH103.2 SECOND FLOOR PLAN - MECHANICAL - PHASE 2

15-MH104.1 ROOF PLAN - MECHANICAL - PHASE 1

15-MH700 MECHANICAL SCHEDULES

15 - ELECTRICAL

15-ED103.1 SECOND FLOOR DEMOLITION PLAN - ELECTRICAL - PHASE 1

15-ED103.2 SECOND FLOOR DEMOLITION PLAN - ELECTRICAL - PHASE 2

15-ED104 ROOF DEMOLITION PLAN - ELECTRICAL

15-EP103.1 SECOND FLOOR PLAN - ELECTRICAL - PHASE 1

15-EP103.2 SECOND FLOOR PLAN - ELECTRICAL - PHASE 2

15-EP104 ROOF PLAN - ELECTRICAL

15-EP303.1 SECOND FLOOR PLAN - ELECTRICAL SYSTEMS - PHASE 1

15-EP303.2 SECOND FLOOR PLAN - ELECTRICAL SYSTEMS - PHASE 2

15-EP600 ELECTRICAL BUILDING 15-ONE LINE DIAGRAM SHEET 3

15-EP700 ELECTRICAL SCHEDULES

15-EP701 ELECTRICAL SCHEDULES

16 - TELECOMMUNICATION

15-TD101 BASEMENT DEMOLITION PLAN - TECHNOLOGY

Project No. 460-22-700 October 1, 2024

List of Drawings 00 01 15 - 14

15-TD102 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY

15-TD103.1 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - PHASE 1

15-TD103.2 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - PHASE 2

15-TN101 BASEMENT LEVEL - TECHNOLOGY

15-TN102 FIRST FLOOR PLAN - TECHNOLOGY

15-TN103.1 SECOND FLOOR PLAN - TECHNOLOGY - PHASE 1

15-TN103.2 SECOND FLOOR PLAN - TECHNOLOGY - PHASE 2

15-TN400.1 TECHNOLOGY ENLARGEMENTS - PHASE 1

15-TN400.2 TECHNOLOGY ENLARGEMENTS - PHASE 2

15-TN401.1 TECHNOLOGY ENLARGEMENTS - PHASE 1

15-TN401.2 TECHNOLOGY ENLARGEMENTS - PHASE 2

15-TN402.1 TECHNOLOGY ENLARGEMENTS - PHASE 1

15-TN402.2 TECHNOLOGY ENLARGEMENTS - PHASE 2

15-TN402.3 TECHNOLOGY ENLARGEMENTS - PHASE 2

15-TN403 TECHNOLOGY ENLARGEMENTS

15-TN500 TECHNOLOGY RISERS

16.4 - PHYSICAL SECURITY

15-TY138 BUILDING 15 - FIRST FLOOR PLAN

15-TY139 BUILDING 15 - SECOND FLOOR PLAN

- - - END - - -

Project No. 460-22-700 October 1, 2024

General Requirements

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for

Wilmington VA Medical Center EHRM Infrastructure Upgrades as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the COR.

C. Offices of Awen Solutions Group, as Architect/Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the

Government and shall not be construed as expressing or implying a contractual act of the

Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

Project No. 460-22-700 October 1, 2024

General Requirements

01 00 00 -2

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: BASE BID: Work includes general construction, alterations, selective removal of existing structures and construction and certain other items.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor�s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give three weeks� notice to the

Contracting Officer so that security arrangements can be provided for the employees.

This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the

Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General

Contractor�s employees off the premises in the event of a national emergency. The

General Contractor may return to the site only with the written approval of the

Contracting Officer.

Project No. 460-22-700 October 1, 2024

General Requirements

01 00 00 -3

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the

Contracting officers representative (COR) for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of �sensitive information�.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked

�Law Enforcement Sensitive� or �Sensitive Unclassified�. Secure such information in separate containers and limit the access to only those who will need it for the project.

Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

5. All paper waste or electronic media such as CD�s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of �sensitive information�.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).

Project No. 460-22-700 October 1, 2024

General Requirements

01 00 00 -4

a) Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

b) �Sensitive information� including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on

Government premises to areas authorized or approved by the Contracting Officer. The

Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the

COR

E. Workers are subject to rules of Medical Center applicable to their conduct.

Project No. 460-22-700 October 1, 2024

General Requirements

01 00 00 -5

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical

Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

Verify that the VA's "Utilities Services" paragraph should have been deleted.

H. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week.

Therefore, any interruption in service must be scheduled and coordinated with the

COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

Project No. 460-22-700 October 1, 2024

General Requirements

01 00 00 -6

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical

Center Director, and Contractor, as follows: Refer to Phasing Plan Drawings G003 and G004 in the construction documents.

3. The Wilmington VAMC requires that an additional phase be included by the General

Contractor that would occur between Phase 2B and Phase 3. This interim Phase is to include:

a. Installation of temporary lighting throughout the ground floor space.

b. Contractor to insulate and add drywall to perimeter block wall.

c. Contractor to construct a finished barrier from floor to ceiling separating the ground floor of the auditorium from the main hospital and in accordance with all specifications for temporary partitions.

d. Contractor to provide double doors to serve as an entryway through the barrier with hardware that can receive Best Lock 7 pin SFIC cores.

I. Areas of building surrounding Project Work Area will be occupied during performance of work; but immediate areas of alterations will be vacated.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.

Project No. 460-22-700 October 1, 2024

General Requirements

01 00 00 -7

Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company

(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of

COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the

Medical Center Director�s prior knowledge and written approval. Refer to specification

Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11

REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.

Project No. 460-22-700 October 1, 2024

General Requirements

01 00 00 -8

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical

Center. Interruption time approved by Medical Center may occur at other than

Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions;

so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

N. Coordinate the work for this contract with other construction operations as directed by

COR. This includes the scheduling of traffic and the use of roadways, as specified in

Article, USE OF ROADWAYS.

Project No. 460-22-700 October 1, 2024

General Requirements

01 00 00 -9

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the

COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by

Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE

CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved.

They shall furnish a report on conditions then existing, of resilient flooring, doors,…